LABORES MINERAS - PLANEAMIENTO DE MEDIAN 2001 Item
Labor
Sección
Observaciones
Unidad
COSTO TOTAL US $/m 406.08
Progr m
1
Galería
3,50 X 3,50
Jumbo/Scoop
US$/m
2 3
Galería Galería
3,00 X 3,00 3,00 x 3,00
Jumbo/Scoop Jackleg/Scoop
US$/m US$/m
300.17 233.76
56.10 90.84
356.27 324.60
50.00 50.00
4
Galería
2,50 x 2,50
Jackleg/Scoop
US$/m
5 6 7
Subnivel Rampa Rampa
2,10 x 1,20Jackleg/Microscoop 3,50 X 3,50 Jumbo/Scoop 3,00 X 3,00 Jumbo/Scoop
US$/m US$/m US$/m
207.65
67.04
274.69
50.00
177.98 357.47 313.51
60.91 64.43 56.10
238.89 421.90 369.61
50.00 50.00 50.00
8 9 10
Rampa 3,00 x 3,00 Rampa 2,50 x 2,50 Chimenea Simpl 1,50 x 1,50
Jackleg/Scoop Jackleg/Scoop Stoper
US$/m US$/m US$/m
234.68 211.65 132.11
90.84 67.04 44.51
325.52 278.69 176.62
50.00 50.00 25.00
11 12
Chimenea Simp 1,50 x 1,50 Chimenea Dobl 3,00 x 1,50
Stoper Stoper
US$/m US$/m
136.98 164.56
44.51 70.95
181.49 235.51
25.00 25.00
13 14
Chimenea Dobl 3,00 x 1,50 Chimenea Alim 1.80 x 1.80
Stoper Equipo Ctta.
US$/m US$/m
184.65 385.00
70.95 133.25
255.60 518.25
25.00 30.00
15
Chimenea Rais diàmetro 1.5
16 17
Tajeos Open Stop Rehabilitaciòn de galerìas
Equipo Ctta.
US$/m
600.00
75.62
675.62
40.00
Jackleg/Scoop
US$/m3 US$/m
44.97 182.51
0.00 0.00
44.97 182.51
1000.00 30.00
Todos estos precios no incluyen IGV La inflaciòn promedio anual as 8%
Costo Unitario US$/m Directo Indirec. 341.65 64.43
40.00
TOTAL:
AMIENTO DE MEDIANO PLAZO 2002 Costo Mensual US $ 16243.30
Costo Unitario US$ Directo Indirec. 368.98 69.58
COSTO TOTAL US $/m 438.57
17813.72 16230.09
324.19 252.46
60.59 98.11
384.78 350.57
13734.27
224.26
72.40
296.66
11944.71 21094.78 18480.28
192.22 386.06 338.59
65.78 69.58 60.59
258.01 455.65 399.17
16276.10 13934.73 4415.51
253.46 228.59 142.68
98.11 72.40 48.07
351.56 300.99 190.75
4537.27 5887.71
147.94 177.72
48.07 76.63
196.01 254.35
6389.88 15547.50
199.42 415.80
76.63 143.91
276.04 559.71
27024.80
648.00
81.67
729.67
44972.23 5475.30
48.57 197.11
0.00 0.00
48.57 197.11
260002.17
TABLA 1 DETERMINACION DEL COSTO UNITARIO DE LA MANO DE OBRA (EMPLEADOS) TC S/. / $ : Ocupación
Sueldo
Dominical Feriados Vacacion
3.50
D.Méd. Gratificac. Parcial ESSALUD FONAVI Accidentes
267
50
13
30
5
60
%.
18.73
4.87
11.24
1.87
22.47
59.18
9.00
Ingeniero Residente
5000.00
936.33
243.45
561.80
93.63
1123.60
2958.80
Ingeniero Seguridad
4500.00
842.70
219.10
505.62
84.27
1011.24
2662.92
Ingeniero Jefe de Zona
4000.00
749.06
194.76
449.44
74.91
898.88
Ingeniero Jefe de Gdia
3200.00
599.25
155.81
359.55
59.93
Topógrafo
2200.00
411.99
107.12
247.19
Ingeniero Mecánico
4000.00
749.06
194.76
Asistenta Social
1500.00
280.90
Administrador
2000.00
374.53
CTS
Parcial
Total
US
US
%.
S/./mes
$/mes
$/HORA
B.SOC.
Sueldo
Trabajo
30
2.00
4.74
11.24
26.98
US$
716.29
159.18
377.25
688.04
1940.76
9899.56
2828.45
14.14
97.99
1428.57
644.66
143.26
339.52
619.24
1746.68
8909.61
2545.60
12.73
97.99
1285.71
2367.04
573.03
127.34
301.80
550.44
1552.61
7919.65
2262.76
11.31
97.99
1142.86
719.10
1893.63
458.43
101.87
241.44
440.35
1242.09
6335.72
1810.21
9.05
97.99
914.29
41.20
494.38
1301.87
315.17
70.04
165.99
302.74
853.93
4355.81
1244.52
6.22
97.99
628.57
449.44
74.91
898.88
2367.04
573.03
127.34
301.80
550.44
1552.61
7919.65
2262.76
11.31
97.99
1142.86
73.03
168.54
28.09
337.08
887.64
214.89
47.75
113.17
206.41
582.23
2969.87
848.53
4.24
97.99
428.57
97.38
224.72
37.45
449.44
1183.52
286.52
63.67
150.90
275.22
776.30
3959.82
1131.38
5.66
97.99
571.43
C. tarea
Sin Benef.
*
DETERMINACION DEL COSTO UNITARIO DE LA MANO DE OBRA (OBREROS) TC S/. / $ : Ocupación
Jor-diario Dominical Feriados Vacacion
3.50
D.Méd. Gratificac. Parcial ESSALUD FONAVI Accidentes
267
50
13
30
5
60
%.
18.73
4.87
11.24
1.87
22.47
59.18
9.00
Lider/Maestro
70.00
13.11
3.41
7.87
1.31
15.73
41.42
Mecánico/Eléctrico I
60.00
11.24
2.92
6.74
1.12
13.48
35.51
Mecánico Perforadoras II 35.00
6.55
1.70
3.93
0.66
7.87
Jumbero I
65.00
12.17
3.16
7.30
1.22
Scoopero
45.00
8.43
2.19
5.06
Ayudante Jumbo (oficial) 30.00
5.62
1.46
Cargador/Desatador (minero) 30.00
5.62
Lamparero (oficial)
35.00
Tubero
CTS
Parcial
Total
US
US
%.
S/./TAR
$/TAR
$/HORA
B.SOC.
Trabajo
30
2.00
4.74
11.24
26.98
US$
10.03
2.23
5.28
9.63
27.17
138.59
39.60
4.95
97.99
20.00
8.60
1.91
4.53
8.26
23.29
118.79
33.94
4.24
97.99
17.14
20.71
5.01
1.11
2.64
4.82
13.59
69.30
19.80
2.47
97.99
10.00
14.61
38.46
9.31
2.07
4.90
8.94
25.23
128.69
36.77
4.60
97.99
18.57
0.84
10.11
26.63
6.45
1.43
3.40
6.19
17.47
89.10
25.46
3.18
97.99
12.86
3.37
0.56
6.74
17.75
4.30
0.96
2.26
4.13
11.64
59.40
16.97
2.12
97.99
8.57
1.46
3.37
0.56
6.74
17.75
4.30
0.96
2.26
4.13
11.64
59.40
16.97
2.12
97.99
8.57
6.55
1.70
3.93
0.66
7.87
20.71
5.01
1.11
2.64
4.82
13.59
69.30
19.80
2.47
97.99
10.00
Sin Benef.
*
28.00
5.24
1.36
3.15
0.52
6.29
16.57
4.01
0.89
2.11
3.85
10.87
55.44
15.84
1.98
97.99
8.00
Perforista Jackleg (minero)32.00
5.99
1.56
3.60
0.60
7.19
18.94
4.58
1.02
2.41
4.40
12.42
63.36
18.10
2.26
97.99
9.14
Ayudante Jackleg (oficial) 30.00
5.62
1.46
3.37
0.56
6.74
17.75
4.30
0.96
2.26
4.13
11.64
59.40
16.97
2.12
97.99
8.57
Bodeguero
30.00
5.62
1.46
3.37
0.56
6.74
17.75
4.30
0.96
2.26
4.13
11.64
59.40
16.97
2.12
97.99
8.57
Peon de mina (operario)
28.00
5.24
1.36
3.15
0.52
6.29
16.57
4.01
0.89
2.11
3.85
10.87
55.44
15.84
1.98
97.99
8.00
Chofer
35.00
6.55
1.70
3.93
0.66
7.87
20.71
5.01
1.11
2.64
4.82
13.59
69.30
19.80
2.47
97.99
10.00
Motorista
51.60
9.66
2.51
5.80
0.97
11.60
30.53
7.39
1.64
3.89
7.10
20.03
102.16
29.19
3.65
97.99
14.74
No incluye utilidad, implementos y herramientas *
Promedio obtenido por Hombre-año de nuestros archivos. (Descanso médico que paga el empleador por los primeros 20 días de Enfermedad)
TABLA 2 COSTO EQUIPO SEGURIDAD POR GUARDIA DETALLE
1 3 4 5 6 7 9 10 11 12 13 14 15
PRECIO U. $
MANTEN. %.
DURACION GDIAS
11.50 5.30 7.00 25.00 25.00 14.60 1.25 22.00 0.30 180.00 25.00 55.08 12.50
0 0 0 0 0 0 0 0 0 100 0 0 0
75 25 150 75 75 300 120 120 1 600 150 150 150
Botas de Jebe Guantes de cuero Correa portalámpa Saco de Jebe Pantalón de jebe Protectores Tapones auditivos Respirador Filtros respirador Lámparas Mineras Mamelucos Arneses de Seguri Correa de segurida
COSTO/GDIA COSTO/HORA $ $ 0.15 0.21 0.05 0.20 0.20 0.05 0.01 0.18 0.30 0.60 0.17 0.37 0.08
0.019 0.027 0.006 0.025 0.025 0.006 0.001 0.023 0.038 0.075 0.021 0.046 0.010
2.57
0.321
Personal de perforación
2.12
0.265
Supervisores, operarios y ayudantes Personal de tajeos y chimeneas
1.72 2.57
0.215 0.321
Costo promedio por hombre POR CATEGORIAS
TABLA 3 COSTO UNITARIO MANGUERAS, HERRAMIENTAS LABORES CON JUMBO Lampa minera Pico de acero Martillo 6 lbs Combo de 12 lbs Llave stillson 18" Cargador de ANFO Manguera antiestática 6 mts Manguera de 1" diámetro 50 Manguera de 1/2" diámetro 5 Caja y Conectores Jumbo Reducciones y válvulas (Jgo Manguera de 1" diámetro 50 Juego de Llaves Dados espe
Costo $/U Duración gdias Unidades/Labor 12 75 1 12 75 1 14 150 1 24 150 1 65 150 1 65 75 1 15 50 1 200 150 1 150 150 1 450 150 1 75 150 1 400 150 1 350 300 0.5
Otros: Cucharillas, barret, etc
10 % del Sub-total
Sub-Total Costo herramientas / Labor-gdia
Costo/gdia 0.16 $ 0.16 $ 0.09 $ 0.16 $ 0.43 $ 0.87 $ 0.30 $ 1.33 $ 1.00 $ 3.00 $ 0.50 $ 2.67 $ 0.58 $ 11.26 $ 1.13 $ 12.38 $
COSTO UNITARIO MANGUERAS, HERRAMIENTAS LABORES CON PERFORADORAS MANUALES Lampa minera Pico de acero Martillo 6 lbs Llave stillson 18" Cargadora de ANFO Reducciones y válvulas (Jgo Manguera de 1" diámetro 50 Manguera de 1/2" diámetro 5 Juego de Llaves
Costo $/U Duración gdias Unidades/Labor 12 75 1 12 75 1 14 150 1 65 150 1 65 150 1 50 150 1 200 150 1 150 150 1 50 600 0.25 Sub-Total
Otros: Sacab, barret, puntas, etc Costo herramientas / Labor-gdia
10 % del Sub-total
Costo/gdia 0.16 $ 0.16 $ 0.09 $ 0.43 $ 0.43 $ 0.33 $ 1.33 $ 1.00 $ 0.02 $ 3.97 $ 0.40 $ 4.36 $
TABLA 4 ANALISIS COSTOS MAQUINA PERFORADORA JACKLEG MARCA SECO S250 ANALISIS DE COSTOS REPUESTOS MAQUINA Durante la vida de la máquina los repuestos se intercambian de la siguiente forma como mínimo: Repuesto Vida en PP N° de cambios Costo US$ Costo Total US$ % increm. Pistón 20000 4.0 195 780 19.50 Bocina o hexagonal 5000 19.0 64 1216 30.40 Chuck nut o Bronce grande 20000 4.0 75 300 7.50 Rifle nut o Bronce chico 5000 19.0 46 874 21.85 Front Cilinder Washer Liner o Guiador 20000 4.0 54 216 5.40 Juego de manilla de mandos 50000 1.0 125 125 3.13 Chuk o Portabocina 35000 2.0 165 330 8.25 Jgo aletas, resortes y pines 10000 9.0 22 198 4.95 Side rods (tirantes y nuts) 20000 4.0 64 256 6.40 Water tube (agujas de agua) 3000 32.0 6 192 4.80 Jgo de Accesorios grampa (Retainer) 50000 1.0 76 76 1.90 Valve 35000 2.0 72 144 3.60 Rifle bar 35000 2.0 132 264 6.60 Ratchet Ring 50000 1.0 65 65 1.63 Juego empaques barra avance 5000 19.0 25 475 11.88 Sub-total 137.78 Otros: Empaquetaduras, Orings, etc. 10 % del Sub-total 13.78 Total costo repuestos durante la vida de la máquina 151.55 ANALISIS DE COSTOS TRASLADO Y MANTENIMIENTO DE MAQUINA La máquina se trasladará en su vida útil como mínimo La barra se trasladará en su vida útil como mínimo Labor a realizar N° veces Traslado de labor-taller-labor (máquina+bar 19 Mantenimiento (máquina) 19 Mantenimiento (barra) 19 Sub-total Otros: Uso de herramientas, petróleo, grasa 10 Total costo mantenim. durante la vida de la máquina
19 veces 19 veces Hrs trabajo Costo horario US$Costo total US$% incremento 2 2.12 80.61 2.02 2.5 2.47 117.56 2.94 1 2.47 47.02 1.18 6.13 % del Sub-total 0.61 6.74
TOTAL INCREMENTO EN PORCENTAJE POR MANTENIMIENTO Y REPUESTOS
Valor máquina perforadora Vida útil aproximado Mantenimiento y repuestos Costo por pie perforado
158.30
4000 100000 158.30 0.11
$ PP %. $
75 800 15 0.11
$ pp % $
TABLA 5 ANALISIS COSTOS BARRENOS Costo Promedio de Barrenos de 4 y 6 pies Vida útil aproximado promedio considerando roturas, atoros e imprevistos Costo afilado barrenos (Mano de obra, afiladora y piedras) Costo por pie perforado
DETERMINACION DEL COSTO HORARIO DE EQUIPOS (No incluye gastos generales y utilidad) MAQUINA
VALOR
VALOR
O
MARCA MODELO AÑO
ADQUISICION US$
RESCATE
VALOR
EQUIPO
Completo Sin Llantas
PERIODO DE
COSTO
COSTO
COSTO
COSTO
COSTO
COSTO
COSTO
COSTO
COSTO
DEPRECIABLE DEPRECIACION POSECIONINTERESES SEGURO MANT-REP COMBUST. LUBRIC. FILTROS GRASAS LLANTAS
%
$
US$
AÑOS
HRS
$/HR
$/HR
$/HR
$/HR
$/HR
$/HR
$/HR
$/HR
$/HR
COSTO TOTAL US $/HR SIN M.O. CON M.O
Jumbo EH
Tamrock Quasar
1998
354000
352400
12%
42480
309920.00
5.00
12000
25.83
15.49
2.21
23.60
0.36
0.75
0.22
0.18
0.36
68.99
Scoop 4,2 yd3
Wagner
ST-700
1999
342200
336600
15%
51330
285270.00
6.00
14400
19.81
14.56
2.08
19.01
7.25
1.50
1.75
0.18
3.20
69.33
72.73
Scoop 3,5 yd3
Wagner
ST-3.5D 1999
324500
318900
15%
48675
270225.00
7.00
16800
16.08
13.52
1.93
15.45
6.53
1.50
1.61
0.18
3.20
59.99
63.39
Scoop 3,0 yd3
Tamrock EJC-100 1998
271400
266600
15%
40710
225890.00
8.00
19200
11.77
11.13
1.59
11.31
5.80
1.50
1.46
0.18
2.74
47.47
50.87
Scoop 2,5 yd3
Wagner
ST-2D
1998
265500
260700
15%
39825
220875.00
9.00
21600
10.23
10.76
1.54
9.83
5.44
1.50
1.39
0.18
2.74
43.59
46.99
Scoop 1,5 yd3
MTI
M125
1998
188800
185200
15%
28320
156880.00
10.00
24000
6.54
7.57
1.08
6.29
4.35
1.20
1.11
0.18
2.06
30.38
33.77
Microscoop 0,5 yd3
France LoCTX 1he 1998
135700
132700
15%
20355
112345.00
11.00
26400
4.26
5.40
0.77
2.57
0.00
1.20
0.24
0.18
1.71
16.32
19.72
Camión de bajo perfil
Wagner
MT2000 1999
413000
407400
12%
49560
357840.00
12.00
28800
12.43
16.31
2.33
11.47
5.80
1.50
1.46
0.18
3.20
54.67
58.07
Camión 9 Tn
Nissan
Condor 9 1999
53500
52300
15%
8025
44275.00
13.00
31200
1.42
2.10
0.42
0.86
5.08
0.38
1.09
0.04
1.20
12.58
15.27
Camioneta 4x4
Nissan
Frontier 1998
32000
31600
20%
6400
25200.00
14.00
33600
0.75
1.25
0.29
0.48
2.90
0.38
0.66
0.04
0.40
7.13
9.82
Ventiladores 30000CF Airtec
1999
12000
10%
1200
10800.00
15.00
36000
0.30
0.47
0.07
0.17
0.02
1.02
Ventiladores 20000CF Airtec
1999
8000
10%
800
7200.00
16.00
38400
0.19
0.31
0.04
0.10
0.02
0.66
Ventiladores 10000CF Airtec
2000
5000
10%
500
4500.00
16.00
38400
0.12
0.19
0.03
0.07
0.02
0.42
Transformador 250KVA
1999
8000
10%
800
7200.00
17.00
40800
0.18
0.31
0.04
0.10
0.02
0.65
1999
9300
10%
930
8370.00
18.00
43200
0.19
0.36
0.05
0.11
0.02
0.73
Cargadora Lámparas
1998
5000
10%
500
4500.00
19.00
45600
0.10
0.19
0.05
0.02
0.36
Instrumentos Topográficos
1999
15000
12%
1800
13200.00
5.00
12000
1.10
0.66
0.63
Bomba 67 lt/seg
Grindex
Midi
2.38
CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 Factor llenado Pe insitu material Pe material roto (considerando factor esponjamiento 50%) Capacidad Cuchara en m3 Capacidad Cuchara en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Tiempo duración 1 ciclo en min en rampas positivas Tiempo duración 1 ciclo en min en rampas negativas Ciclos por hora en galerías horizontales Ciclos por hora en rampas positivas Ciclos por hora en rampas negativas Producción horaria en m3 en galerías horizontales Producción horaria en m3 en rampas positivas Producción horaria en m3 en rampas negativas
Scoop Tamrock EJC-130 3.5 90% 3.00 2.40 2.41 5.78 250.00 6.00 7.11 8.25 8.33 7.03 6.06 20.07 16.93 14.60
Scoop Tamrock EJC-100 2.5 90% 3.00 2.40 1.72 4.13 250.00 6.00 7.11 8.25 8.33 7.03 6.06 14.34 12.09 10.43
Scoop Wagner ST-2D 2.5 90% 3.00 2.40 1.72 4.13 250.00 6.00 7.11 8.25 8.33 7.03 6.06 14.34 12.09 10.43
Scoop MTI M125 1.25 90% 3.00 2.40 0.86 2.06 250.00 6.00 7.11 8.25 8.33 7.03 6.06 7.17 6.05 5.21
Microscoop France Loader CTX 1he 0.5 90% 3.00 2.40 0.34 0.83 150.00 6.00 7.11 8.25 8.33 7.03 6.06 2.87 2.42 2.09
Camión Wagner MT2000
Camión Wagner MT2000
90% 3.00 2.40 8.00 19.20 1000.00 17.25 21.00 23.50 2.90 2.38 2.13 23.19 19.05 17.02
90% 3.00 2.40 8.00 19.20 2000.00 21.00 27.00 29.50 2.38 1.85 1.70 19.05 14.82 13.56
Camión Wagner MT2000
Camión Wagner MT2000
CUADRO DE TIEMPO DE UTILIZACION DE EQUIPOS EN LIMPIEZA DE LABORES Equipo Marca Modelo Labor
Scoop Tamrock EJC-130 Gradiente Equipo Ancho Altura Avance Total m3
Factor
Total m3
Insitu
Esponja.
Roto
Scoop Tamrock EJC-100
Scoop Wagner ST-2D
Scoop MTI M125
Microscoop France Loader CTX 1he
Horas de limpieza sin considerar traslados a labores
GALERIA HORIZONTAL Galería Galería Galería Galería Subnivel RAMPA POSITIVA Rampa Rampa Rampa Rampa
0.5% 0.5% 0.5% 0.5% 0.5%
Jumbo Jumbo Jackleg Jackleg Jackleg
3.50 3.00 3.00 2.50 2.10
3.50 3.00 3.00 2.50 1.20
2.94 2.94 1.54 1.42 1.22
36.07 26.50 13.88 8.91 3.07
25% 25% 25% 25% 25%
45.09 33.12 17.35 11.13 3.84
2.25 1.65
12.0% 12.0% 12.0% 12.0%
Jumbo Jumbo Jackleg Jackleg
3.50 3.00 3.00 2.50
3.50 3.00 3.00 2.50
2.94 2.94 1.54 1.54
36.07 26.50 13.88 9.64
25% 25% 25% 25%
45.09 33.12 17.35 12.05
2.66 1.96
3.73 2.74 1.43
3.73 2.74 1.43
RAMPA NEGATIVA Rampa Rampa Rampa Rampa
-12.0% -12.0% -12.0% -12.0%
Jumbo Jumbo Jackleg Jackleg
3.50 3.00 3.00 2.50
3.50 3.00 3.00 2.50
2.94 2.94 1.51 1.37
36.07 26.50 13.58 8.57
25% 25% 25% 25%
45.09 33.12 16.97 10.72
3.09 2.27
4.32 3.18 1.63
4.32 3.18 1.63
3.14 2.31 1.21
3.14 2.31 1.21
1.94 1.43 0.75 0.48
2.37 1.74 0.91 0.58
2.87 1.99
2.37 1.74 0.91 0.63
3.04 2.24 1.17 0.81
3.26 2.06
2.65 1.95 1.00 0.63
3.32 2.44 1.25 0.79
2.42 1.55
1.34
663935704.xls
MILSA
EfiScoops(100m)
CUADRO DE TIEMPOS - CICLOS DE VIAJE CON SCOOPS 100 METROS DE DISTANCIA Datos:
Unidad
Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo
km/hr km/hr m min min min min min
Galerías
Rampas (+)
Rampas (-)
8.00 6.00 100.00 0.75 1.00 1.50 1.00 4.25
7.00 5.00 100.00 0.86 1.20 2.00 1.00 5.06
6.00 4.00 100.00 1.00 1.50 2.25 1.00 5.75
CUADRO DE TIEMPOS - CICLOS DE VIAJE CON CAMIONES 1000 METROS DE DISTANCIA Datos:
Unidad
Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo
km/hr km/hr m min min min min min
Galerías Normales 16.00 10.00 1000.00 3.75 6.00 6.00 1.50 17.25
Rampas (+) 12% 10.00 8.00 1000.00 6.00 7.50 6.00 1.50 21.00
Rampas (-) 12% 10.00 6.00 1000.00 6.00 10.00 6.00 1.50 23.50
CUADRO DE TIEMPOS - CICLOS DE VIAJE CON CAMIONES 2000 METROS DE DISTANCIA Datos:
Unidad
Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo
km/hr km/hr m min min min min min
Galerías Normales 16.00 10.00 2000.00 7.50 6.00 6.00 1.50 21.00
Rampas (+) 12% 10.00 8.00 2000.00 12.00 7.50 6.00 1.50 27.00
05/10/2023
Rampas (-) 12% 10.00 6.00 2000.00 12.00 10.00 6.00 1.50 29.50
663935704.xls
MILSA
EfiScoops(100m)
CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 Factor llenado Pe insitu material Pe material roto (considerando factor esponjamiento 50%) Capacidad Cuchara en m3 Capacidad Cuchara en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Tiempo duración 1 ciclo en min en rampas positivas Tiempo duración 1 ciclo en min en rampas negativas Ciclos por hora en galerías horizontales Ciclos por hora en rampas positivas Ciclos por hora en rampas negativas Producción horaria en m3 en galerías horizontales Producción horaria en m3 en rampas positivas Producción horaria en m3 en rampas negativas
Scoop Tamrock EJC-130 3.5 85% 3.00 2.22 2.27 5.05 100.00 4.25 5.06 5.75 11.77 9.89 8.70 26.76 22.49 19.78
Scoop Tamrock EJC-100 2.5 85% 3.00 2.22 1.62 3.61 100.00 4.25 5.06 5.75 11.77 9.89 8.70 19.12 16.06 14.13
Scoop Wagner ST-2D 2.5 85% 3.00 2.22 1.62 3.61 100.00 4.25 5.06 5.75 11.77 9.89 8.70 19.12 16.06 14.13
Scoop MTI M125 1.25 85% 3.00 2.22 0.81 1.81 100.00 4.25 5.06 5.75 11.77 9.89 8.70 9.56 8.03 7.06
Microscoop France Loader CTX 1he 0.5 85% 3.00 2.22 0.32 0.72 250.00 4.25 5.06 5.75 11.77 9.89 8.70 3.82 3.21 2.83
Camión Wagner MT2000
Camión Wagner MT2000
85% 3.00 2.22 8.00 17.78 1000.00 17.25 21.00 23.50 2.90 2.38 2.13 23.19 19.05 17.02
85% 3.00 2.22 8.00 17.78 2000.00 21.00 27.00 29.50 2.38 1.85 1.70 19.05 14.82 13.56
Camión Wagner MT2000
Camión Wagner MT2000
CUADRO DE TIEMPO DE UTILIZACION DE EQUIPOS EN LIMPIEZA DE LABORES Equipo Marca Modelo Labor
Scoop Tamrock EJC-130 Gradiente Equipo Ancho Altura Avance Total m3
GALERIA HORIZONTAL Galería Galería Galería Galería Subnivel RAMPA POSITIVA Rampa Rampa Rampa Rampa RAMPA NEGATIVA Rampa Rampa Rampa Rampa
Factor
Total m3
Insitu
Esponja.
Roto
Scoop Tamrock EJC-100
Scoop Wagner ST-2D
Scoop MTI M125
Microscoop France Loader CTX 1he
Horas de limpieza sin considerar traslados a labores
0.5% 0.5% 0.5% 0.5% 0.5%
Jumbo Jumbo Jackleg Jackleg Jackleg
3.50 3.00 3.00 2.50 2.10
3.50 3.00 2.70 2.50 1.20
2.88 2.88 1.51 1.51 1.22
35.28 25.92 12.22 9.43 3.07
35% 35% 35% 35% 35%
47.63 35.00 16.50 12.73 4.15
1.78 1.31
12.0% 12.0% 12.0% 12.0%
Jumbo Jumbo Jackleg Jackleg
3.50 3.00 3.00 2.50
3.50 3.00 2.70 2.50
2.88 2.88 1.51 1.51
35.28 25.92 12.22 9.43
35% 35% 35% 35%
47.63 35.00 16.50 12.73
2.12 1.56
2.97 2.18 1.03
2.97 2.18 1.03
-12.0% -12.0% -12.0% -12.0%
Jumbo Jumbo Jackleg Jackleg
3.50 3.00 3.00 2.50
3.50 3.00 2.70 2.50
2.72 2.72 1.34 1.34
33.32 24.48 10.86 8.38
35% 35% 35% 35%
44.99 33.05 14.67 11.32
2.27 1.67
3.18 2.34 1.04
3.18 2.34 1.04
05/10/2023
2.49 1.83 0.86
2.49 1.83 0.86
2.05 1.51 0.71 0.55
2.50 1.84 0.87 0.67
2.05 1.58
2.50 1.84 0.87 0.67
3.21 2.36 1.11 0.86
2.08 1.60
2.64 1.94 0.86 0.66
3.32 2.44 1.08 0.83
1.73 1.33
1.08
CUADRO DE TIEMPOS - CICLOS DE VIAJE CON LOCOMOTORA 1054 y 600 METROS DE DISTANCIA Datos:
Unidad
Galerías
Galerías
Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo
km/hr km/hr m min min min min min
4.75 4.35 1045.00 13.20 14.41 10.23 8.23 46.07
4.75 4.35 600.00 7.58 8.27 10.23 8.23 34.31
CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 por carro Factor llenado del carro Pe insitu material Pe material roto (considerando factor esponjamiento 70%) Capacidad Locomotora en m3 Capacidad Locomotora en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Ciclos por hora en galerías horizontales Producción horaria en m3 en galerías horizontales
Locomotora CLAYTON
Locomotora CLAYTON
3.02 70% 3.00 2.82 16.18 31.94 1054.00 46.07 1.30 21.07
3.02 70% 3.00 2.82 16.18 31.94 700.00 34.31 1.75 28.29
CUADRO DE TIEMPOS - CICLOS DE PERFORACION JUMBO ELECTROHIDRAULICO QUASAR Datos:
Unida
Galería Roca Dura 3,5 x 3,5
Galería Roca Dura 3,0 x 3,0
Rampa (+) Roca Dura 3,5 x 3,5
Rampa (+) Roca Dura 3,0 x 3,0
Rampa (-) Roca Dura 3,5 x 3,5
Rampa (-) Roca Dura 3,0 x 3,0
Nº de taladros Longitud de perforación Velocidad promedio de perforación
uni pp pp/min
40.00 10.50 3.67
35.00 10.50 3.67
40.00 10.50 3.67
35.00 10.50 3.67
40.00 10.50 3.28
35.00 10.50 3.28
Tiempo perforación promedio por taladro Tiempo de cambio de taladro a taladro Tiempos muertos promedio por taladro
min min min
2.86 1.00 0.50
2.86 1.00 0.50
2.86 1.25 0.50
2.86 1.25 0.50
3.20 1.50 0.50
3.20 1.50 0.75
Tiempo de perforación neta frente min Total Tiempo Cambio de taladros min Total Tiempos muertos min Total Tiempo promedio cambio de brocas y escaread min
114.44 40.00 20.00 15.00
100.14 35.00 17.50 15.00
114.44 50.00 20.00 15.00
100.14 43.75 17.50 15.00
128.05 60.00 20.00 15.00
112.04 52.50 26.25 15.00
Total Tiempo de perforación frente Tiempo de Posicionamiento del equipo según ejes
189.44 15.00
167.64 15.00
199.44 15.00
176.39 15.00
223.05 20.00
205.79 20.00
3.41
3.04
3.57
3.19
4.05
3.76
min min
Total Tiempo para perforar con Jumbo Hrs
TABLA ANFO CUADRO DE CALCULO DE CANTIDAD DE ANFO EN KLS/TALADRO Densidad del ANFO suelto Densidad del ANFO confinado en taladro Longitud de carguío
Diámetro
30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm
0.80 gr/cc 0.95 gr/cc 70% de Longitud
Longitud de taladro perforado en pies 5
5.5
6
6.5
7
7.5
8
8.5
9
9.5
10
10.5
11
11.5
12
12.5
13.5
14
0.72 0.76 0.82 0.87 0.92 0.98 1.03 1.09 1.15 1.21 1.27 1.34 1.40 1.47 1.54 1.61 1.68 1.76 1.83 1.91 1.99
0.79 0.84 0.90 0.95 1.01 1.07 1.13 1.20 1.26 1.33 1.40 1.47 1.54 1.62 1.70 1.77 1.85 1.93 2.02 2.10 2.19
0.86 0.92 0.98 1.04 1.10 1.17 1.24 1.31 1.38 1.45 1.53 1.61 1.68 1.77 1.85 1.93 2.02 2.11 2.20 2.29 2.39
0.93 0.99 1.06 1.13 1.20 1.27 1.34 1.42 1.49 1.57 1.66 1.74 1.83 1.91 2.00 2.10 2.19 2.29 2.38 2.48 2.59
1.00 1.07 1.14 1.21 1.29 1.37 1.44 1.53 1.61 1.69 1.78 1.87 1.97 2.06 2.16 2.26 2.36 2.46 2.57 2.68 2.79
1.07 1.15 1.22 1.30 1.38 1.46 1.55 1.63 1.72 1.82 1.91 2.01 2.11 2.21 2.31 2.42 2.53 2.64 2.75 2.87 2.98
1.15 1.22 1.30 1.39 1.47 1.56 1.65 1.74 1.84 1.94 2.04 2.14 2.25 2.35 2.47 2.58 2.69 2.81 2.93 3.06 3.18
1.22 1.30 1.39 1.47 1.56 1.66 1.75 1.85 1.95 2.06 2.17 2.27 2.39 2.50 2.62 2.74 2.86 2.99 3.12 3.25 3.38
1.29 1.38 1.47 1.56 1.66 1.76 1.86 1.96 2.07 2.18 2.29 2.41 2.53 2.65 2.77 2.90 3.03 3.16 3.30 3.44 3.58
1.36 1.45 1.55 1.65 1.75 1.85 1.96 2.07 2.18 2.30 2.42 2.54 2.67 2.80 2.93 3.06 3.20 3.34 3.48 3.63 3.78
1.43 1.53 1.63 1.73 1.84 1.95 2.06 2.18 2.30 2.42 2.55 2.68 2.81 2.94 3.08 3.22 3.37 3.52 3.67 3.82 3.98
1.50 1.61 1.71 1.82 1.93 2.05 2.17 2.29 2.41 2.54 2.67 2.81 2.95 3.09 3.24 3.38 3.54 3.69 3.85 4.01 4.18
1.58 1.68 1.79 1.91 2.02 2.15 2.27 2.40 2.53 2.66 2.80 2.94 3.09 3.24 3.39 3.55 3.71 3.87 4.03 4.20 4.38
1.65 1.76 1.87 1.99 2.12 2.24 2.37 2.51 2.64 2.78 2.93 3.08 3.23 3.39 3.54 3.71 3.87 4.04 4.22 4.40 4.58
1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.62 2.76 2.91 3.06 3.21 3.37 3.53 3.70 3.87 4.04 4.22 4.40 4.59 4.78
1.79 1.91 2.04 2.17 2.30 2.44 2.58 2.72 2.87 3.03 3.18 3.35 3.51 3.68 3.85 4.03 4.21 4.40 4.58 4.78 4.97
1.93 2.07 2.20 2.34 2.48 2.63 2.79 2.94 3.10 3.27 3.44 3.61 3.79 3.97 4.16 4.35 4.55 4.75 4.95 5.16 5.37
2.01 2.14 2.28 2.43 2.58 2.73 2.89 3.05 3.22 3.39 3.57 3.75 3.93 4.12 4.31 4.51 4.72 4.92 5.13 5.35 5.57
Analisis de Precios Unitarios CLIENTE PARTIDA
GASTOS GENERALES
UNIDAD DE MEDIDA
PORCENTAJE DEL MONTO DE OBRA
MONTO DE OBRA
US$ 180000
TIPO PRESUPUESTO
A TODO COSTO
FECHA
JUNIO DEL 2000 DESCRIPCION
1.A.
2.A.
TC: 3.50 US$
UNID. de
Monto a Valorizar
POR MES
MEDIDA
180000
SUELDOS EMPLEADOS
8
Administrador/Secretario
1
1131.38
MES
0.63%
Ingeniero Mecánico
1
2262.76
MES
1.26%
Mecánico Electricista
1
755.20
MES
0.42%
Lampareros
1
440.53
MES
0.24%
Topógrafo
1
1244.52
MES
0.69%
Ayudantes Topógrafo
1
377.60
MES
0.21%
Capacitación Sistema NOSA
1
2262.76
MES
1.26%
Asistenta Social
1
848.53
MES
0.47%
ALIMENTACION, ALOJAMIENTO, IMPLEMENTOS Y UTILES DE OFICINA Alimentación Empleados
342.86
MES
0.19%
Alojamiento Empleados
150.00
MES
0.08%
Alojamiento Obreros
250.00
MES
0.14%
258.16
MES
0.14%
Utiles de oficina y almacén
100.00
MES
0.06%
Energía Oficinas, campamentos y casalámparas
250.00
MES
0.14%
Instrumentos topográficos
238.13
MES
0.13%
Casa Lámparas (Cargadora, Acidos, H20 Destil., herram.,etc)
318.04
MES
0.18%
Fax, teléfonos, correos, radio
150.00
MES
0.08%
Viajes directivos
220.00
MES
0.12%
Camioneta de supervisión
2000.00
MES
1.11%
Seguro de transporte de personal
208.33
MES
0.12%
Responsabilidad civil contra terceros
291.67
MES
0.16%
Gerente General
1200.00
MES
0.67%
Gerente de Operaciones
1000.00
MES
0.56%
Administrador General
600.00
MES
0.33%
Contador
600.00
MES
0.33%
Secretaria
350.00
MES
0.19%
Jefe de Logistica
400.00
MES
0.22%
Asistente de compras
300.00
MES
0.17%
Costo apoyo logístico Lima-Mina
1000.00
MES
0.56%
Gastos Oficina Lima
300.00
MES
0.17%
Gastos administrativos de la obra
100.00
MES
0.06%
* Otros Gastos e Imprevistos
120.00
MES
0.07%
Exámen médico personal
400.00
MES
0.22%
Contrato de trabajo Ministerio de Trabajo
119.05
MES
0.07%
Inscripciones y Reinscripciones IPSS
59.52
MES
0.03%
Gastos de Identificación de personal
41.67
MES
0.02%
6000.00
MES
3.33%
Inscripciones personal a Digecsamec
44.64
MES
0.02%
Viáticos de personal
100.00
MES
0.06%
26835.33
MES
14.91%
Implementos Personal Administrati
3.A.
4.A.
5.A.
6.A.
6
6
VIAJES Y COMUNICACIONES
SEGUROS
ADMINISTRATIVOS Y FINANCIEROS
PERSONAL
Transporte de personal Chicla - Casapalca
TOTAL GASTOS GENERALES US$/MES
* Mobiliario Oficina Lima, Herramientas Mantenimiento Mina, Gastos Bancarios, Atenciones médicas del personal dentro de los tres primeros meses, Trámites del Ministerio de Energía y Minas, Ministerio de Trabajo, ESSALUD, Gastos por inspecciones de parte de Ministerios, ESSALUD, etc.
663935704.xls
MILSA
Jumbo
DETERMINACION DEL COSTO HORARIO EQUIPOS JUMBO TAMROCK QUASAR D I S
Depreciación Intereses Seguros
Vt Va Ve N Vr i s K
Valor total de adquisición en U Valor adquisición sin llantas e Vida económica en hrs Vida económica en años Valor de rescate Tasa de interes anual Tasa de seguros anual Factor
= 354000 = 352400 = 12000 = 5.00 = 12% = 17.5% = 2.5% = 0.0003
M F
Mantenimiento y Repuestos Filtros
= =
I=
(N+1) * N * Vt * i 2N Ve
K=
(N+1) * N 2N Ve
I = K * Vt * i S = K * Vt * s
80% Vt 20% Comb + Lubr
DEPRECIACION EQUIPO D= Valor adquisición - Valor de rescate Vida económica en años
= 25.83 US$/hr
INTERESES EQUIPO I= K * Vt * i
= 15.49 US$/hr
SEGUROS EQUIPO S= K * Vt * s
=
MANTENIMIENTO Y REPUESTOS M= 75 % Vt Vida económica en años
2.21 US$/hr
= 23.60 US$/hr
COMBUSTIBLES Consumo de Petróleo por Hora Costo Combustible
= =
0.25 gl/hr 1.45 $/gl
=
0.36 US$/hr
LUBRICANTES Consumo de Lubricantes por Hora Costo Lubricantes
= =
0.125 gl/hr 6.00 $/gl
=
0.75 US$/hr
FILTROS Costo Combustible + Lubricantes Costo Filtros
= =
1.11 $/gl 20%
=
0.22 US$/hr
GRASAS Consumo de Grasas por Hora Costo Grasas
= =
0.050 lb/hr 3.50 $/lb
=
0.18 US$/hr
LLANTAS Costo Juego de Llantas Vida útil aproximado
= =
1600 $ 4500 hrs
=
0.36 US$/hr
05/10/2023
MILSA
663935704.xls
COSTO HORARIO SIN MANO DE OBRA, GASTOS GENERALES Y UTILI = 68.99 US$/hr
05/10/2023
Jumbo
663935704.xls
MILSA
ScoopST-2D
DETERMINACION DEL COSTO HORARIO EQUIPOS SCOOPTRAM WAGNER ST-2D DIESEL D I S
Depreciación Intereses Seguros
Vt Va Ve N Vr i s K
Valor total de adquisición en U Valor adquisición sin llantas e Vida económica en hrs Vida económica en años Valor de rescate Tasa de interes anual Tasa de seguros anual Factor
= 265500 = 260700 = 21600 = 9.00 = 15% = 17.5% = 2.5% = 0.0002
M F
Mantenimiento y Repuestos Filtros
= =
I=
(N+1) * N * Vt * i 2N Ve
K=
(N+1) * N 2N Ve
I = K * Vt * i S = K * Vt * s
80% Vt 20% Comb + Lubr
DEPRECIACION EQUIPO D= Valor adquisición - Valor de rescate Vida económica en años
= 10.23 US$/hr
INTERESES EQUIPO I= K * Vt * i
= 10.76 US$/hr
SEGUROS EQUIPO S= K * Vt * s
=
1.54 US$/hr
=
9.83 US$/hr
MANTENIMIENTO Y REPUESTOS M= 60 % Vt Vida económica en años COMBUSTIBLES Consumo de Petróleo por Hora Costo Combustible
= =
3.75 gl/hr 1.45 $/gl
=
5.44 US$/hr
LUBRICANTES Consumo de Lubricantes por Hora Costo Lubricantes
= =
0.250 gl/hr 6.00 $/gl
=
1.50 US$/hr
FILTROS Costo Combustible + Lubricantes Costo Filtros
= =
6.94 $/gl 20%
=
1.39 US$/hr
GRASAS Consumo de Grasas por Hora Costo Grasas
= =
0.050 lb/hr 3.50 $/lb
=
0.18 US$/hr
LLANTAS Costo Juego de Llantas Vida útil aproximado
= =
4800 $ 1750 hrs
=
2.74 US$/hr
05/10/2023
MILSA
663935704.xls
COSTO HORARIO SIN MANO DE OBRA, GASTOS GENERALES Y UTILI = 43.59 US$/hr
05/10/2023
ScoopST-2D
ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: GALERIA +-0,5% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 8.00 4.00 4.00 2.00 1.00 1.00 2.00 1.00 35.00
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 27.00
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
uni uni uni uni uni uni jgo uni pp pp gdia
0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante
uni kls uni uni mts mts
37.00 125.24 37.00 2.00 0.50 12.33
EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta Ventiladora 20.000c.f.m
h-m h-m pp pp h
3.41 3.14 8.83 29.44 8.00
68.99 43.59 0.11 0.11 0.66
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
% % %
14.91 0.00 10.00
273.52 273.52 273.52
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
0.500 0.500 0.500 1.000 0.500 0.500 0.250 0.125 0.125 0.250 0.125 4.375
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
40 u 2.94 ml 45.09 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 16.97 8.49 9.05 3.96 2.12 12.73 18.10 11.31
6.24 2.88 4.32 5.76 2.88 3.07 1.34 0.72 4.32 6.15 3.84
41.55
$/hr $/hr
2.12 5.81
0.72 1.97
2.69
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38
14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21
57.13
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m
22.20 60.87 39.63 0.76 0.18 1.55
7.54 20.67 13.46 0.26 0.06 0.53
42.52
$/hr $/hr $/pp $/pp $/hr
235.08 137.09 0.97 3.24 5.31
79.84 46.56 0.33 1.10 1.80
$ $ $
40.78 0.00 27.35
40.78 0.00 27.35
129.63
68.13 341.65
ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: GALERIA +-0,5% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 m2 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION INCID. UNI. CANTID. 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
0.500 0.500 0.500 0.500 0.750 0.500 0.250 0.250 0.125 0.250 0.125 4.250
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
N° Taladr AVANCE: VOLUM.: PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 4.00 6.00 4.00 2.00 2.00 1.00 2.00 1.00 34.00
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 26.00
0.27 0.22
uni uni uni uni uni uni jgo uni pp pp gdia
0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35 u 2.94 ml 33.12 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 8.49 12.73 9.05 3.96 4.24 12.73 18.10 11.31
6.24 2.88 4.32 2.88 4.32 3.07 1.34 1.44 4.32 6.15 3.84
40.83
$/hr $/hr
2.12 5.59
0.72 1.90
2.62
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38
12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21
51.29
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m
19.20 52.64 34.27 0.76 0.18 1.34
6.52 17.88 11.64 0.26 0.06 0.46
36.81
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20.000c.f.m Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta
uni kls uni uni mts mts
32.00 108.32 32.00 2.00 0.50 10.67
h-m h-m h pp pp
3.04 2.31 8.00 8.83 29.44
68.99 43.59 0.66 0.11 0.11
$/hr $/hr $/hr $/pp $/pp
210.01 100.72 5.31 0.97 3.24
71.33 34.21 1.80 0.33 1.10
108.77
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
% % %
14.91 0.00 10.00
240.32 240.32 240.32
$ $ $
35.83 0.00 24.03
35.83 0.00 24.03
59.86
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
300.17
ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE PARTIDA:
EMPRESA
FECHAMay-23
GALERIA +-0,5%
N° Taladr
EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
INCID.
1.000 1.000 0.350 0.250 0.250 0.125 0.125 0.063 3.163
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
AVANCE: VOLUM.:
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 2.80 2.00 2.00 1.00 1.00 0.50 25.30
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 9.30
0.27 0.22
pp pp gln gdia
192.50 9.19 0.25 1.000
uni kls uni mts
32.00 44.50 32.00 8.00
pp h-m h pp
192.50 2.42 8.00 9.19
0.11 43.59 0.66 0.11
% % %
14.91 0.00 10.00
187.15 187.15 187.15
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35
u
1.54 ml 17.35 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 8.91 3.96 4.24 12.73 9.05 5.66
11.74 11.00 5.78 2.57 2.75 8.25 5.87 3.67
51.63
4.24 2.00
2.75 1.30
4.05
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
21.18 1.01 1.50 4.36
13.73 0.66 0.97 2.83
18.19
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
5.12 21.63 12.16 2.80
3.32 14.02 7.88 1.82
27.04
$/pp $/hr $/hr $/pp
21.18 105.51 5.31 1.01
13.73 68.41 3.44 0.66
86.24
$ $ $
27.90 0.00 18.71
27.90 0.00 18.71
46.62
$/hr $/hr
233.76
ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE
PARTIDA:
EMPRESA
FECHAMay-23
Galería +-0,5%
N° Taladr
EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 2.80 2.00 2.00 1.00 1.00 0.50 25.30
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 9.30
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas
pp pp gln gdia
160.00 8.49 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
29.00 40.33 29.00 5.00
EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 10.000 c.f.m. Perforadora Jackleg Alcayatas
pp h-m h pp
160.00 1.55 8.00 8.49
0.11 43.59 0.42 0.11
% % %
14.91 0.00 10.00
166.24 166.24 166.24
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.350 0.250 0.250 0.125 0.125 0.063 3.163
AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
32
u
1.42 ml 11.13 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 8.91 3.96 4.24 12.73 9.05 5.66
12.70 11.91 6.25 2.78 2.98 8.93 6.35 3.97
55.88
4.24 2.00
2.98 1.40
4.38
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
17.60 0.93 1.50 4.36
12.35 0.66 1.05 3.06
17.12
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.64 19.60 11.02 1.75
3.26 13.76 7.73 1.23
25.97
$/pp $/hr $/hr $/pp
17.60 67.70 3.37 0.93
12.35 47.51 2.37 0.66
62.88
$ $ $
24.78 0.00 16.62
24.78 0.00 16.62
41.41
$/hr $/hr
207.65
ANALISIS DE PRECIOS UNITARIOS SUBNIVEL HORIZONTAL EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: SUBNIVEL +-0,5% EQUIPOS: JACKLEG / MICROSCOOP SECCION: 2.10 x 1.20 NOTA : Distancia de limpieza incluida max.= 150 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 3.20 1.00 2.00 1.00 1.00 0.50 24.70
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 8.70
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas
pp pp gln gdia
125.00 7.27 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
22.00 30.60 22.00 5.00
EQUIPOS Perforadora Jackleg Microscoop 0,5 yd3 Ventiladora 10.000 c.f.m. Perforadora Jackleg Alcayatas
pp h-m h pp
125.00 1.34 8.00 7.27
0.11 16.32 0.42 0.11
% % %
14.91 0.00 10.00
142.49 142.49 142.49
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.400 0.125 0.250 0.125 0.125 0.063 3.088
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
25 u 1.22 ml 3.84 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 10.18 1.98 4.24 12.73 9.05 5.66
14.85 13.92 8.35 1.62 3.48 10.44 7.42 4.64
64.73
4.24 1.87
3.48 1.54
5.01
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
13.75 0.80 1.50 4.36
11.28 0.66 1.23 3.58
16.74
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
3.52 14.87 8.36 1.75
2.89 12.20 6.86 1.44
23.38
$/pp $/hr $/hr $/pp
13.75 21.86 3.37 0.80
11.28 17.93 2.77 0.66
32.63
$ $ $
21.24 0.00 14.25
21.24 0.00 14.25
35.49
$/hr $/hr
177.98
ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: Rampa 12% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 8.00 4.00 3.20 2.00 2.00 1.00 2.00 1.00 35.20
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 27.20
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
uni uni uni uni uni uni jgo uni pp pp gdia
0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante
uni kls uni uni mts mts
37.00 125.24 37.00 2.00 0.50 12.33
h-m h-m h pp pp
3.57 3.73 8.00 8.83 29.44
68.99 43.59 0.66 0.11 0.11
% % %
14.91 0.00 10.00
286.18 286.18 286.18
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
0.500 0.500 0.500 1.000 0.500 0.400 0.250 0.250 0.125 0.250 0.125 4.400
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
40 u 2.94 ml 45.09 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 16.97 8.49 7.24 3.96 4.24 12.73 18.10 11.31
6.24 2.88 4.32 5.76 2.88 2.46 1.34 1.44 4.32 6.15 3.84
41.65
$/hr $/hr
2.12 5.85
0.72 1.99
2.71
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38
14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21
57.13
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m
22.20 60.87 39.59 0.76 0.18 1.55
7.54 20.67 13.45 0.26 0.06 0.53
42.50
$/hr $/hr $/hr $/pp $/pp
246.58 162.55 5.31 0.97 3.24
83.75 55.21 1.80 0.33 1.10
142.19
$ $ $
42.67 0.00 28.62
42.67 0.00 28.62
71.28 357.47
ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: Rampa 12% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 4.00 8.00 3.20 2.00 2.00 1.00 2.00 1.00 35.20
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 27.20
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
uni uni uni uni uni uni jgo uni pp pp gdia
0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante
uni kls uni uni mts mts
32.00 108.32 32.00 2.00 0.50 10.67
h-m h-m h pp pp
3.19 2.74 8.00 8.83 29.44
68.99 43.59 0.66 0.11 0.11
% % %
14.91 0.00 10.00
250.99 250.99 250.99
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
0.500 0.500 0.500 0.500 1.000 0.400 0.250 0.250 0.125 0.250 0.125 4.400
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35 u 2.94 ml 33.12 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 8.49 16.97 7.24 3.96 4.24 12.73 18.10 11.31
6.24 2.88 4.32 2.88 5.76 2.46 1.34 1.44 4.32 6.15 3.84
41.65
$/hr $/hr
2.12 5.85
0.72 1.99
2.71
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38
12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21
51.29
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m
19.20 52.64 34.24 0.76 0.18 1.34
6.52 17.88 11.63 0.26 0.06 0.46
36.80
$/hr $/hr $/hr $/pp $/pp
220.07 119.42 5.31 0.97 3.24
74.74 40.56 1.80 0.33 1.10
118.54
$ $ $
37.42 0.00 25.10
37.42 0.00 25.10
62.52 313.51
ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: Rampa 12% EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 2.40 0.50 0.50 0.50 1.00 0.50 21.41
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 5.41
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas
pp pp gln gdia
175.00 9.19 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
32.00 44.50 32.00 8.00
EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m Perforadora Jackleg Alcayatas
pp h-m h pp
175.00 2.87 8.00 9.19
0.11 43.59 0.66 0.11
% % %
14.91 0.00 10.00
187.88 187.88 187.88
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.300 0.063 0.063 0.063 0.125 0.063 2.676
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35 u 1.54 ml 17.35 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 7.64 1.00 1.07 6.36 9.05 5.66
11.74 11.00 4.95 0.65 0.69 4.13 5.87 3.67
42.70
4.24 1.16
2.75 0.75
3.50
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
19.25 1.01 1.50 4.36
12.48 0.66 0.97 2.83
16.94
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
5.12 21.63 12.16 2.80
3.32 14.02 7.88 1.82
27.04
$/pp $/hr $/hr $/pp
19.25 125.11 5.31 1.01
12.48 81.12 3.44 0.66
97.70
$ $ $
28.01 0.00 18.79
28.01 0.00 18.79
46.80
$/hr $/hr
234.68
ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE
PARTIDA:
EMPRESA
FECHAMay-23
Rampa 12%
N° Taladr
EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 2.40 0.50 0.50 0.50 1.00 0.50 21.41
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 5.41
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas
pp pp gln gdia
160.00 8.49 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
29.00 40.33 29.00 5.00
EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m. Perforadora Jackleg Alcayatas
pp h-m h pp
160.00 1.99 8.00 8.49
0.11 43.59 0.42 0.11
% % %
14.91 0.00 10.00
169.45 169.45 169.45
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.300 0.063 0.063 0.063 0.125 0.063 2.676
AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
32
u
1.42 ml 11.13 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 7.64 1.00 1.07 6.36 9.05 5.66
12.70 11.91 5.36 0.70 0.75 4.47 6.35 3.97
46.21
4.24 1.16
2.98 0.82
3.79
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
17.60 0.93 1.50 4.36
12.35 0.66 1.05 3.06
17.12
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.64 19.60 11.02 1.75
3.26 13.76 7.73 1.23
25.97
$/pp $/hr $/hr $/pp
17.60 86.88 3.37 0.93
12.35 60.97 2.37 0.66
76.35
$ $ $
25.26 0.00 16.94
25.26 0.00 16.94
42.21
$/hr $/hr
211.65
MILSA
663935704.xls
3,5x3,5 r-jumbo
ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE EMPRESA
FECHAMay-23
PARTIDA: Rampa -12% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 26.00
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 18.00
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
uni uni uni uni uni uni jgo uni pp pp gdia
0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante
uni kls uni pies mts mts
37.00 125.24 37.00 14.00 1.00 12.33
h-m h-m h h pp pp
3.57 4.32 8.00 4.00 8.83 29.44
68.99 43.59 0.66 0.73 0.11 0.11
% % %
14.91 0.00 10.00
288.79 288.79 288.79
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Bomba para bombeo d'água Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
0.500 0.500 0.500 0.250 0.250 0.250 0.250 0.250 0.125 0.250 0.125 3.250
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
05/10/2023
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
40 u 2.94 ml 45.09 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 4.24 4.24 4.53 3.96 4.24 12.73 18.10 11.31
6.24 2.88 4.32 1.44 1.44 1.54 1.34 1.44 4.32 6.15 3.84
34.97
$/hr $/hr
2.12 3.87
0.72 1.32
2.04
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38
14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21
57.13
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.04 $/pie 0.30 $/m 0.13 $/m
22.20 61.37 39.59 0.56 0.30 1.60
7.54 20.84 13.45 0.19 0.10 0.54
42.66
$/hr $/hr $/hr $/hr $/pp $/pp
246.58 188.50 5.31 2.91 0.97 3.24
83.75 64.02 1.80 0.99 0.33 1.10
151.99
$ $ $
43.05 0.00 28.88
43.05 0.00 28.88
71.93 360.72
MILSA
663935704.xls
3,0x3,0 r-jumbo
ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA: Rampa -12% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
4.00 4.00 4.00 2.00 4.00 2.00 2.80 2.00 1.00 2.00 1.00 28.80
4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31
h-h h-h
8.00 20.80
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas
uni uni uni uni uni uni jgo uni pp pp gdia
0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000
327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante
uni kls uni pies mts mts
32.00 108.32 32.00 14.00 1.00 10.67
h-m h-m h h pp pp
3.19 3.18 8.00 2.00 8.83 29.44
68.99 43.59 0.66 0.73 0.11 0.11
% % %
14.91 0.00 10.00
252.92 252.92 252.92
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
0.500 0.500 0.500 0.250 0.500 0.250 0.350 0.250 0.125 0.250 0.125 3.600
N° Taladr AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
05/10/2023
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35 u 2.94 ml 33.12 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.38 8.49 12.73 4.24 8.49 4.53 5.54 4.24 12.73 18.10 11.31
6.24 2.88 4.32 1.44 2.88 1.54 1.88 1.44 4.32 6.15 3.84
36.95
$/hr $/hr
2.12 4.47
0.72 1.52
2.24
$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia
37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38
12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21
51.29
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.04 $/pie 0.30 $/m 0.13 $/m
19.20 53.07 34.24 0.56 0.30 1.39
6.52 18.03 11.63 0.19 0.10 0.47
36.94
$/hr $/hr $/hr $/hr $/pp $/pp
220.07 138.49 5.31 1.46 0.97 3.24
74.74 47.03 1.80 0.49 0.33 1.10
125.51
$ $ $
37.71 0.00 25.29
37.71 0.00 25.29
63.00 315.92
MILSA
663935704.xls
3,0x3,0r-jackleg
ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA: Rampa -12% EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
INCID.
1.000 1.000 0.500 0.300 0.250 0.063 0.125 0.063 3.300
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas EXPLOSIVOS Dinamita de 7/8" Anfo Fulminante corriente Nº 8 Conectores Guias de seguridad Mecha Rápida Cordón detonante EQUIPOS Perforadora Jackleg Scooptrams 1,5 yd3 Ventiladora de 20.000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
N° Taladr AVANCE: VOLUM.:
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 4.00 2.40 2.00 0.50 1.00 0.50 26.40
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 10.40
0.27 0.22
pp pp gln gdia
192.50 8.99 0.25 1.000
uni kls uni uni pies mts mts
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 12.73 4.75 4.24 6.36 9.05 5.66
12.00 11.25 8.44 3.15 2.81 4.22 6.00 3.75
51.61
4.24 2.24
2.81 1.48
4.29
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
21.18 0.99 1.50 4.36
14.03 0.66 0.99 2.89
18.58
32.00 44.50 32.00 32.00 230.00 5.33 0.00
0.14 0.51 0.09 0.14 0.04 0.30 0.13
$/uni $/kl $/uni $/uni $/pie $/m $/m
4.48 22.70 2.88 4.48 9.20 1.60 0.00
2.97 15.04 1.91 2.97 6.10 1.06 0.00
30.05
pp h-m h h pp
192.50 3.26 8.00 4.00 8.99
0.11 30.38 0.66 0.73 0.11
$/pp $/hr $/hr $/hr $/pp
21.18 98.89 5.31 2.91 0.99
14.03 65.55 3.52 1.93 0.66
85.69
% % %
14.91 0.00 10.00
190.22 190.22 190.22
$ $ $
28.36 0.00 19.02
28.36 0.00 19.02
47.38
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
05/10/2023
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35 u 1.51 ml 16.97 m3 roto
$/hr $/hr
237.60
MILSA
663935704.xls
2,5x2,5r-jackleg
ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA: Rampa -12% EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 3.60 2.00 1.00 0.50 1.00 0.50 24.60
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 8.60
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas
pp pp gln gdia
176.00 8.18 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Fulminante corriente Nº 8 Conectores Guias de seguridad Mecha Rápida Cordón detonante
uni kls uni uni pies mts mts
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
EQUIPOS Perforadora Jackleg Scooptrams 1,5 yd3 Ventiladora 10,000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.450 0.250 0.125 0.063 0.125 0.063 3.075
N° Taladr AVANCE: VOLUM.:
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 11.46 3.96 2.12 6.36 9.05 5.66
13.20 12.37 8.35 2.89 1.55 4.64 6.60 4.12
53.72
4.24 1.85
3.09 1.35
4.44
0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia
19.36 0.90 1.50 4.36
14.11 0.66 1.09 3.18
19.05
29.00 40.33 29.00 29.00 209.00 4.83 0.00
0.14 0.51 0.09 0.14 0.04 0.30 0.13
$/uni $/kl $/uni $/uni $/pie $/m $/m
4.06 20.57 2.61 4.06 8.36 1.45 0.00
2.96 15.00 1.90 2.96 6.10 1.06 0.00
29.97
pp h-m h h pp
176.00 2.06 8.00 4.00 8.18
0.11 30.38 0.42 0.73 0.11
$/pp $/hr $/hr $/hr $/pp
19.36 62.43 3.37 2.91 0.90
14.11 45.52 2.46 2.12 0.66
64.87
% % %
14.91 0.00 10.00
172.05 172.05 172.05
$ $ $
25.65 0.00 17.21
25.65 0.00 17.21
42.86
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
05/10/2023
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
32 u 1.37 ml 10.72 m3 roto
$/hr $/hr
214.91
ANALISIS DE PRECIOS UNITARIOS CHIMENEA SIMPLE 1,5 X 1,5 HASTA 25 METROS PARTIDA:
EMPRESA
FECHAMay-23
Chimenea simple
N° Taladr
EQUIPOS: Stoper SECCION: 1.50 Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
x
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 0.50 0.50 1.00 1.00 0.50 19.51
2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 3.51
0.32 0.32
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
90.00 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
17.00 23.64 17.00 2.50
EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiliadora 10.000c.f.m
pp h-m h
90.00 0.33 4.00
0.11 43.59 0.42
% % %
14.91 0.00 10.00
88.71 110.01 88.71
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.063 0.063 0.125 0.125 0.063 2.439
1.50
AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr
18
u
1.22 ml 3.43 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 1.00 1.07 12.73 9.05 5.66
14.85 13.92 0.82 0.88 10.44 7.42 4.64
52.97
5.14 1.13
4.22 0.92
5.14
0.11 $/pp 6.00 $/gl 4.36 $/gdia
9.90 1.50 4.36
8.12 1.23 3.58
12.93
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
2.72 11.49 6.46 0.88
2.23 9.42 5.30 0.72
17.67
$/pp $/hr $/hr
9.90 14.39 1.69
8.12 11.80 1.38
$ $ $
13.23 0.00 8.87
13.23 0.00 8.87
$/hr $/hr
21.30
22.10 132.11
ANALISIS DE PRECIOS UNITARIOS CHIMENEA SIMPLE 1,5 X 1,5 DE 25 METROS HASTA 50 MTS EMPRESA PARTIDA: Chimenea simple EQUIPOS: Stoper SECCION: 1.50 x Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
1.50
N° Taladr AVANCE: VOLUM.:
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 4.00 2.80 0.50 0.50 0.50 1.00 0.50 25.81
2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 9.81
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
90.00 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
17.00 23.64 17.00 2.50
EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m
pp h-m h
90.00 0.33 6.00
0.11 43.59 0.42
% % %
14.91 0.00 10.00
93.62 113.66 93.62
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.500 0.350 0.063 0.063 0.063 0.125 0.063 3.226
FECHAMay-23
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
18 u 1.22 ml 3.43 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 9.05 5.94 1.00 1.07 6.36 9.05 5.66
14.85 13.92 7.42 4.87 0.82 0.88 5.22 7.42 4.64
60.04
4.24 2.11
3.48 1.73
5.21
0.11 $/pp 6.00 $/gl 4.36 $/gdia
9.90 1.50 4.36
8.12 1.23 3.58
12.93
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
2.72 11.49 6.46 0.88
2.23 9.42 5.30 0.72
15.44
$/pp $/hr $/hr
9.90 14.53 2.53
8.12 11.92 2.08
$ $ $
13.96 0.00 9.36
13.96 0.00 9.36
$/hr $/hr
20.04
23.32 136.98
ANALISIS DE PRECIOS UNITARIOS CHIMENEA DOBLE 3,0 X 1,5 HASTA 25 METROS PARTIDA:
EMPRESA
FECHAMay-23
Chimenea Doble
N° Taladr
EQUIPOS: Stoper SECCION: 3.00 Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
x
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 3.20 4.00 0.50 0.50 1.00 1.00 0.50 26.71
2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 10.71
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
150.00 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
27.00 37.55 27.00 5.00
EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10.000 c.f.m.
pp h-m h
150.00 0.33 6.00
0.11 43.59 0.42
% % %
14.91 0.00 10.00
111.00 136.91 111.00
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.400 0.500 0.063 0.063 0.125 0.125 0.063 3.339
1.50
AVANCE: VOLUM.:
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
30
u
1.30 ml 7.29 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 7.24 8.49 1.00 1.07 12.73 9.05 5.66
13.97 13.10 5.59 6.55 0.77 0.83 9.83 6.99 4.37
61.99
4.24 2.30
3.27 1.78
5.05
0.11 $/pp 6.00 $/gl 4.36 $/gdia
16.50 1.50 4.36
12.74 1.16 3.37
17.26
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.32 18.25 10.26 1.75
3.33 14.09 7.92 1.35
26.69
$/pp $/hr $/hr
16.50 14.53 2.53
12.74 11.22 1.95
$ $ $
16.55 0.00 11.10
16.55 0.00 11.10
$/hr $/hr
25.91
27.65 164.56
ANALISIS DE PRECIOS UNITARIOS CHIMENEA DOBLE 3,0 X 1,5 HASTA 25 METROS EMPRESA PARTIDA: Chimenea Doble EQUIPOS: Stoper SECCION: 3.00 x Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
1.50
N° Taladr AVANCE: VOLUM.:
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 6.00 6.00 0.50 0.50 1.00 1.00 0.50 31.50
2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 15.50
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
150.00 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
27.00 37.55 27.00 5.00
EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m
pp h-m h
150.00 0.33 6.00
0.11 43.59 0.42
% % %
14.91 0.00 10.00
127.45 152.90 127.45
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.750 0.750 0.063 0.063 0.125 0.125 0.063 3.938
FECHAMay-23
TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
30 u 1.22 ml 6.86 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/ML
18.10 16.97 13.58 12.73 0.99 1.06 12.73 9.05 5.66
14.85 13.92 11.14 10.44 0.81 0.87 10.44 7.42 4.64
74.53
4.24 3.33
3.48 2.74
6.21
0.11 $/pp 6.00 $/gl 4.36 $/gdia
16.50 1.50 4.36
13.53 1.23 3.58
18.34
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.32 18.25 10.26 1.75
3.54 14.97 8.42 1.44
28.36
$/pp $/hr $/hr
16.50 14.53 2.53
13.53 11.92 2.08
$ $ $
19.00 0.00 12.74
19.00 0.00 12.74
$/hr $/hr
25.45
31.75 184.65
ANALISIS DE PRECIOS UNITARIOS DESQUINCHE CON JUMBO Y SCOOP EMPRESA
FECHAMay-23
PARTIDA: DESQUINCHE EQUIPOS: JUMBO / SCOOP SECCION: 1.20 x 1.10 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 16.00 8.00 1.00 1.00 1.00 1.00 1.00 45.00
4.60 2.12 3.18 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 29.00
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Copas de afilado Aguzadora de brocas Herramientas
uni uni uni uni jgo uni gdia
0.143 0.380 0.143 0.143 0.057 0.006 1.000
327.00 85.00 270.00 60.00 180.00 2,400.00 12.38
EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante
uni kls uni uni mts mts
70.00 236.94 70.00 2.00 0.50 23.33
EQUIPOS Jumbo EH Scooptrams 2,5 yd3
h-m h-m
7.00 13.13
68.99 43.59
% % %
14.91 0.00 10.00
8.62 8.62 8.62
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 2.000 1.000 0.125 0.125 0.125 0.125 0.125 5.625
N° Taladr AVANCE: VOLUM.: Vol.roto:
TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
70 u 2.04 ml 188.19 m3 235.24 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/M3
36.77 16.97 50.91 16.97 1.98 2.12 12.73 9.05 11.31
0.20 0.09 0.27 0.09 0.01 0.01 0.07 0.05 0.06
0.84
$/hr $/hr
4.24 6.24
0.02 0.03
0.06
$/uni $/uni $/uni $/uni $/uni $/uni $/gdia
46.62 32.32 38.49 8.55 10.27 13.69 12.38
0.25 0.17 0.20 0.05 0.05 0.07 0.07
0.86
0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m
42.00 115.15 74.97 0.76 0.18 2.94
0.22 0.61 0.40 0.00 0.00 0.02
1.25
$/hr $/hr
482.95 572.22
2.57 3.04
5.61
$ $ $
1.29 0.00 0.86
1.29 0.00 0.86
2.15
10.77
ANALISIS DE PRECIOS UNITARIOS DESQUINCHE JACKLEG + SCOOP
PARTIDA:
EMPRESA
FECHAMay-23
DESQUINCHE
N° Taladr
EQUIPOS: JACKLEG / SCOOP SECCION: 1.00 x 1.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 4.00 0.50 0.50 0.50 0.50 0.50 22.50
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 6.50
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
175.00 0.25 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
35.00 48.68 35.00 5.00
EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3
pp h-m
175.00 4.08
0.11 43.59
% % %
14.91 0.00 10.00
7.24 7.24 7.24
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
1.000 1.000 0.500 0.063 0.063 0.063 0.063 0.063 2.813
AVANCE: VOLUM.: Vol.roto:
TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
35
u
1.34 ml 46.75 m3 58.44 m3 roto
P.PARC. SUBTOT. $ $
TOTAL US$/M3
18.10 16.97 12.73 0.99 1.06 6.36 4.56 5.66
0.39 0.36 0.27 0.02 0.02 0.14 0.10 0.12
1.42
4.24 1.40
0.09 0.03
0.12
0.11 $/pp 6.00 $/gl 4.36 $/gdia
19.25 1.50 4.36
0.41 0.03 0.09
0.54
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
5.60 23.66 13.30 1.75
0.12 0.51 0.28 0.04
0.95
$/pp $/hr
19.25 177.68
0.41 3.80
4.21
$ $ $
1.08 0.00 0.72
1.08 0.00 0.72
1.80
$/hr $/hr
9.04
ANALISIS DE PRECIOS UNITARIOS TAJEOS OPEN STOPE (CASO 1) EMPRESA
FECHAMay-23
PARTIDA: ROTURA TAJEOS + MADERA EQUIPOS: STOPER / MICROSCOOP (Ctta) AREA DE DISPARO: 0.80 x 5.83 NOTA : Distancia de limpieza incluida max.= 150 metros ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante Operador Scoop Enmaderador (Puntales linea, andam Ayudante Enmaderador Tubero Bodeguero, Traslado Madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
INCID.
1.000 1.000 0.500 1.000 1.000 0.125 0.063 0.063 0.125 0.063 4.939
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
N° Taladr AVANCE: VOLUM.: Vol.roto:
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 4.00 8.00 8.00 1.00 0.50 0.50 1.00 0.50 39.51
2.26 2.12 3.18 2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 23.51
0.32 0.32
pp gln gdia
### 0.250 1.500
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
25 u 1.29 ml 6.03 m3 8.13 m3
P.PARC. SUBTOT. $ $ 18.10 16.97 12.73 18.10 16.97 1.98 1.06 6.41 9.05 5.70
3.00 2.82 2.11 3.00 2.82 0.33 0.18 1.06 1.50 0.95
17.77
6.04 5.66 4.25 6.04 5.66 0.66 0.35 2.14 3.02 1.90
5.14 7.56
0.85 1.25
2.11
1.72 2.52
0.11 $/pp 6.00 $/gl 4.36 $/gdia
13.75 1.50 6.55
2.28 0.25 1.09
3.62
4.59 0.50 2.18
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.00 16.90 9.50 6.30
0.66 2.80 1.58 1.05
6.09
1.33 5.64 3.17 2.10
10.25
4.59 15.45
9.92
11.94 0.00 8.01
$/hr $/hr
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m.
uni kls uni mts
25.00 34.77 25.00 18.00
pp h-m h
125.00 2.84 4.00
0.11 16.32 0.42
$/pp $/hr $/hr
13.75 46.31 1.69
2.28 7.69 0.28
GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad
% % %
14.91 0.00 10.00
39.83 39.83 39.83
$ $ $
5.94 0.00 3.98
5.94 0.00 3.98
TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$
TOTAL US$/M3
49.76 16.59
99.44
ANALISIS DE PRECIOS UNITARIOS TAJEOS OPEN STOPE (CASO 1) EMPRESA
FECHAMay-23
ROTURA TAJEOS + MADERA
N° Taladr
EQUIPOS: STOPER / MICROSCOOP (Ctta) AREA DE DISPARO: 0.80 x 5.83 NOTA : Distancia de limpieza incluida max.= 150 metros
AVANCE: VOLUM.: Vol.roto:
PARTIDA:
ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante Operador Scoop Enmaderador (Puntales linea, andam Ayudante Enmaderador Tubero Bodeguero, Traslado Madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
INCID.
1.000 1.000 0.500 1.000 1.000 0.125 0.063 0.063 0.125 0.063 4.939
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 4.00 8.00 8.00 1.00 0.50 0.50 1.00 0.50 39.51
2.26 2.12 3.18 2.26 2.12 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 23.51
0.32 0.32
pp gln gdia
### 0.250 1.000
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
25
P.PARC. SUBTOT. $ $
TOTAL US$/M3
18.10 16.97 12.73 18.10 16.97 1.98 1.06 6.41 9.05 5.70
2.68 2.51 1.88 2.68 2.51 0.29 0.16 0.95 1.34 0.84
15.83
5.14 7.56
0.76 1.12
1.88
0.11 $/pp 6.00 $/gl 4.36 $/gdia
13.75 1.50 4.36
2.03 0.22 0.65
2.90
0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m
4.00 16.90 9.50 6.30
0.59 2.50 1.40 0.93
5.43
$/hr $/hr
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m.
uni kls uni mts
25.00 34.77 25.00 18.00
pp h-m h
125.00 3.18 4.00
0.11 16.32 0.42
$/pp $/hr $/hr
13.75 51.98 1.69
2.03 7.69 0.25
GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad
% % %
14.91 0.00 10.00
36.00 36.00 36.00
$ $ $
5.37 0.00 3.60
5.37 0.00 3.60
TOTAL COSTO METRO CUBICO EN DOLARES US$
u
1.45 ml 6.76 m3 9.13 m3
9.97
8.97 44.97
ANALISIS DE PRECIOS UNITARIOS TAJEOS SHIRINKAGE CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA: ROTURA TAJEOS SHIRINKAGE EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 0.80 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante Operador Scoop (Limpieza) Peon arreglar tajeo Peon para Shuteo Bodeguero Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona
INCID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 6.00 8.00 8.00 2.00 0.50 2.00 0.50 43.01
2.26 2.12 3.18 1.98 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 27.01
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
### 0.250 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
25.00 37.93 25.00 10
EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m
pp h-m h
150.00 3.72 8.00
0.11 16.32 0.42
GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad
% % %
14.91 0.00 10.00
21.86 31.31 21.86
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
1.000 1.000 0.750 1.000 1.000 0.250 0.063 0.250 0.063 5.376
UNI. CANTID.
N° Taladr AVANCE: VOLUM.: Vol.roto:
TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
25 u 1.60 ml 8.52 m3 10.65 m3
P.PARC. SUBTOT. $ $
TOTAL US$/M3
18.10 16.97 19.09 15.84 15.84 4.24 6.41 18.10 5.70
2.12 1.99 2.24 1.86 1.86 0.50 0.75 2.12 0.67
14.11
2.05 5.78 1.82
4.24 5.81
0.50 0.68
1.18
1.35 1.85
0.11 $/pp 6.00 $/gl 4.36 $/gdia
16.50 1.50 4.36
1.94 0.18 0.51
2.62
5.27 0.48 1.39
0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m
3.25 17.83 9.75 2.80
0.38 2.09 1.14 0.33
3.95
1.04 5.69 3.11 0.89
$/pp $/hr $/hr
16.50 60.65 3.37
1.94 7.12 0.40
$ $ $
3.26 0.00 2.19
3.26 0.00 2.19
$/hr $/hr
5.78 5.42 6.09 5.06
9.45
5.45 36.75 12.25
5.27
8.87 0.00 5.95 73.15
ANALISIS DE PRECIOS UNITARIOS TAJEOS CORTE Y RELLENO CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA:
ROTURA TAJEOS +RELLENO
N° Taladr
25
AVANCE: VOLUM.: Vol.roto:
1.60 ml 8.52 m3 10.65 m3
EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 0.80 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante Emmaderador Ayudante de emmaderador Operador Scoop(Limpieza y relleno) Bodeguero/traslado de madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona
INCID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 8.00 4.00 8.00 4.00 1.60 2.00 1.00 44.60
2.26 2.12 2.26 2.12 3.18 2.12 12.73 9.05 11.31
h-h h-h
16.00 28.60
0.32 0.32
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
### 0.250 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
25.00 34.77 25.00 10
EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 20,000 c.f.m
pp h-m h
150.00 3.72 8.00
0.11 16.32 0.66
% % %
14.91 0.00 10.00
25.13 34.81 25.13
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad
1.000 1.000 1.000 0.500 1.000 0.500 0.200 0.250 0.125 5.575
UNI. CANTID.
TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
P.PARC. SUBTOT. $ $
u
TOTAL US$/M3
18.10 16.97 18.10 8.49 25.46 8.49 20.36 18.10 11.31
2.12 1.99 2.12 1.00 2.99 1.00 2.39 2.12 1.33
17.06
5.14 9.19
0.60 1.08
1.68
0.11 $/pp 6.00 $/gl 4.36 $/gdia
16.50 1.50 4.36
1.94 0.18 0.51
2.62
0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m
3.25 16.34 9.75 2.80
0.38 1.92 1.14 0.33
3.77
$/pp $/hr $/hr
16.50 60.65 5.31
1.94 7.12 0.62
$ $ $
3.75 0.00 2.51
3.75 0.00 2.51
$/hr $/hr
9.67
6.26 41.07 13.69
ANALISIS DE PRECIOS UNITARIOS TAJEOS CORTE Y RELLENO CLIENTE:
EMPRESA
FECHAAug-01
PARTIDA: ROTURA TAJEOS +RELLENO EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 1.50 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-
2.-
3.-
4.-
5.-
6.-
MANO DE OBRA Perforista Ayudante Operador Scoop(Limpieza y relleno Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona
INCID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h h-h h-h h-h
8.00 8.00 8.00 0.50 0.50 0.50 0.50 0.50 26.52
2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31
h-h h-h
16.00 10.52
0.27 0.22
MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas
pp gln gdia
### 0.250 1.000
EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida
uni kls uni mts
25.00 37.93 25.00 10
EQUIPOS Perforadora Stoper Microscoop1,5 yd3 Ventiladora 20,000 c.f.m.
pp h-m h
150.00 1.39 8.00
0.11 30.38 0.66
GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad
% % %
14.91 0.00 10.00
8.87 39.71 8.87
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
1.000 1.000 1.000 0.063 0.063 0.063 0.063 0.063 3.315
UNI. CANTID.
N° Taladr AVANCE: VOLUM.: Vol.roto:
TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$
$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr
25 u 1.60 ml 15.98 m3 19.98 m3
P.PARC. SUBTOT. $ $
TOTAL US$/M3
18.10 16.97 25.46 0.99 1.07 6.41 4.56 5.70
1.13 1.06 1.59 0.06 0.07 0.40 0.29 0.36
4.96
0.96 0.68 0.85
4.24 2.26
0.27 0.14
0.41
0.63 0.34
0.11 $/pp 6.00 $/gl 4.36 $/gdia
16.50 1.50 4.36
1.03 0.09 0.27
1.40
2.46 0.22 0.65
0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m
3.25 17.83 9.75 2.80
0.20 1.12 0.61 0.18
2.10
0.49 2.66 1.46 0.42
$/pp $/hr $/hr
16.50 42.33 5.31
1.03 26.48 3.32
$ $ $
1.32 0.00 0.89
1.32 0.00 0.89
$/hr $/hr
2.70 2.53 3.80 0.15
30.84
2.21 41.92 13.97
2.46
3.15 0.00 2.12 28.73
MILSA
663935704.xls
Evac.Scoop
ANALISIS DE PRECIOS UNITARIOS EVACUACION DE CARGA CON SCOOPS EN GALERIAS CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA:
EVACUACION CARGA CON SCOOPS
Distancia:
EQUIPOS:
SCOOP ST-2D
Vol.roto: Vol.insitu
ITEM DESCRIPCION 1.-
MANO DE OBRA Operador Scoop Jefe de Seguridad Jefe de Guardia
2.-
IMPLEMENTOS Implementos personal
3.-
EQUIPOS Scooptrams 2,5 yd3
4.-
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
INCID.
1.000 0.042 0.042 1.083
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h
8.00 0.33 0.33 8.67
h-h
8.67
0.22
h-m
8.00
% % %
14.91 0.00 10.00
TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)
05/10/2023
3.18 $/hr 12.73 $/hr 9.05 $/hr
0.100
mts
152.92 m3 roto 113.28 m3
P.PARC. SUBTOT. $ $
TOTAL US$/M3
25.46 4.24 3.02
0.22 0.04 0.03
0.29
$/hr
1.86
0.02
0.02
43.59
$/hr
348.75
3.08
3.08
3.38 3.38 3.38
$ $ $
0.50 0.00 0.34
0.50 0.00 0.34
0.84
4.23
MILSA
663935704.xls
Perf.tal.Jum.
ANALISIS DE PRECIOS UNITARIOS PERFORACION TALADROS CON JUMBO CLIENTE:
EMPRESA
FECHAMay-23
PARTIDA:
PERFORACION TALADROS CON JUMBO
N° Taladr
72
EQUIPOS: SECCION:
JUMBO 1.20
Mts./tal.: Mts.Perfor
3.20 ml 230.43 ml
ITEM DESCRIPCION 1.-
MANO DE OBRA Jumbero Ayudante Jumbero Jefe de Seguridad Jefe de Guardia Jefe de Zona
x
INCID.
m2
UNI. CANTID.
PRECIO UNITARIO
h-h h-h h-h h-h h-h
8.00 8.00 0.33 0.50 0.33 17.17
4.60 2.12 12.73 9.05 11.31
h-h h-h
16.00 1.17
0.27 0.22
MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Copas de afilado Aguzadora de brocas Herramientas
uni uni uni uni jgo uni gdia
0.230 0.614 0.230 0.230 0.092 0.009 1.000
327.00 85.00 270.00 60.00 180.00 2,400.00 12.38
4.-
EQUIPOS Jumbo EH
h-m
6.00
5.-
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
% % %
14.91 0.00 10.00
2.-
3.-
IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar
1.000 1.000 0.042 0.063 0.042 2.146
1.10
05/10/2023
TOTAL US$/M3
36.77 16.97 4.24 4.53 3.77
0.16 0.07 0.02 0.02 0.02
0.29
$/hr $/hr
4.24 0.25
0.02 0.00
0.02
$/uni $/uni $/uni $/uni $/uni $/uni $/gdia
75.35 52.23 62.22 13.83 16.59 22.12 12.38
0.33 0.23 0.27 0.06 0.07 0.10 0.05
1.11
68.99
$/hr
413.95
1.80
1.80
3.21 3.21 3.21
$ $ $
0.48 0.00 0.32
0.48 0.00 0.32
0.80
TOTAL COSTO METRO PERFORADO CON JUMBO (US$/ML)
$/hr $/hr $/hr $/hr $/hr
P.PARC. SUBTOT. $ $
u
4.01
MILSA
663935704.xls
TA
ANALISIS DE PRECIOS UNITARIOS TAREA ADMINISTRATIVA CLIENTE:
EMPRESA
PARTIDA: Rendimientos:
TAREA ADMINISTRATIVA 1.00 Tarea/Gdia
ITEM DESCRIPCION 1.-
MANO DE OBRA Perforista
2.-
IMPLEMENTOS Implementos personal perforación
3.-
GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad
INCID.
1.000 1.000
FECHAMay-23
UNI. CANTID.
PRECIO UNITARIO
P.PARC. SUBTOT. TOTAL $ $ US$/TAREA
h-h
8.00 8.00
2.26 $/hr
18.10
18.10
18.10
h-h
8.00
0.27
$/hr
2.12
2.12
2.12
% % %
0.15 0.00 0.00
20.22 20.22 20.22
$ $ $
0.03 0.00 0.00
0.03 0.00 0.00
0.03
COSTO POR TAREA ADMINISTRATIVA (US$/TA)
05/10/2023
20.25
LABORES MINERAS - PLANEAMIENTO DE MEDIANO PLAZO 2001 Item Labor
Sección Observaciones Unidad Costo Unitario COSTO US$/m
TOTAL
2002 Progr
Costo
m
Mensual
Directo Indirec. US $/m
US $
Costo Unitario COSTO US$
TOTAL
Directo Indirec. US $/m
1
Galería
3,50 X 3,50 Jumbo/Scoop US$/m 341.65
64.43 406.08
40.00
16243.30
368.98
69.58 438.57
2
Galería
3,00 X 3,00 Jumbo/Scoop US$/m 300.17
56.10 356.27
50.00
17813.72
324.19
60.59 384.78
3
Galería
3,00 x 3,00 Jackleg/Scoop US$/m 233.76
90.84 324.60
50.00
16230.09
252.46
98.11 350.57
4
Galería
2,50 x 2,50 Jackleg/Scoop US$/m 207.65
67.04 274.69
50.00
13734.27
224.26
72.40 296.66
5
Subnivel
2,10 x 1,20Jackleg/MicroscoopUS$/m 177.98
60.91 238.89
50.00
11944.71
192.22
65.78 258.01
6
Rampa
3,50 X 3,50 Jumbo/Scoop US$/m 357.47
64.43 421.90
50.00
21094.78
386.06
69.58 455.65
7 8 9
Rampa Rampa Rampa
3,00 X 3,00 Jumbo/Scoop US$/m 313.51 3,00 x 3,00 Jackleg/Scoop US$/m 234.68 2,50 x 2,50 Jackleg/Scoop US$/m 211.65
56.10 369.61 90.84 325.52 67.04 278.69
50.00 50.00 50.00
18480.28 16276.10 13934.73
338.59 253.46 228.59
60.59 399.17 98.11 351.56 72.40 300.99
10 Chimenea Simple 0 - 25 1,50 x 1,50
Stoper
US$/m 132.11
44.51 176.62
25.00
4415.51
142.68
48.07 190.75
11 Chimenea Simple 25 - 5 1,50 x 1,50 12 Chimenea Doble 0 - 25 3,00 x 1,50
Stoper Stoper
US$/m 136.98 US$/m 164.56
44.51 181.49 70.95 235.51
25.00 25.00
4537.27 5887.71
147.94 177.72
48.07 196.01 76.63 254.35
13 Chimenea Doble 25 - 50 3,00 x 1,50
Stoper
US$/m 184.65
70.95 255.60
25.00
6389.88
199.42
76.63 276.04
US$/m 385.00 133.25 518.25 US$/m 600.00 75.62 675.62
30.00 40.00
15547.50 27024.80
415.80 143.91 559.71 648.00 81.67 729.67
14 Chimenea Alimak 1.80 x 1.80 Equipo Ctta. 15 Chimenea Raise Boring diàmetro 1.5 Equipo Ctta. 16 Tajeos Open Stop
Jackleg/Scoop US$/m3 44.97
0.00 44.97
1000.00
44972.23
48.57
0.00 48.57
US$/m 182.51
0.00 182.51
30.00
5475.30
197.11
0.00 197.11
17 Rehabilitaciòn de galerìas Todos estos precios no incluyen IGV La inflaciòn promedio anual asumida 8%
TOTAL:
260002.17