1 GUILLEN MEDINA, ABDON C972191D 2 PAZ BUSTIOS, ANGEL 970496B 3 SOLANO YALLICO, CARLOS

LABORES MINERAS - PLANEAMIENTO DE MEDIAN 2001 Item

Labor

Sección

Observaciones

Unidad

COSTO TOTAL US $/m 406.08

Progr m

1

Galería

3,50 X 3,50

Jumbo/Scoop

US$/m

2 3

Galería Galería

3,00 X 3,00 3,00 x 3,00

Jumbo/Scoop Jackleg/Scoop

US$/m US$/m

300.17 233.76

56.10 90.84

356.27 324.60

50.00 50.00

4

Galería

2,50 x 2,50

Jackleg/Scoop

US$/m

5 6 7

Subnivel Rampa Rampa

2,10 x 1,20Jackleg/Microscoop 3,50 X 3,50 Jumbo/Scoop 3,00 X 3,00 Jumbo/Scoop

US$/m US$/m US$/m

207.65

67.04

274.69

50.00

177.98 357.47 313.51

60.91 64.43 56.10

238.89 421.90 369.61

50.00 50.00 50.00

8 9 10

Rampa 3,00 x 3,00 Rampa 2,50 x 2,50 Chimenea Simpl 1,50 x 1,50

Jackleg/Scoop Jackleg/Scoop Stoper

US$/m US$/m US$/m

234.68 211.65 132.11

90.84 67.04 44.51

325.52 278.69 176.62

50.00 50.00 25.00

11 12

Chimenea Simp 1,50 x 1,50 Chimenea Dobl 3,00 x 1,50

Stoper Stoper

US$/m US$/m

136.98 164.56

44.51 70.95

181.49 235.51

25.00 25.00

13 14

Chimenea Dobl 3,00 x 1,50 Chimenea Alim 1.80 x 1.80

Stoper Equipo Ctta.

US$/m US$/m

184.65 385.00

70.95 133.25

255.60 518.25

25.00 30.00

15

Chimenea Rais diàmetro 1.5

16 17

Tajeos Open Stop Rehabilitaciòn de galerìas

Equipo Ctta.

US$/m

600.00

75.62

675.62

40.00

Jackleg/Scoop

US$/m3 US$/m

44.97 182.51

0.00 0.00

44.97 182.51

1000.00 30.00

Todos estos precios no incluyen IGV La inflaciòn promedio anual as 8%

Costo Unitario US$/m Directo Indirec. 341.65 64.43

40.00

TOTAL:

AMIENTO DE MEDIANO PLAZO 2002 Costo Mensual US $ 16243.30

Costo Unitario US$ Directo Indirec. 368.98 69.58

COSTO TOTAL US $/m 438.57

17813.72 16230.09

324.19 252.46

60.59 98.11

384.78 350.57

13734.27

224.26

72.40

296.66

11944.71 21094.78 18480.28

192.22 386.06 338.59

65.78 69.58 60.59

258.01 455.65 399.17

16276.10 13934.73 4415.51

253.46 228.59 142.68

98.11 72.40 48.07

351.56 300.99 190.75

4537.27 5887.71

147.94 177.72

48.07 76.63

196.01 254.35

6389.88 15547.50

199.42 415.80

76.63 143.91

276.04 559.71

27024.80

648.00

81.67

729.67

44972.23 5475.30

48.57 197.11

0.00 0.00

48.57 197.11

260002.17

TABLA 1 DETERMINACION DEL COSTO UNITARIO DE LA MANO DE OBRA (EMPLEADOS) TC S/. / $ : Ocupación

Sueldo

Dominical Feriados Vacacion

3.50

D.Méd. Gratificac. Parcial ESSALUD FONAVI Accidentes

267

50

13

30

5

60

%.

18.73

4.87

11.24

1.87

22.47

59.18

9.00

Ingeniero Residente

5000.00

936.33

243.45

561.80

93.63

1123.60

2958.80

Ingeniero Seguridad

4500.00

842.70

219.10

505.62

84.27

1011.24

2662.92

Ingeniero Jefe de Zona

4000.00

749.06

194.76

449.44

74.91

898.88

Ingeniero Jefe de Gdia

3200.00

599.25

155.81

359.55

59.93

Topógrafo

2200.00

411.99

107.12

247.19

Ingeniero Mecánico

4000.00

749.06

194.76

Asistenta Social

1500.00

280.90

Administrador

2000.00

374.53

CTS

Parcial

Total

US

US

%.

S/./mes

$/mes

$/HORA

B.SOC.

Sueldo

Trabajo

30

2.00

4.74

11.24

26.98

US$

716.29

159.18

377.25

688.04

1940.76

9899.56

2828.45

14.14

97.99

1428.57

644.66

143.26

339.52

619.24

1746.68

8909.61

2545.60

12.73

97.99

1285.71

2367.04

573.03

127.34

301.80

550.44

1552.61

7919.65

2262.76

11.31

97.99

1142.86

719.10

1893.63

458.43

101.87

241.44

440.35

1242.09

6335.72

1810.21

9.05

97.99

914.29

41.20

494.38

1301.87

315.17

70.04

165.99

302.74

853.93

4355.81

1244.52

6.22

97.99

628.57

449.44

74.91

898.88

2367.04

573.03

127.34

301.80

550.44

1552.61

7919.65

2262.76

11.31

97.99

1142.86

73.03

168.54

28.09

337.08

887.64

214.89

47.75

113.17

206.41

582.23

2969.87

848.53

4.24

97.99

428.57

97.38

224.72

37.45

449.44

1183.52

286.52

63.67

150.90

275.22

776.30

3959.82

1131.38

5.66

97.99

571.43

C. tarea

Sin Benef.

*

DETERMINACION DEL COSTO UNITARIO DE LA MANO DE OBRA (OBREROS) TC S/. / $ : Ocupación

Jor-diario Dominical Feriados Vacacion

3.50

D.Méd. Gratificac. Parcial ESSALUD FONAVI Accidentes

267

50

13

30

5

60

%.

18.73

4.87

11.24

1.87

22.47

59.18

9.00

Lider/Maestro

70.00

13.11

3.41

7.87

1.31

15.73

41.42

Mecánico/Eléctrico I

60.00

11.24

2.92

6.74

1.12

13.48

35.51

Mecánico Perforadoras II 35.00

6.55

1.70

3.93

0.66

7.87

Jumbero I

65.00

12.17

3.16

7.30

1.22

Scoopero

45.00

8.43

2.19

5.06

Ayudante Jumbo (oficial) 30.00

5.62

1.46

Cargador/Desatador (minero) 30.00

5.62

Lamparero (oficial)

35.00

Tubero

CTS

Parcial

Total

US

US

%.

S/./TAR

$/TAR

$/HORA

B.SOC.

Trabajo

30

2.00

4.74

11.24

26.98

US$

10.03

2.23

5.28

9.63

27.17

138.59

39.60

4.95

97.99

20.00

8.60

1.91

4.53

8.26

23.29

118.79

33.94

4.24

97.99

17.14

20.71

5.01

1.11

2.64

4.82

13.59

69.30

19.80

2.47

97.99

10.00

14.61

38.46

9.31

2.07

4.90

8.94

25.23

128.69

36.77

4.60

97.99

18.57

0.84

10.11

26.63

6.45

1.43

3.40

6.19

17.47

89.10

25.46

3.18

97.99

12.86

3.37

0.56

6.74

17.75

4.30

0.96

2.26

4.13

11.64

59.40

16.97

2.12

97.99

8.57

1.46

3.37

0.56

6.74

17.75

4.30

0.96

2.26

4.13

11.64

59.40

16.97

2.12

97.99

8.57

6.55

1.70

3.93

0.66

7.87

20.71

5.01

1.11

2.64

4.82

13.59

69.30

19.80

2.47

97.99

10.00

Sin Benef.

*

28.00

5.24

1.36

3.15

0.52

6.29

16.57

4.01

0.89

2.11

3.85

10.87

55.44

15.84

1.98

97.99

8.00

Perforista Jackleg (minero)32.00

5.99

1.56

3.60

0.60

7.19

18.94

4.58

1.02

2.41

4.40

12.42

63.36

18.10

2.26

97.99

9.14

Ayudante Jackleg (oficial) 30.00

5.62

1.46

3.37

0.56

6.74

17.75

4.30

0.96

2.26

4.13

11.64

59.40

16.97

2.12

97.99

8.57

Bodeguero

30.00

5.62

1.46

3.37

0.56

6.74

17.75

4.30

0.96

2.26

4.13

11.64

59.40

16.97

2.12

97.99

8.57

Peon de mina (operario)

28.00

5.24

1.36

3.15

0.52

6.29

16.57

4.01

0.89

2.11

3.85

10.87

55.44

15.84

1.98

97.99

8.00

Chofer

35.00

6.55

1.70

3.93

0.66

7.87

20.71

5.01

1.11

2.64

4.82

13.59

69.30

19.80

2.47

97.99

10.00

Motorista

51.60

9.66

2.51

5.80

0.97

11.60

30.53

7.39

1.64

3.89

7.10

20.03

102.16

29.19

3.65

97.99

14.74

No incluye utilidad, implementos y herramientas *

Promedio obtenido por Hombre-año de nuestros archivos. (Descanso médico que paga el empleador por los primeros 20 días de Enfermedad)

TABLA 2 COSTO EQUIPO SEGURIDAD POR GUARDIA DETALLE

1 3 4 5 6 7 9 10 11 12 13 14 15

PRECIO U. $

MANTEN. %.

DURACION GDIAS

11.50 5.30 7.00 25.00 25.00 14.60 1.25 22.00 0.30 180.00 25.00 55.08 12.50

0 0 0 0 0 0 0 0 0 100 0 0 0

75 25 150 75 75 300 120 120 1 600 150 150 150

Botas de Jebe Guantes de cuero Correa portalámpa Saco de Jebe Pantalón de jebe Protectores Tapones auditivos Respirador Filtros respirador Lámparas Mineras Mamelucos Arneses de Seguri Correa de segurida

COSTO/GDIA COSTO/HORA $ $ 0.15 0.21 0.05 0.20 0.20 0.05 0.01 0.18 0.30 0.60 0.17 0.37 0.08

0.019 0.027 0.006 0.025 0.025 0.006 0.001 0.023 0.038 0.075 0.021 0.046 0.010

2.57

0.321

Personal de perforación

2.12

0.265

Supervisores, operarios y ayudantes Personal de tajeos y chimeneas

1.72 2.57

0.215 0.321

Costo promedio por hombre POR CATEGORIAS

TABLA 3 COSTO UNITARIO MANGUERAS, HERRAMIENTAS LABORES CON JUMBO Lampa minera Pico de acero Martillo 6 lbs Combo de 12 lbs Llave stillson 18" Cargador de ANFO Manguera antiestática 6 mts Manguera de 1" diámetro 50 Manguera de 1/2" diámetro 5 Caja y Conectores Jumbo Reducciones y válvulas (Jgo Manguera de 1" diámetro 50 Juego de Llaves Dados espe

Costo $/U Duración gdias Unidades/Labor 12 75 1 12 75 1 14 150 1 24 150 1 65 150 1 65 75 1 15 50 1 200 150 1 150 150 1 450 150 1 75 150 1 400 150 1 350 300 0.5

Otros: Cucharillas, barret, etc

10 % del Sub-total

Sub-Total Costo herramientas / Labor-gdia

Costo/gdia 0.16 $ 0.16 $ 0.09 $ 0.16 $ 0.43 $ 0.87 $ 0.30 $ 1.33 $ 1.00 $ 3.00 $ 0.50 $ 2.67 $ 0.58 $ 11.26 $ 1.13 $ 12.38 $

COSTO UNITARIO MANGUERAS, HERRAMIENTAS LABORES CON PERFORADORAS MANUALES Lampa minera Pico de acero Martillo 6 lbs Llave stillson 18" Cargadora de ANFO Reducciones y válvulas (Jgo Manguera de 1" diámetro 50 Manguera de 1/2" diámetro 5 Juego de Llaves

Costo $/U Duración gdias Unidades/Labor 12 75 1 12 75 1 14 150 1 65 150 1 65 150 1 50 150 1 200 150 1 150 150 1 50 600 0.25 Sub-Total

Otros: Sacab, barret, puntas, etc Costo herramientas / Labor-gdia

10 % del Sub-total

Costo/gdia 0.16 $ 0.16 $ 0.09 $ 0.43 $ 0.43 $ 0.33 $ 1.33 $ 1.00 $ 0.02 $ 3.97 $ 0.40 $ 4.36 $

TABLA 4 ANALISIS COSTOS MAQUINA PERFORADORA JACKLEG MARCA SECO S250 ANALISIS DE COSTOS REPUESTOS MAQUINA Durante la vida de la máquina los repuestos se intercambian de la siguiente forma como mínimo: Repuesto Vida en PP N° de cambios Costo US$ Costo Total US$ % increm. Pistón 20000 4.0 195 780 19.50 Bocina o hexagonal 5000 19.0 64 1216 30.40 Chuck nut o Bronce grande 20000 4.0 75 300 7.50 Rifle nut o Bronce chico 5000 19.0 46 874 21.85 Front Cilinder Washer Liner o Guiador 20000 4.0 54 216 5.40 Juego de manilla de mandos 50000 1.0 125 125 3.13 Chuk o Portabocina 35000 2.0 165 330 8.25 Jgo aletas, resortes y pines 10000 9.0 22 198 4.95 Side rods (tirantes y nuts) 20000 4.0 64 256 6.40 Water tube (agujas de agua) 3000 32.0 6 192 4.80 Jgo de Accesorios grampa (Retainer) 50000 1.0 76 76 1.90 Valve 35000 2.0 72 144 3.60 Rifle bar 35000 2.0 132 264 6.60 Ratchet Ring 50000 1.0 65 65 1.63 Juego empaques barra avance 5000 19.0 25 475 11.88 Sub-total 137.78 Otros: Empaquetaduras, Orings, etc. 10 % del Sub-total 13.78 Total costo repuestos durante la vida de la máquina 151.55 ANALISIS DE COSTOS TRASLADO Y MANTENIMIENTO DE MAQUINA La máquina se trasladará en su vida útil como mínimo La barra se trasladará en su vida útil como mínimo Labor a realizar N° veces Traslado de labor-taller-labor (máquina+bar 19 Mantenimiento (máquina) 19 Mantenimiento (barra) 19 Sub-total Otros: Uso de herramientas, petróleo, grasa 10 Total costo mantenim. durante la vida de la máquina

19 veces 19 veces Hrs trabajo Costo horario US$Costo total US$% incremento 2 2.12 80.61 2.02 2.5 2.47 117.56 2.94 1 2.47 47.02 1.18 6.13 % del Sub-total 0.61 6.74

TOTAL INCREMENTO EN PORCENTAJE POR MANTENIMIENTO Y REPUESTOS

Valor máquina perforadora Vida útil aproximado Mantenimiento y repuestos Costo por pie perforado

158.30

4000 100000 158.30 0.11

$ PP %. $

75 800 15 0.11

$ pp % $

TABLA 5 ANALISIS COSTOS BARRENOS Costo Promedio de Barrenos de 4 y 6 pies Vida útil aproximado promedio considerando roturas, atoros e imprevistos Costo afilado barrenos (Mano de obra, afiladora y piedras) Costo por pie perforado

DETERMINACION DEL COSTO HORARIO DE EQUIPOS (No incluye gastos generales y utilidad) MAQUINA

VALOR

VALOR

O

MARCA MODELO AÑO

ADQUISICION US$

RESCATE

VALOR

EQUIPO

Completo Sin Llantas

PERIODO DE

COSTO

COSTO

COSTO

COSTO

COSTO

COSTO

COSTO

COSTO

COSTO

DEPRECIABLE DEPRECIACION POSECIONINTERESES SEGURO MANT-REP COMBUST. LUBRIC. FILTROS GRASAS LLANTAS

%

$

US$

AÑOS

HRS

$/HR

$/HR

$/HR

$/HR

$/HR

$/HR

$/HR

$/HR

$/HR

COSTO TOTAL US $/HR SIN M.O. CON M.O

Jumbo EH

Tamrock Quasar

1998

354000

352400

12%

42480

309920.00

5.00

12000

25.83

15.49

2.21

23.60

0.36

0.75

0.22

0.18

0.36

68.99

Scoop 4,2 yd3

Wagner

ST-700

1999

342200

336600

15%

51330

285270.00

6.00

14400

19.81

14.56

2.08

19.01

7.25

1.50

1.75

0.18

3.20

69.33

72.73

Scoop 3,5 yd3

Wagner

ST-3.5D 1999

324500

318900

15%

48675

270225.00

7.00

16800

16.08

13.52

1.93

15.45

6.53

1.50

1.61

0.18

3.20

59.99

63.39

Scoop 3,0 yd3

Tamrock EJC-100 1998

271400

266600

15%

40710

225890.00

8.00

19200

11.77

11.13

1.59

11.31

5.80

1.50

1.46

0.18

2.74

47.47

50.87

Scoop 2,5 yd3

Wagner

ST-2D

1998

265500

260700

15%

39825

220875.00

9.00

21600

10.23

10.76

1.54

9.83

5.44

1.50

1.39

0.18

2.74

43.59

46.99

Scoop 1,5 yd3

MTI

M125

1998

188800

185200

15%

28320

156880.00

10.00

24000

6.54

7.57

1.08

6.29

4.35

1.20

1.11

0.18

2.06

30.38

33.77

Microscoop 0,5 yd3

France LoCTX 1he 1998

135700

132700

15%

20355

112345.00

11.00

26400

4.26

5.40

0.77

2.57

0.00

1.20

0.24

0.18

1.71

16.32

19.72

Camión de bajo perfil

Wagner

MT2000 1999

413000

407400

12%

49560

357840.00

12.00

28800

12.43

16.31

2.33

11.47

5.80

1.50

1.46

0.18

3.20

54.67

58.07

Camión 9 Tn

Nissan

Condor 9 1999

53500

52300

15%

8025

44275.00

13.00

31200

1.42

2.10

0.42

0.86

5.08

0.38

1.09

0.04

1.20

12.58

15.27

Camioneta 4x4

Nissan

Frontier 1998

32000

31600

20%

6400

25200.00

14.00

33600

0.75

1.25

0.29

0.48

2.90

0.38

0.66

0.04

0.40

7.13

9.82

Ventiladores 30000CF Airtec

1999

12000

10%

1200

10800.00

15.00

36000

0.30

0.47

0.07

0.17

0.02

1.02

Ventiladores 20000CF Airtec

1999

8000

10%

800

7200.00

16.00

38400

0.19

0.31

0.04

0.10

0.02

0.66

Ventiladores 10000CF Airtec

2000

5000

10%

500

4500.00

16.00

38400

0.12

0.19

0.03

0.07

0.02

0.42

Transformador 250KVA

1999

8000

10%

800

7200.00

17.00

40800

0.18

0.31

0.04

0.10

0.02

0.65

1999

9300

10%

930

8370.00

18.00

43200

0.19

0.36

0.05

0.11

0.02

0.73

Cargadora Lámparas

1998

5000

10%

500

4500.00

19.00

45600

0.10

0.19

0.05

0.02

0.36

Instrumentos Topográficos

1999

15000

12%

1800

13200.00

5.00

12000

1.10

0.66

0.63

Bomba 67 lt/seg

Grindex

Midi

2.38

CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 Factor llenado Pe insitu material Pe material roto (considerando factor esponjamiento 50%) Capacidad Cuchara en m3 Capacidad Cuchara en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Tiempo duración 1 ciclo en min en rampas positivas Tiempo duración 1 ciclo en min en rampas negativas Ciclos por hora en galerías horizontales Ciclos por hora en rampas positivas Ciclos por hora en rampas negativas Producción horaria en m3 en galerías horizontales Producción horaria en m3 en rampas positivas Producción horaria en m3 en rampas negativas

Scoop Tamrock EJC-130 3.5 90% 3.00 2.40 2.41 5.78 250.00 6.00 7.11 8.25 8.33 7.03 6.06 20.07 16.93 14.60

Scoop Tamrock EJC-100 2.5 90% 3.00 2.40 1.72 4.13 250.00 6.00 7.11 8.25 8.33 7.03 6.06 14.34 12.09 10.43

Scoop Wagner ST-2D 2.5 90% 3.00 2.40 1.72 4.13 250.00 6.00 7.11 8.25 8.33 7.03 6.06 14.34 12.09 10.43

Scoop MTI M125 1.25 90% 3.00 2.40 0.86 2.06 250.00 6.00 7.11 8.25 8.33 7.03 6.06 7.17 6.05 5.21

Microscoop France Loader CTX 1he 0.5 90% 3.00 2.40 0.34 0.83 150.00 6.00 7.11 8.25 8.33 7.03 6.06 2.87 2.42 2.09

Camión Wagner MT2000

Camión Wagner MT2000

90% 3.00 2.40 8.00 19.20 1000.00 17.25 21.00 23.50 2.90 2.38 2.13 23.19 19.05 17.02

90% 3.00 2.40 8.00 19.20 2000.00 21.00 27.00 29.50 2.38 1.85 1.70 19.05 14.82 13.56

Camión Wagner MT2000

Camión Wagner MT2000

CUADRO DE TIEMPO DE UTILIZACION DE EQUIPOS EN LIMPIEZA DE LABORES Equipo Marca Modelo Labor

Scoop Tamrock EJC-130 Gradiente Equipo Ancho Altura Avance Total m3

Factor

Total m3

Insitu

Esponja.

Roto

Scoop Tamrock EJC-100

Scoop Wagner ST-2D

Scoop MTI M125

Microscoop France Loader CTX 1he

Horas de limpieza sin considerar traslados a labores

GALERIA HORIZONTAL Galería Galería Galería Galería Subnivel RAMPA POSITIVA Rampa Rampa Rampa Rampa

0.5% 0.5% 0.5% 0.5% 0.5%

Jumbo Jumbo Jackleg Jackleg Jackleg

3.50 3.00 3.00 2.50 2.10

3.50 3.00 3.00 2.50 1.20

2.94 2.94 1.54 1.42 1.22

36.07 26.50 13.88 8.91 3.07

25% 25% 25% 25% 25%

45.09 33.12 17.35 11.13 3.84

2.25 1.65

12.0% 12.0% 12.0% 12.0%

Jumbo Jumbo Jackleg Jackleg

3.50 3.00 3.00 2.50

3.50 3.00 3.00 2.50

2.94 2.94 1.54 1.54

36.07 26.50 13.88 9.64

25% 25% 25% 25%

45.09 33.12 17.35 12.05

2.66 1.96

3.73 2.74 1.43

3.73 2.74 1.43

RAMPA NEGATIVA Rampa Rampa Rampa Rampa

-12.0% -12.0% -12.0% -12.0%

Jumbo Jumbo Jackleg Jackleg

3.50 3.00 3.00 2.50

3.50 3.00 3.00 2.50

2.94 2.94 1.51 1.37

36.07 26.50 13.58 8.57

25% 25% 25% 25%

45.09 33.12 16.97 10.72

3.09 2.27

4.32 3.18 1.63

4.32 3.18 1.63

3.14 2.31 1.21

3.14 2.31 1.21

1.94 1.43 0.75 0.48

2.37 1.74 0.91 0.58

2.87 1.99

2.37 1.74 0.91 0.63

3.04 2.24 1.17 0.81

3.26 2.06

2.65 1.95 1.00 0.63

3.32 2.44 1.25 0.79

2.42 1.55

1.34

663935704.xls

MILSA

EfiScoops(100m)

CUADRO DE TIEMPOS - CICLOS DE VIAJE CON SCOOPS 100 METROS DE DISTANCIA Datos:

Unidad

Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo

km/hr km/hr m min min min min min

Galerías

Rampas (+)

Rampas (-)

8.00 6.00 100.00 0.75 1.00 1.50 1.00 4.25

7.00 5.00 100.00 0.86 1.20 2.00 1.00 5.06

6.00 4.00 100.00 1.00 1.50 2.25 1.00 5.75

CUADRO DE TIEMPOS - CICLOS DE VIAJE CON CAMIONES 1000 METROS DE DISTANCIA Datos:

Unidad

Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo

km/hr km/hr m min min min min min

Galerías Normales 16.00 10.00 1000.00 3.75 6.00 6.00 1.50 17.25

Rampas (+) 12% 10.00 8.00 1000.00 6.00 7.50 6.00 1.50 21.00

Rampas (-) 12% 10.00 6.00 1000.00 6.00 10.00 6.00 1.50 23.50

CUADRO DE TIEMPOS - CICLOS DE VIAJE CON CAMIONES 2000 METROS DE DISTANCIA Datos:

Unidad

Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo

km/hr km/hr m min min min min min

Galerías Normales 16.00 10.00 2000.00 7.50 6.00 6.00 1.50 21.00

Rampas (+) 12% 10.00 8.00 2000.00 12.00 7.50 6.00 1.50 27.00

05/10/2023

Rampas (-) 12% 10.00 6.00 2000.00 12.00 10.00 6.00 1.50 29.50

663935704.xls

MILSA

EfiScoops(100m)

CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 Factor llenado Pe insitu material Pe material roto (considerando factor esponjamiento 50%) Capacidad Cuchara en m3 Capacidad Cuchara en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Tiempo duración 1 ciclo en min en rampas positivas Tiempo duración 1 ciclo en min en rampas negativas Ciclos por hora en galerías horizontales Ciclos por hora en rampas positivas Ciclos por hora en rampas negativas Producción horaria en m3 en galerías horizontales Producción horaria en m3 en rampas positivas Producción horaria en m3 en rampas negativas

Scoop Tamrock EJC-130 3.5 85% 3.00 2.22 2.27 5.05 100.00 4.25 5.06 5.75 11.77 9.89 8.70 26.76 22.49 19.78

Scoop Tamrock EJC-100 2.5 85% 3.00 2.22 1.62 3.61 100.00 4.25 5.06 5.75 11.77 9.89 8.70 19.12 16.06 14.13

Scoop Wagner ST-2D 2.5 85% 3.00 2.22 1.62 3.61 100.00 4.25 5.06 5.75 11.77 9.89 8.70 19.12 16.06 14.13

Scoop MTI M125 1.25 85% 3.00 2.22 0.81 1.81 100.00 4.25 5.06 5.75 11.77 9.89 8.70 9.56 8.03 7.06

Microscoop France Loader CTX 1he 0.5 85% 3.00 2.22 0.32 0.72 250.00 4.25 5.06 5.75 11.77 9.89 8.70 3.82 3.21 2.83

Camión Wagner MT2000

Camión Wagner MT2000

85% 3.00 2.22 8.00 17.78 1000.00 17.25 21.00 23.50 2.90 2.38 2.13 23.19 19.05 17.02

85% 3.00 2.22 8.00 17.78 2000.00 21.00 27.00 29.50 2.38 1.85 1.70 19.05 14.82 13.56

Camión Wagner MT2000

Camión Wagner MT2000

CUADRO DE TIEMPO DE UTILIZACION DE EQUIPOS EN LIMPIEZA DE LABORES Equipo Marca Modelo Labor

Scoop Tamrock EJC-130 Gradiente Equipo Ancho Altura Avance Total m3

GALERIA HORIZONTAL Galería Galería Galería Galería Subnivel RAMPA POSITIVA Rampa Rampa Rampa Rampa RAMPA NEGATIVA Rampa Rampa Rampa Rampa

Factor

Total m3

Insitu

Esponja.

Roto

Scoop Tamrock EJC-100

Scoop Wagner ST-2D

Scoop MTI M125

Microscoop France Loader CTX 1he

Horas de limpieza sin considerar traslados a labores

0.5% 0.5% 0.5% 0.5% 0.5%

Jumbo Jumbo Jackleg Jackleg Jackleg

3.50 3.00 3.00 2.50 2.10

3.50 3.00 2.70 2.50 1.20

2.88 2.88 1.51 1.51 1.22

35.28 25.92 12.22 9.43 3.07

35% 35% 35% 35% 35%

47.63 35.00 16.50 12.73 4.15

1.78 1.31

12.0% 12.0% 12.0% 12.0%

Jumbo Jumbo Jackleg Jackleg

3.50 3.00 3.00 2.50

3.50 3.00 2.70 2.50

2.88 2.88 1.51 1.51

35.28 25.92 12.22 9.43

35% 35% 35% 35%

47.63 35.00 16.50 12.73

2.12 1.56

2.97 2.18 1.03

2.97 2.18 1.03

-12.0% -12.0% -12.0% -12.0%

Jumbo Jumbo Jackleg Jackleg

3.50 3.00 3.00 2.50

3.50 3.00 2.70 2.50

2.72 2.72 1.34 1.34

33.32 24.48 10.86 8.38

35% 35% 35% 35%

44.99 33.05 14.67 11.32

2.27 1.67

3.18 2.34 1.04

3.18 2.34 1.04

05/10/2023

2.49 1.83 0.86

2.49 1.83 0.86

2.05 1.51 0.71 0.55

2.50 1.84 0.87 0.67

2.05 1.58

2.50 1.84 0.87 0.67

3.21 2.36 1.11 0.86

2.08 1.60

2.64 1.94 0.86 0.66

3.32 2.44 1.08 0.83

1.73 1.33

1.08

CUADRO DE TIEMPOS - CICLOS DE VIAJE CON LOCOMOTORA 1054 y 600 METROS DE DISTANCIA Datos:

Unidad

Galerías

Galerías

Velocidad promedio de equipo vacío Velocidad promedio de equipo con carga Distancia en estudio Minutos traslado vacío Minutos traslado con carga Minutos Carguío + imprevistos Minutos descarga + imprevistos Total Ciclo de trabajo

km/hr km/hr m min min min min min

4.75 4.35 1045.00 13.20 14.41 10.23 8.23 46.07

4.75 4.35 600.00 7.58 8.27 10.23 8.23 34.31

CUADRO DE PRODUCCION HORARIA DE EQUIPOS PARA UNA DISTANCIA DETERMINADA Equipo Marca Modelo Capacidad en yd3 por carro Factor llenado del carro Pe insitu material Pe material roto (considerando factor esponjamiento 70%) Capacidad Locomotora en m3 Capacidad Locomotora en tm Distancia en estudio Tiempo duración 1 ciclo en min en galerías horizontales Ciclos por hora en galerías horizontales Producción horaria en m3 en galerías horizontales

Locomotora CLAYTON

Locomotora CLAYTON

3.02 70% 3.00 2.82 16.18 31.94 1054.00 46.07 1.30 21.07

3.02 70% 3.00 2.82 16.18 31.94 700.00 34.31 1.75 28.29

CUADRO DE TIEMPOS - CICLOS DE PERFORACION JUMBO ELECTROHIDRAULICO QUASAR Datos:

Unida

Galería Roca Dura 3,5 x 3,5

Galería Roca Dura 3,0 x 3,0

Rampa (+) Roca Dura 3,5 x 3,5

Rampa (+) Roca Dura 3,0 x 3,0

Rampa (-) Roca Dura 3,5 x 3,5

Rampa (-) Roca Dura 3,0 x 3,0

Nº de taladros Longitud de perforación Velocidad promedio de perforación

uni pp pp/min

40.00 10.50 3.67

35.00 10.50 3.67

40.00 10.50 3.67

35.00 10.50 3.67

40.00 10.50 3.28

35.00 10.50 3.28

Tiempo perforación promedio por taladro Tiempo de cambio de taladro a taladro Tiempos muertos promedio por taladro

min min min

2.86 1.00 0.50

2.86 1.00 0.50

2.86 1.25 0.50

2.86 1.25 0.50

3.20 1.50 0.50

3.20 1.50 0.75

Tiempo de perforación neta frente min Total Tiempo Cambio de taladros min Total Tiempos muertos min Total Tiempo promedio cambio de brocas y escaread min

114.44 40.00 20.00 15.00

100.14 35.00 17.50 15.00

114.44 50.00 20.00 15.00

100.14 43.75 17.50 15.00

128.05 60.00 20.00 15.00

112.04 52.50 26.25 15.00

Total Tiempo de perforación frente Tiempo de Posicionamiento del equipo según ejes

189.44 15.00

167.64 15.00

199.44 15.00

176.39 15.00

223.05 20.00

205.79 20.00

3.41

3.04

3.57

3.19

4.05

3.76

min min

Total Tiempo para perforar con Jumbo Hrs

TABLA ANFO CUADRO DE CALCULO DE CANTIDAD DE ANFO EN KLS/TALADRO Densidad del ANFO suelto Densidad del ANFO confinado en taladro Longitud de carguío

Diámetro

30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm mm

0.80 gr/cc 0.95 gr/cc 70% de Longitud

Longitud de taladro perforado en pies 5

5.5

6

6.5

7

7.5

8

8.5

9

9.5

10

10.5

11

11.5

12

12.5

13.5

14

0.72 0.76 0.82 0.87 0.92 0.98 1.03 1.09 1.15 1.21 1.27 1.34 1.40 1.47 1.54 1.61 1.68 1.76 1.83 1.91 1.99

0.79 0.84 0.90 0.95 1.01 1.07 1.13 1.20 1.26 1.33 1.40 1.47 1.54 1.62 1.70 1.77 1.85 1.93 2.02 2.10 2.19

0.86 0.92 0.98 1.04 1.10 1.17 1.24 1.31 1.38 1.45 1.53 1.61 1.68 1.77 1.85 1.93 2.02 2.11 2.20 2.29 2.39

0.93 0.99 1.06 1.13 1.20 1.27 1.34 1.42 1.49 1.57 1.66 1.74 1.83 1.91 2.00 2.10 2.19 2.29 2.38 2.48 2.59

1.00 1.07 1.14 1.21 1.29 1.37 1.44 1.53 1.61 1.69 1.78 1.87 1.97 2.06 2.16 2.26 2.36 2.46 2.57 2.68 2.79

1.07 1.15 1.22 1.30 1.38 1.46 1.55 1.63 1.72 1.82 1.91 2.01 2.11 2.21 2.31 2.42 2.53 2.64 2.75 2.87 2.98

1.15 1.22 1.30 1.39 1.47 1.56 1.65 1.74 1.84 1.94 2.04 2.14 2.25 2.35 2.47 2.58 2.69 2.81 2.93 3.06 3.18

1.22 1.30 1.39 1.47 1.56 1.66 1.75 1.85 1.95 2.06 2.17 2.27 2.39 2.50 2.62 2.74 2.86 2.99 3.12 3.25 3.38

1.29 1.38 1.47 1.56 1.66 1.76 1.86 1.96 2.07 2.18 2.29 2.41 2.53 2.65 2.77 2.90 3.03 3.16 3.30 3.44 3.58

1.36 1.45 1.55 1.65 1.75 1.85 1.96 2.07 2.18 2.30 2.42 2.54 2.67 2.80 2.93 3.06 3.20 3.34 3.48 3.63 3.78

1.43 1.53 1.63 1.73 1.84 1.95 2.06 2.18 2.30 2.42 2.55 2.68 2.81 2.94 3.08 3.22 3.37 3.52 3.67 3.82 3.98

1.50 1.61 1.71 1.82 1.93 2.05 2.17 2.29 2.41 2.54 2.67 2.81 2.95 3.09 3.24 3.38 3.54 3.69 3.85 4.01 4.18

1.58 1.68 1.79 1.91 2.02 2.15 2.27 2.40 2.53 2.66 2.80 2.94 3.09 3.24 3.39 3.55 3.71 3.87 4.03 4.20 4.38

1.65 1.76 1.87 1.99 2.12 2.24 2.37 2.51 2.64 2.78 2.93 3.08 3.23 3.39 3.54 3.71 3.87 4.04 4.22 4.40 4.58

1.72 1.84 1.96 2.08 2.21 2.34 2.48 2.62 2.76 2.91 3.06 3.21 3.37 3.53 3.70 3.87 4.04 4.22 4.40 4.59 4.78

1.79 1.91 2.04 2.17 2.30 2.44 2.58 2.72 2.87 3.03 3.18 3.35 3.51 3.68 3.85 4.03 4.21 4.40 4.58 4.78 4.97

1.93 2.07 2.20 2.34 2.48 2.63 2.79 2.94 3.10 3.27 3.44 3.61 3.79 3.97 4.16 4.35 4.55 4.75 4.95 5.16 5.37

2.01 2.14 2.28 2.43 2.58 2.73 2.89 3.05 3.22 3.39 3.57 3.75 3.93 4.12 4.31 4.51 4.72 4.92 5.13 5.35 5.57

Analisis de Precios Unitarios CLIENTE PARTIDA

GASTOS GENERALES

UNIDAD DE MEDIDA

PORCENTAJE DEL MONTO DE OBRA

MONTO DE OBRA

US$ 180000

TIPO PRESUPUESTO

A TODO COSTO

FECHA

JUNIO DEL 2000 DESCRIPCION

1.A.

2.A.

TC: 3.50 US$

UNID. de

Monto a Valorizar

POR MES

MEDIDA

180000

SUELDOS EMPLEADOS

8

Administrador/Secretario

1

1131.38

MES

0.63%

Ingeniero Mecánico

1

2262.76

MES

1.26%

Mecánico Electricista

1

755.20

MES

0.42%

Lampareros

1

440.53

MES

0.24%

Topógrafo

1

1244.52

MES

0.69%

Ayudantes Topógrafo

1

377.60

MES

0.21%

Capacitación Sistema NOSA

1

2262.76

MES

1.26%

Asistenta Social

1

848.53

MES

0.47%

ALIMENTACION, ALOJAMIENTO, IMPLEMENTOS Y UTILES DE OFICINA Alimentación Empleados

342.86

MES

0.19%

Alojamiento Empleados

150.00

MES

0.08%

Alojamiento Obreros

250.00

MES

0.14%

258.16

MES

0.14%

Utiles de oficina y almacén

100.00

MES

0.06%

Energía Oficinas, campamentos y casalámparas

250.00

MES

0.14%

Instrumentos topográficos

238.13

MES

0.13%

Casa Lámparas (Cargadora, Acidos, H20 Destil., herram.,etc)

318.04

MES

0.18%

Fax, teléfonos, correos, radio

150.00

MES

0.08%

Viajes directivos

220.00

MES

0.12%

Camioneta de supervisión

2000.00

MES

1.11%

Seguro de transporte de personal

208.33

MES

0.12%

Responsabilidad civil contra terceros

291.67

MES

0.16%

Gerente General

1200.00

MES

0.67%

Gerente de Operaciones

1000.00

MES

0.56%

Administrador General

600.00

MES

0.33%

Contador

600.00

MES

0.33%

Secretaria

350.00

MES

0.19%

Jefe de Logistica

400.00

MES

0.22%

Asistente de compras

300.00

MES

0.17%

Costo apoyo logístico Lima-Mina

1000.00

MES

0.56%

Gastos Oficina Lima

300.00

MES

0.17%

Gastos administrativos de la obra

100.00

MES

0.06%

* Otros Gastos e Imprevistos

120.00

MES

0.07%

Exámen médico personal

400.00

MES

0.22%

Contrato de trabajo Ministerio de Trabajo

119.05

MES

0.07%

Inscripciones y Reinscripciones IPSS

59.52

MES

0.03%

Gastos de Identificación de personal

41.67

MES

0.02%

6000.00

MES

3.33%

Inscripciones personal a Digecsamec

44.64

MES

0.02%

Viáticos de personal

100.00

MES

0.06%

26835.33

MES

14.91%

Implementos Personal Administrati

3.A.

4.A.

5.A.

6.A.

6

6

VIAJES Y COMUNICACIONES

SEGUROS

ADMINISTRATIVOS Y FINANCIEROS

PERSONAL

Transporte de personal Chicla - Casapalca

TOTAL GASTOS GENERALES US$/MES

* Mobiliario Oficina Lima, Herramientas Mantenimiento Mina, Gastos Bancarios, Atenciones médicas del personal dentro de los tres primeros meses, Trámites del Ministerio de Energía y Minas, Ministerio de Trabajo, ESSALUD, Gastos por inspecciones de parte de Ministerios, ESSALUD, etc.

663935704.xls

MILSA

Jumbo

DETERMINACION DEL COSTO HORARIO EQUIPOS JUMBO TAMROCK QUASAR D I S

Depreciación Intereses Seguros

Vt Va Ve N Vr i s K

Valor total de adquisición en U Valor adquisición sin llantas e Vida económica en hrs Vida económica en años Valor de rescate Tasa de interes anual Tasa de seguros anual Factor

= 354000 = 352400 = 12000 = 5.00 = 12% = 17.5% = 2.5% = 0.0003

M F

Mantenimiento y Repuestos Filtros

= =

I=

(N+1) * N * Vt * i 2N Ve

K=

(N+1) * N 2N Ve

I = K * Vt * i S = K * Vt * s

80% Vt 20% Comb + Lubr

DEPRECIACION EQUIPO D= Valor adquisición - Valor de rescate Vida económica en años

= 25.83 US$/hr

INTERESES EQUIPO I= K * Vt * i

= 15.49 US$/hr

SEGUROS EQUIPO S= K * Vt * s

=

MANTENIMIENTO Y REPUESTOS M= 75 % Vt Vida económica en años

2.21 US$/hr

= 23.60 US$/hr

COMBUSTIBLES Consumo de Petróleo por Hora Costo Combustible

= =

0.25 gl/hr 1.45 $/gl

=

0.36 US$/hr

LUBRICANTES Consumo de Lubricantes por Hora Costo Lubricantes

= =

0.125 gl/hr 6.00 $/gl

=

0.75 US$/hr

FILTROS Costo Combustible + Lubricantes Costo Filtros

= =

1.11 $/gl 20%

=

0.22 US$/hr

GRASAS Consumo de Grasas por Hora Costo Grasas

= =

0.050 lb/hr 3.50 $/lb

=

0.18 US$/hr

LLANTAS Costo Juego de Llantas Vida útil aproximado

= =

1600 $ 4500 hrs

=

0.36 US$/hr

05/10/2023

MILSA

663935704.xls

COSTO HORARIO SIN MANO DE OBRA, GASTOS GENERALES Y UTILI = 68.99 US$/hr

05/10/2023

Jumbo

663935704.xls

MILSA

ScoopST-2D

DETERMINACION DEL COSTO HORARIO EQUIPOS SCOOPTRAM WAGNER ST-2D DIESEL D I S

Depreciación Intereses Seguros

Vt Va Ve N Vr i s K

Valor total de adquisición en U Valor adquisición sin llantas e Vida económica en hrs Vida económica en años Valor de rescate Tasa de interes anual Tasa de seguros anual Factor

= 265500 = 260700 = 21600 = 9.00 = 15% = 17.5% = 2.5% = 0.0002

M F

Mantenimiento y Repuestos Filtros

= =

I=

(N+1) * N * Vt * i 2N Ve

K=

(N+1) * N 2N Ve

I = K * Vt * i S = K * Vt * s

80% Vt 20% Comb + Lubr

DEPRECIACION EQUIPO D= Valor adquisición - Valor de rescate Vida económica en años

= 10.23 US$/hr

INTERESES EQUIPO I= K * Vt * i

= 10.76 US$/hr

SEGUROS EQUIPO S= K * Vt * s

=

1.54 US$/hr

=

9.83 US$/hr

MANTENIMIENTO Y REPUESTOS M= 60 % Vt Vida económica en años COMBUSTIBLES Consumo de Petróleo por Hora Costo Combustible

= =

3.75 gl/hr 1.45 $/gl

=

5.44 US$/hr

LUBRICANTES Consumo de Lubricantes por Hora Costo Lubricantes

= =

0.250 gl/hr 6.00 $/gl

=

1.50 US$/hr

FILTROS Costo Combustible + Lubricantes Costo Filtros

= =

6.94 $/gl 20%

=

1.39 US$/hr

GRASAS Consumo de Grasas por Hora Costo Grasas

= =

0.050 lb/hr 3.50 $/lb

=

0.18 US$/hr

LLANTAS Costo Juego de Llantas Vida útil aproximado

= =

4800 $ 1750 hrs

=

2.74 US$/hr

05/10/2023

MILSA

663935704.xls

COSTO HORARIO SIN MANO DE OBRA, GASTOS GENERALES Y UTILI = 43.59 US$/hr

05/10/2023

ScoopST-2D

ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: GALERIA +-0,5% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 8.00 4.00 4.00 2.00 1.00 1.00 2.00 1.00 35.00

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 27.00

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

uni uni uni uni uni uni jgo uni pp pp gdia

0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante

uni kls uni uni mts mts

37.00 125.24 37.00 2.00 0.50 12.33

EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta Ventiladora 20.000c.f.m

h-m h-m pp pp h

3.41 3.14 8.83 29.44 8.00

68.99 43.59 0.11 0.11 0.66

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

% % %

14.91 0.00 10.00

273.52 273.52 273.52

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

0.500 0.500 0.500 1.000 0.500 0.500 0.250 0.125 0.125 0.250 0.125 4.375

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

40 u 2.94 ml 45.09 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 16.97 8.49 9.05 3.96 2.12 12.73 18.10 11.31

6.24 2.88 4.32 5.76 2.88 3.07 1.34 0.72 4.32 6.15 3.84

41.55

$/hr $/hr

2.12 5.81

0.72 1.97

2.69

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38

14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21

57.13

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m

22.20 60.87 39.63 0.76 0.18 1.55

7.54 20.67 13.46 0.26 0.06 0.53

42.52

$/hr $/hr $/pp $/pp $/hr

235.08 137.09 0.97 3.24 5.31

79.84 46.56 0.33 1.10 1.80

$ $ $

40.78 0.00 27.35

40.78 0.00 27.35

129.63

68.13 341.65

ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: GALERIA +-0,5% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 m2 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION INCID. UNI. CANTID. 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

0.500 0.500 0.500 0.500 0.750 0.500 0.250 0.250 0.125 0.250 0.125 4.250

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

N° Taladr AVANCE: VOLUM.: PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 4.00 6.00 4.00 2.00 2.00 1.00 2.00 1.00 34.00

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 26.00

0.27 0.22

uni uni uni uni uni uni jgo uni pp pp gdia

0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35 u 2.94 ml 33.12 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 8.49 12.73 9.05 3.96 4.24 12.73 18.10 11.31

6.24 2.88 4.32 2.88 4.32 3.07 1.34 1.44 4.32 6.15 3.84

40.83

$/hr $/hr

2.12 5.59

0.72 1.90

2.62

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38

12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21

51.29

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m

19.20 52.64 34.27 0.76 0.18 1.34

6.52 17.88 11.64 0.26 0.06 0.46

36.81

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20.000c.f.m Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta

uni kls uni uni mts mts

32.00 108.32 32.00 2.00 0.50 10.67

h-m h-m h pp pp

3.04 2.31 8.00 8.83 29.44

68.99 43.59 0.66 0.11 0.11

$/hr $/hr $/hr $/pp $/pp

210.01 100.72 5.31 0.97 3.24

71.33 34.21 1.80 0.33 1.10

108.77

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

% % %

14.91 0.00 10.00

240.32 240.32 240.32

$ $ $

35.83 0.00 24.03

35.83 0.00 24.03

59.86

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

300.17

ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE PARTIDA:

EMPRESA

FECHAMay-23

GALERIA +-0,5%

N° Taladr

EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

INCID.

1.000 1.000 0.350 0.250 0.250 0.125 0.125 0.063 3.163

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

AVANCE: VOLUM.:

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 2.80 2.00 2.00 1.00 1.00 0.50 25.30

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 9.30

0.27 0.22

pp pp gln gdia

192.50 9.19 0.25 1.000

uni kls uni mts

32.00 44.50 32.00 8.00

pp h-m h pp

192.50 2.42 8.00 9.19

0.11 43.59 0.66 0.11

% % %

14.91 0.00 10.00

187.15 187.15 187.15

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35

u

1.54 ml 17.35 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 8.91 3.96 4.24 12.73 9.05 5.66

11.74 11.00 5.78 2.57 2.75 8.25 5.87 3.67

51.63

4.24 2.00

2.75 1.30

4.05

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

21.18 1.01 1.50 4.36

13.73 0.66 0.97 2.83

18.19

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

5.12 21.63 12.16 2.80

3.32 14.02 7.88 1.82

27.04

$/pp $/hr $/hr $/pp

21.18 105.51 5.31 1.01

13.73 68.41 3.44 0.66

86.24

$ $ $

27.90 0.00 18.71

27.90 0.00 18.71

46.62

$/hr $/hr

233.76

ANALISIS DE PRECIOS UNITARIOS GALERIA HORIZONTAL EN ROCA COMPETENTE

PARTIDA:

EMPRESA

FECHAMay-23

Galería +-0,5%

N° Taladr

EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 2.80 2.00 2.00 1.00 1.00 0.50 25.30

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 9.30

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas

pp pp gln gdia

160.00 8.49 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

29.00 40.33 29.00 5.00

EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 10.000 c.f.m. Perforadora Jackleg Alcayatas

pp h-m h pp

160.00 1.55 8.00 8.49

0.11 43.59 0.42 0.11

% % %

14.91 0.00 10.00

166.24 166.24 166.24

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.350 0.250 0.250 0.125 0.125 0.063 3.163

AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

32

u

1.42 ml 11.13 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 8.91 3.96 4.24 12.73 9.05 5.66

12.70 11.91 6.25 2.78 2.98 8.93 6.35 3.97

55.88

4.24 2.00

2.98 1.40

4.38

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

17.60 0.93 1.50 4.36

12.35 0.66 1.05 3.06

17.12

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.64 19.60 11.02 1.75

3.26 13.76 7.73 1.23

25.97

$/pp $/hr $/hr $/pp

17.60 67.70 3.37 0.93

12.35 47.51 2.37 0.66

62.88

$ $ $

24.78 0.00 16.62

24.78 0.00 16.62

41.41

$/hr $/hr

207.65

ANALISIS DE PRECIOS UNITARIOS SUBNIVEL HORIZONTAL EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: SUBNIVEL +-0,5% EQUIPOS: JACKLEG / MICROSCOOP SECCION: 2.10 x 1.20 NOTA : Distancia de limpieza incluida max.= 150 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 3.20 1.00 2.00 1.00 1.00 0.50 24.70

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 8.70

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas

pp pp gln gdia

125.00 7.27 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

22.00 30.60 22.00 5.00

EQUIPOS Perforadora Jackleg Microscoop 0,5 yd3 Ventiladora 10.000 c.f.m. Perforadora Jackleg Alcayatas

pp h-m h pp

125.00 1.34 8.00 7.27

0.11 16.32 0.42 0.11

% % %

14.91 0.00 10.00

142.49 142.49 142.49

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.400 0.125 0.250 0.125 0.125 0.063 3.088

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

25 u 1.22 ml 3.84 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 10.18 1.98 4.24 12.73 9.05 5.66

14.85 13.92 8.35 1.62 3.48 10.44 7.42 4.64

64.73

4.24 1.87

3.48 1.54

5.01

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

13.75 0.80 1.50 4.36

11.28 0.66 1.23 3.58

16.74

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

3.52 14.87 8.36 1.75

2.89 12.20 6.86 1.44

23.38

$/pp $/hr $/hr $/pp

13.75 21.86 3.37 0.80

11.28 17.93 2.77 0.66

32.63

$ $ $

21.24 0.00 14.25

21.24 0.00 14.25

35.49

$/hr $/hr

177.98

ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: Rampa 12% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 8.00 4.00 3.20 2.00 2.00 1.00 2.00 1.00 35.20

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 27.20

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

uni uni uni uni uni uni jgo uni pp pp gdia

0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante

uni kls uni uni mts mts

37.00 125.24 37.00 2.00 0.50 12.33

h-m h-m h pp pp

3.57 3.73 8.00 8.83 29.44

68.99 43.59 0.66 0.11 0.11

% % %

14.91 0.00 10.00

286.18 286.18 286.18

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

0.500 0.500 0.500 1.000 0.500 0.400 0.250 0.250 0.125 0.250 0.125 4.400

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

40 u 2.94 ml 45.09 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 16.97 8.49 7.24 3.96 4.24 12.73 18.10 11.31

6.24 2.88 4.32 5.76 2.88 2.46 1.34 1.44 4.32 6.15 3.84

41.65

$/hr $/hr

2.12 5.85

0.72 1.99

2.71

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38

14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21

57.13

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m

22.20 60.87 39.59 0.76 0.18 1.55

7.54 20.67 13.45 0.26 0.06 0.53

42.50

$/hr $/hr $/hr $/pp $/pp

246.58 162.55 5.31 0.97 3.24

83.75 55.21 1.80 0.33 1.10

142.19

$ $ $

42.67 0.00 28.62

42.67 0.00 28.62

71.28 357.47

ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: Rampa 12% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 4.00 8.00 3.20 2.00 2.00 1.00 2.00 1.00 35.20

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 27.20

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

uni uni uni uni uni uni jgo uni pp pp gdia

0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante

uni kls uni uni mts mts

32.00 108.32 32.00 2.00 0.50 10.67

h-m h-m h pp pp

3.19 2.74 8.00 8.83 29.44

68.99 43.59 0.66 0.11 0.11

% % %

14.91 0.00 10.00

250.99 250.99 250.99

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

0.500 0.500 0.500 0.500 1.000 0.400 0.250 0.250 0.125 0.250 0.125 4.400

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35 u 2.94 ml 33.12 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 8.49 16.97 7.24 3.96 4.24 12.73 18.10 11.31

6.24 2.88 4.32 2.88 5.76 2.46 1.34 1.44 4.32 6.15 3.84

41.65

$/hr $/hr

2.12 5.85

0.72 1.99

2.71

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38

12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21

51.29

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m

19.20 52.64 34.24 0.76 0.18 1.34

6.52 17.88 11.63 0.26 0.06 0.46

36.80

$/hr $/hr $/hr $/pp $/pp

220.07 119.42 5.31 0.97 3.24

74.74 40.56 1.80 0.33 1.10

118.54

$ $ $

37.42 0.00 25.10

37.42 0.00 25.10

62.52 313.51

ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: Rampa 12% EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 2.40 0.50 0.50 0.50 1.00 0.50 21.41

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 5.41

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas

pp pp gln gdia

175.00 9.19 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

32.00 44.50 32.00 8.00

EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m Perforadora Jackleg Alcayatas

pp h-m h pp

175.00 2.87 8.00 9.19

0.11 43.59 0.66 0.11

% % %

14.91 0.00 10.00

187.88 187.88 187.88

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.300 0.063 0.063 0.063 0.125 0.063 2.676

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35 u 1.54 ml 17.35 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 7.64 1.00 1.07 6.36 9.05 5.66

11.74 11.00 4.95 0.65 0.69 4.13 5.87 3.67

42.70

4.24 1.16

2.75 0.75

3.50

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

19.25 1.01 1.50 4.36

12.48 0.66 0.97 2.83

16.94

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

5.12 21.63 12.16 2.80

3.32 14.02 7.88 1.82

27.04

$/pp $/hr $/hr $/pp

19.25 125.11 5.31 1.01

12.48 81.12 3.44 0.66

97.70

$ $ $

28.01 0.00 18.79

28.01 0.00 18.79

46.80

$/hr $/hr

234.68

ANALISIS DE PRECIOS UNITARIOS RAMPA POSITIVA EN ROCA COMPETENTE

PARTIDA:

EMPRESA

FECHAMay-23

Rampa 12%

N° Taladr

EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 2.40 0.50 0.50 0.50 1.00 0.50 21.41

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 5.41

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas

pp pp gln gdia

160.00 8.49 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

29.00 40.33 29.00 5.00

EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m. Perforadora Jackleg Alcayatas

pp h-m h pp

160.00 1.99 8.00 8.49

0.11 43.59 0.42 0.11

% % %

14.91 0.00 10.00

169.45 169.45 169.45

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.300 0.063 0.063 0.063 0.125 0.063 2.676

AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

32

u

1.42 ml 11.13 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 7.64 1.00 1.07 6.36 9.05 5.66

12.70 11.91 5.36 0.70 0.75 4.47 6.35 3.97

46.21

4.24 1.16

2.98 0.82

3.79

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

17.60 0.93 1.50 4.36

12.35 0.66 1.05 3.06

17.12

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.64 19.60 11.02 1.75

3.26 13.76 7.73 1.23

25.97

$/pp $/hr $/hr $/pp

17.60 86.88 3.37 0.93

12.35 60.97 2.37 0.66

76.35

$ $ $

25.26 0.00 16.94

25.26 0.00 16.94

42.21

$/hr $/hr

211.65

MILSA

663935704.xls

3,5x3,5 r-jumbo

ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE EMPRESA

FECHAMay-23

PARTIDA: Rampa -12% EQUIPOS: JUMBO / SCOOP SECCION: 3.50 x 3.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 2.00 2.00 2.00 2.00 2.00 1.00 2.00 1.00 26.00

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 18.00

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

uni uni uni uni uni uni jgo uni pp pp gdia

0.131 0.349 0.131 0.131 0.026 0.026 0.052 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante

uni kls uni pies mts mts

37.00 125.24 37.00 14.00 1.00 12.33

h-m h-m h h pp pp

3.57 4.32 8.00 4.00 8.83 29.44

68.99 43.59 0.66 0.73 0.11 0.11

% % %

14.91 0.00 10.00

288.79 288.79 288.79

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m. Bomba para bombeo d'água Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

0.500 0.500 0.500 0.250 0.250 0.250 0.250 0.250 0.125 0.250 0.125 3.250

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

05/10/2023

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

40 u 2.94 ml 45.09 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 4.24 4.24 4.53 3.96 4.24 12.73 18.10 11.31

6.24 2.88 4.32 1.44 1.44 1.54 1.34 1.44 4.32 6.15 3.84

34.97

$/hr $/hr

2.12 3.87

0.72 1.32

2.04

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

42.79 29.66 35.33 7.85 6.02 7.98 9.42 12.56 0.97 3.24 12.38

14.53 10.07 12.00 2.67 2.04 2.71 3.20 4.27 0.33 1.10 4.21

57.13

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.04 $/pie 0.30 $/m 0.13 $/m

22.20 61.37 39.59 0.56 0.30 1.60

7.54 20.84 13.45 0.19 0.10 0.54

42.66

$/hr $/hr $/hr $/hr $/pp $/pp

246.58 188.50 5.31 2.91 0.97 3.24

83.75 64.02 1.80 0.99 0.33 1.10

151.99

$ $ $

43.05 0.00 28.88

43.05 0.00 28.88

71.93 360.72

MILSA

663935704.xls

3,0x3,0 r-jumbo

ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA: Rampa -12% EQUIPOS: JUMBO / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Ayudante Perforista Jackleg y Servicios Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

4.00 4.00 4.00 2.00 4.00 2.00 2.80 2.00 1.00 2.00 1.00 28.80

4.60 2.12 3.18 2.12 2.12 2.26 1.98 2.12 12.73 9.05 11.31

h-h h-h

8.00 20.80

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Rimadora de 89 mm Adaptador de Rimadora Copas de afilado Aguzadora de brocas Barrenos integrales (Perf. Alcayatas) Barrenos integrales (perf. Cuneta) Herramientas

uni uni uni uni uni uni jgo uni pp pp gdia

0.115 0.305 0.115 0.115 0.026 0.026 0.046 0.005 8.83 29.44 1.000

327.00 85.00 270.00 60.00 230.00 305.00 180.00 2,400.00 0.11 0.11 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad Mecha Rápida Cordón detonante

uni kls uni pies mts mts

32.00 108.32 32.00 14.00 1.00 10.67

h-m h-m h h pp pp

3.19 3.18 8.00 2.00 8.83 29.44

68.99 43.59 0.66 0.73 0.11 0.11

% % %

14.91 0.00 10.00

252.92 252.92 252.92

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

EQUIPOS Jumbo EH Scooptrams 2,5 yd3 Ventiladora 20,000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas Perforadora Jackleg Encuadre cuneta GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

0.500 0.500 0.500 0.250 0.500 0.250 0.350 0.250 0.125 0.250 0.125 3.600

N° Taladr AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

05/10/2023

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35 u 2.94 ml 33.12 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.38 8.49 12.73 4.24 8.49 4.53 5.54 4.24 12.73 18.10 11.31

6.24 2.88 4.32 1.44 2.88 1.54 1.88 1.44 4.32 6.15 3.84

36.95

$/hr $/hr

2.12 4.47

0.72 1.52

2.24

$/uni $/uni $/uni $/uni $/uni $/uni $/uni $/uni $/pp $/pp $/gdia

37.44 25.95 30.92 6.87 6.02 7.98 8.24 10.99 0.97 3.24 12.38

12.72 8.81 10.50 2.33 2.04 2.71 2.80 3.73 0.33 1.10 4.21

51.29

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.04 $/pie 0.30 $/m 0.13 $/m

19.20 53.07 34.24 0.56 0.30 1.39

6.52 18.03 11.63 0.19 0.10 0.47

36.94

$/hr $/hr $/hr $/hr $/pp $/pp

220.07 138.49 5.31 1.46 0.97 3.24

74.74 47.03 1.80 0.49 0.33 1.10

125.51

$ $ $

37.71 0.00 25.29

37.71 0.00 25.29

63.00 315.92

MILSA

663935704.xls

3,0x3,0r-jackleg

ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA: Rampa -12% EQUIPOS: JACKLEG / SCOOP SECCION: 3.00 x 3.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

INCID.

1.000 1.000 0.500 0.300 0.250 0.063 0.125 0.063 3.300

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas EXPLOSIVOS Dinamita de 7/8" Anfo Fulminante corriente Nº 8 Conectores Guias de seguridad Mecha Rápida Cordón detonante EQUIPOS Perforadora Jackleg Scooptrams 1,5 yd3 Ventiladora de 20.000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

N° Taladr AVANCE: VOLUM.:

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 4.00 2.40 2.00 0.50 1.00 0.50 26.40

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 10.40

0.27 0.22

pp pp gln gdia

192.50 8.99 0.25 1.000

uni kls uni uni pies mts mts

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 12.73 4.75 4.24 6.36 9.05 5.66

12.00 11.25 8.44 3.15 2.81 4.22 6.00 3.75

51.61

4.24 2.24

2.81 1.48

4.29

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

21.18 0.99 1.50 4.36

14.03 0.66 0.99 2.89

18.58

32.00 44.50 32.00 32.00 230.00 5.33 0.00

0.14 0.51 0.09 0.14 0.04 0.30 0.13

$/uni $/kl $/uni $/uni $/pie $/m $/m

4.48 22.70 2.88 4.48 9.20 1.60 0.00

2.97 15.04 1.91 2.97 6.10 1.06 0.00

30.05

pp h-m h h pp

192.50 3.26 8.00 4.00 8.99

0.11 30.38 0.66 0.73 0.11

$/pp $/hr $/hr $/hr $/pp

21.18 98.89 5.31 2.91 0.99

14.03 65.55 3.52 1.93 0.66

85.69

% % %

14.91 0.00 10.00

190.22 190.22 190.22

$ $ $

28.36 0.00 19.02

28.36 0.00 19.02

47.38

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

05/10/2023

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35 u 1.51 ml 16.97 m3 roto

$/hr $/hr

237.60

MILSA

663935704.xls

2,5x2,5r-jackleg

ANALISIS DE PRECIOS UNITARIOS RAMPA NEGATIVA EN ROCA COMPETENTE CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA: Rampa -12% EQUIPOS: JACKLEG / SCOOP SECCION: 2.50 x 2.50 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 3.60 2.00 1.00 0.50 1.00 0.50 24.60

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 8.60

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Barrenos integrales (Perf. Alcayatas) Lubricantes Herramientas

pp pp gln gdia

176.00 8.18 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Fulminante corriente Nº 8 Conectores Guias de seguridad Mecha Rápida Cordón detonante

uni kls uni uni pies mts mts

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

EQUIPOS Perforadora Jackleg Scooptrams 1,5 yd3 Ventiladora 10,000 c.f.m Bomba para bombeo d'água Perforadora Jackleg Alcayatas GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.450 0.250 0.125 0.063 0.125 0.063 3.075

N° Taladr AVANCE: VOLUM.:

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 11.46 3.96 2.12 6.36 9.05 5.66

13.20 12.37 8.35 2.89 1.55 4.64 6.60 4.12

53.72

4.24 1.85

3.09 1.35

4.44

0.11 $/pp 0.11 $/pp 6.00 $/gl 4.36 $/gdia

19.36 0.90 1.50 4.36

14.11 0.66 1.09 3.18

19.05

29.00 40.33 29.00 29.00 209.00 4.83 0.00

0.14 0.51 0.09 0.14 0.04 0.30 0.13

$/uni $/kl $/uni $/uni $/pie $/m $/m

4.06 20.57 2.61 4.06 8.36 1.45 0.00

2.96 15.00 1.90 2.96 6.10 1.06 0.00

29.97

pp h-m h h pp

176.00 2.06 8.00 4.00 8.18

0.11 30.38 0.42 0.73 0.11

$/pp $/hr $/hr $/hr $/pp

19.36 62.43 3.37 2.91 0.90

14.11 45.52 2.46 2.12 0.66

64.87

% % %

14.91 0.00 10.00

172.05 172.05 172.05

$ $ $

25.65 0.00 17.21

25.65 0.00 17.21

42.86

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

05/10/2023

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

32 u 1.37 ml 10.72 m3 roto

$/hr $/hr

214.91

ANALISIS DE PRECIOS UNITARIOS CHIMENEA SIMPLE 1,5 X 1,5 HASTA 25 METROS PARTIDA:

EMPRESA

FECHAMay-23

Chimenea simple

N° Taladr

EQUIPOS: Stoper SECCION: 1.50 Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

x

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 0.50 0.50 1.00 1.00 0.50 19.51

2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 3.51

0.32 0.32

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

90.00 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

17.00 23.64 17.00 2.50

EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiliadora 10.000c.f.m

pp h-m h

90.00 0.33 4.00

0.11 43.59 0.42

% % %

14.91 0.00 10.00

88.71 110.01 88.71

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.063 0.063 0.125 0.125 0.063 2.439

1.50

AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr

18

u

1.22 ml 3.43 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 1.00 1.07 12.73 9.05 5.66

14.85 13.92 0.82 0.88 10.44 7.42 4.64

52.97

5.14 1.13

4.22 0.92

5.14

0.11 $/pp 6.00 $/gl 4.36 $/gdia

9.90 1.50 4.36

8.12 1.23 3.58

12.93

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

2.72 11.49 6.46 0.88

2.23 9.42 5.30 0.72

17.67

$/pp $/hr $/hr

9.90 14.39 1.69

8.12 11.80 1.38

$ $ $

13.23 0.00 8.87

13.23 0.00 8.87

$/hr $/hr

21.30

22.10 132.11

ANALISIS DE PRECIOS UNITARIOS CHIMENEA SIMPLE 1,5 X 1,5 DE 25 METROS HASTA 50 MTS EMPRESA PARTIDA: Chimenea simple EQUIPOS: Stoper SECCION: 1.50 x Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

1.50

N° Taladr AVANCE: VOLUM.:

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 4.00 2.80 0.50 0.50 0.50 1.00 0.50 25.81

2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 9.81

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

90.00 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

17.00 23.64 17.00 2.50

EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m

pp h-m h

90.00 0.33 6.00

0.11 43.59 0.42

% % %

14.91 0.00 10.00

93.62 113.66 93.62

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.500 0.350 0.063 0.063 0.063 0.125 0.063 3.226

FECHAMay-23

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

18 u 1.22 ml 3.43 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 9.05 5.94 1.00 1.07 6.36 9.05 5.66

14.85 13.92 7.42 4.87 0.82 0.88 5.22 7.42 4.64

60.04

4.24 2.11

3.48 1.73

5.21

0.11 $/pp 6.00 $/gl 4.36 $/gdia

9.90 1.50 4.36

8.12 1.23 3.58

12.93

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

2.72 11.49 6.46 0.88

2.23 9.42 5.30 0.72

15.44

$/pp $/hr $/hr

9.90 14.53 2.53

8.12 11.92 2.08

$ $ $

13.96 0.00 9.36

13.96 0.00 9.36

$/hr $/hr

20.04

23.32 136.98

ANALISIS DE PRECIOS UNITARIOS CHIMENEA DOBLE 3,0 X 1,5 HASTA 25 METROS PARTIDA:

EMPRESA

FECHAMay-23

Chimenea Doble

N° Taladr

EQUIPOS: Stoper SECCION: 3.00 Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

x

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 3.20 4.00 0.50 0.50 1.00 1.00 0.50 26.71

2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 10.71

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

150.00 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

27.00 37.55 27.00 5.00

EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10.000 c.f.m.

pp h-m h

150.00 0.33 6.00

0.11 43.59 0.42

% % %

14.91 0.00 10.00

111.00 136.91 111.00

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.400 0.500 0.063 0.063 0.125 0.125 0.063 3.339

1.50

AVANCE: VOLUM.:

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

30

u

1.30 ml 7.29 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 7.24 8.49 1.00 1.07 12.73 9.05 5.66

13.97 13.10 5.59 6.55 0.77 0.83 9.83 6.99 4.37

61.99

4.24 2.30

3.27 1.78

5.05

0.11 $/pp 6.00 $/gl 4.36 $/gdia

16.50 1.50 4.36

12.74 1.16 3.37

17.26

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.32 18.25 10.26 1.75

3.33 14.09 7.92 1.35

26.69

$/pp $/hr $/hr

16.50 14.53 2.53

12.74 11.22 1.95

$ $ $

16.55 0.00 11.10

16.55 0.00 11.10

$/hr $/hr

25.91

27.65 164.56

ANALISIS DE PRECIOS UNITARIOS CHIMENEA DOBLE 3,0 X 1,5 HASTA 25 METROS EMPRESA PARTIDA: Chimenea Doble EQUIPOS: Stoper SECCION: 3.00 x Incluye colocación de puntales de avance ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Enmaderador Ayudante enmaderador Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

1.50

N° Taladr AVANCE: VOLUM.:

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 6.00 6.00 0.50 0.50 1.00 1.00 0.50 31.50

2.26 2.12 2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 15.50

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

150.00 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

27.00 37.55 27.00 5.00

EQUIPOS Perforadora Stoper Scooptrams 2,5 yd3 Ventiladora 10,000 c.f.m

pp h-m h

150.00 0.33 6.00

0.11 43.59 0.42

% % %

14.91 0.00 10.00

127.45 152.90 127.45

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.750 0.750 0.063 0.063 0.125 0.125 0.063 3.938

FECHAMay-23

TOTAL COSTO METRO LINEAL EN DOLARES (US$/M-L)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

30 u 1.22 ml 6.86 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/ML

18.10 16.97 13.58 12.73 0.99 1.06 12.73 9.05 5.66

14.85 13.92 11.14 10.44 0.81 0.87 10.44 7.42 4.64

74.53

4.24 3.33

3.48 2.74

6.21

0.11 $/pp 6.00 $/gl 4.36 $/gdia

16.50 1.50 4.36

13.53 1.23 3.58

18.34

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.32 18.25 10.26 1.75

3.54 14.97 8.42 1.44

28.36

$/pp $/hr $/hr

16.50 14.53 2.53

13.53 11.92 2.08

$ $ $

19.00 0.00 12.74

19.00 0.00 12.74

$/hr $/hr

25.45

31.75 184.65

ANALISIS DE PRECIOS UNITARIOS DESQUINCHE CON JUMBO Y SCOOP EMPRESA

FECHAMay-23

PARTIDA: DESQUINCHE EQUIPOS: JUMBO / SCOOP SECCION: 1.20 x 1.10 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Jumbero Ayudante Jumbero Operador Scoop Cargadores disparadores Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 16.00 8.00 1.00 1.00 1.00 1.00 1.00 45.00

4.60 2.12 3.18 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 29.00

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Copas de afilado Aguzadora de brocas Herramientas

uni uni uni uni jgo uni gdia

0.143 0.380 0.143 0.143 0.057 0.006 1.000

327.00 85.00 270.00 60.00 180.00 2,400.00 12.38

EXPLOSIVOS Dinamita de 1 1/2" Anfo Fanel Guias de seguridad ensamblada Mecha Rápida Cordón detonante

uni kls uni uni mts mts

70.00 236.94 70.00 2.00 0.50 23.33

EQUIPOS Jumbo EH Scooptrams 2,5 yd3

h-m h-m

7.00 13.13

68.99 43.59

% % %

14.91 0.00 10.00

8.62 8.62 8.62

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 2.000 1.000 0.125 0.125 0.125 0.125 0.125 5.625

N° Taladr AVANCE: VOLUM.: Vol.roto:

TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

70 u 2.04 ml 188.19 m3 235.24 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/M3

36.77 16.97 50.91 16.97 1.98 2.12 12.73 9.05 11.31

0.20 0.09 0.27 0.09 0.01 0.01 0.07 0.05 0.06

0.84

$/hr $/hr

4.24 6.24

0.02 0.03

0.06

$/uni $/uni $/uni $/uni $/uni $/uni $/gdia

46.62 32.32 38.49 8.55 10.27 13.69 12.38

0.25 0.17 0.20 0.05 0.05 0.07 0.07

0.86

0.60 $/uni 0.49 $/kl 1.07 $/uni 0.38 $/uni 0.35 $/m 0.13 $/m

42.00 115.15 74.97 0.76 0.18 2.94

0.22 0.61 0.40 0.00 0.00 0.02

1.25

$/hr $/hr

482.95 572.22

2.57 3.04

5.61

$ $ $

1.29 0.00 0.86

1.29 0.00 0.86

2.15

10.77

ANALISIS DE PRECIOS UNITARIOS DESQUINCHE JACKLEG + SCOOP

PARTIDA:

EMPRESA

FECHAMay-23

DESQUINCHE

N° Taladr

EQUIPOS: JACKLEG / SCOOP SECCION: 1.00 x 1.00 NOTA : Distancia de limpieza incluida max.= 250 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante perforista Operador Scoop Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Jefe de Zona

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 4.00 0.50 0.50 0.50 0.50 0.50 22.50

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 6.50

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

175.00 0.25 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

35.00 48.68 35.00 5.00

EQUIPOS Perforadora Jackleg Scooptrams 2,5 yd3

pp h-m

175.00 4.08

0.11 43.59

% % %

14.91 0.00 10.00

7.24 7.24 7.24

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

1.000 1.000 0.500 0.063 0.063 0.063 0.063 0.063 2.813

AVANCE: VOLUM.: Vol.roto:

TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

35

u

1.34 ml 46.75 m3 58.44 m3 roto

P.PARC. SUBTOT. $ $

TOTAL US$/M3

18.10 16.97 12.73 0.99 1.06 6.36 4.56 5.66

0.39 0.36 0.27 0.02 0.02 0.14 0.10 0.12

1.42

4.24 1.40

0.09 0.03

0.12

0.11 $/pp 6.00 $/gl 4.36 $/gdia

19.25 1.50 4.36

0.41 0.03 0.09

0.54

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

5.60 23.66 13.30 1.75

0.12 0.51 0.28 0.04

0.95

$/pp $/hr

19.25 177.68

0.41 3.80

4.21

$ $ $

1.08 0.00 0.72

1.08 0.00 0.72

1.80

$/hr $/hr

9.04

ANALISIS DE PRECIOS UNITARIOS TAJEOS OPEN STOPE (CASO 1) EMPRESA

FECHAMay-23

PARTIDA: ROTURA TAJEOS + MADERA EQUIPOS: STOPER / MICROSCOOP (Ctta) AREA DE DISPARO: 0.80 x 5.83 NOTA : Distancia de limpieza incluida max.= 150 metros ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante Operador Scoop Enmaderador (Puntales linea, andam Ayudante Enmaderador Tubero Bodeguero, Traslado Madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

INCID.

1.000 1.000 0.500 1.000 1.000 0.125 0.063 0.063 0.125 0.063 4.939

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

N° Taladr AVANCE: VOLUM.: Vol.roto:

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 4.00 8.00 8.00 1.00 0.50 0.50 1.00 0.50 39.51

2.26 2.12 3.18 2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 23.51

0.32 0.32

pp gln gdia

### 0.250 1.500

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

25 u 1.29 ml 6.03 m3 8.13 m3

P.PARC. SUBTOT. $ $ 18.10 16.97 12.73 18.10 16.97 1.98 1.06 6.41 9.05 5.70

3.00 2.82 2.11 3.00 2.82 0.33 0.18 1.06 1.50 0.95

17.77

6.04 5.66 4.25 6.04 5.66 0.66 0.35 2.14 3.02 1.90

5.14 7.56

0.85 1.25

2.11

1.72 2.52

0.11 $/pp 6.00 $/gl 4.36 $/gdia

13.75 1.50 6.55

2.28 0.25 1.09

3.62

4.59 0.50 2.18

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.00 16.90 9.50 6.30

0.66 2.80 1.58 1.05

6.09

1.33 5.64 3.17 2.10

10.25

4.59 15.45

9.92

11.94 0.00 8.01

$/hr $/hr

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m.

uni kls uni mts

25.00 34.77 25.00 18.00

pp h-m h

125.00 2.84 4.00

0.11 16.32 0.42

$/pp $/hr $/hr

13.75 46.31 1.69

2.28 7.69 0.28

GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad

% % %

14.91 0.00 10.00

39.83 39.83 39.83

$ $ $

5.94 0.00 3.98

5.94 0.00 3.98

TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$

TOTAL US$/M3

49.76 16.59

99.44

ANALISIS DE PRECIOS UNITARIOS TAJEOS OPEN STOPE (CASO 1) EMPRESA

FECHAMay-23

ROTURA TAJEOS + MADERA

N° Taladr

EQUIPOS: STOPER / MICROSCOOP (Ctta) AREA DE DISPARO: 0.80 x 5.83 NOTA : Distancia de limpieza incluida max.= 150 metros

AVANCE: VOLUM.: Vol.roto:

PARTIDA:

ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante Operador Scoop Enmaderador (Puntales linea, andam Ayudante Enmaderador Tubero Bodeguero, Traslado Madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

INCID.

1.000 1.000 0.500 1.000 1.000 0.125 0.063 0.063 0.125 0.063 4.939

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 4.00 8.00 8.00 1.00 0.50 0.50 1.00 0.50 39.51

2.26 2.12 3.18 2.26 2.12 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 23.51

0.32 0.32

pp gln gdia

### 0.250 1.000

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

25

P.PARC. SUBTOT. $ $

TOTAL US$/M3

18.10 16.97 12.73 18.10 16.97 1.98 1.06 6.41 9.05 5.70

2.68 2.51 1.88 2.68 2.51 0.29 0.16 0.95 1.34 0.84

15.83

5.14 7.56

0.76 1.12

1.88

0.11 $/pp 6.00 $/gl 4.36 $/gdia

13.75 1.50 4.36

2.03 0.22 0.65

2.90

0.16 $/uni 0.49 $/kl 0.38 $/uni 0.35 $/m

4.00 16.90 9.50 6.30

0.59 2.50 1.40 0.93

5.43

$/hr $/hr

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m.

uni kls uni mts

25.00 34.77 25.00 18.00

pp h-m h

125.00 3.18 4.00

0.11 16.32 0.42

$/pp $/hr $/hr

13.75 51.98 1.69

2.03 7.69 0.25

GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad

% % %

14.91 0.00 10.00

36.00 36.00 36.00

$ $ $

5.37 0.00 3.60

5.37 0.00 3.60

TOTAL COSTO METRO CUBICO EN DOLARES US$

u

1.45 ml 6.76 m3 9.13 m3

9.97

8.97 44.97

ANALISIS DE PRECIOS UNITARIOS TAJEOS SHIRINKAGE CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA: ROTURA TAJEOS SHIRINKAGE EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 0.80 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante Operador Scoop (Limpieza) Peon arreglar tajeo Peon para Shuteo Bodeguero Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona

INCID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 6.00 8.00 8.00 2.00 0.50 2.00 0.50 43.01

2.26 2.12 3.18 1.98 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 27.01

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

### 0.250 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

25.00 37.93 25.00 10

EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 10,000 c.f.m

pp h-m h

150.00 3.72 8.00

0.11 16.32 0.42

GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad

% % %

14.91 0.00 10.00

21.86 31.31 21.86

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

1.000 1.000 0.750 1.000 1.000 0.250 0.063 0.250 0.063 5.376

UNI. CANTID.

N° Taladr AVANCE: VOLUM.: Vol.roto:

TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

25 u 1.60 ml 8.52 m3 10.65 m3

P.PARC. SUBTOT. $ $

TOTAL US$/M3

18.10 16.97 19.09 15.84 15.84 4.24 6.41 18.10 5.70

2.12 1.99 2.24 1.86 1.86 0.50 0.75 2.12 0.67

14.11

2.05 5.78 1.82

4.24 5.81

0.50 0.68

1.18

1.35 1.85

0.11 $/pp 6.00 $/gl 4.36 $/gdia

16.50 1.50 4.36

1.94 0.18 0.51

2.62

5.27 0.48 1.39

0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m

3.25 17.83 9.75 2.80

0.38 2.09 1.14 0.33

3.95

1.04 5.69 3.11 0.89

$/pp $/hr $/hr

16.50 60.65 3.37

1.94 7.12 0.40

$ $ $

3.26 0.00 2.19

3.26 0.00 2.19

$/hr $/hr

5.78 5.42 6.09 5.06

9.45

5.45 36.75 12.25

5.27

8.87 0.00 5.95 73.15

ANALISIS DE PRECIOS UNITARIOS TAJEOS CORTE Y RELLENO CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA:

ROTURA TAJEOS +RELLENO

N° Taladr

25

AVANCE: VOLUM.: Vol.roto:

1.60 ml 8.52 m3 10.65 m3

EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 0.80 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante Emmaderador Ayudante de emmaderador Operador Scoop(Limpieza y relleno) Bodeguero/traslado de madera Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona

INCID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 8.00 4.00 8.00 4.00 1.60 2.00 1.00 44.60

2.26 2.12 2.26 2.12 3.18 2.12 12.73 9.05 11.31

h-h h-h

16.00 28.60

0.32 0.32

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

### 0.250 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

25.00 34.77 25.00 10

EQUIPOS Perforadora Stoper Microscoop 0,5 yd3 Ventiladora 20,000 c.f.m

pp h-m h

150.00 3.72 8.00

0.11 16.32 0.66

% % %

14.91 0.00 10.00

25.13 34.81 25.13

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad

1.000 1.000 1.000 0.500 1.000 0.500 0.200 0.250 0.125 5.575

UNI. CANTID.

TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

P.PARC. SUBTOT. $ $

u

TOTAL US$/M3

18.10 16.97 18.10 8.49 25.46 8.49 20.36 18.10 11.31

2.12 1.99 2.12 1.00 2.99 1.00 2.39 2.12 1.33

17.06

5.14 9.19

0.60 1.08

1.68

0.11 $/pp 6.00 $/gl 4.36 $/gdia

16.50 1.50 4.36

1.94 0.18 0.51

2.62

0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m

3.25 16.34 9.75 2.80

0.38 1.92 1.14 0.33

3.77

$/pp $/hr $/hr

16.50 60.65 5.31

1.94 7.12 0.62

$ $ $

3.75 0.00 2.51

3.75 0.00 2.51

$/hr $/hr

9.67

6.26 41.07 13.69

ANALISIS DE PRECIOS UNITARIOS TAJEOS CORTE Y RELLENO CLIENTE:

EMPRESA

FECHAAug-01

PARTIDA: ROTURA TAJEOS +RELLENO EQUIPOS: STOPER / MICROSCOOP (Ctta.) AREA DE DISPARO: 1.50 x 6.67 m2 Microscoop/Tolvas/Locomotora No incluye desquinche para circulación de Microscoop ITEM DESCRIPCION 1.-

2.-

3.-

4.-

5.-

6.-

MANO DE OBRA Perforista Ayudante Operador Scoop(Limpieza y relleno Tubero Bodeguero Jefe de Seguridad Jefe de Guardia Ingeniero Jefe de Zona

INCID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h h-h h-h h-h

8.00 8.00 8.00 0.50 0.50 0.50 0.50 0.50 26.52

2.26 2.12 3.18 1.98 2.12 12.73 9.05 11.31

h-h h-h

16.00 10.52

0.27 0.22

MATERIALES Y HERRAMIENTAS Barrenos integrales Lubricantes Herramientas

pp gln gdia

### 0.250 1.000

EXPLOSIVOS Dinamita de 7/8" Anfo Guias de seguridad Mecha Rápida

uni kls uni mts

25.00 37.93 25.00 10

EQUIPOS Perforadora Stoper Microscoop1,5 yd3 Ventiladora 20,000 c.f.m.

pp h-m h

150.00 1.39 8.00

0.11 30.38 0.66

GASTOS INDIRECTOS Gastos Generales Contingencias Utilidad

% % %

14.91 0.00 10.00

8.87 39.71 8.87

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

1.000 1.000 1.000 0.063 0.063 0.063 0.063 0.063 3.315

UNI. CANTID.

N° Taladr AVANCE: VOLUM.: Vol.roto:

TOTAL COSTO METRO CUBICO EN DOLARES US$ TOTAL COSTO TONELADA EN DOLARES US$

$/hr $/hr $/hr $/hr $/hr $/hr $/hr $/hr

25 u 1.60 ml 15.98 m3 19.98 m3

P.PARC. SUBTOT. $ $

TOTAL US$/M3

18.10 16.97 25.46 0.99 1.07 6.41 4.56 5.70

1.13 1.06 1.59 0.06 0.07 0.40 0.29 0.36

4.96

0.96 0.68 0.85

4.24 2.26

0.27 0.14

0.41

0.63 0.34

0.11 $/pp 6.00 $/gl 4.36 $/gdia

16.50 1.50 4.36

1.03 0.09 0.27

1.40

2.46 0.22 0.65

0.13 $/uni 0.47 $/kl 0.39 $/uni 0.28 $/m

3.25 17.83 9.75 2.80

0.20 1.12 0.61 0.18

2.10

0.49 2.66 1.46 0.42

$/pp $/hr $/hr

16.50 42.33 5.31

1.03 26.48 3.32

$ $ $

1.32 0.00 0.89

1.32 0.00 0.89

$/hr $/hr

2.70 2.53 3.80 0.15

30.84

2.21 41.92 13.97

2.46

3.15 0.00 2.12 28.73

MILSA

663935704.xls

Evac.Scoop

ANALISIS DE PRECIOS UNITARIOS EVACUACION DE CARGA CON SCOOPS EN GALERIAS CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA:

EVACUACION CARGA CON SCOOPS

Distancia:

EQUIPOS:

SCOOP ST-2D

Vol.roto: Vol.insitu

ITEM DESCRIPCION 1.-

MANO DE OBRA Operador Scoop Jefe de Seguridad Jefe de Guardia

2.-

IMPLEMENTOS Implementos personal

3.-

EQUIPOS Scooptrams 2,5 yd3

4.-

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

INCID.

1.000 0.042 0.042 1.083

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h

8.00 0.33 0.33 8.67

h-h

8.67

0.22

h-m

8.00

% % %

14.91 0.00 10.00

TOTAL COSTO METRO CUBICO EN DOLARES (US$/M3)

05/10/2023

3.18 $/hr 12.73 $/hr 9.05 $/hr

0.100

mts

152.92 m3 roto 113.28 m3

P.PARC. SUBTOT. $ $

TOTAL US$/M3

25.46 4.24 3.02

0.22 0.04 0.03

0.29

$/hr

1.86

0.02

0.02

43.59

$/hr

348.75

3.08

3.08

3.38 3.38 3.38

$ $ $

0.50 0.00 0.34

0.50 0.00 0.34

0.84

4.23

MILSA

663935704.xls

Perf.tal.Jum.

ANALISIS DE PRECIOS UNITARIOS PERFORACION TALADROS CON JUMBO CLIENTE:

EMPRESA

FECHAMay-23

PARTIDA:

PERFORACION TALADROS CON JUMBO

N° Taladr

72

EQUIPOS: SECCION:

JUMBO 1.20

Mts./tal.: Mts.Perfor

3.20 ml 230.43 ml

ITEM DESCRIPCION 1.-

MANO DE OBRA Jumbero Ayudante Jumbero Jefe de Seguridad Jefe de Guardia Jefe de Zona

x

INCID.

m2

UNI. CANTID.

PRECIO UNITARIO

h-h h-h h-h h-h h-h

8.00 8.00 0.33 0.50 0.33 17.17

4.60 2.12 12.73 9.05 11.31

h-h h-h

16.00 1.17

0.27 0.22

MATERIALES Y HERRAMIENTAS Barras de perforación Brocas de 45 mm Shank adapter Coplas Copas de afilado Aguzadora de brocas Herramientas

uni uni uni uni jgo uni gdia

0.230 0.614 0.230 0.230 0.092 0.009 1.000

327.00 85.00 270.00 60.00 180.00 2,400.00 12.38

4.-

EQUIPOS Jumbo EH

h-m

6.00

5.-

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

% % %

14.91 0.00 10.00

2.-

3.-

IMPLEMENTOS Implementos personal perforación Implementos personal auxiliar

1.000 1.000 0.042 0.063 0.042 2.146

1.10

05/10/2023

TOTAL US$/M3

36.77 16.97 4.24 4.53 3.77

0.16 0.07 0.02 0.02 0.02

0.29

$/hr $/hr

4.24 0.25

0.02 0.00

0.02

$/uni $/uni $/uni $/uni $/uni $/uni $/gdia

75.35 52.23 62.22 13.83 16.59 22.12 12.38

0.33 0.23 0.27 0.06 0.07 0.10 0.05

1.11

68.99

$/hr

413.95

1.80

1.80

3.21 3.21 3.21

$ $ $

0.48 0.00 0.32

0.48 0.00 0.32

0.80

TOTAL COSTO METRO PERFORADO CON JUMBO (US$/ML)

$/hr $/hr $/hr $/hr $/hr

P.PARC. SUBTOT. $ $

u

4.01

MILSA

663935704.xls

TA

ANALISIS DE PRECIOS UNITARIOS TAREA ADMINISTRATIVA CLIENTE:

EMPRESA

PARTIDA: Rendimientos:

TAREA ADMINISTRATIVA 1.00 Tarea/Gdia

ITEM DESCRIPCION 1.-

MANO DE OBRA Perforista

2.-

IMPLEMENTOS Implementos personal perforación

3.-

GASTOS INDIRECTOS Gastos Generales y Administrativos Contingencias Utilidad

INCID.

1.000 1.000

FECHAMay-23

UNI. CANTID.

PRECIO UNITARIO

P.PARC. SUBTOT. TOTAL $ $ US$/TAREA

h-h

8.00 8.00

2.26 $/hr

18.10

18.10

18.10

h-h

8.00

0.27

$/hr

2.12

2.12

2.12

% % %

0.15 0.00 0.00

20.22 20.22 20.22

$ $ $

0.03 0.00 0.00

0.03 0.00 0.00

0.03

COSTO POR TAREA ADMINISTRATIVA (US$/TA)

05/10/2023

20.25

LABORES MINERAS - PLANEAMIENTO DE MEDIANO PLAZO 2001 Item Labor

Sección Observaciones Unidad Costo Unitario COSTO US$/m

TOTAL

2002 Progr

Costo

m

Mensual

Directo Indirec. US $/m

US $

Costo Unitario COSTO US$

TOTAL

Directo Indirec. US $/m

1

Galería

3,50 X 3,50 Jumbo/Scoop US$/m 341.65

64.43 406.08

40.00

16243.30

368.98

69.58 438.57

2

Galería

3,00 X 3,00 Jumbo/Scoop US$/m 300.17

56.10 356.27

50.00

17813.72

324.19

60.59 384.78

3

Galería

3,00 x 3,00 Jackleg/Scoop US$/m 233.76

90.84 324.60

50.00

16230.09

252.46

98.11 350.57

4

Galería

2,50 x 2,50 Jackleg/Scoop US$/m 207.65

67.04 274.69

50.00

13734.27

224.26

72.40 296.66

5

Subnivel

2,10 x 1,20Jackleg/MicroscoopUS$/m 177.98

60.91 238.89

50.00

11944.71

192.22

65.78 258.01

6

Rampa

3,50 X 3,50 Jumbo/Scoop US$/m 357.47

64.43 421.90

50.00

21094.78

386.06

69.58 455.65

7 8 9

Rampa Rampa Rampa

3,00 X 3,00 Jumbo/Scoop US$/m 313.51 3,00 x 3,00 Jackleg/Scoop US$/m 234.68 2,50 x 2,50 Jackleg/Scoop US$/m 211.65

56.10 369.61 90.84 325.52 67.04 278.69

50.00 50.00 50.00

18480.28 16276.10 13934.73

338.59 253.46 228.59

60.59 399.17 98.11 351.56 72.40 300.99

10 Chimenea Simple 0 - 25 1,50 x 1,50

Stoper

US$/m 132.11

44.51 176.62

25.00

4415.51

142.68

48.07 190.75

11 Chimenea Simple 25 - 5 1,50 x 1,50 12 Chimenea Doble 0 - 25 3,00 x 1,50

Stoper Stoper

US$/m 136.98 US$/m 164.56

44.51 181.49 70.95 235.51

25.00 25.00

4537.27 5887.71

147.94 177.72

48.07 196.01 76.63 254.35

13 Chimenea Doble 25 - 50 3,00 x 1,50

Stoper

US$/m 184.65

70.95 255.60

25.00

6389.88

199.42

76.63 276.04

US$/m 385.00 133.25 518.25 US$/m 600.00 75.62 675.62

30.00 40.00

15547.50 27024.80

415.80 143.91 559.71 648.00 81.67 729.67

14 Chimenea Alimak 1.80 x 1.80 Equipo Ctta. 15 Chimenea Raise Boring diàmetro 1.5 Equipo Ctta. 16 Tajeos Open Stop

Jackleg/Scoop US$/m3 44.97

0.00 44.97

1000.00

44972.23

48.57

0.00 48.57

US$/m 182.51

0.00 182.51

30.00

5475.30

197.11

0.00 197.11

17 Rehabilitaciòn de galerìas Todos estos precios no incluyen IGV La inflaciòn promedio anual asumida 8%

TOTAL:

260002.17

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF