Applied Current (A) Secondary 1.00∟0˚ 1.00∟240˚ 1.00∟120˚
Measured Current in Relay Primary (KA) 2.00 2.00 2.00
Phase Ref
Applied Value (V)
VT Ratio Applied
Displayed Primary Value (KV)
VAB
110∟30°
400KV/110V
400
VBC
110∟270°
400KV/110V
400
VCA
110∟150°
400KV/110V
400
VAN
63.51∟0.0°
400KV/110V
231
VBN
63.51∟240°
400KV/110V
231
VCN
63.51∟120°
400KV/110V
231
INPUT
INJECTION VALUE
EXPECTED VALUE
DISPLAYED VALUE
Frequency
50 HZ
50 Hz
50 Hz
P (GW)
VA=63.51∟0°
1385.64MW
1.38 GW
Q (GVAR)
VB=63.51∟240°
0.00 MVAR
0.0 GVAR
S (GVA)
VC=63.51∟120°
1385.64MVA
1.38 GVA
1.00
1.00
IA=1.0∟0.0° PF
IB=1.0∟240° IC=1.0∟120°
4. ZONE REACH & TIMING TEST: TESTED BY M/s SIEMENS
WITNESSED BY PGCIL
DATE
06.08.2012
Doble test report format Attached *Distance protection is blocked during VT Fuse fail condition and Line isolator open condition. 5. COMMUNICATION SCHEME LOGIC CR SEND SIGNAL LOGIC Z1-Forward –CR Send checked OK Z2-Forward- CR Send checked OK TRIP LOGIC Z2 Fault + CR Receive + CR Channel Healthy
-
23.30ms
Z2 Fault + CR Receive + CR Channel Faulty
-
322.10ms
Z2 Fault + NO CR Receive + CR Channel Healthy -
326.80ms
Z2 Fault + NO CR Receive + CR Channel Faulty
322.80ms
-
6. FAULT LOCATOR Reactance = 0.1817Ω/KM Line Length=102KM Total line reactance = 18.5334 Ω, 86° % of Line length 100 50
7. SWITCH ON TO FAULT (SOTF) Address 2404 50HS High Speed SOTF-O/C P/U = 2.50 A 1232 Recognition of line closure with = Manual close BI OR Current flow 1150 Seal in Time after Manual Closure = 0.3 sec 1232 Instant. Trip after SOTF to inactive Current Flow Method TESTED BY M/s SIEMENS
WITNESSED BY PGCIL
With Manual close BI DATE
06.08.2012
Meas.Time Pickup Current (A) (S) R-N 2.515 23.20 2.550 Y-N 2.520 18.10 2.550 B-N 2.515 31.10 2.550 *Inject directly 2.51A and Measure the trip time. Phase Ref.
Pickup Current (A)
Meas.Time (S) 22.60 22.00 31.10
8. OVER VOLTAGE PROTECTION (PH-E) Stage-1: Setting: 70V, 2.0Sec Phase Ref R-N Y-N B-N
Pickup (V) 70.04 70.04 69.97
Drop-Off (V) 68.62 68.68 68.63
DO/PU Ratio 97.97% 98.05% 98.08%
Time (S) 2.033 2.034 2.033
DO/PU Ratio 97.97% 97.96% 98.06%
Time (ms) 133.30 133.20 133.50
Stage-2: Setting: 95V, 0.1Sec Phase Ref R-N Y-N B-N
Pickup (V) 95.04 95.07 94.96
Drop-Off (V) 93.12 93.14 93.12
OVER VOLTAGE PROTECTION (PH-PH) Stage-1: Setting: 121V, 2.0Sec Phase Ref R-Y Y-B B-R
9. DIRECTIONAL EARTH FAULT Setting: 0.1A, 1.00Sec, α=338°, β=122° Phase Ref Pick-up (A) Drop-Off (A) Time (S) Operating Region R-N 0.104 0.081 1.028 340°-0°-122° Y-N 0.106 0.085 1.030 219°-240°-0° B-N 0.103 0.083 1.029 100°-120°-242° *DEF blocking is checked during VT Fuse fail condition. 10. VT FUSE FAIL ALARM Address 2911 Minimum Voltage Threshold U> =30.0V 2912 Maximum Current Threshold I< =0.10A 2913 Maximum Voltage Threshold U< =5V 2914 Differential Current threshold I =0.10A
1Ø VT Fuse fail 3Ø VT Fuse fail Pick-up Uo Applied Phase Ref Pick-up (V) (V) Current(A) R-N 29.95 4.99 1.00 Y-N 30.03 4.99 1.00 B-N 29.95 4.99 1.00 *For 3Ø VT fuse fail, Reduced the 3Ø voltage less than the set value immediately.
TESTED BY M/s SIEMENS
WITNESSED BY PGCIL
DATE
06.08.2012
11. STUB PROTECTION Based on Phase Current I>1.50A, 0.0Sec Phase Ref R-N Y-N B-N
I>Set (A) 1.50 1.50 1.50
Pick-up (A) 1.495 1.498 1.498
Time (ms) 37.40 37.40 37.40
Based on Zero Sequence current 3Io>0.20A, 0.00Sec Phase Ref 3Io> (A) Pick-up (A) Time (ms) R-N 0.02 0.199 30.00 Y-N 0.02 0.199 37.10 B-N 0.02 0.199 32.70 *STUB protection is blocked while isolator is in closed condition. 12. UNDER VOLTAGE PROTECTION (PH-E): ALARM ONLY Stage-1: Setting: 57.00V, 2.0Sec Phase Ref R-N Y-N B-N
Applied Current (A) 0.20 0.20 0.20
Pickup (V)
Time (S)
57.07 57.08 57.01
2.0319 2.0320 2.0326
Stage-2: Setting: 32.00V, 0.1Sec Phase Ref R-N Y-N B-N
Applied Current (A) 0.20 0.20 0.20
TESTED BY M/s SIEMENS
Pickup (V)
Time (ms)
31.99 32.04 32.01
132.90 132.20 132.90
WITNESSED BY PGCIL
DATE
06.08.2012
UNDER VOLTAGE PROTECTION (PH-PH): ALARM ONLY Stage-1: Setting: 99.00V, 2.0Sec Phase Ref R-Y Y-B B-R