DISEÑO DE COLUMNAS y ZAPATAS, finaaal para imprimir!!!!

July 8, 2019 | Author: LIshi Guzman Rojas | Category: Ingeniería civil, Carpintería, Ingeniería estructural, Trabajo en madera, Ingeniería mecánica
Share Embed Donate


Short Description

Download DISEÑO DE COLUMNAS y ZAPATAS, finaaal para imprimir!!!!...

Description

DISEÑO DE COLUMNAS

PREDIMENSIONAMIENTO DE COLUMNAS  COLUMNA C-1 (EJE C-C , EJE 2-2)

ELEMENTO

Losa  Aligerada Viga Principal Viga Secundaria Columnas Sobrecarga pastelero

CM= CV=

1º PISO

300 x 4.07 x 2.55

2º PISO

= 3113.55 300 x 4.07 x 2.55

= 3113.55

0.25 x 0.40 x 3.82 x 2400 =

916.8

0.25 x 0.40 x 3.82 x 2400 =

916.8

0.15 x 0.35 x 2.55 x 2400 =

321.3

0.15 x 0.35 x 2.55 x 2400 =

321.3

0.25 x 0.40 x 2.80 x 2400 = 672 0.25 x 0.40 x 2.80 x 2400 = 672 500 x 4.07 x 2.55 = 5189.25 200 x 4.07 x 2.55 = 2075.7 1.00 x 4.07 x 2.55 x 100 = 1037.85 1.00 x 4.07 x 2.55 x 100 = 1037.85

6061.5 kg 5189.3 kg

CM= CV=

6061.5 kg 2075.7 kg

P= 6061.5+6061.5

P= 12123.00 Kg  F’c = 210 kg/cm 2 n = 0.30 P = 1.10 PG  Aplicando la la ecuación para el Predimensionamiento: Predimensionamiento:

b* D = 423.343 cm2  b = D = 21 x 21 cm 2 

Según el Reglamento Nacional de Construcciones la sección mínima para columnas es de 600 cm2, para una Columna tipo C-1, las dimensiones son:

b x D = 25 x 40 cm2 

DISEÑO DEL AREA DE ACERO EN COLUMNAS  UTILIZANDO ABACOS 

Especificaciones Especificaciones Técnicas: f'c =210 Kg/m2 f'y =4200 Kg/m2 r =5 cm COLUMNAS (CENTRALES) :

COLUMNA 1 (Primer piso): Datos: b t Ag Pu Mu

=25 cm =40 cm =1000 cm2 =26171.52 Kg = 108600Kg-cm

SECCION DE LA COLUMNA DEL PRIMER PISO 2 Φ 3/4" ●

Pu / Ag = 26.172 Mu/(Ag x h) = 2.715 g = 0.750

40 cm 2 Φ 3/4" ●



←———→ 25 cm

Utilizando el Abaco nos encontramos con una cuantía de: r g = 0.01

r g = Ast / (b x t)

 As = Pg x (b x t)

 As = 10 cm2 DISEÑO POR CORTE  Especificaciones Técnicas: r =4cm Datos: Pu = 26171.52Kg Mu 1 = 108600Kg-cm Mu 2 = 54300Kg-cm d = 35cm h columna= 3.4m Vu = 0.48 ton  Ast = 4 o3/4''  Ast = 11.4 cm2  Av = 1.42 cm2 CONTRIBUCION DE CONCRETO

Vc = 0.53(1+0.007 (Pu/Ag))(f'c).b.d Vc = 27035.281kg Vc = 27.04ton



< > 4Φ 3/4" 

si: Vc Vu 27.04 ton> 0.48 ton

Debido a que Vc >Vu solo colocaremos As mínimo para confinamiento; el  acero a utilizar es de 3/8'' 

LONGITUD DE CONFINAMIENTO  lo =

ln /6 = 57 b y t = 40 > 45 cm Entonces lo = 57 cm

Slo =

t/2 = 20 b/2= 12.5 < 10 cm S =10 cm

Dentro del nudo: Smax =

Av* fy 0.90 ton

Debido a que Vc >Vu solo colocaremos As mínimo para confinamiento; el  acero a utilizar es de 3/8'' 

LONGITUD DE CONFINAMIENTO  lo =

ln /6 = 57 b y t = 40 > 45 cm

Tómanos el Mayor  

Entonces lo = 57 cm

Slo =

t/2 = 20 b/2= 12.5 < 10 cm S =10 cm

Tomamos el Menor  

Dentro del nudo: Smax =

Av* fy