Attachment-6 Available Diesel Oil Operations of each phase Phase Before installation of the facilities at COMBO DOCK and diesel oil pipeline (Month 17)
After installation of the facilities at COMBO DOCK and diesel oil pipeline
_ _ _ __ RA| D __| N I ||___ OV-2
15-N
006
Available operation
Corresponding section
Diesel unloading operation by tanker truck
4.2.1
Diesel oil refueling operation at GPFSB area
5.1.5
Diesel oil unloading operation by 080-P-1001 or ship pump
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.