FAST PLANETS Co LTD., ENGINEERING DEPARTMENT P.0. BOX : 34620 RIYADH - 11478
ANALYSIS / COMPARATIVE STUDY OF EXISTING 25+4.0m Extended Latticed MONOPOLE TOWER (LTE Project 2011)
Main Site No.:
ZND090
ORIGINAL DESIGN LOAD + EXISTING & PROPOSED LOADING CONDITION
LTE Project 2011
ZND090-AMT-Td-0001 Rev.A
TABLE OF CONTENTS TITLE
PAGE NO.
COVER PAGE
1
TABLE OF CONTENTS
2
INTRODUCTION
3
CONCLUSION
3
TOWER COMPARATIVE STUDY
4
TABLE I - WIND LOAD ON ANTENNA SUPPORT PIPE AND OTHER MOUNTED POLE STRUCTURE
6
TABLE II - STANDARD 25m SELF-SUPPORT MONOPOLE WIND LOAD
7
TOWER DEFLECTION
8
TOWER INFORMATION
9
ATTACHMENT ORIGINAL TOWER LOAD DESIGN CALCULATION TOWER PROFILE
Analyzed by:
J.B.Vasquez Telecom Engineer
Checked by:
Approved by:
J.A.Hasson Structural Engineer
A.A.Aleem Projects Manager
L'
Page 2 of 11
LTE Project 2011
Main Site No.
ZND090-AMT-Td-0001 Rev.A
ZND090
INTRODUCTION Tower load comparative study for main site no. ZND090 was performed to compare the design load against the actual load to determine its feasibility to support the existing and the proposed new antenna loading to be used for LTE Project 2011. Refer to pages 4 to 7 for the detailed comparative study of the tower original design loading and actual loading. Tower existing loading condition and proposed new antennas and tower physical condition and other relevant information are tabulated on pages 9 to 11. For information on tower mast geometry and member sizes, see attachment.
CONCLUSION The results show that the tower meet the criteria of 39 m/s (140KPH) basic wind speed. The original design load of the tower is greater than the present actual load and it is indicative that there is no increase in antenna loads. Hence, we can conclude that the tower can safely support the existing and the proposed microwave antenna loading for LTE Project 2011 .
Page 3 of 11
LTE Project 2011
ZND090-AMT-Td-0001 Rev.A
Comparison between original design loads and actual loads for standard 25.0m Monopole tower
Tower height = Gh =
25 m 1.690
Original Design Loads Wind speed =
39 m/s
Design Loads
Size
Dept
Qty, n
(m)
Elevation
Kz
(m)
Fa
Fa*Gh*Kz*n
Base Moment
(kN)
(kN)
(kN-m)
PANEL
900 MHZ
GSM
9
25.0
1.299
0.89
17.51
437.64
HP
1.20 DIA
MW
2
25.0
1.299
1.39
6.10
152.57
HP
2.40 DIA
MW
1
25.0
1.299
5.56
12.21
305.15
Tubular Poles 1
25.0 m high
GSM
LS
N/A 4
1.000
N/A 4
N/A 4
4636.41
Mounted Poles 2
2.0 m high
GSM
LS
N/A 4
1.000
N/A 4
N/A 4
2.86
Cantilevered Lattice 3
4.0 m high
GSM
LS
N/A 4
1.000
N/A 4
N/A 4
137.89
Total Base Moment =
1 25.0m high Monopole Tubular Pole 2 2.0 m high Mounted Pole 3 4.0m high Cantileverd Lattice 4 Previously gusted (i.e. K Z and Gh equal to 1.0), see Tables I, II & III
Page 4 of 11
5672.52
LTE Project 2011
ZND090-AMT-Td-0001 Rev.A
Actual Loads Wind speed = Actual Loads LR PANEL HP PANEL HP PANEL 3G HP HP HP HP HP NEW LTE 1 Tubular Poles Mounted Poles Cantilevered Lattice