Design of micro hydro power
February 19, 2017 | Author: Sufi Shah Hamid Jalali | Category: N/A
Short Description
Download Design of micro hydro power...
Description
ID-number 28-2802-0014 -2 A Province: Bamyan District: Shebar Village: Gonbad Project type :M,H,P No F 256
MHP
Data from site for river foram50m(U/S) to Intak h1= h2= h3= h4= h5= h6 h7 n S= B= h= h= h= L= Slop = H2= P= A= R= V= Q= H1= P= A= R= V= Q= H3= P= A= R= V= Q=
U / S Normal elevation of ware in the river D / S Normal elevation of water in the river U / S flood elevation of water in the river D / S flood elevation of water in the river elevation for apron of river U/S minmam elevation of water in the river D/S minmam elevation of water in the river fom tabale length sarvay Slop width of river h1-h2 for Normal time h3-h4 for Flood time h6-h7 for minmam water Horizontal Length= S^2- h^2 V/H minma water depth in the river (h7 - h5 ) B + 2* H1 wetted perimeter for minm water depth B*H3 A/P the hydraulic radic for minm water depth 1 /n *R^0.6667* √ S for Normal water minm. Water in the river Normal water depth for Norma time in the river(h2-h5)
B + 2* H1 wetted perimeter for Normal water depth B*H1 A/ P the hydraulic radic for Normal water depth 1 /n *R^0.6667* √ S for Normal water Normal water in the river for normal time maxm water depth for flood time in the river(h4-h5)
B + 2* H2 wetted perimeter for flood water depth B*H2 A/P the hydraulic radic for floodl water depth 1 /n *R^0.6667* √ S for flod water Maxm water in the river for flood time
2805.08
2804.80 2805.18
2804.90 2804.13 2804.95
2804.670 0.025 50.00 7.00 0.28 0.28 0.28 50.00 0.0056 0.54 8.0880 3.8080 0.4708 1.8116
6.90 0.674 8.3480 4.7180 0.5652 2.046
9.65 0.77 8.5480 5.4180 0.6338 2.2087
11.97
m m m m m m m m m m m m
m m m2 m m/sec m3/sec m m m2 m m/sec m3/sec m m m2 m m/sec m3
ID-number 28-2802-0014 -2 A Province: Bamyan District: Shebar Village: Gonbad Project type :M,H,P No F 256
MHP
Deta from site for canal H= freeboard
0.2
m
h1= U / S minm elevation of water in the canal
2804.7
m
h2= D / S minm elevation of water in the canal
2803.77
m
h3= U / S elevation for flood water in the canal
2804.90
m
h4= D / S elevation for flood water in the canal
2804
m
h5= elevation for apron of canal n fom tabale for canal S= length sarvay
0.017
Slop
400
m
1
m
h= h1-h2 for Normal time
0.90
m
h= h3-h4 for Flood time
0.90
m
B= width of canal
L= Horizontal Length=
S^2- h^2
H1=
minmam water depth in the canal(h2-h5)
P= B + 2* H1
wetted perimeter for Normal water depth
A= B*H1 R= A / P
the hydraulic radic for Normal water depth
V= 1 /n *R^0.6667* √ S
for Normal water(1-1.5)
Q= minmam water in the canal for normal time A*V S=
H2= flood water depth in the canal(h4-h5) wetted perimeter for flood water depth
A= B*H2 R= A / P
the hydraulic radic for floodl water depth
V= 1 /n *R^0.6667* √ S
for flod water
Q= Maxm water in the canal for floodl time=A *V
Q=
0.50
m
2.0000
m
0.5
m2
0.250
m
1.107
m.sec
0.554
m3/sec
0.0022
(n*V/ R^0.667*√S*R
P= B + 2* H2
400.00 0.0022
Slop = V / H
S=
2803.27
(n*V / R^0.667)^2 A * 1/ n *R0.6667* √ R*S
0.730
m
2.46
m
0.73
m
0.297
m
1.24
m
0.906
m3/sec
0.0023 0.906
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2 A Bamyan Shebar Gunbad M,H,P 256
MHP
Canal desing canal type stone masonry with cement mortor Q n
(Rectangular canal)
flood flow coefficent
m³
0.906 0.017
Q
desing flow
m³
0.554
N
for gravelly earth side slope
m
0
V
choos Velocity
m/s
1.107
Crosection area
m²
0.50
A=Q/ V X=2√(1+N^2) - 2N H= √ A / (X+N) B=H*X T=B+(2H*N)
best factor for canal the water depth incana
m
0.500
The bed width
m
1.000
top width
m
1.000
Vc Vc
0
m/s critical velocity √ A*g /T
0.8 Vc
V< 0.8 Vc
ok
m/s
2.2
m/s
1.8
m
2.000
m
0.250
> v ok
the wetted perimeter P=B + 2* H√ (1+N^2) the hydraulic radic R= A / P the reqired canal slope S=[n*V / R^0.667]^2
0.0023
Cheke Q=A*1/n *R^0.1667*√R*S check the flow depth for maximum flood flow in the canal
0.554
Q=[(B*H+N*(H)^2)^5/3*√S] / n*[B+2*H√(1+N^2)]^2/3
By trall and error method H
Triaf value of H(m) 0.3 0.4 d=11RS
0k
Correspandding Q =1.11m³/s 0.27 0.408
0.73 0.90 largest particle that will be transported in the canal(mm)
ok 6
Desing of Channel for Q= 1 m3 for shadman CDCs
No
n
s
b,m
√S V(m/s) Q,m3
h,m A,m2 P(m) R(m) R⅔
3 4
0.017 0.0023 0.017 0.0023
1.0 1.0
0.3 0.4
0.3 0.40
1.6 1.8
0.188 0.326 0.222 0.365
0.05 0.05
0.91 1.02
0.27 0.41
5
0.017 0.0023
1.0
0.73
0.73
2.5
0.297 0.443
0.05
1.24
0.90
Note: Mostly when we going to make Design for channel we can uese the Trille Method and also we can uese the mening formula for design of the channel.you can see the following Lenth of channel=245m Q=V*A
s=slope of channel=2%
R=A/P
V=C√RS
n=0.014
P=2h+b
C=1/n*R1/6
Design for Q=1m3
A=b*h
Q=V*A=C√RS*A=1/n*R⅔*A*√S Free board=20cm Actual diminstion=(100*200)cm
73
Section ↓
100
0.579
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2 A Bamyan Shebar Gunbad M,H,P 256
MHP
Design sizing Oriffice g
9.81
m/s²
0.6
m/s
C
for roughlyfinshed stone masonry oriffic
V1
velocity for M.H.P 1-1.5
1.107
m³/s
Q
desing flow
0.554
m³
Q
desing flood
0.906
w
width of canal
1.000
m
Hh
headrace canal
0.50
m
Hfr
flood water level
0.77
m
Hnr
Normal water Level in the river
0.67
Q
increased Trashrack and seepeage losses
15%
Q
Q desing*1.15
15% increased to meet trashrack
0.637
m³/s
A
oriffice area
Q / V1
0.58
m²
H
oriffice height
choose
0.2
m
W
oriffice width
A/H
2.88
m
h
bottom of the oriffic above the river bed level
0.2
m
Q
discharge in oriffic A*C√2g*(Hr-Hh)
0.637
m³/s
V
acceptable rang
1.108
m/s
Qflood
in to river
Q/A
Discharge =Athrough *C √ 2*g(Hf-Hh) the oriffic during flood flow
m³/s
Q=
A*C √2*g *(Hf - Hh)
0.80
m³/s
H=
depth of water in the canal A / width canalfor normal
0.58
m
0.246
m³/sec
0.083
m³/sec
Spill excessflood water=
Q flood -Q desing
Spill Normal excess water=
Q discharge in oriffiic - Qdesing
Spill normal water=
ok
ok ok
ID-number 28-2802-0014 -2 A Province: Bamyan District: Shebar Village: Gonbad Project type : M,H,P No F 256
MHP
Design of Vertical drop weir Step 1. Q=
Maximum flood discharge
L = 4.75 Q1/2 =
Length of water way
11.97
m³/sec
16.432
m
L=
Provide
7.00
m
q= Q/L=
discharge per unit length of water way
0.728
m³
Step 2. f=
Lacey ,s silt factor
R= 1.35 (q2/f) 1/3
1
Scour depth
0.239
m
3.05
m/sec
0.475
m
H.F L before construction
2804.90
m
Level of d/s T.E.L. = H.F.L before cons. + V2/2g
2805.37
m
1
m
=q/R
Regime Velocity 2
Velocity head = V /2g Step3
Afflux Level of u/s T.E.L. = d/s T.E.L. + Afflux
2806.37
U/s H.F.L= Us T.E.L - V^²/ 2*g
2805.90
m
Actual d/s H.F.L. allowing 0.5 m for retrogression H.F = L before construction - 0.5
2804.4
m
0.568
m
2805.81
m
2805.54
m
Step 4. Discharge Over crest of the weir is given bay q= 1.7 k3/2 k = (q/1.7)2/3 Crest level= u/s T.E.L. – k Step 6. Level of bottom of u/s pile(d1)
= u/s H.F.L. – 1.5 R
u/s pile may take up to a level ( d1 )
2803.8
d/s bed level
m
m
2804.126 m
Minmam water Level -U/s Pile 0.33 m Hence provide concrete cutoff of 0.5 m depth below the bed of river at the u/s end of Level of bottom of d/s pile (d2) = d/s H.F.L. after retrogression – 2R 2803.92 m Dept of u/s cut off = d1
d2= Manimam water water level -Level of bottum of d/s pile
0.48
m
1.68
m
1.68
m
0.568
m
0.85
m
1.00
m
0.57
m
1.00
m
Step 7. Head of water
Hs =crest Level - Bed level
Height of crest
H= crest level - Bed Level
v (B) Design of weir wall (B1) Step 8. Calculation of top width d = u/s T,E.L. – Crest level = Top width
B1 = d/√G
B1provide From sliding consideration, a = 3d/2G = From practical considerations, B1 = s + 1 = Step 9. Calculation of bottom width (B) Consideration II.
When the water is flowing over the weir and the weir is submerged. Considering the tail water the weir overturning moment given by Mo = wh H2/2 When the water is at the crest, d and h will be equal. For this case, the value of d is given by h= d = [q2/ (2/3C)2 x 2g]1/3 (Neglecting the velocity of approach) where C = 0.58 is the coefficient of discharge. 3
Substituting q= 0.673 M /sec/m, we get
0.58 0.728
m³/sec
q²=
0.53
m³/sec
(2/3C)^2=
0.15
2g= d= water depth over the weir 2
2
h=d= [q / (2/3C) x 2g]
1/3
Mo = W h H2/2
19.62
m/sec
0.565
m
0.566
m
0.80
tm
if u/s is level The moment of resistance is given by: Mr = {WH(G-1)/6} (B2 + B1B - B1²) Mr= 2.24*1.5(2.24-1)/6(B²+0.85*B-0.85^²)= 0.43B² +0.43B -0.43*(0.85)²=Mo
0.31 0.5 B² +0.26B -1.18 =0 0.31 B² + 0.31 B B=- b+(b^2-4ac)^0.5 /2*a 1.1087
-1.11 = 0
B provide
0 1.46
m
2.2
m
v (C) Design of impervious and pervious aprons: Step 10. Assuming C = 12, total creep length is
L = CHs
C=
12
L= C*Hs
20.2
m
10.9
m
L2 = L – L1 – (B + 2d1 + 2d2)
5.5
m
L3= 18*C √ (Hs / 10 ) ( q / 75 )
8.72
m
-2.15
m
12.78
m
Minimum length of inverted filter 1.5 d2
0.72
m
Minimum horizontal length of launching apron 2.5 d2
1.19
m
1.91
m
Step 11. d/s impervious apron (L1): without crest shuttersL1 = 2.21*C √ Hs / 10 Step 12. u/s impervious apron (L2): Step 13. Total length of d/s apron Step 14. Length of filter + launching apron = OR
L3=
Total minimum length of both
L3 - L1
Min,inve+Min,hor,Lan+L1
inverted filter+launching apron
Step 15. u/s block protection and launching apron: d1 =
0.33
m
Length of u/s block protection = d1 = m.
0.33
m
Length of u/s Talus = 2d1 =.
0.652
m
Step 16. Thickness of impervious floor Provide a nominal thickness of 0.2 m to the u/s of the weir wall and 0.5 m below the weir wall Residual pressure at point A of figure just at the d/s of weir wall Hr = Hs – (Hs/L) x(2*d2+L-L1+B) 0.64 Thickness (t) = 4/3* (Hr/G – 1)
m
0.69
m
20
T / m²
Hence provide a thickness of0.59 m from the d/s of weir wall to a point m 5from
Breing capocity of soil
Sand and garval
Cf
Coefficient of friction
rwater =
Density of water
1
t/m³
rstone =
Density of stone
2.24
t/m³
P= H/2*(2*h+H) *D,water
2.36
t/m
Ww=Ww*(a+b)/2*H
6.02
tm
Mo= P*H/3 (3*h+H)/(2*h+H)
1.59
tm
X=W1*(B-B1/2)+W2*2/3*(B-B1)-Mo / Ww
1.099
m
Mr=Ww*X
6.62
tm
e=B/2-X Chek Pmax= Ww/B *(1+6*e/B)
0.001
m
2.75
tm
SFs=µ* Ww / P> 1.5
1.53
ok
SFO=MR / MO> 1.5
4.16
ok
0.6
20
<
ID-number 28-2802-0014 -2 A Province: Bamyan District: Shebar Village: Gonbad Project type : M,H,P 256
MHP pagr 5
Weir Design Breing capocity of soil Sand and garval 20 h freeboard 0.2 H the wire height 1.68 L length or weir 16.432 Cw were coefficint 1.5 b Top width of weir 1.00 B Bottom width of weir 2.20 h Height of water form Top of weir 0.565 m Coefficient of friction 0.6 rwater = Density of water 1 rstone = Density of stone 2.24 Q= Maxm water in the river for flood time 11.97 d H/3 { (3h+H) / (2h + H ) } 0.673 W1 = b*H *rstone 3.76 W2 = 0.5 ( B - b)* H*Drstone 2.3 W= W1 + W2 6.02 P= H/2 ( 2h + H )*D rwater 2.36 Let x be the distance from toe where resultant of forces strike the base. Taking moment about toe, X=W1*(B-b/2)+W2*2/3(B-b)-P*d/w 1.0984 P=
P siol ≥
e=
B/2 - x B/6
Sliding check
W*m W*m
PmatrailsW =
>
20 ≥
0.002 P 3.6
Chek Pmax= Ww/B *(1+6*e/B)
20
T / m² m m m m m m t/m³ t/m³ m³ m t/m t/m t/m t/m
6.02
ok
<
0.002 0.367 0.367
ok
>
3.61 2.36
ok
>
2.75
SFs=µ* Ww / P> 1.5
1.53
ok
Mo= P*d
1.59
tm
MR=Ww*(X)
6.61
tm
SFO=MR / MO> 1.5
4.16
ok
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2A Bamyan shebar Gunbad
MHP
M.H.P 256
PENSTOCK Desing Head Loss: ˝ 2
2
hf = 10 L n Q
D hf = L= n= Q= D= D=
20
5.3
Pipe dia :
head loss due to friction (m) penstock length roughness coefficient flow for one penstock 41*Q^0.38 internal pipe diameter
0.508
(m3/s)
0.27 9.0 0.012 0.554
(m)
0.452
(m) (m) (m) (m) (%) (m)
28 8.5 0.26 0.3 0.5 6 7.97
(m / s) (m3/s) (m)
2.73 0.554 0.508
(m)
˝
2 1
(SB p.126, "n" p.128)
Velocity:
v=
Provide
v= Q= d=
∝ Gross head (w/ forebay) Turbulence head loss Friction head loss (hf) Total head loss % loss < 10%hg Net Head 4Q 3.14 * d2 velocity limit 2.5 to3.5 m/s flow Inside diameter
(DM. p. 127, SB p. 130)
Turbulence Losses: htl =
2
v
(K entrance + K bend + K valve + K contraction) 2g
htl = total turbulence head loss (m) v = penstock water velocity (m/s) K entrance = K bend = K valve = K contraction =
0.26 2.73 0.2 0.14 0.1 0.25
ok
ok provide
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2A Bamyan shebar Gunbad
MHP
M.H.P 256
Surge calcultion a=1440 / √( 1+ ( 2150 * d) E*t E=youngs pressure wave velocity
200000
N/mm²
t= thickness of pip
3
mm
t=choos closuer time
5
s
1423
m/s
0.0127
sec < 5sec ok
a=pressurewave velocity=1+(2150*d)/E*t Tc=2*L /a
Critical timme of close
K=(L*V / g*hgross* T )
0.00014
3.5 Falang thickness=2* thickness penstok Di, of bolts=AS/3.14 With falang=5* Di, of bolts pip Di 20"
No. of Kamazes
#REF!
Nb,holes
16
Length of penstock sections
3
m
Total Penstock Length
9.0
m
Sections needed
3
Pc
Flanges needed
6
Pc
Flange washers needed
3
Pc
Kgs of Nuts & Bolts
14.4
Kg
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2A Bamyan shebar Gunbad
MHP
M.H.P 256
Airvent pip desing
H
forbay
F
uried pip
2.74 5 3
t
thickness penstock
mm 553.6
Q
Flow for one penstack
E
ToungsMudlus
D
Di of penstock
L /s 200000
t=(effective thickness)=( t / 1.1*1.2 ) - 1 (D/ T effective)^3 Q*(F/E) (D/T)^3*Q*(F/E) (D/T)^3*Q*(F/E)
N/mm² 14"
508 1.27
mm mm
63589452.43 0.01 880123.24 938.15
d= {Q*((F/E)*(D/Teffective)3)1/2}1/2
30.629
L= Lingth= hf +20%
3.288
m
d= {Q*((F/E)*(D/Teffective)3)1/2}1/2
1.206
in
mm
ID-number 28-2802-0014 -2 A Province: Bamyan District: Shebar Village: Gunbad Project type M,H,P : No F 256
MHP
Desing Foreby for one turbin D
penstok
0.508
m
h1
free bourd
0.2
m
Q
discharge
0.554
m³/s
V
velocity in the penstock
2.73
m/s
hs=
1.5V²/2g or we can 4*Di penstock
2.03
m
Hf=
Hf =hs+Di penstock+fery bourd +free bourd
2.74
m
V1=
vulem of forbay=20* Q discharge
11.1
m³
A=
V1 / hs
5.4
m
L=
√2*A
Length of foreby
3.30
m
W=
L/2
Width of foreby
1.65
m
ID-number Province: District: Village:
28-2802-0014 -2 A Bamyan Shebar Gunbad M,H,P 256
Project type :
No F
MHP
Settling Desing ∞
11
º
ß
26.5
º
Width of canal
1.00
TAN15°
0.26
V
1.11
Q
desing flow
d
lomit
W
from shilels graph
A
Required basin surface area
B
width =Assum
L
A / B
Vp Y
0.5536 0.3
mm
0.037
m/s
30
m²
3.30
m
10.0
m
0.44√d limit
0.24
m/s
Q / B*Vp
0.70
m
2*Q / W
provide
Storage Desing freeborad
0.2 1
P=packingfactor S=density
2600
kg/m³
T=Flushing frequncy( 6 ) h
28800
sec
2
kg
31889.00
kg
V sediment=S lod / Sdecnity* P factor
12.26
m³
Ystorege=
0.37
m
33
m
1.94
m
1.27
m
0.80
m
C=Assum sediment concentration (kg) Sedimen load
Q*T*C
V sediment / Basin area
Actual area
L*B
L inIet=
Y storege / sin∞
Required Basin depth=
L outlet=
Y storeg / sin ß
Y+Y storeg+Freebourd
ID-number Province: District: Village: No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256 Design of Support Pier (SP1)
Penstock Internal Diameter Penstock thickness U/s penstock inclination D/s penstock inclination Dist. to upper support pier
d= t= a= b= L2u =
0.31 0.003 28 2.7 0
m m
L1u =
0
m
Dist. to lower support pier
L2d =
4.5
m
Buired depth of block at u/s face Buired depth of block at d/s face
L1d = h1= h2 =
3 1 0.6
m m m
h3 = B= B1 = W= i= f soil = f= g soil = P= m= g concrete =
0.8 1.8 0.89 1.3 25 25 0.25 17 100 0.5 20
m m m
0.663225116 0.04712389
Ht. of block from GL to bottom of pipe at d/s Length of block (Base) Length of block (Top) Width of block Uphill ground slope 0.436332313 Angle of friction (soil) 0.436332313 Coefficient of friction (tar sheet used) Unit weight of soil Allowable bearing pressure Coefficient of friction between soil and concrete Unit weight of masonry
R R
R R
Unit weight of steel Unit weight of water Ht. of block at u/s face Ht. of block at d/s face Ht. of block from base to c.l. of bend
o o
KN/m3.
KN/m3.
g steel = g water =
9.8
KN/m3. KN/m3.
H1 =
2.1
m.
H2 =
1.4
m.
H3 =
8.432
m.
b1= b2 =
0.856
m.
0.054
m.
0.055 1.080 0.342 0.712 0.022 0.309 0.469 2.934 3.814
0.9 0.43 0.381 1.764 1.152 0.571 m² m³
[ = h2+h3+(B1*tan l) ] [ = h2+h3 ] [ = h2+h3+(.5B)Tanl ]
Calculation of Block volume excluding volume of pipe Volume of pipe upper side B1*Π*d^2 /4*COSœ Block areas h2*B b1*(h1-h2) B1 *h3 0.5*b2*h3 0.5*B1*(H1-H2) 0.5* b1(H1-h1) Total area of block Volume of block Total area of block*Width of blok
m
a1 = a2 = a3 = a4 = a5 = a6 =
77
X1 X2 X3 X4 X5 X6
Volume of block excluding pipe Weight of the block
Vplum b.+ Vloum .p g concrete = Volum .b *
Wb =
3.869 76.29
m³ KN
Weight of pipe
[ = p(d+t) t gsteel ]
Wp =
0.23
KN/m
Weight of water
[ = p d gwater / 4 ]
Ww =
0.74
KN/m
Wp + Ww =
0.97
KN/m
F1u = [ = (Wp + Ww)L1u Cos a ]
0.000
KN
F1d = [ = (Wp + Ww)L1d Cos b ]
2.897
KN
0.857
KN/SP
0.857
KN
2
Frictional force per support pire F2d =
[ = f (Wp + Ww)L2d Cos a ]
F10=
Soil force
2 2 0.5 Ka= [ cosi - (cos i - cos f)
( cosi + (cos i - cos f) 2
2
1.0
0.5
F10= [ g soil H12 Cosi Ka w / 2] This force acts at
Resolution of forces a= 28 b= 2.7 i= 25 Forces (KN) F1u = F1d = F2d =
0.000 2.897 0.857
F10= Wb =
43.969 76.29 ∑H = ∑H =
43.969 0.333
from base.
o o o
0.488692 R 0.047124 R 0.436332 R X - component (KN) 0.000 1.224 0.757 0.757 -0.757 39.850 0 41.831 Exp. 40.317 Cont.
∑V = ∑V =
Y - component (KN) 0.000 2.626 0.402 0.402 -0.402 18.582 76.29 97.897 97.093
The center of gravity of the block from the upstream face of the block 0.699 m. Weight of the block W b acts at from O. 0.699 Sum of horizontal forces that act at the bend 1. Expansion case 1.981 KN 2. Contraction case 0.468 KN Acting at = 8.432 from O Sum of vertical forces that act at the bend 1. Expansion case 3.028 KN 2. Contraction case 2.223 KN Acting at = 1.301 from O
∑H -F10x
∑V -F10y -Wb
Exp. Cont.
KN m.
Check against overturning 1. Expansion case ∑M @O = 87.28 d= 0.891 e= 0.009 eeffective = 0.300 >e ok
[ = ∑M / ∑V ] [ = (B/2) -d ] [ = (B/6) ]
2. Contraction case ∑M @O = d= 0.757 e= 0.143 eeffective =
[ = ∑M / ∑V ] [ = (B/2) -d ] [ = (B/6) ]
73.47
0.300 >e ok
Check against bearing capacity 1. Expansion case Pbase = 43.02 KN/m2 2. Contraction case Pbase = 61.32 Pallowable =
KN/m2 100
Check against sliding 1. Expansion case m∑V ∑H < 41.831 < 48.95 2. Contraction case m∑V ∑H < 40.317 < 48.55
[ = (∑V/Abase) (1 + 6e/Lbase) ]
KN/m2 >Pbase ok
ok
ok
h2
b1 b2
B
H2 H3
h2
h1
H1
i
l
B1
90
H2 H3
ID-number Province: District: Village: Project type :
No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256
MHP
POWER & TURBINE Desing gras head
for one Turbine
Flow= atention 0.25m³ Net Head=Hg-Total head loss
Q=
m CMS Meters
H=
7.97
e,turb =
0.65
e,belts =
0.90
e,gen =
0.85
Turbine efficiency V-belt efficiency
8.50 0.554
Generator efficiency
Overall efficiency e= 0.50 Total Power=belt e*gen ,e * turbine ,e* 9.81Q*Hg ((( Not: one ,turbine ))) or P=Q*gras,H*g *0.5 23.1
KW
Turbine shaft Power Output=1.1*Genretor out put / ( G , efficincy *V-belt efficincy)
33.2
KW
p,turb = D runner for T12
28.11 0.300
KW m
Shaft output power of turbine in KW.= 9.8XQ XHnXe turb D1 =
ideal Turbine Rpm=(40 * Hn) / D runnr Tjet=0.2 Drunnr
OR
133 *√ Hn
RPm =
Rotor length (width)=0.23 *Q / Tj*Hn OR 3.623*Q/√Hn bo= Normal range=0.3 up to 4.0=ratios of (0.3:1) up to (4:1) b0 to D1 ratio =bo / D1 Rpm generator Generator pulley OD Turbine pulley OD after Intemediaftn shaft
D>we need make Intermediate shaft Turbine pulley OD (It,s raed N,S,P)
NSP porogerams= Pulley ,G / Pulley ,T ( 1 / 4 )
375
R/m
0.060
m
0.71
m
2.4 1500.0 0.127 0.507 20.000
ok R/m m m in
4.00
ok
Ideal Specific Speed=1.2*Rp Turbine* Turbine shaft power / Hn^1.25 Overspeed Specific Speed=Ideal specific speed+20% Selected Over speed Specific Speed= form geraf (Maxm) Overspeed R,P,M=Over speed specific Speed * Net Specific Speed=1.2*RPM TURBIN* Turbine shaft power / Hn^1.25 % Over speed= (Overspeed R,P,M - Turbin R,P,M) / Tubin R,P,M * 100
193.83 232.59 150 291 150
Pulley Ratio=
5.16 450.59 R/m
(22.6) %
R,P ,M generator / Over speed R, P ,M
Overspeed Turbine RPM for puly sizing =Ideal RPM Turbin+20% Turbine pulley OD = Ideal RPM ratio = 1500 / Ideal RPMTurbin
0.423 3.99
m ok
Normal range=2.0 up to 6.0=ratios of (2:1) up to (6:1) 3.33
Overspeed RPM ratio =1500/ over speed Turbin RPM
ok
Normal range=2.0 up to 6.0=ratios of (2:1) up to (6:1) Circumference of rotor
Cr =
0.942
Number of blades Distance between blades Number of belt=Total Power to shaft / Power of one belt Typ of belt BV Power of one belt Center distnce between tow puly= G Di + T Di
Nb = Db =
28 0.034 4.1 8 0.634
Pc kw m
ID-number Province: District: Village:
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256
Project type :
No F
MHP
Intermediate shaft Generator
(Fixed ) RPM inches
1500 5
Intermediate shaft ------------5 RPM
1500.0 5
Target RPM =
375
>>>>>>>
Target RPM Ratio =
4.00
0.13
sqrt of RPM Ratio =
2.0
1500.0
20
5
Turbine ------------RPM
1500
5
375
375
5
1500.0
20
Diff
375.00
0.5 ≤ 19%
Available Pulley Sizes Inches Mms Note: For T7, standard bo (mm) 5 127 85, 100, 120, 145, 175, 210, 250, 300, 360, 430, 520,620 6
152
For HKT, bo is upto 645mm
7 8 10 12
178 203 254 305
14
356
Max b0 in Afg = 1.3m HKT For TMT, bo is generally either 165mm or 320mm Rote dia T12 T7 HKT A10 TMT D(m) 0.300 0.360 0.340 0.300 No-blades 28 30 24 24
16 18 20 22 24
406 457 508 559 610
23
584
25
635.00
Pelton, single jet: 10 - 30
26 27
660 686
Pelton, multi-jet: 18 - 70
28 30
711
Typ of belt Power(kw) RPM T12= RPM T7=
0.270 24
A B C D 2 4 8 11 133*√ Hn bo=3.623 * Q / √ Hn for T12 form 100 to1120mm 114*√ Hn bo=Q / 0.3* √ Hn fo T 7 Specific Speeds
Turgo: 20 - 70 Crossflow: 20 - 150
762
Francis: 80 - 400 Prop & Kaplan: 340 - 1000
R,Pl,Md XDiPl,Md=R,Pm,G XDi,Pl G Di,Pl, turbin X Rp,m, turb=Rpm ,Md XD, P,M p,turb = Shaft output power of turbine in KW. = 9.8 x Q x H x e,turb =
KW 25.9
Q 0.554
Net H 7.97
e,turb 0.6
=
13.3
0.4
5.65
0.6
ID-number Province: District: Village: Project type :
No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P
MHP
256
Cable sizing
P
power
23.082
KW
P1
phase
3
pf
power factor
S.F
seftefactor
1.33
V
voltage
400
V
I
current Rating
95.9
A
A
area
50 and 35
mm²
0.8
1.33 * P / V*pf
form tebal
arder cable
form genrator to cantorol panal Cu
4X25
mm²
arder cable
form cantorol panal to poleAL
4X50
mm²
arder cable
1.6*P
69.2
mm²
for theer phase
Current rating (AC) for three and four core 110 volts armoured or unarmoured cables
Nominal cross Laid direct in Ground Laid Duct Laid in Air Aluminui Aluminui Aluminui section Copper(C m(AL) Copper(C m(AL) Copper(C m(AL) area U)(Amps) (Amps) U)(Amps) (Amps) (mm²) U)(Amps Amps
1.5
21
16
17
13
17
13
2.5
27
21
24
19
24
19
4
36
30
30
23
30
23
6
45
35
38
30
39
30
10
60
47
50
39
52
40
16
77
60
64
50
66
51
25
99
77
81
63
90
70
35
120
94
99
77
110
86
50
145
110
125
95
135
105
70
175
135
150
115
165
130
95
210
165
175
140
200
155
120
240
185
195
155
230
180
150
270
210
225
175
265
205
185
300
235
255
200
305
240
generator rating factors 30
35
40
1.08
1.06
1.03
1
1000
1250
1500
1750
2000
altitude factor
1.00
0.98
0.96
0.945
0.93
Altitudes
3000
3250
3500
3750
4000
B2
altitude factor
0.86
0.845
0.83
0.815
0.80
C
ELC corection factor
max.Ambeant A
B1
temperature in C°
20
25
1.1
Altitudes
Temperature factor
when load is light bulbs only D
power factor when load includes tube light and other imductive lodes
ID-number Province: District: Village:
28-2802-0014 -2A Bamyan shebar Gunbad
Project type :
M.H.P
No F
MHP
256
Genertor Selection
A-
temperature in C°
1.03
B-
Altitudes
0.915
C-
ELC corection factor
0.83
D-
power factor
0.8
S-
seftefactor
1.3
P-
power
G-
generator 1.3*P
G-
generator 1.3* P
2250
/A*B*C*D
c°
23.082
kw
48.0
KVA
30
kw
ID-number
28-2802-0014-2A
Province:
Bamyan
District: Village:
shebar Gunbad
Project type : No F
M,H,P 256
P= 23.0822 Wat /Family
√3
Conde Power ctivity factor 0f AL
MHP
kwat 90.16
wat
Voltage Drop Calculation for Transmission and Distribution System:
Volt at No-F To-No- Length ACSR Rated Voltage node Sectio in F in between area( Phase Power at Voltage Current drop branch n section section nodes (m) mm²) 1,3 node (W) (V) (A) (V) (V)
S
256
1624
K
3
400
35
0.8
PH-A
103
256
694
50
3
23082.2
400
41.65
28.6
371.4
1.73
35
0.8
A-B
55
533
50
3
13795.19
400
26.81
14.1
357.3
1.73 1.73
35 35
0.8 0.8
B-C C-D
68 30
153 98 30
255 142
50 50
8836.14 2704.94
4.5 0.8
35
0.8
A-K
70
70
300
16
12.26
13.1
1.73
35
0.8
B-J
49
49
200
50
15.84
3.6
1.73
35
0.8
C--H
51
51
50
16
9.41
1.68
1.73
35
0.8
D-E
23
23
300
16
4.25
4.6
1.73
35
0.8
D-F
39
39
281
16
7.21
7.2
1.73
35
0.8
D-G
24
24
500
16
400 400 400 230 400 230 400 230 400 230 400 230 400 230
17.85 5.53
1.73
3 3 3 1 3 1 3 1 3 1 3 1 3 1
4.44
7.9
352.8 352.0 371.4 201.3 357.3 202.7 352.8 202.0 352.0 198.7 352.0 196.0 352.0 195.3
for
3 phase
I= P / 1.732 x 0.8 x V ∆V= I x 1.732 x L / K* A
for 1
4418.07 4598.40 2073.79 3516.42 2163.95
phase
I= P/V*pf ∆V= (2X L X I ) / K x A
≤16%
7.2 10.7
OK OK
11.8 12
OK OK
12.5
OK
11.9
OK
12.2
OK
13.6
OK
14.8
OK
15.1
OK
400
1.73
6311.53
% voltag drop
ID-number 28-2802-0014-2A Bamyan Province: shebar District: Gunbad Village: Project type :M,H,P No F 256 P= 23.0822 kwat Wat /Family 90.164664
MHP
wat
Voltage Drop Calculation for Transmission and Distribution System:
√3
Conde Power ctivity factor 0f AL
Volt at No-F To-No- Length ACSR Rated Voltage node Sectio in F in between area( Phase Power at Voltage Current drop branch n section section nodes (m) mm²) 1,3 node (W) (V) (A) (V) (V)
S
256 256 85 85
1.732
35
0.8 PH-A
256
1.732 1.732 1.732 1.732
35 35 35 35
0.8 0.8 0.8 0.8
A-K K-L L-M M-N
36 24 18 7
49 25 7
1.732 1.732 1.732
35 35 35
0.8 A-D 0.8 D-E 0.8 E-F
47 25 13
85 38 13
1.732 1.732 1.732
35 35 35
0.8 A-G 0.8 G-H 0.8 H-I
42 25 19
86 44
85
86
for
3 phase
I= P / 1.732 x 0.8 x V ∆V= I x 1.732 x L / K* A
19
3070 694 850 300 200 170 180 653 300 200 153 873 500 198 175
for 1
50 50 35 35 16 35 25 16 50 35 25
3 3 3 1 1 1 1 3 1 1 1 3 1 1 1
400 23082.2 7664.0 4418.1 2254.1 631.2 7664.0 3426.3 1172.1 7754.2 3967.2 1713.1
phase
I= P/V*pf ∆V= (2X L X I ) / K x A
400 400 230 230 230 230 400 230 230 230 400 230 230 230
% voltag drop
≤16%
400 41.65
28.61
14.89 26.39 14.04 4.01
5.11 8.62 3.90 2.58
14.89 20.68 7.41
7.29 9.45 4.05
15.07 24.10 10.82
8.61 7.79 4.33
371.4 371.4 209.3 200.7 196.8 194.2 371.4 207.1 197.6 193.5 371.4 205.80 198.00 193.7
7.2 OK 9 12.7 14.4 15.6
OK OK OK OK
10 OK 14.1 OK 15.9 OK 10.5 OK 13.9 OK 15.8 OK
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256
MHP
Fuse sizing
P
power
33.19
P1
phase
3
pf
power factor
0.8
S.F
seftefactor
1.25
V
voltage
400
V
I
current Rating
43.2
A
SF * P / 3* V*pf
KW
ID-number Province: District: Village:
28-2802-0014 -2 A Bamyan Shebar
Gunbad Project type : M,H,P No F 256
MHP
DesingGravel trap ∞
11
º
ß
26.5
º
2
mm
d
limet
Q
Full canal flow,
0.903
m3/sec.
H
flow depth
0.7300
m
B
width of headrace
1.00
m
V
Velocity
1.11
m/s
A
area
0.815
m²
Q/V
4≤ L / b ≥ 10
dimension such B
Width
L
Length of the gravel trap
6*B
L/ B=
6.00
m
10.00
m
1.67
ok
Vp
Maximum Horizontal vlocity
0.44√ dlim
0.62
m/s
Y
depth of basin
Q / B* Vp
0.2
m
0.73
ok
1.3
m
Y =flood hight L
inIet=
Y storege / sin∞
Sediment storage requirement h
Assume sediment concetration
freeborad
0.2
C S
density
P
Pfactor
T
Flushing frequency( 6 ,h )
S
Sedimen load Q*T*C
V
2
kg/m³
2600
kg/m³
1 21600
ses
39005.77
kg
V sediment=S lod / Sdecnity* P factor
15.0
m³
Y
depth of storege=
0.25
m
A
Actual area
L*B
60
m²
L
outlet=
Y storeg / sin ß
0.54
m
Y+Y storeg + Freebourd
1.18
m
Required Basin depth=
V sediment / Basin area
ID-number Province: District: Village:
ype :
No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256
MHP
Vertical flush pipe h=
freebourd
Q= Cw= H= H=
0.2
M
desing flow
0.554
M³ / S
orifice coefficient water depth in the basin during the desing flow prior to flushing
2.76
is the flushing head when basin is empty
2.74
m
2.54
m
the pipe dimeter can be determined by rewriting the above equation as d=
{(4*Qdesing / π *C * √ (h flush)}^1.2
d=
0.40
m
d=
16
in
is the area of pipe= π *d^² / 4
0.126
m²
C*A * √ h flush
0.554
d=
{(6*Qdesing / π *C * √ (h flush+h basin)}^1.2
0.408
m
A=
is the area of pipe= π *d^² / 4
0.131
m²
0.830
m³ /sec
0.830
m³ /sec ok
A=
Q desing
1.5 *Q desing = C*A * √ hflush+h basin
1.5*Q desing=
m³ /sec ok
ID-number Province: District: Village:
28-2802-0014 -2 A Bamyan Shebar
Gunbad Project type : M,H,P No F 256
MHP
Spillway (Weir ) Calculations for geraval terips h=
freebourd
0.2
Q=
Q desing
0.554
Q=
Maxm water in the canal for floodl time=A *V
0.906
weir coefficient
Cw=
overtop= (0.5*freeborard-0.05)
1 2
M³ / S M³ / S
1.6
spillway crest should be 0.05m above normal canal water level no morden 50% of the freebourd h
M
0.5 0.05
m the spillway must be abie to conveey the entire flood floe of in case the headrace canal downstream gets obstructed the spillway shuld be able to spil the excess flow when there is no obstruction
Cas-2
during flood
L=
length of spillway
Q flood - Q desing L = 2* Q / Cw X h ^1.5
0.353 39
M³ / S M
Spillway (Weir ) Calculations for spill deschage h=
freebourd
0.2
Q=
Q design
0.554
Q=
discharge in oriffic
0.637
Q=
Excess water
Cw= h L=
Qdesign - Qdischarch in oriffice
1.6
overtop= (0.5*freeborard-0.05)
0.05
L = 2* Q excess / Cw X h ^1.5
M³ / S
0.083
weir coefficient
length of spillway
M
9.33
m M
ID-number
28-2802-0014 -2A
Province:
Bamyan
District:
shebar
Village:
Gunbad
Project type :M.H.P No F
MHP
256
Thunderbolt cacolation
h1=
highte,c
3
m
h=
hight e,c materials
10
m
ha=
h-h1
7
m
rx=
1.6 *ha / ( 1+h1 / h)
8.62
m
ID-number Province: District: Village: Project type : No F
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P 256
MHP
Design of Anchor Block # Type AB2
Penstock internal diameter
(d / 2)=0.62/2
d=
508
mm
t=
3
mm
dsmall =
0
mm
Gross head
h gross =
8.5
m
Surge head
h surge =
0.10
m
a=
28
b=
0
Penstock thickness Penstock internal diameter (Smaller)
U/s penstock inclination
0.48869 R
D/s penstock inclination
0
Dist. to upper
L1u =
7.5
m
Dist. to lower
L1d =
2.3
m
h total =
8.60
m
Buired depth of block at u/s face
h1 =
1.2
m
Buired depth of block at d/s face
h2 =
0.4
m
Ht. of block from base to CL of pipe at d/s
h3 =
0.59
m
Ht. of block from CL of pipe to top at d/s
h4 =
0.91
m
Ht. of block from CL of pipe to top at u/s
h5 =
0.85
m
Length of block
L=
2.51
m
Width of block
B=
2
m
Bend position from u/s face of block
b1 =
2
0.20944 R
i=
12
0.5236 R
f soil =
30
Total H=
hg + hsu
Uphill ground slope Angle of friction (soil) Coefficient of friction
for stiff day soil
steel onsteel with tar oaper in between
f=
0.25 KN/m3
g soil =
20
Allowable bearing pressure
P=
100
Coefficient of friction between soil and concrete
m=
0.5
No. of support piers u/s
N=
0
Unit weight of concrete
g concrete =
22
KN/m3
Unit weight of steel
g steel =
77
KN/m3
Unit weight of water
g water =
9.8
KN/m3
Unit weight of soil
for stiff day soil
2 H1 =
2.903
m
H2 =
1.9
m
h2+h3
H3 =
0.99
m
B-b1
b2 =
0
m
( h2+h3+h5+(b1*tan27)
Ht. of block at u/s face= Ht. of block at d/s face
h2+h3+h4
Ht. of block from base to c.l. of bend Bend position from u/s face of block Calculation of Block volume excluding volume of pipe Volume of pipe upper side
b1**d^2/ 4*Cosa
a
0.4591
m³
Volume of pipe downward side
b2**d^2/ 4*Cosb
b
0.0000
m³
0.459
m³
12.057
m³
11.597
m³
255.14
KN
A
0.37
KN/m
B
1.99
KN/m
2.36
KN/m
F1u = Wp + Ww )* L1u*COSa
15.609
KN
F1d = Wp + Ww )* L1d*COSb
5.421
KN
-8.269
KN
Total volume of pipe
a+b
A
Volume of block excluding pipe
(H2*B + B*(H1-H2)*0.5)* L
Volume of block
B-A
B
Wb = B-A *Ỵconcrate
Weight of the block
(d+t) * t * Ỵ steel
Weight of pipe
Wp =
Weight of water
Ww = *d^2 / 4 ) * Ỵwater Wp + Ww = A+B Calculate the relevant forces
2
F3 = [ = 15.4*htotal *d *Sin( (b-a)/2) ]
Hydrostatic force Soil force Ka= [ cosi - (cos i - cos f) 2
2
0.5
cosi + (cos i - cos f) 2
/
2
0.5
0.365
F10= [ g soil h12 Cosi Ka w / 2] This force acts at
from base.
10.291
KN
0.400
m.
Resolution of forces a=
28
o
=
0.49
R
30
o
=
0.52
R
i=
12
o
=
0.21
ß=
0
o
=
0
F1u =
15.609
- F1u *Sin∞
-7.328
Fu1*Cosin∞
13.782
F1d =
5.421
- F1u *Sinß
0.000
F1d*Cosinß
5.421
F3 =
8.024
f soil =
Forces (KN)
R R
X - component (KN)
Y - component (KN)
-8.269
F3*Sin((ß-∞))/2
2.001
F3*Coson((ß-∞)/2)
F10=
10.29
F10*Sini
10.066
F10*Sini
Wb =
255.144
0
2.140 255.144
SUM
∑H =
10.066
Exp.
∑V =
262.705
Exp.
SUM
∑H =
12.066
Cont.
∑V =
270.729
Cont.
The center of gravity of the block from point O 0.90 Weight of the block W b acts at
m. 0.895 from O.
3 ∑H -F10x
Sum of horizontal forces that act at the bend 1. Expansion case
0.000
KN
2. Contraction case
2.001
KN
0.990
from O
Acting at =
∑V -F10y -Wb
Sum of vertical forces that act at the bend 1. Expansion case
5.421
KN
2. Contraction case
13.445
KN
Acting at =
2
from O
Check against overturning 1. Expansion case ∑M @O =
249.27
d=
0.949
e=
0.051
eallowable =
0.333
[ = ∑M / ∑V ] [ = (B/2) -d ] >e ok
[ = (B/6) ]
2. Contraction case ∑M @O =
267.30
d=
0.987
e=
0.013
eallowable =
0.333
[ = ∑M / ∑V ] [ = (B/2) -d ] >e ok
Check against bearing capacity 1. Expansion case Pbase =
60.36
KN/m2
[ = (∑V/Abase) (1 + 6e/Lbase) ]
2. Contraction case Pbase =
55.98
Pallowable =
100
KN/m2 >Pbase ok KN/m2
Check against sliding 1. Expansion case ∑H
<
10.066
<
m∑V 131.35 ok
2. Contraction case ∑H
<
12.066
<
m∑V 135.36 ok
h2
bi B h3
H3
h1
H2
H1
i
h4
l h5
4
b2 b=0
28-2802-0014 -2A Bamyan shebar Gunbad M.H.P MHP 256
ID-number Province: District: Village: No F
Desing Trashrack for forbay h=
for in site
0.50
cm
H
Nrmal water level in canal
0.50
m
Q
flow in canal
0.55
m³/s
b
space between bars
0.06
m
t
thickness bars
0.003
m
Kt
trashrack loss coefficient from tebal
2.40
L=
Length of trashrack
3.30
m
g
gravitation constant
9.81
m/s²
a=
cross section area of water=L* H
1.65
m²
t/b
ratio of maximum bar thickness to space btween bars
0.05
mm
V
approach velocity = desing flow / cross section area of (0.5 water-1
0.34
m/s
A1
Area of discharch
1.65
m²
(50 to 75 mm)
) m / sec
Q/V
∞ =
angle of bars with horizontal
60.00
º
∞ =
RADIANS
1.05
R
0.81
m
(H+freeboard) / sin∞
S=
Lenght of trashrack slop
A2=
L*S
all area
2.67
m²
A3=
t+b=
area steel and blank space
0.06
m²
NO=
A2 / t+b
42.35
m
A4=
t *(A2 / t+b)
0.13
m
A5=
A2-A4
2.54
no
NO=
no of balnk Space
A5 / b
42.35
no
h=kt* (t / b) 4 / 3*(V^2 / 2g)*sin∞
0.08
m
h=head loss across trashrack
area balnk Space
ID-number Province: District: Village:
28-2802-0008 -1 A Bamyan Shebar Ljalmesh CCD M,H,P MHP 321
No F
Desing Trashrack for Oriffce H
flood water level in rever
Q
Discharge through the oriffic during flood flow
b
space between bars
t
thickness bars
0.774
m
0.799915069
m³/s
(50 to 75 mm)
0.06 0.003
m m
2.4
Kt
trashrack loss coefficient from tebal
L=
oriffice width
2.875
m
L=
for trashrack porovid
3.075
m
g
gravitation constant
a=
cross section area of water=L*H
t/b
9.81
m/s²
2.38005
m²
ratio of maximum bar thickness to space btween bars
0.05
mm
V
approach velocity Desing floow/ caras section water (0.5 to 1 )
0.336091708
m/s
A1
Area of discharch
2.38005
m²
Q/V
∞ =
angle of trashrack with horizontal
∞ =
RADIANS (H+freeboard) / sin∞
S=
Lenght of trashrack slop
A2=
L*S
all area trashrack
A3=
t+b=
area steel and blank space
NO=
A2 / t+b
A4=
t *(A2 / t+b)
A5=
A2-A4
NO=
no of balnk Space
h=head loss across trashrack
60
º
1.047197551
R
1.124678324
m
3.458385847
m²
0.063
m²
54.89501345
no
0.16468504
area balnk Space
3.293700807
A5 / b
54.89501345
no
h=kt* (t / b) 4 / 3*(V^2 / 2g)*sin∞
0.001005166
m
28-2802-0014 -2A ID-number shebar Province: Bayan District: Gunbad Village: Project M.H.P type : No F 256
P= No- F= Wat / H= Pf = Phase =
#### Kwat 256 K #### ∆V= Volt 0.8 V=Volt threeL=(m) 300 Ф=(mm) 16 No-F= 70 Σpower=wat 6311.5
L=(m) 694
∆V= Volt V=Volt
Ф=(mm) 50 A No-F= 256 L=(m) Σpower=wat #### Ф=(mm) No-F=no Σpower=wat
P,H
MHP
13.14 201.3
28.6 371.4
J ∆V= Volt3.62 V=Volt 202.7 L=(m) 200 Ф=(mm) 50 No-F= 49 Σp=wat 4418.07 ∆V=Volt14.14 V=Volt 357.3 B
533 50 153 13795.194
H ∆V= Volt V=Volt L=(m) Ф=(mm) No-F= Σp=wat
L=(m) Ф=(mm) No-F=no Σpower=wat
1.68 202 50 16 51 4598.4 ∆V=Volt V=Volt
C 255 50 98 8836.1
4.5 352.8
E ∆V= Volt V=Volt L=(m) Ф=(mm) No-F= Σp=wat
4.56 198.7 300 16 23 2073.79
∆V= Volt
0.8
D V=Volt L=(m) Ф=(mm) No-F=(no) Σpower=wat
142 50 30 2704.9
L=(m) Ф=(mm) No-F= Σp=wat ∆V= Volt V=Volt G
F 352
500 16 24 2163.95 7.92 195.3
ID-number
28-2802-0014 -2A
Province:
shebar
District:
Bayan
Village:
Gunbad
Project type :
M.H.P
MHP
No F 256 P= 23.08
L=(m) 153 Ф=(mm) 16
Kwat
No- F= 256
No-F= 13
Wat / H= 90.2
Σpower=wat 1172.14
F
∆V= Volt
4.05
V=Volt
194
Pf = 0.8 Phase = three
L=(m) 200 Ф=(mm) 25
E
No-F= 38 Σpower=wat 3426 L=(m) 300
V=Volt
L=(m) 170
L=(m) 694
V=Volt
371.4
Σpower=wat 7664
No-F= 256 Σpower=wat 23082
V=Volt
L=(m) 500 Ф=(mm) 50 No-F= 86 Σpower=wat 7754
∆V= Volt
8.61583
V=Volt
200.7
K ∆V= Volt
A
Ф=(mm) 50
No-F= 7
Σpower=wat 2254
Σpower=wat 631 N ∆V= Volt 2.57712
M ∆V= Volt
L=(m) 200
5.1061
209
Ф=(mm) 16
No-F= 25 L
Ф=(mm) 35
G
V=Volt
3.89656429
V=Volt
197
No-F= 49
∆V= Volt 8.6 V=Volt
L=(m) 180
Ф=(mm) 35
L=(m) 300 No-F= 85
P,H
197.6
207
Ф=(mm) 50 28.61
V=Volt
∆V= Volt 7.3
No-F= 85
∆V= Volt
9.5
D
Ф=(mm) 35 Σpower=wat 7664
∆V= Volt
Σpower=wat 4418
206 L=(m) 198 Ф=(mm) 35 No-F= 44 Σpower=wat 3967
H ∆V= Volt
7.8
V=Volt
198
I L=(m) 175
Ф=(mm) 25 No-F= 19 Σpower=wat 1713
∆V= Volt
4.3
V=Volt
194
194.2
ID-number 28-2802-0014 -2A Province: Bamyan shebar District: Gunbad Village: Project typeM.H.P : No F 256
MHP
MHP Equipment Estimating Utilities: Electrical materials, Penstock, RCC, Roofing Community:
Toghi pain Summary of Electrical Materials No. of
No of
Total Length
(40m spacing)
No. of Insulator
No of
No of
x-arms/pole
of Wire (m)
No. of Poles
and Shackle sets
No of Cross-arms & Pole clamps
No of
Wires
180x14mm bolts
25x12 mm bolts
12x2.5mm washers
694
4
2
2,776
17
69
34.7
69
602
1412
500
2
1
1,000
13
25
12.5
25
156
388
300
2
1
600
8
15
8
15
56
158
4,376
37
109
54.7
109.4
815
1957
5,251 5,500 1,500 400.0
Item
Details
Length
50mm2
PH-A A-G AK
Total
35mm2
1,494
2
+20% sag Use Kgs of wire 2
5
10
10
10
50
140
L-M
170
2
1
340
4
9
4.25
9
18
61.625
A-D
300
2
1
600
8
15
7.5
15
56
157.5
G-H
198
2
1
396
5
10
5
10
25
79
0
0
0
0
0
0
0
0
0
0
0
0
0
1,736
22
43
27
43
149
438
K-L
Total
25mm2
200
868
D-E H-I
Total
200 175
2 2
+20% sag
2,083
Use Kgs of wire
2,200 2,300
1 1
400 350 0 0 0 0 0 750 900 1,000 106
5 4 0 0 0 0 0 9
10 9 0 0 0 0 0 19
5 4 0 0 0 0 0 9
10 9 0 0 0 0 0 19
10 9 0 0 0 0 0 19
50 44 0 0 0 0 0 94
360 306 0 0 0 0
5 4 0 0 0 0
9 8 0 0 0 0
5 4 0 0 0 0
9 8 0 0 0 0
20 15 0 0 0 0
68 52 0 0 0 0
375 +20% sag Use Kgs of wire
16mm2
M-N E-F
180 153
2 2
1 1
Total
TOTALS Stay rods & Wire Sets (See map) 1 L, 2S 2x4mm2 Survice
333
Earthing Straight Length Plates of Run 5 2,737 1 L, 2 S line Alumunume 40M*226HH
0
+20% sag Use Kgs of wire
666 799 850 90
Kgs of Elec Nuts & Bolts 38 21 0
Kgs of wire 3,996 5 0
8
17
8
17
35
120
(40m spacing) No. of Poles 77 82
No. of Insulator and Shackle sets 188 200
No of Crossarms & Pole 99 106
No. of 180x12mm bolts 188 200
No. of 25x12mm bolts 1,017 1,083
No. of 12x2.5mm washers 2,609 2,779
Electrical Parts of M:H :P ID-number Province
District: Village Project purpose NO of family No
particular of item and delail of work
28-2802-0014 -2A Bamyan Shebar Gunbad M,H,P
256 Contribution CDC Afg NSP Afg
Quantity
Unit
Unit price in AFS
Total price in Afs
1
pc
30000
30000
0
30000
1
Genrator (30)kW, three Phase, Brush type
2
ACSR d=50mm²
5,500
meter
35
192500
0
192500
ACSR d=35mm²
2,200
meter
30
66000
0
66000
3
ACSR d=25mm²
1,000
meter
25
25000
0
25000
4
ACSR d=16mm²
850
meter
20
17000
0
17000
5
D-Bracket and Insulator (complete set)
200
pc
100
20046.1
0
20046.1
6
Cross -arms(50 cm long -10cmX10cm)
106
pc
300
31666.8
0
31666.8
7
Stay sets (complete)
2
set
350
700
0
700
8
Earthing Set (60cmX60cmX3mm copper plate, 10m long 4mm dia copper wire, 5m long 19mm dia GI Pipe, 10kg Salt, 1 bag charcoal)
4
set
3000
12000
0
12000
9
Control Panel (complete set)
1
pc
15000
15000
0
15000
10
Signboard
1
pc
1000
1000
0
1000
11
Tools & tool box
1
pc
1000
1000
0
1000
25
m
300
7500
0
7500
50
m
250
12500
0
12500
82
pc
1000
81750
71219.49
10530.51
513662.9
71219.49
442443.4
12 13 14
4X35mm2 CU cable (to connect Gnerator and Control Panel) 4X50mm2 Al Cable (to connect control panel and first Pole) 7m high wooden pole
Note: Any other needed material can be added.
Remark
As per DWG
( پیشنهاد پروژه ) ادامه: ۷ فورمه 28-28020014 - 2A نمبر قریه 256 No :Famil
Gunbad
shebar ولسوالی
قریه
Bamyan والیت
تفصیل هزینه اقالم ای که باید با استفاده از قسط اول تهیه شود شماره
قلم اموزش وغیره.ترانسپورت. کار. مواد وتجحزات
مقدارمجمو عی
واحد
قمیت فی واحد
قمیت مجموعی
سهم ها برنامه همبستگی
مقدار همبستگی
مردم
1
shovel with handl
5.00
pc
100.00
500.00
500.00
5.00
0.00
مقدار مردم 0.00
2
pickax with handl
5.00
pc
200.00
1000.00
1000.00
5.00
0.00
0.00
3
slodge hammer with handl
1.00
pc
500.00
500.00
500.00
1.00
0.00
0.00
4
wheel barrow
2.00
pc
1500.00
3000.00
3000.00
2.00
0.00
0.00
5
Rubber bucket
6.00
pc
60.00
360.00
360.00
6.00
0.00
0.00
6
Rope
20.00
m
20.00
400.00
400.00
20.00
0.00
0.00
7
Stone
770.12
m³
0
0.00
0.00
#DIV/0!
0.00
#DIV/0!
8
Cement
1986.26
bag
350
695192.50
695192.50
1986.26
0.00
0.00
9
Sundy
553.18
m³
1000
553184.89
553184.89
553.18
0.00
0.00
10
soil
5.20
m³
100
520.00
520.00
5.20
0.00
0.00
11
Straw
6.00
kg
10
60.00
60.00
6.00
0.00
0.00
12
Complete Doors (1.2X2.2)m
1.00
pc
3000
3000.00
3000.00
1.00
0.00
0.00
13
Complete Windows(1.5X1.5)m
1.00
pc
3500
3500.00
3500.00
1.00
0.00
0.00
14
Complete window(1X1)m
2.00
pc
800
1600.00
1600.00
2.00
0.00
0.00
15
Niel
4.61
kg
70
322.87
322.87
4.61
0.00
0.00
16
Glasses
3.12
m²
200
624.75
624.75
3.12
0.00
0.00
17
Marble powder
22.31
kg
15
334.67
334.67
22.31
0.00
0.00
18
powder paint
0.60
kg
200
120.44
120.44
0.60
0.00
0.00
19
solt
0.60
kg
10
6.02
6.02
0.60
0.00
0.00
20
Oil paint
2.11
kg
200
422.82
422.82
2.11
0.00
0.00
21
oil
3.92
kg
65
254.48
254.48
3.92
0.00
0.00
22
wooden beem Ø25 cm,L=4.00 m
94.57
pc
300
28370.40
28370.40
94.57
0.00
0.00
23
bourd
175.45
pc
200
35090.40
35090.40
175.45
0.00
0.00
24
Steel 10mm² area
368.62
kg
60
22117.38
22117.38
368.62
0.00
0.00
25
wooden beem Ø40 cm,L=5.00 m
63.54
ml
300
19062.00
19062.0000
63.54
0.00
0.00
26
Wair 1mm
2.58
kg
80
206.43
206.43
2.58
0.00
0.00
27
Instelation G,I hood
1.00
Pc
100
100.00
100.00
1.00
0.00
0.00
28 29
Skilled labour on site
657.28
md
700.00
460095.21
460095.21
657.28
0.00
0.00
Unskilled labour on site
1400.90
md
350.00
490314.51
24456.69
69.88
465857.82
1331.02
2X0.2X0.02
( پیشنهاد پروژه ) ادامه: ۷ فورمه 28-28020014 - 2A نمبر قریه 256 No :Famil
Gunbad
shebar ولسوالی
قریه
Bamyan والیت
تفصیل هزینه اقالم ای که باید با استفاده از قسط اول تهیه شود شماره
قلم اموزش وغیره.ترانسپورت. کار. مواد وتجحزات
مقدارمجمو عی
واحد
قمیت فی واحد
قمیت مجموعی
1.00
pc
30000.00
سهم ها برنامه همبستگی
مقدار همبستگی
مردم
30000.00
0.00
0.00
0.00
مقدار مردم 0.00
30
Genrator (30)kW, three Phase, Brush type
31
ACSR d=50mm²
5500.00
meter
35.00
192500.00
0.00
0.00
0.00
0.00
32
ACSR d=35mm²
2200.00
meter
30.00
66000.00
32500.00
1083.33
0.00
0.00
33
ACSR d=25mm²
1000.00
meter
25.00
25000.00
25000.00
1000.00
0.00
0.00
34
ACSR d=16mm²
850.00
meter
20.00
17000.00
17000.00
850.00
0.00
0.00
35
D-Bracket and Insulator (complete set)
200.46
pc
100.00
20046.06
20046.06
200.46
0.00
0.00
36
Cross -arms(50 cm long -10cmX10cm)
105.56
pc
300.00
31666.81
31666.81
105.56
0.00
0.00
37
Stay sets (complete)
2.00
set
350.00
700.00
700.00
2.00
0.00
0.00
38
Earthing Set (60cmX60cmX3mm copper plate, 10m long 4mm dia copper long 19mm3000.00 dia GI Pipe, 10kg Salt, 1 bag charcoal) 4.00wire, 5m set 12000.00 12000.00
4.00
0.00
0.00
39
Control Panel (complete set)
1.00
pc
15000.00
15000.00
15000.00
1.00
0.00
0.00
40
Signboard
1.00
pc
1000.00
1000.00
1000.00
1.00
0.00
0.00
41
Tools & tool box
1.00
pc
1000.00
1000.00
1000.00
1.00
0.00
0.00
42
4X35mm2 CU cable (to connect Gnerator and Control Panel)
25.00
m
300.00
7500.00
7500.00
25.00
0.00
0.00
43
4X50mm2 Al Cable (to connect control panel and first Pole)
50.00
m
250.00
12500.00
12500.00
50.00
0.00
0.00
44
7m high wooden pole
81.75
pc
1000.00
81750.00
81750.00
81.75
0.00
0.00
1.00
set
80000.00
80000.00
80000.00
1.00
0.00
0.00
45
A. : Turbine (33 kW, T12), B.: Adaptor for Turbine, C: . Base Frame for Turbine and Generator, D: . Intermediate Shaft, E.: Pulleys (-20" nos, 5" - 3 ) F: . D, V Belts-3 nos
9.00
m
2500.00
22500.00
22500.00
9.00
0.00
0.00
46
508mm dia, 3mm thickness, MS Penstock Pipes with one bends and required washers, bolts and nuts (Bends are shown in DWG)
47
Airvent pipe (diameter=30.62 mm) ( 1 .2inch)
3.29
m
150.00
493.20
493.20
3.29
0.00
0.00
48
15.00
m
150.00
2250.00
2250.00
15.00
0.00
0.00
2.67
m²
4000.00
10692.00
10692.00
2.67
0.00
0.00
1.00
set
4000.00
4000.00
4000.00
1.00
0.00
0.00
51
PVC Pipe for flushing (arani) Trahsrack (3.3mX0.81m) with frame, 20mm spacing of bar, bar size: 5mmX25mm for forbay Flushing Cone (0.440m dia,(17") 1.55m height), As shown in DWG 3" Valve with 2m GI Pipe
1.00
set
3000.00
3000.00
3000.00
1.00
0.00
0.00
52
Sluice Gate ( 1.2m (H)X 1m (B)) for settling basin
1.20
m²
10000.00
12000.00
12000.00
1.20
0.00
0.00
53
Sluice Gate for geravaltiraos (1.2m(H) X0.1 m (B))
1.20
m²
10000.00
12000.00
12000.00
1.20
0.00
0.00
54
Taransportation
Ls
Ls
30000.00
30000.00
30000.00
0.00
0.00
55
Probables
Ls
Ls
15000.00
15000.00
15000.00
0.00
3025858
2304000.0
49 50
Total
0.00
465858
فورمه : ۷پیشنهاد پروژه ) ادامه ( Bamyan والیت
shebar ولسوالی
28-28020014 - 2A نمبر قریه 256 No :Famil
Gunbad قریه
تفصیل هزینه اقالم ای که باید با استفاده از قسط دوم تهیه شود قلم
سهم ها مردم
مقدار همبستگی
برنامه همبستگی
شماره
مقدار مردم
قمیت مجموعی
قمیت فی واحد
واحد
مقدارمجمو عی
مواد وتجحزات .کار .ترانسپورت.اموزش وغیره Genrator (30)kW, three Phase, Brush type
0.00
0.00
1.00
30000.00
30000.00
30000.00
pc
1.00
0.00
0.00
5500.00
192500.00
192500.00
35.00
meter
5500.00
ACSR d=50mm²
0.00
0.00
1340.00
33500.00
33500.00
25.00
meter
1340.00
ACSR d=25mm²
256000
256000
1
Total
2 3
( پیشنهاد پروژه ) ادامه: ۷ فورمه 28-2802-0014 - 2A No :Famil SNO
Gunbad قریه
نمبر قریه 256 Itam
Unit
shebar ولسوالی
Quantity
Unit cost
Total cost
NSP
LS
LS
5760
5760
Bamyan والیت CDC
1
Tooles
2
Site preparation
m²
929.99
14
13019.8
0.0
13019.8
3
Excavation
m³
446.69
175
78171.4
0.0
78171.4
4
Stone massonary
m³
770.12
1628.9
1254456.4
1079353.6
175102.9
5
Shuttingُ
m²
47.28
1413.5
66835.9
63526.1
3309.9
6
RCC(1:2:4)
m³
3.36
4250
14287.5
13110.9
1176.6
7
PCC(1:4:8)
m³
144.08
3550
511495.5
461066.3
50429.1
8
Mechanical Part
Ls
LS
0
146935.2
146935.2
0.0
9
Electrical Part
Ls
LS
0
513662.9
442443.4
71219.5
10
Steel work
kg
368.62
71.41
26323.4
25420.2
903.1
11
Palastering
m²
435.26
205
89227.8
61806.6
27421.2
12
Ponting
m²
703.28
202.5
142415.0
100569.6
41845.4
13
Carpentary Work
pc
4.00
2151
8604.0
8324.0
280.0
14
Water Pinting
m²
30.11
34.2
1030.2
1030.2
0.0
15
Installtionn woodenbeem 3/m L=5m
M.L
63.54
321
20396.3
19729.2
667.2
16
oil painting on wooden
m²
7.83
293.7
2299.7
2217.5
82.2
17
Installation of glass 3mm
m²
2.98
238
708.1
666.4
41.7
18
mud pull work of roof
m²
12.00
71.5
858.0
768.0
90.0
19
mud & straw
m²
12.00
39.3
472.0
304.0
168.0
20
fixing bourd on the roof
m²
13.44
546.9
7350.3
7162.2
188.2
21
Filling
m³
4.00
275
1100.0
400.0
700.0
22
geraval Levaling
m³
74.41
1014
75448.4
74406.7
1041.7
23
Transportation
%
LS
0
30000.0
30000
24
Probables
%
LS
0
15000.0
15000
3025858
2560000
Total(Afs)
465858
Summary Work Plan ID-No Provence District CDC Sub Project
: : : : :
028-28027-0014 -2A Bamyan
Shebar Gunbad M,H,P
Milstone No
Totl Budg: ( Discription
2nd Installment (10)%
First Instalment((90)%
1
Unit Quintity
Tooles
LS
Unit Cost Total Cost Af AF LS 5760
Contribution CDC NSP 5760
2
Site preparation
m²
929.99
14
13019.8
13019.8
3
Excavation
m³
446.69
175
78171.4
78171.4
4
Stone massonary
m³
770.12
1628.9
1254456.4
175102.9
5
Shuttingُ
m²
47.28
1413.5
66835.9
3309.9
6
RCC(1:2:4)
m³
3.36
4250
14287.5
1176.6
7
PCC(1:4:8)
m³
144.08
3550
511495.5
50429.1
8
Mechanical Part work
Ls
LS
0
146935.2
0.0
9
Electrical Part work
Ls
LS
0
257662.9
71219.5
10
Steel work
kg
368.62
71.41
26323.4
903.1
11
Palastering
m²
435.26
205
89227.8
27421.2
12
Ponting
m²
703.28
202.5
142415.0
41845.4
13
Carpentary Work
pc
4.00
2151
8604.0
280.0
14
Water Pinting
m²
30.11
34.21475
1030.2
0.0
15
Installtionn woodenbeem
M.L
63.54
321
20396.3
667.2
16
oil painting on wooden
m²
7.83
293.7
2299.7
82.2
17
Installation of glass 3mm
m²
2.98
238
708.1
41.7
18
mud pull work of roof
m²
12.00
71.5
858.0
126.0
19
mud & straw
m²
12.00
39.33333
472.0
168.0
20
fixing bourd on the roof
m²
13.44
546.9
7350.3
141.1
21
Filling
m³
4.00
275
1100.0
700.0
22
geraval Levaling
m³
74.41
1014
Total
75448.4
1041.7
2719098
465846.8
Activity % 0.1936 0.0 0.4376 0.0 2.6275 1079353.5 42.165 63526.1 2.2465 13110.9 0.4802 461066.3 17.193 146935.2 4.9388 186443.4 8.6607 25420.2 0.8848 61806.6 2.9992 100569.6 4.7869 8324.0 0.2892 1030.2 0.0346 19729.2 0.6856 2217.5 0.0773 666.4 0.0238 732.0 0.0288 304.0 0.0159 7209.2 0.2471 400.0 0.037 74406.7 2.536
2253251
1
InstalationACSR 50mm tarnsmission Line
m
5500.00
35.00
192500
192500
6.470
2
InstalationACSR 25mm tarnsmission Line
m
1340.00
25.00
33500
33500
1.126
3
Instalation genrator
Pc
1
30000
30000
30000
1.008
Total
256000
256000
G-Total
2975098
465846.8
2509251
100
1
2
3
3025857.82 4
5
6
7
8
) Week 9 10 11 12 13 14 15 16 17
mary Work Plan
Week 18
Project Summary Sheet ID-number Province District Village Project No- F
: 28-2802-0014 - 2 A : Bamyan : Shebar : Gunbad M,H,P 256
Goal of Sub Project: for light to family
Brief descripption of main activities: 1-Excavation in the foundation 2-Stonemassonary 3- R.C.C & P.C.C 4-Fixing Torben & Genrator 5- Fixing line
Budget Total: =
3025857.82
Afs
NSP: =
2560000.0
Afs
CDC:=
465857.82
Afs
Beneficiaries: All Family
Expected Training needs:
yes
Project Milestones CDC
NSP
90%
Afs
465858
Afs
2304000
Afs
10%
Afs
0.00
Afs
256000.0
Afs
Total buget
3025857.82
Number of Disbursements: ----------TWO--------------------------------------------------------------------------------------------------------------
Project Risks
-NO
Village
28-2802-0014 -2A Bamyan Shebar Gunbad
Project purpose
M,H,P
ID-number Province District:
NO of family
No
1
Mechanical Part of MHP
256
Particular of item and detail of work A. : Turbine (33 kW, T12), B.: Adaptor for Turbine, C: . Base Frame for Turbine and Generator, D: . Intermediate Shaft, E.: Pulleys (-20" nos, 5" - 3 ) F: .
Contribution Total price in Afs CDC Afg NSP Afg
Quantity
Unit
Unit price in Afs
1
set
80000
80000
0
80000
9
m
2500
22500
0
22500
D, V Belts-3 nos 2
508mm dia, 3mm thickness, MS Penstock Pipes with one bends and required washers, bolts and nuts (Bends are shown in DWG)
3
Airvent pipe (diameter=30.62 mm) ( 1 .2inch)
3.3
m
150
493.2
0
493
4
PVC Pipe for flushing (arani)
15.0
m
150
2250
0
2250
2.673
m²
4000
10692
0
10692
1
set
4000
4000
0
4000
1
set
3000
3000
0
3000
5 6
Trahsrack (3.3mX0.81m) with frame, 20mm spacing of bar, bar size: 5mmX25mm for forbay Flushing Cone (0.440m dia,(17") 1.55m height), As shown in DWG
7
3" Valve with 2m GI Pipe
8
Sluice Gate ( 1.2m (H)X 1m (B)) for settling basin
1.20
m²
10000
12000
0
12000
9
Sluice Gate for geravaltiraos (1.2m(H) X0.1 m (B))
1.20
m²
10000
12000
0
12000
146935
0
146935
Note: Any other needed material can be added.
Remark
پالن تدارکاتی (خالصه مصرف پروژه ( فشرده کار کر گران تو سط اعضای شورای انکشا فی ساعت تعین شده کاری کارگران شورای انکشافی ساعت کاری مردان ساعت کاری زنان
2058.2
اوسط نرخ )افغانی ( 461.8
مجمو ع مصر ف به )افغا نی( 950409.7
جمع فرعی )الف(
950409.7
رویش های تدارکاتی شرح مواد/کارها/خدمات ترانسپورت ،آموزیش وغیره )(2توضیح اجناس،امورساختمانی وخدمات
خر یداری یک پا یه د ینمو ( (30کیلوات چینا ی خر یداری کبل المو نیمی بدون پوش 50 خر یداری کبل المو نیمی بدون پوش 35 خر یداری کبل المو نیمی بدون پوش25 خر یداری کبل المو نیمی بدون پوش16 خر یداری (دی( براکت خریداری سیلب سا یز ( 50سا تی متر در 10در 10سانتمر خر یداری محار کش تخته مسی ( 60در 60سانتمتر و 3ملی متر ضخا مت ( خریداری فیوز بکس فر ما یش و خرداری لو حه شورا تو بکس کیبل مسی ( 4در 10ملی( پو شدار کیبل المو نیمی ( 4در 16ملی( پو شدار خر یداری پا یه چو بی به طول هفت تر خر یداری تور بین کراسفلو ( (33کبلو وات مکمل با پو لی و شا فت ما بسنی و پو لی ها نل اهنی به قطر 508ملی متر ضخا مت 3مای متر با نت و بولت ووا شل و زا نو خم نل هوا کش به قطر ( (1.2انچ بطوا ( (3.3متر نل پال ستکی چهار انچ بطو ل ( (15متر جا لی محا فظطی خسگیز نل پا ک کننده اهنی بطول ( (390ملی و قطر ( (250ملی وال ( (3انچ بر نجی همرا با نل جستی ( (3انچ بطول یک متر در وازه اهنی برای رفع نمو دن اب به سا یز ( 55در 70سا نتی تر ( در وازه اهنی برای رفع نمو دن اب به سا یز ( 138در 70سا نتی تر (
مصرف فی واحد مقدار) (3واحد ) (4تخمینی )افغانی () (5
سهم گری بر نا مه شو رای مر د همبستگی می)(9 ملی)(10
مصرف تخمینی )افغانی ()(6
رویش تدارکاتی)(7
مدت ماه هایالزم )(8
1
پا یه
30000
30000
نرخ گری
6هاه
30000
5,500
متر
35
192500
نرخ گری
6هاه
192500
2,200
متر
30
66000
1,000
متر
25
25000
66000 6هاه
25000
850
متر
20
17000
6هاه
17000
200
دا نه
100
20046.05863
مستقیم
6هاه
20046.0586
105.6
سیت
300
31666.80782
مستقیم
6هاه
31666.8078
2
دانه
350
700
مستقیم
6هاه
700
4
سیت
3000
12000
مستقیم
6هاه
12000
1
پا یه
15000
15000
نرخ گری
6هاه
15000
1
دانه
1000
1000
مستقیم
6هاه
1000
1
سیت
1000
1000
مستقیم
6هاه
1000
25
متر
300
7500
مستقیم
6هاه
7500
50
متر
250
12500
مستقیم
6هاه
12500
82
پا یه
1000
81750
نرخ گری
6هاه
1
پا یه
80000
80000
نرخ گری
6هاه
80000
9
متر
2500
22500
نرخ گری
6هاه
22500
3.288
متر
150
493.2
مستقیم
6هاه
493.2
15
متر
150
2250
مستقیم
6هاه
2250
2.673
سیت
4000
10692
مستقیم
6هاه
10692
1
متر مر بع
4000
4000
مستقیم
6هاه
4000
71219
10530.51
1
دانه
3000
3000
مستقیم
6هاه
3000
1.2
متر مر بع
10000
12000
مستقیم
6هاه
12000
1.2
متر مر بع
10000
12000
نرخ گری
6هاه
12000
خر داری سنگ
770.1متر مکعب
0.0
0.0
نرخ گری
6ماه
0.0
خرداری سیمنت
1986.3متر مکعب
350.0
695192.5
نرخ گری
6ماه
695192.5
خر داری ر یگ
553.2متر مکعب
1000.0
553184.9
نرخ گری
6ماه
553184.9
خر داری خا ک
5.2
متر مکعب
100.0
520.0
نرخ گری
6ماه
520.0
خر داری کاه
6.0
متر مکعب
10.0
60.0
مستقیم
6ماه
60.0
خر داری دروازه
1.0
متر مکعب
3000.0
3000.0
مستقیم
6ماه
3000.0
خر داری کلین( 1.5در 1.5متر (
1.0
متر مکعب
3500.0
3500.0
مستقیم
6ماه
3500.0
خر داری کلین( 1در .1متر (
2.0
متر مکعب
800.0
1600.0
مستقیم
6ماه
1600.0
خر داری میخ
4.6
متر مکعب
70.0
322.9
مستقیم
6ماه
322.9
خر داری شیشه
3.1
متر مکعب
200.0
624.8
مستقیم
6ماه
624.8
خر داری کلو خه مر مر
22.3متر مکعب
15.0
334.7
مستقیم
6ماه
334.7
خر داری رنگ پو دری
0.6
متر مکعب
200.0
120.4
مستقیم
6ماه
120.4
خر داری نمک
0.6
متر مکعب
10.0
6.0
مستقیم
6ماه
6.0
خر داری رنگ رو غنی
2.1
متر مکعب
200.0
422.8
مستقیم
6ماه
422.8
خر داری تیل خا ک
3.9
متر مکعب
65.0
254.5
مستقیم
6ماه
254.5
خر داری چوب گو ل ( (4متره برای قا لب بندی
94.6متر مکعب
300.0
28370.4
نرخ گری
6ماه
28370.4
خر داری تخته ( 2متره 20سا نتی در 2.5سا نتی متره
175.5متر مکعب
200.0
35090.4
نرخ گری
6ماه
35090.4
خر داری سیخ گو ل ( (10ملی متر
368.6متر مکعب
60.0
22117.4
نرخ گری
6ماه
22117.4
خر داری جوب گول ( (5متره براب پو شش بام
63.5متر مکعب
300.0
19062.0
نرخ گری
6ماه
19062.0
خر داری سیم ( (1ملی متر
2.6
متر مکعب
80.0
206.4
مستقیم
6ماه
206.4
خر داری نا وه اهنی
1.0
متر مکعب
100.0
100.0
مستقیم
6ماه
100.0
کسبه کار ما هر
657.3متر مکعب
700.0
460095.2
نرخ گری
6ماه
460095.2
کسبه کار غیر ما هر
1400.9متر مکعب
350.0
490314.5
نرخ گری
6ماه
465858
24456.7
سا مان و و سا یل کار
Ls
متر مکعب
5760.0
5760.0
نرخ گری
6ماه
5760.0
تر انسپورتشن
Ls
متر مکعب
30000.0
30000.0
نرخ گری
6ماه
30000.0
احتما ال ت
Ls
متر مکعب
15000.0
15000.0
نرخ گری
6ماه
15000.0
جمع کل فر عی (ب (
537077.3
جمع کلی(جمع فر عی (الف( جمع فر عی (ب((
2488780.51 537077.31
Eng AFP
Eng PMU
2488781
شماره 1 2
رویش های تدارکاتی شماره
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50
Equipment sheet NO
Family
256
28-2802-0014 -2A Bamyan shebar Gunbad
ID-number: Province: District: Village: Project purpose:
NO
M,H,P
Equipment
Unit
Quantity
Unit cost Total cost Afg Afg
1
shovel with handl
pc
5
100
500
2
pickax with handl
pc
5
200
1000
3
slodge hammer with handl
pc
1
500
500
4
wheel barrow
pc
2
1500
3000
5
Rubber bucket
pc
6
60
360
6
Rope
m
20
20
400
Total Cost Afs
5760
Remark
Parawn
Bamyan
No :Famil
A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
قریه
نمبر قریه
Proqurment list
256
CIVIL
SNO
28-2802-0014 - 2A
Gunbad
ولسوالی
والیت
Unit
Quantity
Unit cost
Total cost
Responsiblity
pc pc pc pc pc m m³ bag m³ m³ kg pc pc pc kg m² kg kg kg kg kg pc pc kg ml kg Pc
5 5 1 2 6 20 770 1986 553 5 6 1 1 2 5 3 22 1 1 2 4 95 175 369 64 3 1
100.00 200.00 500.00 1500.00 60.00 20.00 0.00 350.00 1000.00 100.00 10.00 3000.00 3500.00 800.00 70.00 200.00 15.00 200.00 10.00 200.00 65.00 300.00 200.00 60.00 300.00 80.00 100.00
500.0 1000.0 500.0 3000.0 360.0 400.0 0.0 695192.5 553184.9 520.0 60.0 3000.0 3500.0 1600.0 322.9 624.8 334.7 120.4 6.0 422.8 254.5 28370.4 35090.4 22117.4 19062.0 206.4 100.0 1369850.0
Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite
Mterials shovel with handl pickax with handl slodge hammer with handl wheel barrow Rubber bucket Rope Stone Cement Sundy soil Straw Complete Doors (1.2X2.2)m Complete Windows(1.5X1.5)m Complete window(1X1)m Niel Glasses Marble powder powder paint solt Oil paint oil wooden beem Ø25 cm,L=4.00 m bourd 2X0.2X0.02 Steel 10mm² area wooden beem Ø40 cm,L=5.00 m Wair 1mm Instelation G,I hood
Total(Afs)
Daite foram to
Parawn
Bamyan
ولسوالی
والیت No :Famil
C
قریه
نمبر قریه
Proqurment list
256
Electrical
28-2802-0014 - 2A
Gunbad
Unit
Quantity
Unit cost
Total cost
Responsiblity
pc
1
30000.00
30000.0
Proqurment Commite
1
Genrator (30)kW, three Phase, Brush type
2
ACSR d=50mm²
meter
5500
35.00
192500.0
Proqurment Commite
ACSR d=35mm²
meter
2200
30.00
66000.0
Proqurment Commite
3
ACSR d=25mm²
meter
1000
25.00
25000.0
Proqurment Commite
4
ACSR d=16mm²
meter
850
20.00
17000.0
Proqurment Commite
6
D-Bracket and Insulator (complete set)
pc
200
100.00
20046.1
Proqurment Commite
7
Cross -arms(50 cm long -10cmX10cm)
pc
106
300.00
31666.8
Proqurment Commite
8
Stay sets (complete)
set
2
350.00
700.0
Proqurment Commite
9
Earthing Set (60cmX60cmX3mm copper plate, 10m long 4mm dia copper wire, set 5m long 4 19mm dia3000.00 GI Pipe, 10kg Salt, 12000.0 1 bag charcoal) Proqurment Commite
10
Control Panel (complete set)
pc
1
15000.00
15000.0
Proqurment Commite
11
Signboard
pc
1
1000.00
1000.0
Proqurment Commite
12
Tools & tool box
pc
1
1000.00
1000.0
Proqurment Commite
13
4X35mm2 CU cable (to connect Gnerator and Control Panel)
m
25
300.00
7500.0
Proqurment Commite
14
4X50mm2 Al Cable (to connect control panel and first Pole)
m
50
250.00
12500.0
Proqurment Commite
15
7m high wooden pole
pc
82
1000.00
81750.0
Proqurment Commite
Total(Afs)
513662.9
0
Daite foram to
Parawn
Bamyan
ولسوالی
والیت No :Famil
1
قریه
A. : Turbine (33 kW, T12), B.: Adaptor for Turbine, C: . Base Frame for Turbine and Generator, D: . Intermediate Shaft, E.: Pulleys (-20" nos, 5" - 3 ) F: . D, V Belts-3 nos
نمبر قریه
Proqurment list
256
mechanical
D
28-2802-0014 - 2A
Gunbad
Unt
Quantity
Unit cost
Total cost
set
1.00
80000.00
80000
Responsiblity
Proqurment Commite
508mm dia, 3mm thickness, MS Penstock Pipes with one bends and required washers, bolts and nuts (Bends are shown in DWG)
m
9.00
2500.00
22500
Airvent pipe (diameter=30.62 mm) ( 1 .2inch)
m
3.29
150.00
493.2
PVC Pipe for flushing (arani)
m
15.00
150.00
2250
Trahsrack (3.3mX0.81m) with frame, 20mm spacing of bar, bar size: 5mmX25mm for forbay
m²
2.67
4000.00
10692
Flushing Cone (0.440m dia,(17") 1.55m height), As shown in DWG
set
1.00
4000.00
4000
3" Valve with 2m GI Pipe
set
1.00
3000.00
3000
8
Sluice Gate ( 1.2m (H)X 1m (B)) for settling basin
m²
1.20
10000.00
12000
Proqurment Commite
9
Sluice Gate for geravaltiraos (1.2m(H) X0.1 m (B))
m²
1.20
10000.00
12000
Proqurment Commite
2 3 4 5 6 7
Total(Afs)
146935.2
Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite Proqurment Commite
0
Daite foram to
Power Group Membar Charges NO-Famili =
256 ID-number: 28-2802-0014 - 2 A Province: Bamyan District: Shebar Village: Gunbad Project: M .H .P 1 2 3 4
5
6
NSP
Depreciation: 10% of total capital investment(include of power house rehabilitation cost etc.)for 10years Total costs for 10 years 297509.782 Cost per year 29751 14875 Repair/replesments costs 5% of investments for the 189138.23 Repair/replesments costs per year 1487.5 100 Salary (Estimated for the operator) 3000 Salary per month: Salary per year: 36000 Others: physical contingency 2% 52232.945950.195636 Mobil Oil (1%) Fuel Unit Cost Fuel consumption per hour Fuel consumption per day Fuel consumption per mounth Fuel consumption per year Total costs Cost participation of family 67238.53 433190.28 No of family 256 No Participation family per year 262.7 Afs Participation family per month 21.9 Afs Participation Family per day 0.73 Afs
خزانه دار شورا4 مسول دفتر ولسوالی موسسه همکار
منشی شورا3
معاون شورا2
ریس شورا
ID-number Province District Village Project type No- F
256
Itam
Un it
Unt cost
No
Cheke Liste
Unt cost chek
TOTAL Qun
chek Unt cost
Costurtion Activity An,bolack
Qun
geravalterp s
Qun
Oriffice
Qun
GI sheet
Qu
weir
Qun
Canal
Qun
Satllement basin
Qun
Power ,H
Qun
25.76
1
Tooles
2
Site preparation
m²
14
14
929.99
0.00
29.4
3
Excavation
m³
175
175
446.7
0.00
551.25
4
Stone massonary
m³
1628.90
1628.900
770.1
0.00
5
Shuttingُ
m²
1413.50
1413.50
47.28
0.00
6
RCC(1:2:4)
m³
4250.00
4250.0
3.4
0.00
7
PCC(1:4:8)
m³
3550.00
3550.0
144.1
0.00
8
Mechanical Part
Ls
LS
LS
9
Electrical Part
Ls
Ls
LS
10 Steel work
kg
71.41
71.41
368.6
0.00
11 Palastering
m²
205.0
205.00
435.3
0.00
7,431.168
36.250
12 Ponting
m²
202.5
202.5
703
0.00
7,776.00
38.40
13 Carpentary Work
pc
2151.00
2151.00
4.0
0.00
0
8604
4.00
14 Water Pinting
m²
34.21
34.21
30.1
0.00
0
1030.206
30.11
15 Installtionn woodenbeem 3/m L=5m
M.L
321.00
321.00
63.5
0.00
0
20396.34
63.5
18 oil painting on wooden
m²
293.70
293.70
7.8
0.00
0
2299.671
7.83
19 Installation of glass 3mm
m²
238.00
238.00
3.0
0.00
0
708.05
2.98
20 mud pull work of roof
m²
71.50
71.50
12.0
0.00
0
858
12.00
21 mud & straw
m²
39.33
39.33
12.0
0.00
0
472
12.00
22 fixing bourd on the roof
m²
546.90
546.90
13.4
0.00
0
7350.336
13.44
24 Filling
m³
275.00
275.00
4.000
0.00
0
1100
4
25 geraval Levaling
m³
1014.00
1014.00
74.407
0.00
2461.992
2.428
TOTAL
6,360.75
2.10 3.150
1064
76
0
2648.8
189.2
7280.0
520.00
686.00
49
360.64
21.504
0.00
9,923
57
49,000.00
280.00
3001.25
17.15
1444.8
8.3
2845.92
16.26
61,548.96
37.79
0.00
356,690
219.0
628,176
386
51241.94
31.46
46785.27
28.7
17388.83
10.68
0.0
11675.51
8.26
0
4270.4
1.00
6239.258323
87.4
831.48
0.82
4.500
3.4
Qun
3,763.20
0.000 12,022.7
of Price
Turbinarea
28,517.01
8.033
0.00
212492.4 59.86
213,817
60.2
12350.45
3.48
2808.05
0.8
60421.70
294.740
5719.89
27.90
5762.55
28.11
60,616
299.340
6648.1
32.83
8680.37
42.87
0 0 0.000
425.880
0.420
12,168.000
0 0
0.0
50058.0
12.000
247.2
32448.00
32
7551.36
7.447
19,389.95
122,268.34
0
631811.66
1051758
87199.0
111122.27
43251.4
1
Transportation
%
%
0.03
19,389.95
122,268.34
0.0
631811.66
1,051,758
87199.0
111122.27
43251.4
2
Probables
%
%
0.02
0.00
0.00
0.0
0.0
0.0
0.00
0.00
0.0
GRAND TOTAL
3025857.8
Total Spelway
Qun
Forbay
Qun
52.00
222.95
15.93
Tools 5760
728.00
Qun 5760.0 13019.8
4858.00
27.76
2784.4775
15.91
78171.4
44859.906
27.54
47766.02649
29.32
1254456.4
11194.92
7.92
37604.75
26.60
66835.9
10017.12
2.36
14287.5
6484.43
1.83
511495.5
23004
6.48
20084.11
281
146935
146935.2
513663
513662.9 26323.4
4805.20
23.440
5087.28
24.82
89227.8
2976.75
14.700
5659
27.95
142415.0 8604.0 1030.2 20396.3 2299.7 708.1 858.0 472.0 7350.3 1100.0
18252
18.00
1309.72296
1.2916
75448.4
110678.8
137020.3
666358
2980857.8
110678.776
137020.3436
666358
30000.0
0.0
0.0
0.0
15000.0
#######
3025857.8
28-2802-0014 -2A Bayan shebar Gunbad
ID-number Province: District: Village:
256 Summary sheet of MAP
No-F
F1 A 1 2 3 4 5 6 7 8 B 1 2 3 4 5 6 7 8 9 C
1 2 1 2 3 4
Micro hydro power Quantity Un cost Total cost Remarks Civil Work: Construction cost of geraval tiraps 37.79 3235.844868 122268.3398 2445.366797 Construction cost of 1m length of canal 386 2727.28 1,051,758 21035.16123 Construction cost of settlement basin 31.46 2771.92 87198.96 1743.979202 Construction cost of fore bay 29.32 4672.62 137020.34 2740.406871 Construction cost of power house 28.722 3868.89 111122.27 2222.445316 Construction cost of Turbine Area 10.68 4051.58 43251 865.0280321 Construction cost of spillway 27.54 4018.84 110678.78 2213.57552 Construction cost of Anc bolack and Suporter 3.39 5725.38 19389.95 387.7989333 Sub total cost of civil work: 1,682,688.10 33653.7619 Mechanical with hydraulic work: 0 A. : Turbine (33 kW, T12), B.: Adaptor for Turbine, C: . Base Frame 1 for Turbine and 80000 Generator, D: . Intermediate 80000 Shaft, E.: Pulleys (-20" 1600nos, 5" - 3 ) F: . D, V B 508mm dia, 3mm thickness, MS Penstock Pipes with one bends9 and required washers, 2500 bolts and nuts22500 (Bends are shown in DWG) 450 Airvent pipe (diameter=30.62 mm) ( 1 .2inch) 3.288 150 493.2 9.864 PVC Pipe for flushing (arani) 15 150 2250 45 Trahsrack (3.3mX0.81m) with frame, 20mm spacing of bar, bar 2.673 size: 5mmX25mm for 4000 forbay 10692 213.84 Flushing Cone (0.440m dia,(17") 1.55m height), As shown in DWG 1 4000 4000 80 3" Valve with 2m GI Pipe 1 3000 3000 60 Sluice Gate ( 1.2m (H)X 1m (B)) for settling basin 1.2 10000 12000 Sluice Gate for geravaltiraos (1.2m(H) X0.1 m (B)) 1.2 10000 12000 Subtotal cost of mechanical work: 146935.2 2938.704 Electrical work: LS LS 513662.87 10273.25733 Sub total cost of electrical part: 513662.87 10273.25733 Transportation 0.05 5760.00 30000.00 600 probables 0.03 15000.00 15000.00 300 Tools LS 5760.00 5760.00 115.2 Sub total cost 50760.00 1015.2 Total project cost: (A+B+C) 2,394,046.16 2,394,046.16
canal Forbay Power house
Mechanic al Penstok
23480.53 6777.962 3475.272
1600 564.864
Tarnmasion 6919.26 Onther
Total
1015.2
47880.92
Bill of Quantity (BoQ) 28-2802-0014 -2A Bamyan shebar Gunbad weir 256
ID-number: Province: District: Village: Project type: No-F
for M,H,P
Title No. A1
1.00 1.01
A2
Norm No 1
L
W
H
22
8.6
0
0.04
Item
Quantity
Unit
189.2
Unskilled labour on site Foundation excavation
Site preparation
Unit cost Total cost
Contribution
Afs
Afs
CDC, Afs NSP, Afs
md
14.0
2648.8
2648.8
0.0
7.6
md
350.0
2648.8
2648.8
0.0
56.700
m3
175.0
9922.5
9922.5
0.0
1
7.00
0.5
0.48 for d / s pile
1.680
m³
1
7.00
0.2
0.55 for u / s pile
0.770
m³
1
7.00
5.5
0.2
u/s impervious apron
7.700
m³
1
7.00
10.1
0.5
d/s impervious apron
35.350
m³
1
7.00
5
11.200
m³
Unskilled labour on site
28.350
md
350.0
9922.5
9922.5
0.0
Stone work for the foundation
51.840
m3
1628.9
84442.2
18144.0
66298.2
0.32 for under the weir wall
0.5
3.00 2
22.00
0.8
0.6
for weir protection wall
21.120
m³
2
32.00
0.8
0.6
Wing wall
30.720
m³
Stone including transportation
51.8
m3
0.0
0.0
0.0
0.0
3.02 0.385
Sand
20.0
m3
1000.0
19958.4
0.0
19958.4
3.05
77.7
Cement (M: 200, 1:5)
4,028.0
kg
7.0
28195.8
0.0
28195.8
3.07
0.5
Skilled labour on site
25.9
md
700.0
18144.0
0.0
18144.0
3.08
1
Unskilled labour on site
51.8
md
350.0
18144.0
18144.0
0.0
Stone work for walls
167.136
m3
1628.9
272247.8
58497.6
213750.2
3.01
A4
Diminsions
A*
2.00
2.01 A3
Norm / unit
Estimated total project cost in Afs. =
4.00
1
18.816
m³
0.6
1.68 for weir wall 2.44 for protection wall
64.416
m³
0.6
2.19 Wing wall
83.904
m³
Stone including transportation
167.1
m3
0.0
0.0
0.0
0.0
4.02 0.385
Sand
64.3
m3
1000.0
64347.4
0.0
64347.4
4.05
77.7
Cement (M: 200, 1:5)
12,986.5
kg
7.0
90905.3
0.0
90905.3
4.07
0.5
Skilled labour on site
83.6
md
700.0
58497.6
0.0
58497.6
4.08
1
Unskilled labour on site
167.1
md
350.0
58497.6
58497.6
0.0
Pointing stone work
247.200
m2
202.5
50058.0
14708.4
35349.6
2.5
m3
1000.0
2472.0
0.0
2472.0
4.01
A5
A6
1
7.00
1.6
2
22.00
2
32.00
1
5.00 2
22.00
2
32.00
2.44 for protection wall 2.19 Wing wall
107.360 139.840
5.01
0.01
5.02
2
Cement (M:400, 1:3)
494.4
kg
7.0
3460.8
0.0
3460.8
5.04
0.17
Skilled labour on site
42.0
md
700.0
29416.8
0.0
29416.8
5.05
0.17
Unskilled labour on site
42.0
md
350.0
14708.4
14708.4
0.0
PCC
59.857
m3
3550.0
212492.4
20950.0
191542.4
Sand
6.00
S
1.42 0.8
1
1.68
7.00
0.1
for on the vertical walls
1.176
m³
1
1.20
7
0.1
for on the weir
0.840
m³
1
1.63
7
0.1
for Slop of weir
1.141
m³
1
7.00
5.5
0.2
for U / S impervious apron
7.700
m³
1
7.00
10.1
0.5
for d / S impervious apron
35.350
m³
1
7.00
5
11.200
m³
1
7.00
0.2
0.32 below the weir 0.55 for u / s pile
0.770
m³
1
7.0
0.5
0.48 for d / s pile
1.680
m³
14,964.3
kg
7.0
104749.8
0.0
104749.8
6.01
250
cement
6.02
1.1
sand
65.8
liter
1000.0
65842.7
0.0
65842.7
6.03
0.5
Skilled labour on site
29.9
md
700.0
20950.0
0.0
20950.0
6.04
1
Unskilled labour on site
59.9
md
350.0
20950.0
20950.0
0.0
0.0
631811.7
124871.3
506940.4
Total cost of (A1+A2+A3+A5+A6)
Bill of Quantity (BoQ) ID-number: Province: District: Village: Project type: No-f
Title No. A1
A4
Estimated total project cost in Afs. = Bold items to be filled by in tenderer (A1,A2,…,An). Light items for cost estimation only by CDC,FP,OC. Item Contribution A* Diminsions Quantity Unit Unit cost Total cost Norm No H Afs Afs CDC, Afs L W 1
5.6
4.6
0.04
2.00 2.01
A3
Norm/ unit
1.00 1.01
A2
28-2802-0014 -2A Bamyan shebar Gunbad Power house for MHP Plant 256
2
8.6
25.76
m2
14.00
360.64
Site preparation, clearing site ect.
1.030
md
350.00
360.64
8.3
m3
175.00
1,444.80
4.1
md
350.00
1,444.80
8.256
m3
1,628.90
13,448.20
0.8 0.6 Foundation excavation
0.5
3.00
Site preparation
Unskilled labour 2
8.6
0.8 0.6 Stone work for the foundation
-
-
3.01
1
Stone
8.256
m3
3.02
0.385
Sand
3.2
m3
1,000.00
3,178.56
3.05
77.7
Cement (M: 200, 1:5)
641.5
kg
7.00
4,490.44
-
3.07
0.5
Skilled labour on site
4.1
md
700.00
2,889.60
-
3.08
1
Unskilled labour on site
8.256
md
350.00
2,889.60
Stone work for walls
20.47
m3
1,628.90
33,337.07
4.00
Negative
2
8.2
0.6 2.5 Wall
24.60
m3
-1
1.2
0.6 2.2 Door
1.584
m3
-1
1.5
0.6 1.5 Window
1.35
m3
-2
1
0.6
Window
1.20
m3
1
-
-
-
-
-
4.01
1
Stone
20.5
m3
-
4.02
0.385
Sand
7.9
m3
1,000.00
7,879.41
4.05
77.7
Cement (M: 200, 1:5)
1,590.2
kg
7.00
11,131.46
-
4.07
0.5
Skilled labour on site
10.2
md
700.00
7,163.10
-
4.08
1
Unskilled labour on site
20.5
md
350.00
7,163.10
A5
5.00 Negative
A6
5.01 5.02 5.03 5.04 6.00 6.01
7 1.2 1.5 1
2 0.03 0.14 0.18
Pointing stone work of power house
Negative
6.02 6.03 6.04
2 -1 -1 -2
in site palastering M -300(1:4) 2.5 wall 2.2 Door 1.5 Window 1 Window cement sand Skilled labour on site Unskilled labour on site
2 -1 -1 -2
9.4 1.2 1.5 1
0.01 2 0.17 0.17 1
4
2.5 0.6 2.2 Door 0.6 1.5 Window 0.6 1 Window Sand Cement (M:400, 1:3) Skilled labour on site Unskilled labour on site mud pole on th roof 3
soil Skilled labour on site Unskilled labour on site
0.05 0.08 0.03 A7
7.00 7.01 7.02 7.03 7.04 7.05
1 0.05 0.5 0.010 0.04 1
A8
Negative 8.01 1 8.03 0.04
1 1 -1
4
3
Straw mud of roofing Soil Straw Skilled labour on site Unskilled labour on site Instelation G,I hood geraval Levaling
4.2 3.2 0.2 for floor 1.2 1.00 0.2 befoor door 2.5 1.00 0.2 turbin area geraval Unskilled labour on site
28.11 35.00 2.64 2.25 2.00 56.2 0.84 3.94 5.06 42.87 47.000 1.584 1.350 1.200 0.429 85.7 7.287 7.287 12.00 0.6 0.960 0.36 12.00 0.6 6.0 0.1 0.48 1.0 2.428 2.69 0.24 0.50 2.4 0.097
m2
205.00
5,762.55
-
7.00 1,000.00 700.00 350.00 202.50
393.54 843.30 2,754.78 1,770.93 8,680.37
-
1,000.00 7.00 700.00 350.00 71.50 100.00 700.00 350.00 39.33 100.00 10.00 700.00 350.00 100.00 1,014.00
428.66 600.12 5,101.05 2,550.53 858.00 60.00 672.00 126.00 472.00 60.00 60.00 84.00 168.00 100.00 2,461.99
1,000.00 350.00
2,428.00 33.99
m2 m2 m2 m2 kg m3 md md m2
-
m2 m2 m2 m2 m3 kg md md m2 m3 md md m2 m3 kg md md pc m3 m3 m3 m3 m3 md
-
A9
PCC 4.2 3 0.07 for floor 1.2 1.00 0.07 befoor door 2.5 1.00 0.07 turbin area cement sand Skilled labour on site Unskilled labour on site
9.00 1 1 -1
Negative 9.01 9.02 9.03 9.04 A10 10.00
250 1.1 0.5 1
Doors + windows for power house
1 1 2 10.01 10.02 A11 11.00
1.2 1.5 1
Complete Doors (1.2X2.2)m Complete Windows(2X1.5)m Complete Windows(1X1)m Skilled labour on site Unskilled labour on site Glass fitting for windows
0.08 0.2 70% 70%
11.01 11.02 A12 12.00 12.01 12.02
2.2 1.5 1
1 2
1.5 1.5 1 1
1.05 0.04 1 1 0.50
5
2
Glasses Skilled labour on site 0.4 Filling with soil and compaction Soil Unskilled labour on site
0.7910
m3
0.88 0.08 0.18 197.8 0.9 0.4 0.8 4.000 1.000 1.000 2.000 0.3 0.8 2.9750 1.575 1.4 3.12 0.119 4.00 4.0 2.0
m3
3,550.00
2,808.05
-
7.00 1,000.00 700.00 350.00 2,151.00 3,000.00 3,500.00 800.00 700.00 350.00 238.00
1,384.25 870.10 276.85 276.85 8,604.00 3,000.00 3,500.00 1,600.00 224.00 280.00 708.05
-
200.00 700.00 275.00 100.00 350.00
624.75 83.30 1,100.00 400.00 700.00
-
m3 m3 kg m3 md md pc pc pc pc md md m2
m2 md m3 m3 md
-
A13 13.00 Negative
13.01 0.603 13.02 0.02 13.03 0.02 13.04 0.027 A14 14.00 2 Door 100% Windows 30% Windows 30% 14.01 0.27 14.02 0.5 14.03 0.046 14.04 0.5 A15 15
2 -1 -1 -2
7.4 1.2 1.5 1
2 2 4
2.5 2.2 1.5 1
Water painting wall Door Window Window Marble powder powder paint solt Skilled labor oiLPainting
1.2 2.2 for door 1.5 1.5 for Window 1 1 for Window
Oil paint oil
3 3 3
4.2 2.5 2
4.4 0.6 0.6
Skilled labour on site Unskilled labour on site instelation Wooden beem on the roof Wooden beem L=4.4m D=40cm Wooden beem for Lintal L=2.5m D=40cm Wooden beem for Lintal L=2m D=40cm
Nail 0.01 15.01 Wooden beem 1 15.02 0.014 Skilled labour on site Unskilled labour on site 15.03 0.030 instelation wooden board on the beem A16 16 1 4.2 3.2 16 bourd 2X0.2X0.02 0.4 16 Nail 0.12 16 0.040 Skilled labour on site Unskilled labour on site 16 0.03 Total cost of (A1+A2+A3+A5+A6+A7+A11+A12+A13+A14+A15+A16)
30.11 37.0 2.6 2.3 2.0 22.3 0.6 0.6 0.8 7.830 5.28 1.35 1.20 2.1 3.9 0.4 3.9 63.54 55.4 4.5 3.6
m2
34.21
1,030.21 -
-
kg
15.00 200.00 10.00 700.00 293.70
334.67 120.44 6.02 569.08 2,299.67 -
-
200.00 65.00 700.00 350.00 321.000
422.82 254.48 252.13 1,370.25 20396.34
-
70 300 700.00 350.00 546.9 200 70 700.00 350.00 -
44.478 19062 622.692 667.17 7350.336 6720 112.896 376.32 141.12 111,122.27
kg kg kg m2 m2 m2
-
m3 kg m3 liter md m.L
-
ml ml ml
0.6354
kg
63.54 0.88956 1.9062 13.44 33.6 1.6128 0.5376 0.4032
ml m/d m/d m2 pc kg m/d m/d
0 0 0 0 0 0 -
Bill of Quantity (BoQ)
by in tenderer (A1,A2,…,An). Light items for cost estimation only by CDC,FP,OC. Contribution NSP, Afs 360.64 360.64 1,444.80 1,444.80 13,448.20 3,178.56 4,490.44 2,889.60 2,889.60 33,337.07
7,879.41 11,131.46 7,163.10 7,163.10
5,762.55
393.54 843.30 2,754.78 1,770.93 8,680.37
428.66 600.12 5,101.05 2,550.53 858.00 60.00 672.00 126.00 472.00 60.00 60.00 84.00 168.00 100.00 2,461.99
2,428.00 33.99
2,808.05
1,384.25 870.10 276.85 276.85 8,604.00 3,000.00 3,500.00 1,600.00 224.00 280.00 708.05
624.75 83.30 1,100.00 400.00 700.00
1,030.21 -
334.67 120.44 6.02 569.08 2,299.67 422.82 254.48 252.13 1,370.25 20,396.34
44.478 19062 622.692 667.17 7350.336 6720 112.896 376.32 141.12 111,122.27
Bill of Quantity (BoQ) ID-number: Province: District: Village: Project type: No-F
28-2802-0014 -2A Bamyan shebar Gunbad Canal for Settement basin 256
Title No. Norm/ A* unit Norm No A1
1.00
A2
A3
2.6
Unit cost Afs
Total cost Afs
Contribution CDC, Afs
md
14.0
5496.4
5496.4
Site preparation, clearing site ect.
15.70
md
350.0
5496.4
5496.4
Foundation excavation
211.40
m3
175.0
36995.0
36995.0
Unskilled labour
105.70
md
350.0
36995.0
36995.0
Stone work for the foundation
144.96
m3
1628.9
236125.3
50736.0
Stone
144.96
m3
0.0
0.0
0.0
3.02 0.385
Sand
55.81
m3
1000.0
55809.6
0.0
3.05
77.7
Cement (M: 200, 1:5)
11263.39
kg
7.0
78843.7
0.0
3.07
0.5
Skilled labour on site
72.48
md
700.0
50736.0
0.0
3.08
1
Unskilled labour on site
144.96
md
350.0
50736.0
50736.0
Stone work for walls
139.52
m3
1628.9
139.52
m3
Stone
139.52
m3
0.0
0.0
0.0
4.02 0.385
Sand
53.72
m3
1000.0
53716.7
0.0
4.05
77.7
Cement (M: 200, 1:5)
10841.01
kg
7.0
75887.1
0.0
4.07
0.5
Skilled labour on site
69.76
md
700.0
48833.4
0.0
4.08
1
Unskilled labour on site
139.52
md
350.0
48833.4
43070.5
0.04
2.00
2
151.000
1
2
151.000
0.8
1
4.00 2 4.01
0.7
0.5
3.00 3.01
A4
Quantity Unit 392.60
2.01
151.0
Item H Site preparation
1.01
1
Diminsions L W
for M,H,P
1
151.000
0.6
0.6
0.77 for walls
227270.6
43070.5
A5
5.00
Pointing stone work 2
A6
A8
0.77 for walls
m2
202.5
47089.4
0.0
232.54
m2
2.33
m3
1000.0
2325.4
0.0
5.01
0.01
5.02
2
Cement (M:400, 1:3)
465.08
kg
7.0
3255.6
0.0
5.04
0.17
Skilled labour on site
39.53
md
700.0
27672.3
0.0
5.05
0.17
Unskilled labour on site
39.53
md
350.0
13836.1
geraval Levaling
24.16
m3
1014.0
24498.2
0.0
0.2 for floor
24.16
m3
geraval
24.16
m3
1000.0
24160.0
0.0
Unskilled labour on site
0.97
md
350.0
338.2
PCC
42.88
m3
3550.0
152238.2
0.0
Sand
6.00 1
A7
151.000
232.54
6.01
1
6.02
0.04
151.0
0.80
7.00 2
151.000
0.6
0.07 for on the walls
12.68
m3
2
151.000
1.00
0.1
30.20
m3
1
151.000
1.00
0.07 for floor
10.57
m3
10721.00
kg
7.0
75047.0
0.0
under the wall foundtion
7.01
250
cement
7.02
1.1
sand
47.17
m3
1000.0
47172.4
0.0
7.03
0.5
Skilled labour on site
21.44
md
700.0
15009.4
0.0
7.04
1
Unskilled labour on site
42.88
md
350.0
15009.4
palastering M :300 (1:4)
211.40
m2
205.0
43337.0
0.0
211.40
m2
422.80
kg
7.0
2959.6
0.0
8 2
151.000
0.70 in site
8
2
8
0.03
sand
6.34
m3
1000.0
6342.0
0.0
8
0.14
Skilled labour on site
29.60
md
700.0
20717.2
0.0
8
0.18
Unskilled labour on site
38.05
md
350.0
13318.2
0.0
773050.2
Total cost of (A1+A2+A3+A5+A6+A7+A8)
cement
136297.9
Bill of Quantity (BoQ)
Contribution NSP, Afs 0.0 0.0 0.0 0.0 185389.3 0.0 55809.6 78843.7 50736.0 0.0 184200.1
0.0 53716.7 75887.1 48833.4 5762.9
47089.4
2325.4 3255.6 27672.3 13836.1 24498.2
24160.0 338.2 152238.2
75047.0 47172.4 15009.4 15009.4 43337.0
2959.6 6342.0 20717.2 13318.2
636752.3
28-2802-0014 -2A Bamyan shebar Gunbad Turbine Area for MHP Plant 256
ID No: Province: District: Village: Project purpose:
No-F Title No.
Norm/ A* unit Norm
A1 1.00 1.01
Diminsions
Item
No
L
W
H
1
4.8
2.6
0.8
0.5
Quantity Unit
Total cost
Afs
Afs
CDC, Afs
NSP, Afs
0.00
1,747.20
Site excavation
9.98
m3
175.00
1,747.20
Unskilled labour
5.0
md
350
1,747.20
6.278
m3
175
1,098.72
foundation excavation 2
3.1
0.8
0.6 for walls
2.976
m3
3
1.96
0.8
0.6 for basin
2.822
m3
1
1.00
0.8
0.6 for basin
0.480
m3
3.1
md
350
1,098.72
5.338
m3
1,628.90
8,694.42
0.5
Unskilled labour
A2 2.00
Stone work for the foundation
Contribution
Unit cost
1,747.20 0.00
1,098.72
1,098.72 0.00
8,694.42
2
3.1
0.8
0.6 for walls
2.976
m3
2
1.96
0.8
0.6 for basin
1.882
m3
1
1.00
0.8
0.6 for basin
0.480
m3
Stone
5.3
m3
0.00
0.00
0.00
2.02 0.385
Sand
2.1
m3
1,000.00
2,054.98
2,054.98
2.05
77.7
Cement (M: 200, 1:5)
414.7
kg
7.00
2,903.12
0.00
2,903.12
2.07
0.5
Skilled labour on site
2.7
md
700.00
1,868.16
0.00
1,868.16
2.08
1
Unskilled labour on site
5.3
md
350.00
1,868.16
5.338
m3
1,628.90
8,694.42
0.00
8,694.42
0.00
0.00
2.01
1
A3 3.00
Stone work for walls of TA
1,868.16
2
3.1
0.6
0.8 for walls
2.976
m3
2
2.0
0.6
0.80 for basin
1.882
m3
1
1.0
0.6
0.80 for basin
0.480
m3
Stone
5.3
m3
0.00
0.00
3.02 0.385
Sand
2.1
m3
1,000.00
2,054.98
3.05
77.7
Cement (M: 200, 1:5)
414.7
kg
7.00
2,903.12
0.00
2,903.12
3.07
0.5
Skilled labour on site
2.7
md
700.00
1,868.16
0.00
1,868.16
3.08
1
Unskilled labour on site
5.3
md
350.00
1,868.16
3.01
1
2,054.98
1,868.16
Westeg
A4 4.00
4.01
0.4
4.02
2
4.03
20%
Shuttering 2
3.1
3
1.0
0.8 Shuttering for walls 1 Shuttering for bsin walls
1
1.0
0.3 Shuttering for bsin walls
8.260
m2
5.0
m2
3.0
m2
0.3
1,413.50
11,675.51
0.00
11,675.51
0.00
4,956.00
Wooden plank
24.780
pcs
200.00
4,956.00
Wooden pole 4m long
16.52
pcs
300.00
4,956.00
0.05
Nail
0.413
kg
70.00
28.91
0.00
28.91
4.04
0.2
Skilled labour on site
1.652
md
700.00
1,156.40
0.00
1,156.40
4.05
0.2
Unskilled labour on site
1.652
md
350.00
578.20
4,956.00
578.20
A5
0.820
m3
1,014.00
831.48
0.8
m3
0.8
m3
1,000.00
820.00
820.00
Unskilled labour on site
0.033
md
350.00
11.48
11.48
Turbine Area RCC
1.005
m3
for Walls
0.397
m3
geraval Levaling 1 5.01
4.1
1.0
0.2 floor
1
geraval
5.03 0.04 A6 6.00
-
831.48
4,250.00
4,270.40
0.00
4,270.40
2
3.1
0.08
0.8
3
1
0.08
1
for basin Walls
0.240
m3
1
1
0.08
0.3
for basin Walls
0.024
m3
1
4.1
1
0.328
m3
1
1
0.5
0.040
m3
1.1
m3
1,000.00
1,105.28
0.00
1,105.28
0.08 Floor 0.08 Slab
6.01
1.1
Sandy gravel
6.02
350
Cement (M: 200, 1:5)
351.7
kg
7.00
2,461.76
0.00
2,461.76
6.03
0.5
Skilled labour on site
0.5
md
700.00
351.68
0.00
351.68
6.04
1
Unskilled labour on site
1.0
md
350.00
351.68
87.372
kg
71.41
6,239.26
0.00
6,239.26
19.63
ml
17.33
ml
for Walls @15cm c/c
23.00
ml
3.0 for Walls @15cm c/c 1.0 for floor @15cm c/c
21.00
ml
23.77
ml
21.67
ml
7.67
ml
7.67
ml
A7 7.00
No
L(m)
6.3
3.1
21.7
0.8
7.7
3.0
21.0
1
7.7
3.1
21.7
1.0
7.7
1
3.1 for floor @15cm c/c 1.0 for basin floor @15cm c/c
7.7
1
1.0 for basin floor @15cm c/c
1.0
1
0.5
for slab @15cm c/c
1.00
ml
1.0
0.5
1
for slab @15cm c/c
0.50
ml
Steel bar 10 mm
87.4
Kg
60.00
5,242.34
0.00
5,242.34
7.02 0.007
Wire 1 mm
0.6
Kg
80.00
48.93
0.00
48.93
7.03 0.012
Skilled labour on site
1.048
md
700.00
733.93
0.00
733.93
7.04 0.007
Unskilled labour on site
0.6
md
350.00
214.06
7.01
h(m) Steel working
351.68
0.8 for Walls @15cm c/c 3.1 for Walls @15cm c/c 1
0.61
Total cost of (A1+A2+A3+A4+A5+A6+A7)
0.00
43,251.4
214.06
0
43251.4
Bill of Quantity (BoQ) ID-number 28-2802-0014 -2A Province: Bamyan District: shebar Village: Gunbad Project type: Fore Bay for MHP Plant 256 No-F
Title No. A1
1.00 1.01
A2
1
L
W
4.90
3.25
Item
Afs
2
6.55
1
1.49
222.95
-
0.64
md
350.00
222.95
222.95
-
15.911
m3
175.00
2,784.48
2,784.48
-
5.445
m3
9.170
m3
0.87 for falshcon place
1.296
m3
Unskilled labor
7.96
md
350.00
2,784.48
2,784.48
-
29.324
m3
1,628.9
47,766.03
10,263.44
0.6 for fundation 0.70 2.81 for short walls
6.29
m3
6.49
m3
0.70 2.81 for long wall 0.70 2.11 for bufet wall
8.85
m4
6.65
m3
0.50 0.60 for falshcon wall 0.50 0.60 for falshcon wall
0.45
m3
0.60
m3
1.65 1.00 for site 1 0.7 for Fundation 1
Stone work
0.80
2
1.65
1
4.50
1
4.50
1
1.49
2
1.00
NSP, Afs
222.95
3.00 6.55
CDC, Afs
14.00
0.5 2
Afs
Contribution
md
Excavation 3.30
Total cost
15.93
Site preparation Unskilled labor
1
Quantity Unit Unit cost
H
0.04
0.60
A4
Diminsions
2.00
2.01 A3
Norm A* Norm / unit No
0.8
3.01
1
3.02
0.39
3.05
77.7
Cement (M: 200, 1:5)
3.07
0.5
3.08
1
Stone including transportation
2
6.55
1
-
-
m3
1,000
11,289.78
kg
7.00
15,949.38
-
15,949.38
Skilled labor on site
14.66
md
700.00
10,263.44
-
10,263.44
Unskilled labor on site
29.32
md
350.00
10,263.44
10,263.44
1.827
m3
3,550.0
6,484.43
639.31
5,845.12
On the walls
0.52
m3
0.1 under the foundtion
1.31
PCC-M200 0.6
-
11.29
4.00 6.15
m3
2278.48
Sand
2
29.32
37,502.59
0.07
4.01
1.1
Sandy gravel
4.04
250
Cement (M:120, 1:6)
4.06
0.5
4.07
1
11,289.78
-
2.009
m3
1,000.0
2,009.26
-
2,009.26
456.650
kg
7.00
3,196.55
-
3,196.55
Skilled labor on site
0.913
md
700.00
639.31
-
639.31
Unskilled labor on site
1.827
md
350.00
639.31
639.31
-
A5
A6
A7
A8
1.292
m3
1.1
m3
0.2
m3
geraval Unskilled labour on site
1.3
In site Plastering Mortar (1:3)
geraval Levaling
5.01
1
5.03
0.04
1
3.30
1.65
1
1.49
0.68
6.00
6.01
0.03
6.02
2
6.03
0.14
6.04
0.18 Westeg
7.00 Westeg
7.01
0.4
7.02
2
7.03
0.05
7.04
0.2
7.05
0.2
8.00
1
6.60
1
3.300
0.2 floor 0.2 for falshcon floor
2.74 for for three wall 2.04 for bufet wall Sand
1,014.0
1,309.72
18.08
1,291.64
m3
1,000.0
1,291.64
-
1,291.64
0.052
md
350.00
18.08
18.08
24.816
m2
205.00
5,087.28
1,563.41
18.084
m2
6.732
m2
0.74
m3
1,000.0
744.48
-
744.48
50
kg
7.00
347.42
-
347.42
3
md
700.00
2,431.97
-
2,431.97
4
md
350.00
1,563.41
1,563.41
26.604
m2
1,413.5
37,604.75
1,862.28
18.084
m2
6.732
m2
Cement
20%
Skilled labor on site Unskilled labor on site Shuttering 1
6.60
1
3.300
2.74 for for three wall 2.04 for bufet wall
2
1.490
0.60 for falshcon wall
20%
3,523.87
35,742.47
1.788
m2
Wooden plank
79.812
pcs
200.00
15,962.40
-
15,962.40
Wooden pole 4m long
53.2080
pcs
300.00
15,962.40
-
15,962.40
Nail
1.330
kg
70.00
93.11
-
93.11
Skilled labor on site Unskilled labor on site
5.321
md
700.00
3,724.56
-
3,724.56
5.321
md
350.00
1,862.28
1,862.28
71.41
20,084.11
689.06
19,395.05
-
No
L(m) w(m) h(m) Steel working For forbay
281.251
kg
19
6.60
127.16
ml
45
2.74
2.74 for three @15cm c/c 6.60 for three @15cm c/c
123.30
ml
15
3.30
ml
2.04
2.04 for bufet wall @15cm c/c 3.30 for bufet wall @15cm c/c
48.18
23
46.92
ml
12
3.30
1.65
for floor @15cm c/c
39.60
ml
23
1.65
3.30
for floor @15cm c/c
37.95
ml
5
1.00
ml
8
0.60
0.60 four wall for falshcon l @ 15 cm C/C5.00 1.00 four wall for falshcon @ 15 cm C/C4.60
8
1.49
1.00
for falshcon floor @ 15 cm C/C
11.42
ml
11
1.00
1.49
for falshcon floor @ 15 cm C/C
10.93
ml
5
0.60
0.60
for flashcon slab @ 15cm C/C
3.00
ml
5
0.60
0.60
for flashcon slab @ 15cm C/C
3.00
ml
281.25
Kg
60.00
16,875.04
-
16,875.04
Kg
80.00
157.50
-
157.50
-
2,362.51
ml
8.02
0.61
8.04
0.01
Wire 1 mm
2.0
8.05
0.01
3.4
md
700.00
2,362.51
8.06
0.01
Skilled labor on site Unskilled labor on site
2.0
md
350.00
689.06
Steel bar diameter 10 mm
689.06
-
A9
9.00
4,250.0
10,017.12
m3
1,000.0
2,592.67
824.9
kg
7.00
5,774.58
-
5,774.58
1.178
md
700.00
824.94
-
824.94
Unskilled labor on site
2.4
md
350.00
824.94
824.94
-
Pointing stone work
27.948
m²
202.50
5,659.47
1,662.91
15.62
m2
12.33
m2
0.279
m3
1,000.0
279.48
-
279.48
55.896
kg
7.00
391.27
-
391.27
4.751
md
700.00
3,325.81
-
3,325.81
4.751
md
350.00
1,662.91
RCC work
9.01
1.1
9.04
350
9.06
0.5
9.07
1
1
6.60
0.07 2.74
1
3.30
0.07 2.04
1
3.30
1.65 0.07
2
1.00
0.60 0.07
1
1.49
1.00 0.07
1
0.60
1.20 0.07
0.01
10
2
10
0.17
10
0.17
for bufet wall for floor for flashcon wall for flashcon floor for flashcon slab Sandy gravel Cement (M: 200, 1:5) Skilled labor on site
A10 10.00
110
for three walls
2
2.85
2.74
1
4.50
2.74
Total cost of (A1+...+A11)
for tow walls for one wall Sand Cement (M:400, 1:3) Skilled labour on site Unskilled labour on site
2.357
m3
1.266
m3
0.471
m3
0.381
m3
0.084
m3
0.104
m3
0.050
m3
2.6
-
137020.34
824.94
9,192.18
2,592.67
1,662.91
20530.9
3,996.56
-
116489
Bill of Quantity (BoQ) ID-number: 28-2802-0014 -2A Province: Bamyan District: shebar Village: Gunbad Project type: Settelment basin N-F 256 Bold items to be filled by in tenderer (A1,A2,…,An). Light items for cost estimation only by CDC,FP,OC. Item Quantity Unit Unit cost Total cost Diminsions Title No. Norm/ A* unit Norm No A1
1.00 1.01
A2
A4
W
10
4.90
H
Afs
0.04
Afs
49.00
md
14.00
686.00
2.0
md
350.00
686.00
Foundation excavation
17.150
m3
175.00
3,001.25
Site preparation Site preparation, clearing site ect.
2.00
2.01 A3
1
L
2
10.0
1
0.7
for wall
14.000
m3
2
2.25
1
0.7
for wall
3.150
m3
8.6
md
350.00
3,001.25
Stone work for the foundation
11.760
m3
1,628.90
19,155.86
0.5
Unskilled labour
3.00 2
10.0
0.8
0.6
wall
9.600
m3
2
2.25
0.8
0.6
wall
2.160
m3
-
-
-
1
Stone
11.8
m3
3.02
0.385
Sand
4.528
m3
1,000.00
4,527.60
-
3.05
77.7
Cement (M: 200, 1:5)
913.8
kg
7.00
6,396.26
-
3.07
0.5
Skilled labour on site
5.9
md
700.00
4,116.00
-
3.08
1
Unskilled labour on site
11.8
md
350.00
4,116.00
Stone work for walls
19.698
m3
1,628.90
32,086.07
2
10.000
0.6
1.34 for walls
16.080
m3
2
2.25
0.6
1.34 for wall
3.618
m3 -
-
CDC, Afs
3.01
4.00
-
Contribution
-
-
-
4.01
1
Stone
19.698
m3
-
4.02
0.385
Sand
7.58
m3
1,000.00
7,583.7
-
4.05
77.7
Cement (M: 200, 1:5)
1,530.5
kg
7.00
10,713.7
-
4.07
0.5
Skilled labour on site
9.8
md
700.00
6,894.3
-
4.08
1
Unskilled labour on site
19.7
md
350.00
6,894.3
A5
5.00
Pointing stone work
A8
m2
202.50
6,648.08
-
2
10.000
1.34 for walls
26.800
m2
2
2.250
1.34 for wall
6.030
m2
Sand
0.3
m3
1,000.00
328.30
-
5.01
0.01
5.02
2
Cement (M:400, 1:3)
65.7
kg
7.00
459.62
-
5.04
0.17
Skilled labour on site
5.6
md
700.00
3,906.77
-
5.05
0.17
Unskilled labour on site
5.6
md
350.00
1,953.39
7.447
m3
1,014.00
7,551.36
-
-
A6
A7
32.830
geraval Levaling 0.74
1
10.000 3.30
0.2 floor
6.600
m3
2.29
1
1.970
0.2 floor
0.847
m3
7.4
m3
1,000.00
7,447.10
Unskilled labour on site
0.298
md
350.00
104.26
PCC
3.479
m3
3,550.00
12,350.45
-
6.01
1
6.03
0.04
2.15
geraval
7.00 2
10.000
0.6
0.07 for on the walls
0.840
m3
2
2.250
0.6
0.07 for walls
0.189
m3
2
10.000 1.00
0.1
under the foundtion
2.000
m3
2
2.250
0.1
under the foundtion
0.450
m3
1
10.000 3.30
0.07 for floor
2.310
m3
1
1.970
0.07 for floor
0.296
m3
869.8
kg
7.00
6,088.25
-
1.00
2.15
7.01
250
cement
7.02
1.1
sand
3.8
m3
1,000.00
3,826.90
-
7.03
0.5
Skilled labour on site
1.7
md
700.00
1,217.65
-
7.04
1
Unskilled labour on site
3.5
md
350.00
1,217.65
27.902
m2
205
m2
8.00
palastering M :300 (1:4)
8.01
2
8.02
2
10.000
1.27 in site
25.400
1
1.970
1.27 in site
2.502
5,719.89
0.00
cement
55.804
kg
7.00
390.63
0.00
0.03
sand
0.837
m3
1,000.00
837.06
0.00
8.03
0.14
Skilled labour on site
3.906
md
700.00
2,734.39
0.00
8.04
0.18
Unskilled labour on site
5.022
md
350.00
1,757.82
-
87198.96
Total cost of (A1+A2+A3+A5+A6+A7+A8)
0
Bill of Quantity (BoQ)
Contribution NSP, Afs 686.00 686.000 3,001.25
3,001.25 19,155.86
4,527.60 6,396.26 4,116.00 4,116.00 32,086.07
7,583.73 10,713.74 6,894.30 6,894.30
6,648.08
328.30 459.62 3,906.77 1,953.39 7,551.36
7,447.10 104.26 12,350.45
6,088.25 3,826.90 1,217.65 1,217.65 5,719.89
390.63 837.06 2,734.39 1,757.82
87199
Bill of Quantity (BoQ) ID-number: 28-2802-0014 -2A Province: Bamyan District: shebar Village: Gunbad Project type: Spillway for sataling basine 256 No-F Title A1
No. 1.00 1.01
A2
A4
Diminsions No
L
W
1
5
2.60
0.04
Item
Quantity
Unit
H Site preparation Site preparation, clearing site ect.
2.00
2.01 A3
Norm/ A* unit Norm
for M,H,P
Foundation excavation
Unit cost
Total cost
Afs
Afs
Contribution CDC, Afs
13.00
md
14.00
182.00
182.00
0.5
md
350.00
182.00
182.00
6.960
m3
175.00
1,218.00
1,218.00
2
5.00
1
0.60 for canal walls foundation
6.000
m3
4
1.00
0.3
0.80 for impervious foundation
0.960
m3
3.5
md
350.00
1,218.00
1,218.00
5.760
m3
1,628.90
9,382.46
2,016.00
0.5
Unskilled labour
3.00
Stone work for the foundation 2
5.00
0.8
0.60 for canal wall foundation
4.800
m3
4
1.00
0.3
0.80 for impervious foundation
0.960
m3
3.01
1
Stone
5.8
m3
3.02
0.385
Sand
2.22
m3
1,000.00
2,217.60
-
3.05
77.7
Cement (M: 200, 1:5)
447.6
kg
7.00
3,132.86
-
3.07
0.5
Skilled labour on site
2.9
md
700.00
2,016.00
-
3.08
1
Unskilled labour on site
5.8
md
350.00
2,016.00
2,016.00
Stone work for walls
7.620
m3
1,628.90
12,412.22
2,667.00
7.620
m3
4.00 2
5.00
0.60
1.27 for canal walls
-
-
-
-
-
4.01
1
Stone
7.6
m3
-
4.02
0.385
Sand
2.934
m3
1,000.00
2,933.70
-
4.05
77.7
Cement (M: 200, 1:5)
592.1
kg
7.00
4,144.52
-
4.07
0.5
Skilled labour on site
3.8
md
700.00
2,667.00
-
4.08
1
Unskilled labour on site
7.6
md
350.00
2,667.00
2,667.00
A5
5.00 2
5.000
2,571.75
12.700
m2
Sand
0.1
755.65
m3
1,000.00
127.00
-
0.01
5.02
2
Cement (M:400, 1:3)
25.4
kg
7.00
177.80
-
5.04
0.17
Skilled labour on site
2.2
md
700.00
1,511.30
-
5.05
0.17
Unskilled labour on site
2.2
md
350.00
755.65
755.65
geraval Levaling
0.80
m3
1,014.00
811.20
11.20
0.8
m3
geraval
0.8
m3
1,000.00
800.00
-
Unskilled labour on site
0.0
md
350.00
11.20
11.20
1.210
m3
3,550.00
4,295.50
423.50
6.01
1
6.03
0.04
5.00
0.800
0.2 for canal floor
7.00
PCC 2
5.00
0.6
0.07 for on the canal walls
0.420
m3
1
5.00
1.00
0.07 for canal floor
0.350
m3
4
1.00
0.10
1.1
for step
0.440
m3
302.5
kg
7.00
2,117.50
-
1.3
m3
1,000.00
1,331.00
-
0.6050
md
700.00
423.50
-
1.2
md
350.00
423.50
423.50
5.280
m2
1,413.50
7,463.28
369.60
5.280
m2
Wooden plank
15.840
pcs
200.00
3,168.00
-
Wooden pole 4m long
10.5600
pcs
300.00
3,168.00
-
7.01
250
cement
7.02
1.1
sand
7.03
0.5
Skilled labour on site
7.04
1
Unskilled labour on site
8.00
Westeg
Shuttering
Westeg
A9
202.50
5.01
1
A8
m2
1.27 for canal walls
A6
A7
12.700
Pointing stone work
20%
4
1.000
1.10 for stap
8.01
0.4
8.02
2
8.03
0.05
Nail
0.264
kg
70.00
18.48
-
8.04
0.2
Skilled labor on site
1.056
md
700.00
739.20
-
8.05
0.2
Unskilled labor on site
1.056
md
350.00
369.60
369.60
palastering M :300 (1:4)
12.000
m2
205
12.000
m2
cement
24.000
kg
9.00 2
5.00
1.20 in site the canal walls
2,460.00
756.00
7.00
168.00
0.00
360.00
0.00
9.01
2
9.02
0.03
sand
0.360
m3
1,000.00
9.03
0.14
Skilled labour on site
1.680
md
700.00
1,176.00
0.00
9.04
0.18
Unskilled labour on site
2.160
md
350.00
756.00
756.00
40,796
8398.95
Total cost of (A1+A2+A3+A5+A6+A7+A8+A9)
-
Bill of Quantity (BoQ)
Contribution NSP, Afs -
7,366.46
2,217.60 3,132.86 2,016.00 9,745.22
2,933.70 4,144.52 2,667.00 -
1,816.10
127.00 177.80 1,511.30 800.00
800.00 3,872.00
2,117.50 1,331.00 423.50 7,093.68
3,168.00 3,168.00 18.48 739.20 1,704.00
168.00 360.00 1,176.00 0.00
32397.5
Bill of Quantity (BoQ) ID-number: 28-2802-0014 -2A Province: Bamyan District: shebar Village: Gunbad Project type: garavaltiraps 256 No-F Diminsions Title No. Norm A* / unit Norm No L W A1
A2
1.00
A3
Quantity Unit
H
7.6
Unit cost Afs
Total cost Afs
Contribution CDC, Afs
76.0
md
14.00
1,064.00
1,064.00
1.01 0.04
Site preparation, clearing site ect.
3.0
md
350.00
1,064.00
1,064.00
2.00
Foundation excavation
21.504
m3
175.00
3,763.20
3,763.20
2
10
1
0.7
for wall
14
2
2.81
1
0.7
for inlet
3.934
2
2.55
1
0.7
for outlet
3.57
Unskilled labour
10.8
md
350.00
3,763.20
3,763.20
14.746
m3
1,628.90
24,019.11
5,160.96
0.5
3.00
Stone work for foundation 2
10
0.8
0.6
for wall
9.6
m3
2
2.810 0.80
0.60 for inlet
2.6976
m3
2
2.550 0.80
0.60 for outlet
2.448
m3
Stone
14.7
m3
0
3.02 0.385
Sand
5.7
m3
1,000.00
5,677.06
-
3.05 77.7
Cement (M: 200, 1:5)
1,145.7
kg
7.00
8,020.13
-
3.07
0.5
Skilled labour on site
7.4
md
700.00
5,160.96
-
3.08
1
Unskilled labour on site
14.7
md
350.00
5,160.96
5,160.96
Stone work for walls
23.040
m3
1,628.90
37,529.86
8,064.00
3.01
A4
10
Item Site preparation
2.01
1
for M,H,P
1
4.00
4.01
1
2
10
0.6
1.25 for wall
15
2
2.810
0.6
1.25 for inlet
4.2
2
2.550
0.6
1.25 for outlet
3.8
Stone
23.0
m3
-
-
-
4.02 0.385
Sand
8.9
m3
1,000.00
8,870.40
-
4.05 77.7
Cement (M: 200, 1:5)
1,790.2
kg
7.00
12,531.46
-
4.07
0.5
Skilled labour on site
11.5
md
700.00
8,064.00
-
4.08
1
Unskilled labour on site
23.0
md
350.00
8,064.00
8,064.00
A5
A6
5.00
Pointing stone work
m2
2
10
1.25 for wall
25
2
2.81
1.25 for inlet
7.025
m2
2
2.55
1.25 for outlet
6.375
m2
202.50
7,776.00
2,284.80
m2
5.01 0.01
Sand
0.4
m3
1,000.00
384.00
-
5.02
Cement (M:400, 1:3)
76.8
kg
7.00
537.60
-
5.04 0.17
Skilled labour on site
6.5
md
700.00
4,569.60
-
5.05 0.17
Unskilled labour on site
6.5
md
350.00
2,284.80
36.250
m2
205
2
6
palastering M :300 (1:4) 2
10.00
1.18 for wall
23.600
m2
2
2.81
1.18 for inlet
6.632
m2
2
2.55
1.18 for outlet
6.018
m2
cement
72.499
kg
7.00
2,284.80
7,431.17
2,283.72
507.49
0.00
6
2
6
0.03
sand
1.087
m3
1,000.00
1,087.49
0.00
6
0.14
Skilled labour on site
5.075
md
700.00
3,552.46
0.00
6
0.18
Unskilled labour on site
6.525
md
350.00
2,283.72
2,283.72
geraval Levaling
12.000
m3
1,014.00
12,168.00
168.00
12.00
m3
0.92
m3
0.42
m3
geraval
12.0
m3
1,000.00
12,000.00
-
7.02 0.04
Unskilled labour on site
0.480
md
350.00
168.00
168.00
8.00
PCC
8.033
m3
3,550.00
28,517.01
2,811.54
A7
7.01
A8
38.400
1
10.00
6.0
1
1.32
3.5
1
0.60
3.5
for floor 0.2 for inlet floor 0.2 for outlet floor 0.2
1
1
10.00
6.0
0.07 for floor
4.200
m3
area
1
1.32
3.5
0.07
for inlet
0.323
m3
area
1
0.60
3.5
0.07
for outlet
0.147
m3
2
11.84
0.6
0.07 for on the walls
0.995
m3
2
11.84
1
0.1
2.368
m3
2,008.2
kg
7.00
14,057.68
-
for under the foundtion
8.01
250
cement
8.02
1.1
sand
8.8
liter
1,000.00
8,836.26
-
8.03
0.5
Skilled labour on site
4.0
md
700.00
2,811.54
-
8.04
1
Unskilled labour on site
8.0
md
350.00
2,811.54
2,811.54
Total cost of (A1+A2+A3+A5+A6)
-
122,268.3
25,600.22
Bill of Quantity (BoQ)
Contribution NSP, Afs -
18,858.15
5,677.06 8,020.13 5,160.96 29,465.86
8,870.40 12,531.46 8,064.00 -
5,491.20
384.00 537.60 4,569.60 5,147.44
507.49 1,087.49 3,552.46 0.00 12,000.00
12,000.00 25,705.47
14,057.68 8,836.26 2,811.54 -
96,668.1
Bill of Quantity (BoQ) ID-number: Province: District: Village: Project type: N-F
28-2802-0014 -2A Bamyan shebar Gunbad Canal for garaval tiraps 256
Title No. Norm A* / unit Norm No A1
1.00
1
for M,H,P
Estimated total project cost in Afs. = Bold items to be filled by in tenderer (A1,A2,…,An). Light items for cost estimation only by CDC,FP,OC. Item Diminsions Contribution Quantity Unit Unit cost Total cost L W H Afs Afs CDC, Afs NSP, Afs 49.00
2.60
127.40
md
14.00
1,783.60
1,783.60
-
5.1
md
350.00
1,783.60
1,783.60
-
68.600
m3
175.00
12,005.00
12,005.00
-
34.3
md
350.00
12,005.00
12,005.00
-
47.040
m3
1,628.90
76,623.5
16,464.00
Stone
47.0
m3
3.02 0.39
Sand
18.1
m3
1,000.00
18,110.40
-
18,110.40
3.05 77.7
Cement (M: 200, 1:5)
3,655.0
kg
7.00
25,585.06
-
25,585.06
3.07
0.5
Skilled labour on site
23.5
md
700.00
16,464.00
-
16,464.00
3.08
1
Unskilled labour on site
47.0
md
350.00
16,464.00
16,464.00
Stone work for walls
54.120
m3
1,628.90
88,156.1
18,942.00
walls for flood time
58.800
m3
Site preparation
1.01 0.04 A2
2.00 2.01
A3
A4
2
49.00
1
0.7
0.5
3.00 3.01
Site preparation, clearing site ect. Foundation excavation Unskilled labour 2
49.00
0.8
0.6
1
4.00
Stone work for the foundation
-
-
-
60,159.46 -
69,214.1
2
49.00
0.6
1.00
-1
39.00
0.6
0.20 over floow
4.680
m3
Stone
54.1
m3
4.02 0.39
Sand
20.8
m3
1,000.00
20,836.20
-
20,836.20
4.05 77.7
Cement (M: 200, 1:5)
4,205.1
kg
7.00
29,435.87
-
29,435.87
4.07
0.5
Skilled labour on site
27.1
md
700.00
18,942.00
-
18,942.00
4.08
1
Unskilled labour on site
54.1
md
350.00
18,942.00
4.01
1
-
-
-
18,942.00
-
-
A5
A6
5.00
m2
walls for flood time
98.000
m2
202.50
13,527.00
3,974.60
9,552.40
49.00
1.00
-1
39.00
0.80 over floow
-31.200
m2
5.01 0.01
Sand
0.7
m3
1,000.00
668.00
-
668.00
5.02
Cement (M:400, 1:3)
133.6
kg
7.00
935.20
-
935.20
5.04 0.17
Skilled labour on site
11.4
md
700.00
7,949.20
-
7,949.20
5.05 0.17
Unskilled labour on site
11.4
md
350.00
3,974.60
3,974.60
6.00
geraval Levaling
7.8
m3
1,014.00
7,949.76
109.76
7,840.00
7.840
m3
geraval
7.8
m3
1,000.00
7,840.00
-
7,840.00
6.03 0.04
Unskilled labour on site
0.3
md
350.00
109.76
109.76
7.00
PCC
17.346
m3
3,550.00
61,578.30
6,071.10
6.01
A8
66.800
2
2
1
A7
Pointing stone work
49.00
0.80
0.2 floor
1
2
49.00
0.6
0.07 for on the walls
4.116
m3
1
49.00
1.00
0.07 for floor
3.430
m3
2
49.00
1.00
0.1
9.800
m3
4,336.5
kg
7.00
30,355.50
under the wall Foundation
-
55,507.20
250
cement
7.02
1.1
sand
19.1
m3
1,000.00
19,080.60
-
19,080.60
7.03
0.5
Skilled labour on site
8.7
md
700.00
6,071.10
-
6,071.10
7.04
1
Unskilled labour on site
17.3
md
350.00
6,071.10
83.340
m2
205
8.00
8.01
palastering M :300 (1:4)
30,355.50
6,071.10
-
17,084.70
5,250.42
11,834.28
2
49.00
0.93 for in side
91.140
m2
-1
39.00
0.20 over floow
-7.800
m2
166.680
kg
7.00
1,166.76
0.00
1,166.76
2
cement
8.02 0.03
sand
2.500
m3
1,000.00
2,500.20
0.00
2,500.20
8.03 0.14
Skilled labour on site
11.668
md
700.00
8,167.32
0.00
8,167.32
8.04 0.18
Unskilled labour on site
15.001
md
350.00
5,250.42
5,250.42
0.00
-
278,707.9
64,600.48
214,107.4
Total cost of (A1+A2+A3+A5+A6+A7+A8)
ID-number: Province: District: Village: Project type: No-F Title No. Nor m/ unit A1 1.00 A2
Diminsions
A* Norm No 1
L
W
39.0
1.00
Item
2.6
2
1.00
0.6
2
1.00
1
Total cost
Afs
Afs
Contribution CDC, Afs
md
14.00
546.00
546.00
1.6
md
350.00
546.00
546.00
20.800
m3
175.00
3,640.00
3,640.00
0.7 for canal foundation 1 for impervious foundatoin
18.200
m3
1.200
m3
0.7 for basin foundtion
1.400
m3
Unskilled labour
10.4
md
350.00
3,640.00
3,640.00
Stone work for the foundation
6.960
m3
1,628.90
11,337.14
2,436.00
canal walls for Spilway foundation 4.800 1.200 for impervious foundation
m³
Foundation excavation 5.0
Unit cost
39.00
Site preparation
2.00 2
Quantity Unit
H Site preparation, clearing site ect.
0.5
3.00 2
5.0
0.8
0.6
2
1.00
0.6
1
2
1.00
0.8
m³
Stone
7.0
m3
3.02 0.39
Sand
2.7
m3
1,000.0
2,679.60
-
3.05 77.7
Cement (M: 200, 1:5)
540.8
kg
7.0
3,785.54
-
3.07
0.5
Skilled labour on site
3.5
md
700.0
2,436.00
-
3.08
1
Unskilled labour on site
7.0
md
350.0
2,436.00
2,436.00
Stone work for walls
7.200
m3
1,628.90
11,728.08
2,520.00
1.00 for canal walls 1.50 for canal wall
1.200
m³
3.600
m³
1.00 for canal wall 1.00 for basin wall
1.200
m3
1.200
m³
Stone
7.2
m3
4.02 0.39
Sand
2.8
m3
1,000.00
2,772.00
-
4.05 77.7
Cement (M: 200, 1:5)
559.4
kg
7.00
3,916.08
-
4.07
0.5
Skilled labour on site
3.6
md
700.00
2,520.00
-
4.08
1
Unskilled labour on site
7.2
md
350.00
2,520.00
1
4.00
4.01
1
2
1.0
0.6
2
2.0
0.6
2
1.0
0.6
2
1.00
0.6
0.6 for basin foundtion
m³
0.960
3.01
A4
for M,H,P
1.01 0.04
2.01 A3
28-2802-0014 -2A Bamyan shebar Gunbad Spillway for geraval tiraps 256
-
-
-
-
-
-
2,520.00
A5
5.00 2 2 2 2
1.0 2.0 1.0 1.00
1.00 1.50 1.00 1.00
5.01 0.01 5.02 2 5.04 0.17 5.05 0.17 A6 2 2
A7
A8
0.2 0.2
6.01 1 6.02 0.04 7.00 2 2 2 2 1 2
A8
5.0 0.80 39.00 1.00
7.01 250 7.02 1.1 7.03 0.5 7.04 1 8.00 Westeg Westeg 20% 8.01 0.4 8.02 2 8.03 0.05 8.04 0.2 8.05 0.2 8
2
2 2 2 2
5.0 5.0 5.0 1.00 39.0 1.00
1.00
1.0 2.0 1.0 1.00
8.01 2 8.02 0.03 8.03 0.14 8.04 0.18 Total cost of (A1+A2+A3+A5+A6+A7)
0.6 1.00 1.00 0.10 1.00 1.00
0.07 0.07 0.1 1.1 0.07 0.1
Pointing stone work for out of canal walls for out of canal walls for out of canal walls for basin wall Sand Cement (M:400, 1:3) Skilled labour on site Unskilled labour on site geraval Levaling for canal floor for basin floor geraval Unskilled labour on site PCC for on the canal walls for canal floor under the canal foundtion for step for Basin floor under the basin wall foundtion cement sand Skilled labour on site Unskilled labour on site Shuttering
1.10 for stap Wooden plank Wooden pole 4m long Nail Skilled labor on site Unskilled labor on site palastering M :300 (1:4) 0.93 in site canal wall 1.43 in site canal wall 0.93 in site canal wall 1.00 in Basin wall cement sand Skilled labour on site Unskilled labour on site
2.000 2.000 6.000 2.000 2.000 0.0 4.0 0.3 0.3 17.200 1.60 15.60 17.2 0.688 5.270 0.420 0.700 1.000 0.220 2.730 0.200 1,317.5 5.8 2.6350 5.3 2.640 2.640 7.920 5.2800 0.132 0.528 0.528 11.440 1.860 5.720 1.860 2.000 22.880 0.343 1.602 2.059
m2 m² m² m3 m² m3 kg md md m3 m3 m3 m3 md m3 m3 m3 m3 m3 m3 m3 kg m3 md md m2 m2 pcs pcs kg md md m2 m2 m2 m2 kg m3 md md
202.50
405.00
119.00
1,000.00 7.00 700.00 350.00 1,014.00
20.00 28.00 238.00 119.00 17,440.80
119.00 240.80
1,000.00 350.00 3,550.00
17,200.00 240.80 18,708.50
240.80 1,844.50
7.00 1,000.00 700.00 350.00 1,413.50
9,222.50 5,797.00 1,844.50 1,844.50 3,731.64
1,844.50 184.80
200.00 300.00 70.00 700.00 350.00 205
1,584.00 1,584.00 9.24 369.60 184.80 2,345.20
184.80 720.72
160.16 343.20 1,121.12 720.72
0.00 0.00 0.00 720.72
7.00 1,000.00 700.00 350.00 -
69,882.36
12,251.8
Contribution NSP, Afs -
8,901.14
2,679.60 3,785.54 2,436.00 9,208.08
2,772.00 3,916.08 2,520.00 -
286.00
20.00 28.00 238.00 17,200.00
17,200.00 16,864.00
9,222.50 5,797.00 1,844.50 3,546.84 1,584.00 1,584.00 9.24 369.60 1,624.48
160.16 343.20 1,121.12 0.00 57,630.54
Bill of Quantity (BoQ) ID-number Province: District: Village: Project type: No-F= 256
28-2802-0014 -2A Bamyan shebar Gunbad Ancar bolack
Estimation total project cost in Afs. =
Cost of forebay in Afs.= Bold items to be filled in by tenderer (A1,A2,…,An). Light items for cost estimation only by CDC,FP,OC. Title No. Norm/ A* Diminsions Item Quantity Unit Unit cost L W unit Nor No H Afs A1 1.00 1.01
1
2.1
1
0.04
A2 2.00
2.01
1
2.1
1
2
2.100
1
0.5
3.01
2.1
1.0
14.00
29.40
29.40
-
Unskilled labor
0.08
md
350.00
29.40
29.40
-
Excavation
3.15
m3
175.00
551.25
551.25
-
1.050
m3
2.100
m3
1.58
md
350.00
551.25
551.25
-
0.420
m3
1,014.00
425.88
5.88
0.4
m3
1,000.00
420.00
0.017
md
350.00
5.88
5.88
3.39
m3
3,550.00
12,022.67
1,185.33
2.25
m3
Fundation Excavation
0.2 floor
1
geraval
3.03 0.04
Unskilled labour on site A4 4.00 For bend less then45°(2*(DI Pen/300) PCC-M200 1
1.500
1
Contribution CDC, Afs NSP, Afs
md
geraval Levaling 1
/
2.10
Unskilled labor
A3
Total cost Afs
/
Site preparation
0.500 site Excavation 0.5
Date:
1.5
420.00
0.420 -
420.00 10,837.33
4.01
1.1
Sandy gravel
3.725
m3
1,000.00
3,725.33
-
3,725.33
4.02
250
Cement (M:120, 1:6)
846.67
kg
7.00
5,926.67
-
5,926.67
4.03
0.5
Skilled labor on site
1.693
md
700.00
1,185.33
-
1,185.33
4.04
1
Unskilled labor on site 1.500 Shuttering
3.387
md
350.00
1,185.33
1,185.33
4.50 m2
1,413.50
6,360.75
315.0
6,045.75
0.02 Wooden plank
13.500 pcs
200.00
2,700.00
-
2,700.00
9.0000 pcs
300.00
2,700.00
-
2,700.00
-
15.75
A5 5.00 5.01
Westeg2 0.4 ###
5.02
2
5.03
0.05
5.04 5.06
1.500 2
0.2
Wooden pole 4m long
-
Nail
0.225
kg
70.00
15.75
0.2
Skilled labor on site
0.900 md
700.00
630.00
-
630.00
0.2
Unskilled labor on site
0.900 md
350.00
315.00
315.00
-
Total cost of (A1+...+A4+A5) FOR one PC
-
19389.95
2086.86
17303.08
19389.95
2086.86
17303.08
) پیشنهاد پروژه ( ادامه: ۷ فورمه No-F 256 28-2802-0014 - 2A نمبر قریه A 1 2 3 4 5 6
B 1 2 3 4 5 6 8 11 C 1 2
Civil Work for MHP project: Construction cost of weir Construction of Canal Construction of Settlement Basin Construction of Fore Bay Construction of Power House Construction of spill way Construction cost of Anc bolack TOTAL Mechanical with hydraulic Work : Construction Turbine whith pully for 8 Kw paghecening Generator whith pully 10 kw (single phase) Construction Penstock d=16˝(0.4m( Construction penstock nut & bult construction Penstock bend d=16˝(0.4m( construction Airvent pip(Di=22mm) construction Trahsrack / size (221X 70 ,104X161)cm complete with fram costruction water spill way gate(55X70, 70X138) cm&(100X171) cm TOTAL Electrical Work for MHP project: Installation of Min Lin Other works
Gunbad
1
2
Bamyan والیت
Shebar ولسوالی
قریه 3
4
5
6
7
8
9
10
11
12
UNIT RATE OF MATERIAL & LABOUR : Row
Description Rate Afs. Skilled Labour 500 Unskilled Labour 250 Sand 300 Aggregate Cement 5 Stone 500 Bond Stone Soil 100 Tor Steel 50 Binding rod 80 Local wood Nail 70 Primer Enamel CGI sheet 250 8mm. nut bolt 10 J-hooh 0 Bitiumen washer 0 GI sheet 0 Salwood Wooden Beam 120 Wooden Planks 80 Reed rening gutlen 100 Straw 10 Woode 3000 Woode 500 Door 2000 31 Glue (wood) 200 32 Glasses 200 Lock for door 120 Hinge 3 inches, 3 for each door Hinge 2 inches Hard ware for windows wooden plate 1x2 Marble powder 8 powder paint 120 solt 5 Oil paint 130 oil 35 shovel with handl 100 pickax with handl 200 slodge hammer with handl 500 wheel barrow 1500 Rubber bucket 60 Rope 20 Personal 300 Wooden Beam D=30 100 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Unit No. No. Cum. Cum. Kg. Cum. Cum. Cum. Kg. Kg. Cum. Kg. Lt. Lt. Sqm. No. No. No. Rm. Cum. M.L Pc Sqm. pc Kg. Cum.
4m 400
Kg. Sqm. pc 60 50 20 10 lkg Kg. Kg. Kg. Kg.
pcs pair pair pcs pcs
Water regulator gate 15000 Turbine whith pully for 10 Kw Generator whith pully 10 kw (theer phase) Penstock d=20˝(0.5m( penstock nut & bult Penstock bend d=20˝(0.5m( Boiller 100 liter Airvent pip(Di=139mm) Expansin joint overhead condudtor d= 50mm² overhead condudtor d= 35mm² overhead condudtor d= 25mm² overhead condudtor d= 16mm² insulator& shackle sets Cross -arms& poleclamps Stay Rads & Wair Ertingscolls ,colls,lim.coal 25X12mmbolts 180X12mm bolts 2.5X12mm Washers Conterol panal Fous 12A With Fous box Fous 4 A With Fous box Fous 16A With Fous box Fous 50A With Fous box Fous 35A With Fous box Fous 16A With Fous box Fous 20A With Fous box Fous 25A With Fous box Fous 20A With Fous box Signboard Trsh rack 2.5 X4m Tools & tool box Generator cable4X6mm² Wooden beem L=7m Di=50 cm thunderbolt rade
70000 10000 2800 80 2800 10000 150 25000 35 30 20 15 75 75 750 950 10 15 0.5 11250 130 250 200 200 180 150 100 120 150 2500 1500 2500 385 900 6000
Trahsrack / size (0.58X
4500 1,31)mcomplete with fram
hood
100
Bill of Quantity (BoQ) 28-2802-0014 -2A bamyan Shebar Gunabd Oriffce 256
Title
A1
No.
1.00 1.01
A2
Diminsions
A* Norm
for M,H,P
Item
No
L
W
H
1
2.61
1.72
0
0.04
2.00
2.01 A3
Norm/ unit
ID-number: Province: District: Village: Project type: No-F
Quantity
Unit
Unit cost Total cost Afs
Afs
Contribution CDC, Afs NSP, Afs
Site preparation
4.5
md
0.0
0.0
0.0
0.0
Site preparation, clearing site ect.
0.2
md
0.0
0.0
0.0
0.0
9.643
m3
0.0
0.0
0.0
0.0
Foundation excavation 1
2.61
0.8
0.7 for oriffice wall foundtion
1.462
m³
2
5.00
0.8
0.7 for decrese ples wall foundtion
5.600
m³
1
2.61
0.8
0.7
1.462
m³
2
1.00
0.8
0.7 for side of trashrck wall foundtion
1.120
m³
4.8
md
0.0
0.0
0.0
0.0
8.266
m3
0.0
0.0
0.0
0.0
0.5
for stin wall foundtion
Unskilled labour
3.00
Stone work for the foundation 1
2.61
0.8
0.6 for oriffice
1.253
m³
2
5.00
0.8
0.6 for decrese place
4.800
m³
1
2.61
0.8
0.6
1.253
m³
2
1.00
0.8
0.6 for side of trashrck wall foundtion
0.960
m³
Stone including transportation
8.3
m3
0.0
0.0
0.0
0.0
3.02 0.385
Sand
3.2
m3
0.0
0.0
0.0
0.0
3.05
77.7
Cement (M: 200, 1:5)
642.2
kg
0.0
0.0
0.0
0.0
3.07
0.5
Skilled labour on site
4.1
md
0.0
0.0
0.0
0.0
3.08
1
Unskilled labour on site
8.3
md
0.0
0.0
0.0
0.0
3.01
1
walls for stin
A4
10.387
m3
1.566
m³
7.620
m³
walls for stin
0.313
m³
for side of trashrck wall
0.888
m³
Stone including transportation
10.4
4.02 0.385
Sand
4.0
4.05
77.7
Cement (M: 200, 1:5)
4.07
0.5
4.08
1
4.01
0.0
0.0
m3
0.0
0.0
0.0
0.0
m3
0.0
0.0
0.0
0.0
807.1
kg
0.0
0.0
0.0
0.0
Skilled labour on site Unskilled labour on site
5.2
md
0.0
0.0
0.0
0.0
10.4
md
0.0
0.0
0.0
0.0
Pointing stone work
31.984
m2
0.0
0.0
0.0
0.0
2.820
m³
0.522
m³
0.282
m²
25.400
m³
2.960
m³
Sand
0.3
m3
0.0
0.0
0.0
0.0
Cement (M:400, 1:3)
64.0
kg
0.0
0.0
0.0
0.0
Skilled labour on site Unskilled labour on site
5.4
md
0.0
0.0
0.0
0.0
5.4
md
0.0
0.0
0.0
0.0
1.917
m3
0.0
0.0
0.0
0.0
0.110
m3
0.110
m3
0.1 for under the oriffice wall foundation 0.261 0.1 for under the stin wall foundation 0.261
m3
0.1 for between stand and oroffice 0.07 for on the wall decrese place
0.141
m3
0.420
m3
0.1 for floor decrese plsce 0.07 for on the side trashrack wall
0.528
m3
0.087
m³
479.3
kg
0.0
0.0
0.0
0.0
1
2.61
0.6
2
5.00
0.6
1.00 for oriffice 1.27 for decrese place
1
2.61
0.6
0.2
2
0.74
0.6
1
5.00
area 5.01
A6
0.0
Stone work for walls
area
A5
0.0
4.00
2
1.41
1
2.61
1.00 for oriffice 0.2 walls for stin
1
1.41
0.2
4
5.000
1.27 for decrese place
4
0.740
for side of trashrck wall
0.01
5.02
2
5.04
0.17
5.05
0.17
walls for stin
6.00
PCC 1
2.61
0.6
1
2.61
0.6
1
2.61
1
1
2.61
1
1
1.41
1.00
2
5.0
0.6
1
5.0
1.06
2
1.040
0.6
0.07 for on the oriffice walls 0.07 for on the stin wall
m3
6.01
250
cement
6.02
1.1
sand
2.1
liter
0.0
0.0
0.0
0.0
6.03
0.5
1.0
md
0.0
0.0
0.0
0.0
6.04
1
Skilled labour on site Unskilled labour on site
1.9
md
0.0
0.0
0.0
0.0
A7
A8
7.00
Lintal RCC
0.310
m3
Lintal for wall
0.217
m3
0.093
m3
0.3
1
1.81
0.60
0.2
1
1.61
0.48
0.12 pick
0.00
0.00
0.00
0.00
m3
0.00
0.00
0.00
0.00
7.01
1.1
Sandy gravel
7.02
350
Cement (M: 200, 1:5)
108.5
kg
0.00
0.00
0.00
0.00
7.03
0.5
Skilled labour on site
0.2
md
0.00
0.00
0.00
0.00
7.04
1
Unskilled labour on site
0.3
md
0.00
0.00
0.00
0.00
15.316
kg
0.00
0.00
0.00
0.00
8.00
No
L(m)
h(m) Steel working
4.0
1.81
0.0 for lintal @15cm c/c
7.24
ml
4.2
1.60
0.48 for pick @15cmc/c
6.72
ml
11.7
0.48
1.6 for pick@15c/c
5.60
ml
9.05
1.70
1.81 Ring@20c/c
15.39
ml
8.01
0.61
Steel bar 10 mm
11.9
Kg
0.00
0.00
0.00
0.00
8.02
0.22
Steel bar 6 mm
3.4
Kg
0.00
0.00
0.00
0.00
Wire 1 mm
0.107
Kg
0.00
0.00
0.00
0.00
8.03 0.007 8.04
0.01
Skilled labour on site
0.184
md
0.00
0.00
0.00
0.00
8.05
0.01
Unskilled labour on site
0.107
md
0.00
0.00
0.00
0.00
0.0
0.0
0.0
Total cost of (A1+A2+A3+A5+A6+A7+A8)
0.0
بر نامه همبستگی ملی فورم 5ب )به ریاست انکشاف دهات /برنامه همبستگی ملی /موسسه ناظر تسلیم شود( 28-2802-0014/2a یک هفته بعد از اخذ پول
تاریخ شروع:
تاریخ احتمالی ختم کار:
در مدت شش ماه
موسسه همکار:
بنیاد اقا خان
نام پروژه:
پروژه برق ابی کوچک
هدف پروژه فرعی:
والیت :
بامیان
ولسوالی:
شیبر
قریه)ها):
گنبد
تعداد فامیلها:
256
نمبر جی پی ایس:
روشن ساختن منازل مسکونی اهالی شورا
توضیح خالصه فعالیت های عمده: کندن کاری .سنگ کاری .کانکر یت ریزی .پلستر کاری .هنگاف کاری .قالب بندی . سیخبندی .نصب تور بین .تمدید لین انتقال برق .نصب پا یه های برق
بودجه مجموع
3025858
برنامه همبستگی ملی:
2560000
قریه:
465858
مستفدین:
ضرورتهای متوقعه اموزشی:
اموزش برای بر قی
نقطه عطف پروژه: کندن کاری 446متر مکعب .سنگ کاری 770متر مکعب .پلستر کاری 435متر مر بع .هنگاف کاری 703متر ر بع قالب بندی47 متر مربع
تعداد پرداخت ها :پول در دو قسط نود وده فیصد حواله میشود. خطرات پروژه:
کدام خطر ندارد.
Rev Date 14/12/03
Form Transfer CDC/FP-RRD/NSP/OC-MRRD/OC
20Form 5b
View more...
Comments