Deluge - Weekly Report No. 035 - As Of 16th May to 22nd May 16.pdf

Share Embed Donate


Short Description

asd...

Description

Ref. No.: No.: BPS-121085BPS-121085-F.RP F.RP

CIKARANG CIKARANG POWER STATION PROJECT Babel Babelan, an, Bekasi Bekasi,, Jakart Jakarta, a, Indon Indonesi esia a No. 035

WEEKLY WEEKLY REPORT As Of  th

nd

16 May May 2016 2016 –  22 May May 2016 2016

Prepared Prepared by DELUGE DELUGE

Cikarang Cikarang Power Power Station Station Project Project Babelan, Babelan, Bekasi, Bekasi, Indones Indonesia ia

Page 1 of 5

1.

SAFETY & SECURITY HSE The number of manpower having successfully completed Safety Induction Course and updated are as follows: PT Deluge Engineering Construction : 12 (No Update) PT Surabaya Prakarsa Fire Service (Fire Alarm) : 10 (No Update) PT Piping System Indonesia (Aboveground) : 91 (Last Week 88) PT Valvtrol Global Flowsystem (Underground) : 17 (No Update) Total Manpower : 130

1.1

a.

1.2

Manpower (PT Deluge Site Project Management)

a) b) c) d) e) f) g) h) i)  j) k) l) m)

Soh Kee Hong Eko Kurniawan Ismail Amin Limhot Angga Aditya Rahmat Lito Nosa Yaakop Joey Rahman Wahid

(Project Manager –  Ph. 0812 9605 0510) (Construction Manager –  Ph. 0812 9396 1612) (Doc, QA/QC Control - Ph. 0821 1062 4212) (Safety Coordinator –  Ph. 0813 6844 1153) (Draftsman –  Ph. 0813 1010 7275) (Storeman –  Ph. 081 286 45 3134) (Site Engineer –  Ph. 085659636791) (Draftsman –  Ph. 085788087472) (Design Manager) (Asst Design Manager) (Asst Design Manager) (Fire Alarm Engineer) (Site Engineer)

2. -

SITE FACILITIES Sandblasting and Painting activities is still on going at PT. Deluge Site Office Workshop.

3.

QA/ QC th - Hydrotest Hydrant Underground at Gate-01 Area is done by Wednesday, 18 May 2016. - Official Line Check is done and accepted for Fire Ring Main Underground Pipe in front of GIS Building Section. - Welding Test Result is 2 Welders passed RT Test of 12 Welders who following the welding test.

4. PROGRESS 4.1 Engineering Issues a. Drawing Submission - Attached b. Document Submission - No Submission

Cikarang Power Station Project Babelan, Bekasi, Indonesia

Page 2 of 5

4.2 Update Construction Progress 4.2.1 Fire System Mechanical Under Ground; a. Parking Area; Progress : th - Hydrotest for Underground Hydrant Line to The Gate 01 area is done at Wednesday, 18 May 2016 - Back Fill Underground Hydrant pipe along below of BC-02 to Pipe Bridge (section-03) is done. Mechanical Above Ground; a. Piperack Boiler 1 Area; FHS Area; Piping Progress : Fit-Up Progress Welding Progress Summary To Date Fit-Up Progress Summary To Date Welding Progress

: 2 Joints (Last Week 15 Joints) : 2 Joints (Last Week 15 Joints) / 1 welder : 91 Joints of Estimate 212 Joints : 91 Joints of Estimate 212 Joints

Note: 212 Joints include latest Fire Ring main changes. Conveyor BC-09; Piping Progress :

b.

Fit-Up Progress Welding Progress

Summary To Date Fit-Up Progress Summary To Date Welding Progress c. d. e. f. -

: 22 Joints (Last week 15 jt) : 25 Joints (Last week 12 jt) / 2 welders : 37 Joints of Estimate 85 Joints : 37 Joints of Estimate 85 Joints

Pump House Power Island: Install Discharge, Return and Suction Pipe above the Pipe Rack and around Fire Water Tank. FHS Cable Basement Sprinkler Installation inside cable Basement and Install Main Line Pipe is completed. Boiler 1 Transformer 1BFT20 & 1BFT25 Internal Line check. Workshop Fabrication; Progress : Piping Fabrication, Pipe Support, Threading pipe. Painting; Progress : Painting and Sandblasting is continue on going.

Cikarang Power Station Project Babelan, Bekasi, Indonesia

Page 3 of 5

Fire Alarm a. Fin Fan 1 & 2 Building; Install cable conduit, pulling cable, install SAP and install smoke detector. st b. Boiler E-Kiosk 1; 1 Floor Pulling cable and install Smoke Detector. c. Oil Pump Area; Install Cable conduit and pulling cable. 4.3 Dust Suppression a. Parking & Water Pond Area ; Progress : - Backfill along BC-02. rd

th

5 Action Plan for this Week (May, 23 2016  –  May, 29 2016) 5.1 Fire System 5.1.1 Mechanical Under Ground; a. Parking Area: Back Fill Hydrant Line at Gate-01 area. b. BC-07B Southern Area; Hydrotest c. BC-07A Inside Coal Yard; Progress Target: Hydrotest. d. BC-09 Area; Excavation and Back Fill. e. Oil Pump Area; Install Valve Pit, Install Hydrant Post, Install Outdoor Hydrant Box. f. West Side Boiler Area; Spreading and jointing HDPE Pipe g. ACC GIS Area; Spreading, jointing, Hydrotest, Excavation and Backfill HDPE Underground Ring Main Hydrant Pipe. Above Ground; a. Pipe Rack; - FHS Cable Bridge: Progress Target : Fit-Up & Welding b. Boiler Cable Basement Unit 1; Progress Target: Official Line Check, Hydrotest. c. Boiler Cable Basement Unit 2; Progress Target: Official Line Check, Hydrotest. d. CAB Cable Basement; Progress Target: Internal Line Check. e. Switchgear Cable Basement: Progress Target: Internal Line Check. f. FHS Cable Basement: Progress Target: Piping installation, Install Control Header. g. Boiler #1 Transformer 1BFT20 & 1BFT25 Progress Target: Install Pipe & Support for Boiler 1 Transformer 1BFT20 continuing. Internal Line Check and Official Joint Line check with Client

Cikarang Power Station Project Babelan, Bekasi, Indonesia

Page 4 of 5

Fire Pump House Power Island; Progress Target: Pump Installation, Internal Line Check for Sprinkler Line. Fuel Handling; Progress Target: Pump Installation, Install Sprinkler System. i. BC-09 Progress Target: Install Piping Sprinkler System, Welding Main line Pipe.  j. TT-09 Progress Target: Install Piping Sprinkler System Workshop k. - Fabrication; Pipe Header Fabrication, Pipe Support Fabrication, Pipe Spool Fabrication, Threading Pipe Fabrication. - Painting; Daily Joint Inspection Painting with PTCL at PT. Deluge Workshop Babelan Site. Continuing Painting and Sandblasting at PT. Deluge Workshop. h.

5.2 Fire Alarm a. FinFan Building; install cable tray b. Boiler 2 Ekiosk Building; Pulling Cable and Install Smoke Detector 5.3 a. b.

Dust Suppression Coal Yard Area : Internal Line Check  Service Water Tank Area : Continue Spreading and Joint pipe to Dust Suppression Pump.

6. a.

MATERIAL DELIVERIES Raw Piping and Pipe Support Material; 1 Truck 

7. 7.1

TIME SCHEDULE Week Work Plan Schedule - Attached

8.

Other Issues - No Issues