Decision making factors when moving to SAP NetWeaver Process Integration 7.3

Patrick Kelleher, Regional Implementation Group

April, 2011

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

© SAP 2007 / Page 2

Overview

1. Preparation Phase 1.1 1.2 1.3

Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

© SAP 2008 / Page 3

Evaluate your reasons for moving to SAP NetWeaver PI 7.3



Ensure your Future:

The SAP NW PI 7.3 release will be the release of choice.



Improved SOA Infrastructure:

Central Monitoring, Better Federation Support



Enhanced Integrated Configuration:

Option of choice for new content development.



Advanced Adapter Engine Extended (AEX)

Is a more feature complete single stack option for SAP NW PI 7.3.

Overview

1. Preparation Phase 1.1 1.2 1.3

Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

© SAP 2008 / Page 5

Elevator Pitch SAP NetWeaver PI 7.3 Centralized Monitoring, Single Stack ESB, Reduced TCO  Centralized monitoring via SAP Solution Manager 7.1 - Good morning page - Monitor multiple PI domains - Reduced time for root cause analysis

 Single stack ESB capabilities through Advanced Adapter Engine - Up to 60% less energy consumption - Lower footprint, easy maintenance: 1h installation*, ½ HW requirements* comp. to double stack, 90 sec restart*

Major Improvements for  Reduced cost of operations via increased fault tolerance  Design governance  Standards based interoperability and connectivity *Hardware dependent

Overview

1. Preparation Phase 1.1 1.2 1.3

Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

© SAP 2008 / Page 7

Technical prerequisites that need to be evaluated before an Upgrade 

Check Product Availability Matrix for SAP NetWeaver Process Integration 7.3 http://service.sap.com/pam  Requires a 64-bit Operating System  Compatible with certain database releases

 Check

SAP Software Catalog http://www.sap.com/ecosystem/customers/directories/SearchSolution.epx  Not all 3rd-party Adapters are certified on SAP NW PI 7.3

 Check

for SAP Business Content availability  Check for 3rd-party PI Content availability from your 3rd-party solution providers http://service.sap.com/swdc

© SAP 2008 Page 8

PI constraints that need to be evaluated before an Upgrade 

Minimum SP requirements: 

XI 3.0 requires minimum SP15  PI 7.0 requires minimum SP09 (SR1) 

PI 7.1 requires minimum SP01 (RTC)  PI 7.11 requires minimum SP01 (RTC)



Single usage type?



Additional components? 

Non-Central Adapter Engine



J2SE Adapter Engine  PCK (Migration to AEX)

© SAP 2008 Page 9

Overview

1. Preparation Phase 1.1 1.2 1.3

Reasons to move to PI 7.3 Overview of new features Technical prerequisites

2. Upgrade Options

© SAP 2008 / Page 10

Upgrade Paths to SAP NetWeaver Process Integration 7.3 Upgrade paths will be offered for SAP NetWeaver PI 7.3

SAP NetWeaver 2004 (XI 3.0)

Update

SAP NetWeaver 7.0 (2004s) (PI 7.0) Update paths will be offered for

EHP1 for SAP NetWeaver PI 7.1 (PI 7.11)

Upgrade

SAP NetWeaver PI 7.1

PI 7.1 and 7.11

XI 3.0 and PI 7.0

© SAP 2008 Page 11

Options How to Get to SAP PI 7.1

Two options exist to go from XI/PI to SAP PI 7.3:  Option

1: Technical Upgrade



Upgrade of existing XI/PI system



32 Bit Operating System is not supported



SAP JVM is installed during upgrade process

 Option

2: New Installation and Phase-out



New SAP PI 7.3 Installation



Use SAP PI 7.3 for new integration scenarios



Phased migration of application systems

© SAP 2008 Page 12

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

© SAP 2007 / Page 13

Overview

1. Performing a PI 7.3 Upgrade   

© SAP 2008 / Page 14

SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

SLD Considerations Example migration from a SAP NW PI 7.0 PI 7.0 PI

Registered in Central SLD

SAP Applications

PI Central SLD (7.0) Running Stand-Alone AS Java 7.0 in HA

External Accounting and Email based Applications Are registered in the Central SLD And communicate with PI and SolMan

SLD

SLD

Upgrade to PI 7.3 Use Central SLD

SLD

SLD

PI

Solution Manager 7.0 With Local SLD 7.0 SLD

SLD SLD

Upgrade to PI 7.3 Use Local PI 7.3 SLD

SLD Considerations Example migration from a SAP NW PI 7.0 Upgrade to PI 7.3 and use the Central SLD: PI 7.0 Registered in Central SLD

PI 7.3 can run as client of a 7.0 SLD (SAP Note 954820)

PI

PI

Central SLD (7.0)

SLD

SLD SLD

Solution Manager 7.0 With Local SLD 7.0

SLD

SLD Considerations Example migration from a SAP NW PI 7.0 PI 7.0 Registered in Central SLD

PI Upgrade to PI 7.3 with local (7.3) SLD:

Central SLD (7.0)



Improved performance of SLD 7.3 2 parallel SLD versions Full automatic synchronization

• • SLD

SLD

PI

Solution Manager 7.0 With Local SLD 7.0 SLD

SLD SLD

Overview

1. Performing a PI 7.3 Upgrade   

© SAP 2008 Page 18

SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

Option 1: Upgrade Three-Tier Landscape 1

PI DEV 7.X

PI QA 7.X

3

2

PI

PI DEV 7.3

DEV 7.3

PI

PI

QA 7.X

QA 7.X

5

4

PI DEV 7.3

PI

PI

Disconnect

DEV 7.3

Test

PI QA 7.3

QA 7.X

Upgrade

Load Test Patch

PI Prod 7.X

1-2 days

© SAP 2007 Page 19

PI

PI Prod 7.X

Prod 7.X

14 – 18 days

PI Prod 7.X

1-2 days

PI Prod 7.3

Upgrade Steps

 Upgrade

Operating System to 64Bit and Database (see PAM)  Clean-up XI/PI   

Get rid of erroneous messages Reducing latency period Clear open change lists

 Upgrade

to PI 7.3



Configure new features of PI 7.3  Test your business scenarios  Repeat

© SAP 2008 Page 20

for Test and Production system

Option 2: Upgrade with a Development Sandbox 1

PI

PI

DEV 7.X

DEV 7.X’

PI

PI

DEV 7.X

QA 7.X

QA 7.X

Prod 7.X

2 days

© SAP 2007 Page 21

Prod 7.X

14 days

4&5

PI

DEV 7.X

DEV 7.3

PI

QA 7.X

PI

PI

PI

DEV 7.3’

PI

PI

PI

PI

3

2

PI

QA 7.3’

QA 7.3

PI

Prod 7.X

14 days

Prod 7.3

2 days

Overview

1. Performing a PI 7.3 Upgrade   

© SAP 2008 Page 22

SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities

Post Upgrade Steps 

Adjust and redeploy adapter modules and Java Proxies 

Custom adapter modules  3rd-party adapters and modules 

3rd-party dependant content

Deploy J2EE5 compliant JDBC/JMS drivers  Check that message packaging is switched on globally  XSLT and Java Mappings might have to be adjusted due to changes in the JVM and built-in XSLT processor 

© SAP 2008 Page 23

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

© SAP 2007 Page 24

New Installation of SAP PI 7.3

Existing XI/PI Track

PI 7.3 Track

PI

PI DEV 7.X

DEV ECC

DEV FIN

PI

PI QA 7.X

QA ECC

QA FIN

© SAP 2007 Page 25

QA 7.3’

PI

PI Prod 7.X

DEV 7.3’

Prod ECC

Prod FIN

Prod 7.3’

Migration: Pre-flight Checklist

Check PI 7.3 PAM and Sizing Guide Evaluate HA setup

Install PI 7.3 development system Create/Transfer communication users Optional: Setup new SLD 7.3 Optional: Transport selected SLD content Transport selected basic and operations relevant configuration (Alerts, archiving, ABAP transports, etc)

© SAP 2008 Page 26

Transition from existing PI to new PI 7.3 installation Existing XI/PI Track

PI

PI DEV 7.X

DEV ECC

QA ECC

© SAP 2007 Page 27

DEV FIN

QA 7.3’

QA FIN

PI

PI Prod 7.X

DEV 7.3’

PI

PI QA 7.X

PI 7.3 Track

Prod ECC

Prod 7.3’

Prod FIN

Migration to PI 7.3

 Move

Selected Scenarios to PI 7.3



Transport selected Integration Repository content  Transport selected Integration Directory  Configure Communication Channels 

Transport Custom ABAP Development

 Perform

Post-Upgrade steps



Update Adapter, Modules, and Proxies  Deploy JMS/JDBC Drivers 

Switch on message packaging  Update XSLT and Java Mappings  Test

Migration  Migrate QA and Production

© SAP 2008 Page 28

Gradual phase-out of existing PI.

Existing XI/PI Track

PI DEV 7.X

PI QA 7.X

PI Prod 7.X

© SAP 2007 Page 29

PI 7.3 Track

PI DEV 7.3’

DEV ECC

DEV FIN

QA ECC

QA FIN

Prod ECC

Prod FIN

PI QA 7.3’

PI Prod 7.3’

Phase-out Steps



Execute Final Testing of all migrated interfaces on Dev and QA



Disconnect Remaining Systems/Components from existing PI



Optional: Create a final Backup of the existing production PI



Transport remaining scenarios from QA to Production

© SAP 2008 Page 30

Agenda

1. 2. 3. 4.

Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration

© SAP 2007 Page 31

Upgrade: Pros and Cons

Upgrade Pros 

Less effort because no redirection of the business scenarios are required



No adjustment of the Sending/Receiving systems  Existing basis customization can be reused after upgrade

Cons 

High risk (no fallback XI/PI solution available, only restore possible)



Higher downtime compared to new installation and phase-out  Existing limitations for upgrade –

SAP Note 1407530: Release restrictions for SAP NetWeaver 7.3 - Process Integration



SAP Note 1403832: Central Note: Upgrade Systems on SAP NetWeaver 7.3

© SAP 2008 Page 32

New Install: Pros and Cons

New Installation and Phase-out Pros 

Low risk



Phased approach for interface implementation  Lower downtime compared to upgrade

Cons 

More effort because XI/PI scenarios have to be transported to the SAP PI 7.3 system and communication channels have to be changed manually  Existing basis has to be incorporated in the new SAP PI 7.3 system  Additional hardware is required

© SAP 2008 Page 33

Major Decision Factors

Upgrade

Decision Factors

Options

Is XI/PI the only usage type installed?

New Installation & Phaseout

Yes

Is your current OS version and/or DB version supported? (Check PAM for PI 7.3)

What is the maximum allowed downtime of your productive PI system (in hours)?

Yes

No

No

> 12h

< 12h

As soon as you answer one of the major questions with No or with less than 12 hours downtime, you should go with a new installation of SAP NetWeaver PI 7.3

© SAP 2008 Page 34

Technology/Operation Related Decision Factors Upgrade

Decision Factors

New Installation & Phaseout

Options

Are you already using the HA setup with ASCS/SCS?

ASCS/SCS

SCS/CI

Do you require XI/PI runtime information for auditing?

Yes

No

Do you have many longrunning ccBPM processes?

Many

Few

Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?

Yes

No

Have your third-party adapters/contents already been released for PI 7.3.?

Yes

1 © SAP 2008 Page 35

2

3

No

4

5

6

7

Interface Related Decision Factors

Upgrade

Decision Factors

Do you want to use only limited new PI 7.3 features and functions?

Limited

Do you have many business systems connected to your XI/PI system?

New Installation & Phaseout

Options

Intensive

Many BS

Few BS

Do you have many SAP systems connected by proxy?

Many SAP Proxies

Few SAP Proxies

Do you have many live interfaces?

Many

Few

Normal EO/EOIO

Which types of high-volume scenarios do you run?

1 © SAP 2008 Page 36

2

3

ccBPM/ AAE

4

5

6

7

Decision Example © SAP 2008 / SAP TechEd 08 / SOA213 Page

Technology/Operation Related Decision Factors – Customer Example for Decisions Upgrade

Decision Factors

New Installation & Phaseout

Options

Are you already using the HA setup with ASCS/SCS?

ASCS/SCS

4.8

Do you require XI/PI runtime information for auditing?

Yes

No

Do you have many longrunning ccBPM processes?

Many

Few

Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?

Yes 2.0

Have your third-party adapters/contents already been released for PI 7.3.?

© SAP 2008 Page 38

2

6.0 5.5

No

Yes

1

SCS/CI

3

5.0

4

5

No

6

7

Interface Related Decision Factors – Customer Example for Decisions Upgrade

Decision Factors

Do you want to use only limited new PI 7.3 features and functions?

Limited

Do you have many business systems connected to your XI/PI system?

Many BS

Do you have many live interfaces?

Few BS

2.5

Few SAP Proxies

1.5 Many

1

2

6.2

Few

Normal EO/EOIO

Which types of high-volume scenarios do you run?

© SAP 2008 Page 39

Intensive 5.0

Many SAP Proxies

Do you have many SAP systems connected by proxy?

New Installation & Phaseout

Options

3

ccBPM/ AAE

3.5 4

5

6

7

Example Rating for Decision

Factor

Rating

HA Setup

4.8



Rating is done by customer

Auditing Required

6.0



Long-Running ccBPM Processes

5.5

Customer own factors have to be taken into account

Well-Configured Productive System

2.0



Third-Party Adapters / Content

5.0

Final decision has to be taken by the customer

Usage of New PI 7.3 Functionality

5.0

Many Connected Business Systems

2.5

Many SAP Systems Connected By Proxies

6.2

Many Live Interfaces

1.5

Types of High-Volume Scenarios

3.5

Customer-own KPIs – For Example Skills, Operations Costs, and so on

tbd

Summary Rating

4,2

© SAP 2008 Page 40

Thank you!