Decision making factors when moving to SAP NetWeaver Process Integration 7.3
Patrick Kelleher, Regional Implementation Group
April, 2011
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
© SAP 2007 / Page 2
Overview
1. Preparation Phase 1.1 1.2 1.3
Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
© SAP 2008 / Page 3
Evaluate your reasons for moving to SAP NetWeaver PI 7.3
Ensure your Future:
The SAP NW PI 7.3 release will be the release of choice.
Improved SOA Infrastructure:
Central Monitoring, Better Federation Support
Enhanced Integrated Configuration:
Option of choice for new content development.
Advanced Adapter Engine Extended (AEX)
Is a more feature complete single stack option for SAP NW PI 7.3.
Overview
1. Preparation Phase 1.1 1.2 1.3
Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
© SAP 2008 / Page 5
Elevator Pitch SAP NetWeaver PI 7.3 Centralized Monitoring, Single Stack ESB, Reduced TCO Centralized monitoring via SAP Solution Manager 7.1 - Good morning page - Monitor multiple PI domains - Reduced time for root cause analysis
Single stack ESB capabilities through Advanced Adapter Engine - Up to 60% less energy consumption - Lower footprint, easy maintenance: 1h installation*, ½ HW requirements* comp. to double stack, 90 sec restart*
Major Improvements for Reduced cost of operations via increased fault tolerance Design governance Standards based interoperability and connectivity *Hardware dependent
Overview
1. Preparation Phase 1.1 1.2 1.3
Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
© SAP 2008 / Page 7
Technical prerequisites that need to be evaluated before an Upgrade
Check Product Availability Matrix for SAP NetWeaver Process Integration 7.3 http://service.sap.com/pam Requires a 64-bit Operating System Compatible with certain database releases
Check
SAP Software Catalog http://www.sap.com/ecosystem/customers/directories/SearchSolution.epx Not all 3rd-party Adapters are certified on SAP NW PI 7.3
Check
for SAP Business Content availability Check for 3rd-party PI Content availability from your 3rd-party solution providers http://service.sap.com/swdc
© SAP 2008 Page 8
PI constraints that need to be evaluated before an Upgrade
Minimum SP requirements:
XI 3.0 requires minimum SP15 PI 7.0 requires minimum SP09 (SR1)
PI 7.1 requires minimum SP01 (RTC) PI 7.11 requires minimum SP01 (RTC)
Single usage type?
Additional components?
Non-Central Adapter Engine
J2SE Adapter Engine PCK (Migration to AEX)
© SAP 2008 Page 9
Overview
1. Preparation Phase 1.1 1.2 1.3
Reasons to move to PI 7.3 Overview of new features Technical prerequisites
2. Upgrade Options
© SAP 2008 / Page 10
Upgrade Paths to SAP NetWeaver Process Integration 7.3 Upgrade paths will be offered for SAP NetWeaver PI 7.3
SAP NetWeaver 2004 (XI 3.0)
Update
SAP NetWeaver 7.0 (2004s) (PI 7.0) Update paths will be offered for
EHP1 for SAP NetWeaver PI 7.1 (PI 7.11)
Upgrade
SAP NetWeaver PI 7.1
PI 7.1 and 7.11
XI 3.0 and PI 7.0
© SAP 2008 Page 11
Options How to Get to SAP PI 7.1
Two options exist to go from XI/PI to SAP PI 7.3: Option
1: Technical Upgrade
Upgrade of existing XI/PI system
32 Bit Operating System is not supported
SAP JVM is installed during upgrade process
Option
2: New Installation and Phase-out
New SAP PI 7.3 Installation
Use SAP PI 7.3 for new integration scenarios
Phased migration of application systems
© SAP 2008 Page 12
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
© SAP 2007 / Page 13
Overview
1. Performing a PI 7.3 Upgrade
© SAP 2008 / Page 14
SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities
SLD Considerations Example migration from a SAP NW PI 7.0 PI 7.0 PI
Registered in Central SLD
SAP Applications
PI Central SLD (7.0) Running Stand-Alone AS Java 7.0 in HA
External Accounting and Email based Applications Are registered in the Central SLD And communicate with PI and SolMan
SLD
SLD
Upgrade to PI 7.3 Use Central SLD
SLD
SLD
PI
Solution Manager 7.0 With Local SLD 7.0 SLD
SLD SLD
Upgrade to PI 7.3 Use Local PI 7.3 SLD
SLD Considerations Example migration from a SAP NW PI 7.0 Upgrade to PI 7.3 and use the Central SLD: PI 7.0 Registered in Central SLD
PI 7.3 can run as client of a 7.0 SLD (SAP Note 954820)
PI
PI
Central SLD (7.0)
SLD
SLD SLD
Solution Manager 7.0 With Local SLD 7.0
SLD
SLD Considerations Example migration from a SAP NW PI 7.0 PI 7.0 Registered in Central SLD
PI Upgrade to PI 7.3 with local (7.3) SLD:
Central SLD (7.0)
•
Improved performance of SLD 7.3 2 parallel SLD versions Full automatic synchronization
• • SLD
SLD
PI
Solution Manager 7.0 With Local SLD 7.0 SLD
SLD SLD
Overview
1. Performing a PI 7.3 Upgrade
© SAP 2008 Page 18
SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities
Option 1: Upgrade Three-Tier Landscape 1
PI DEV 7.X
PI QA 7.X
3
2
PI
PI DEV 7.3
DEV 7.3
PI
PI
QA 7.X
QA 7.X
5
4
PI DEV 7.3
PI
PI
Disconnect
DEV 7.3
Test
PI QA 7.3
QA 7.X
Upgrade
Load Test Patch
PI Prod 7.X
1-2 days
© SAP 2007 Page 19
PI
PI Prod 7.X
Prod 7.X
14 – 18 days
PI Prod 7.X
1-2 days
PI Prod 7.3
Upgrade Steps
Upgrade
Operating System to 64Bit and Database (see PAM) Clean-up XI/PI
Get rid of erroneous messages Reducing latency period Clear open change lists
Upgrade
to PI 7.3
Configure new features of PI 7.3 Test your business scenarios Repeat
© SAP 2008 Page 20
for Test and Production system
Option 2: Upgrade with a Development Sandbox 1
PI
PI
DEV 7.X
DEV 7.X’
PI
PI
DEV 7.X
QA 7.X
QA 7.X
Prod 7.X
2 days
© SAP 2007 Page 21
Prod 7.X
14 days
4&5
PI
DEV 7.X
DEV 7.3
PI
QA 7.X
PI
PI
PI
DEV 7.3’
PI
PI
PI
PI
3
2
PI
QA 7.3’
QA 7.3
PI
Prod 7.X
14 days
Prod 7.3
2 days
Overview
1. Performing a PI 7.3 Upgrade
© SAP 2008 Page 22
SLD Considerations Upgrade Project Steps Adjust Scenarios to SAP PI 7.3 capabilities
Post Upgrade Steps
Adjust and redeploy adapter modules and Java Proxies
Custom adapter modules 3rd-party adapters and modules
3rd-party dependant content
Deploy J2EE5 compliant JDBC/JMS drivers Check that message packaging is switched on globally XSLT and Java Mappings might have to be adjusted due to changes in the JVM and built-in XSLT processor
© SAP 2008 Page 23
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
© SAP 2007 Page 24
New Installation of SAP PI 7.3
Existing XI/PI Track
PI 7.3 Track
PI
PI DEV 7.X
DEV ECC
DEV FIN
PI
PI QA 7.X
QA ECC
QA FIN
© SAP 2007 Page 25
QA 7.3’
PI
PI Prod 7.X
DEV 7.3’
Prod ECC
Prod FIN
Prod 7.3’
Migration: Pre-flight Checklist
Check PI 7.3 PAM and Sizing Guide Evaluate HA setup
Install PI 7.3 development system Create/Transfer communication users Optional: Setup new SLD 7.3 Optional: Transport selected SLD content Transport selected basic and operations relevant configuration (Alerts, archiving, ABAP transports, etc)
© SAP 2008 Page 26
Transition from existing PI to new PI 7.3 installation Existing XI/PI Track
PI
PI DEV 7.X
DEV ECC
QA ECC
© SAP 2007 Page 27
DEV FIN
QA 7.3’
QA FIN
PI
PI Prod 7.X
DEV 7.3’
PI
PI QA 7.X
PI 7.3 Track
Prod ECC
Prod 7.3’
Prod FIN
Migration to PI 7.3
Move
Selected Scenarios to PI 7.3
Transport selected Integration Repository content Transport selected Integration Directory Configure Communication Channels
Transport Custom ABAP Development
Perform
Post-Upgrade steps
Update Adapter, Modules, and Proxies Deploy JMS/JDBC Drivers
Switch on message packaging Update XSLT and Java Mappings Test
Migration Migrate QA and Production
© SAP 2008 Page 28
Gradual phase-out of existing PI.
Existing XI/PI Track
PI DEV 7.X
PI QA 7.X
PI Prod 7.X
© SAP 2007 Page 29
PI 7.3 Track
PI DEV 7.3’
DEV ECC
DEV FIN
QA ECC
QA FIN
Prod ECC
Prod FIN
PI QA 7.3’
PI Prod 7.3’
Phase-out Steps
Execute Final Testing of all migrated interfaces on Dev and QA
Disconnect Remaining Systems/Components from existing PI
Optional: Create a final Backup of the existing production PI
Transport remaining scenarios from QA to Production
© SAP 2008 Page 30
Agenda
1. 2. 3. 4.
Overview Performing a PI 7.3 Upgrade Creating a new PI 7.3 Installation Decision making factors to take into consideration
© SAP 2007 Page 31
Upgrade: Pros and Cons
Upgrade Pros
Less effort because no redirection of the business scenarios are required
No adjustment of the Sending/Receiving systems Existing basis customization can be reused after upgrade
Cons
High risk (no fallback XI/PI solution available, only restore possible)
Higher downtime compared to new installation and phase-out Existing limitations for upgrade –
SAP Note 1407530: Release restrictions for SAP NetWeaver 7.3 - Process Integration
–
SAP Note 1403832: Central Note: Upgrade Systems on SAP NetWeaver 7.3
© SAP 2008 Page 32
New Install: Pros and Cons
New Installation and Phase-out Pros
Low risk
Phased approach for interface implementation Lower downtime compared to upgrade
Cons
More effort because XI/PI scenarios have to be transported to the SAP PI 7.3 system and communication channels have to be changed manually Existing basis has to be incorporated in the new SAP PI 7.3 system Additional hardware is required
© SAP 2008 Page 33
Major Decision Factors
Upgrade
Decision Factors
Options
Is XI/PI the only usage type installed?
New Installation & Phaseout
Yes
Is your current OS version and/or DB version supported? (Check PAM for PI 7.3)
What is the maximum allowed downtime of your productive PI system (in hours)?
Yes
No
No
> 12h
< 12h
As soon as you answer one of the major questions with No or with less than 12 hours downtime, you should go with a new installation of SAP NetWeaver PI 7.3
© SAP 2008 Page 34
Technology/Operation Related Decision Factors Upgrade
Decision Factors
New Installation & Phaseout
Options
Are you already using the HA setup with ASCS/SCS?
ASCS/SCS
SCS/CI
Do you require XI/PI runtime information for auditing?
Yes
No
Do you have many longrunning ccBPM processes?
Many
Few
Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?
Yes
No
Have your third-party adapters/contents already been released for PI 7.3.?
Yes
1 © SAP 2008 Page 35
2
3
No
4
5
6
7
Interface Related Decision Factors
Upgrade
Decision Factors
Do you want to use only limited new PI 7.3 features and functions?
Limited
Do you have many business systems connected to your XI/PI system?
New Installation & Phaseout
Options
Intensive
Many BS
Few BS
Do you have many SAP systems connected by proxy?
Many SAP Proxies
Few SAP Proxies
Do you have many live interfaces?
Many
Few
Normal EO/EOIO
Which types of high-volume scenarios do you run?
1 © SAP 2008 Page 36
2
3
ccBPM/ AAE
4
5
6
7
Decision Example © SAP 2008 / SAP TechEd 08 / SOA213 Page
Technology/Operation Related Decision Factors – Customer Example for Decisions Upgrade
Decision Factors
New Installation & Phaseout
Options
Are you already using the HA setup with ASCS/SCS?
ASCS/SCS
4.8
Do you require XI/PI runtime information for auditing?
Yes
No
Do you have many longrunning ccBPM processes?
Many
Few
Is your productive system wellcustomized and optimized with regard to Monitoring Setup, Alerting Setup, and Operations Setup?
Yes 2.0
Have your third-party adapters/contents already been released for PI 7.3.?
© SAP 2008 Page 38
2
6.0 5.5
No
Yes
1
SCS/CI
3
5.0
4
5
No
6
7
Interface Related Decision Factors – Customer Example for Decisions Upgrade
Decision Factors
Do you want to use only limited new PI 7.3 features and functions?
Limited
Do you have many business systems connected to your XI/PI system?
Many BS
Do you have many live interfaces?
Few BS
2.5
Few SAP Proxies
1.5 Many
1
2
6.2
Few
Normal EO/EOIO
Which types of high-volume scenarios do you run?
© SAP 2008 Page 39
Intensive 5.0
Many SAP Proxies
Do you have many SAP systems connected by proxy?
New Installation & Phaseout
Options
3
ccBPM/ AAE
3.5 4
5
6
7
Example Rating for Decision
Factor
Rating
HA Setup
4.8
Rating is done by customer
Auditing Required
6.0
Long-Running ccBPM Processes
5.5
Customer own factors have to be taken into account
Well-Configured Productive System
2.0
Third-Party Adapters / Content
5.0
Final decision has to be taken by the customer
Usage of New PI 7.3 Functionality
5.0
Many Connected Business Systems
2.5
Many SAP Systems Connected By Proxies
6.2
Many Live Interfaces
1.5
Types of High-Volume Scenarios
3.5
Customer-own KPIs – For Example Skills, Operations Costs, and so on
tbd
Summary Rating
4,2
© SAP 2008 Page 40
Thank you!