b Pest Control Computer Room Walls Minimum 1 hour fire rating (NFPA 75 )
a
11
AHU Room
Height (Minimum 18”) Panel type (high pressure laminate anti static ) Panel load rating (1,200 lbs. or higher concentrated load) Noncombustible Material Concrete filled panels (used in aisles with high rolling loads)
g
Stringer Vs Non stringer Bolted stringer Vs Non bolted (bolted preferred)
h
Cleaning procedure established
Ramps and Handrails Ramp incline 1” rise per foot (12” a raised floor height = 12’ ramp length)
Confidential Copy
13
14
15
16
b
Ramp floor load rating (high rolling loads)
c
Rubber nonskid pads
d
Handrails for handicapped & safely
Ceiling a
8’0” to 10" height- False Floor to False Ceiling
b
Dropped ceiling to be used?
c
Ducted air returns at PAHU/PAC
d
Serve ceiling as air return plenum
e
Direct hot aisle air return to PAHU/PAC
Ambient Lighting a
400-500Lux
b
Parabolic light fixtures (reduce glare)
c
Lights out rooms to be used?
d
10% emergency lighting to be used
e
Independent control at zone
Acoustics/Insulation a
Ceiling insulation
b
Flooring insulation
c
Acoustic wall covering
d
Area partitioning panels acoustic
Fire Protection a
FM200/NOVEC1230
b
Manual disarm switch
c
0/ 45 / 60 / 180 second delay to allow abort in case of false alarm
d
17
e
Water detection under raised floor Audible & visual alarm in room & at guard station
f
Fire Protection Abort switches
g
Hand held extinguishers
h
Fire Protection warning signs posted
Dual Power Paths / Single Power Paths a
Substation power inputs
b
Single phase and three phase required
c
UPS System required?
d
UPS Batteries (Sealed Vs non sealed)
Confidential Copy
e
Automatic Transfer Switch
f
Power back up (DG Set) Diesel fuel storage tank size & time (ex. 12 hours)
g h i
EPO switches at principal exit doors 50 HZ Power Distribution Units (415 Volt) to be used
j
Grounding for safety (IS3043)
18
Air Conditioning / Chilled Water Optimal room temperature a 21 degrees C (+/- 2) Optimal room % of relative b humidity 50 (+/- 5)
19
Air Conditioning Capacity Needed
20
21
a
Sensible heat load % (equipment)
b
CFM requirement (Precision AC)
c d
CFM requirement (Comfort AC) Redundancy level for server hall AC Unit
e
Condenser type (air, water, glycol)
f g
Condenser location & distance from DC Direct Expansion A/C or chilled water based ac for fan coil units
h
Type of humidification
Emergency Procedures a
Adequate emergency exits
b
Exits well marked
c d
Fire Protection signs posted (ex. “FM200/NOVEC1230. Total Flooding Sys in use”) Emergency evacuation procedures posted
e
Clear aisles to exits
Earthquake Exposures High Center of gravity tethering a methods b
22
c
Floating frames Bolted down frames transmit vibration directly into hardware
d
Check Local Codes
Serviceability
Confidential Copy
a b c
23
24
Service clearances for service and floor loading Gates/Doors must open Allow for proper perimeter air circulation
d Minimize the use of dead end aisles Building location (Clients scope/Vendors scope) a
Approval from Civil authority
b
Approval from Water authority
c
Approval from Electrical authority
d
Approval from Fire authority
Decisions Affecting Layout a b c d e f g h
Building columns in DC Preferred cable path between floors or overhead Air Conditioners in server room or our side server room Power Distribution Units (PDU) at each row UPS in a room, Batteries in different room Power bus duct or cable duct Water lines to Air Conditioners dual or single Dual false ceilings (due to large void ) or single
Data Center Components: CIVIL & INTERIORS WORKS Flooding and storm water Thermal Insulation on floor / PAC room areas Fire rated Partitions , Fire rated doors fixing works Construction validation for fire/load bearing/seismic Plumbing system Loading /unloading bay Raised Flooring works False Ceiling Painting & Finishing works Providing & fixing of furniture items (Eco friendly ) MECHANICAL - CHILLER & PRECISION AC Chiller Plants
Confidential Copy
Remarks
Chilled water Piping Cooling Tower Water treatment plant PAHU AHU Ductable air handling units Comfort Air Conditioners Ducting work Fresh air & Pressurization system Ventilation system Water Pumping System ELECTRICAL - UPS & BATTERY SYSTEM UPS & Accessories Batteries & Accessories Battery management ELECTRICAL - PANELS & POWER DISTRIBUTION SYSTEM HT & LT substation Main Panels Cable tray - Power and data cable Cable laying DG Set Fuel storage and filling management AMF Panel/ PLC Panel / Synchronization Panel Electromagnetic interference level Emergency power off Transformer Earthing system Surge protection Raising Mains Power distribution Units Light fixtures & Wiring works FIRE DETECTION & SUPRESSION SYSTEM Fire alarm/detection system VESDA Fire suppression system Exhaust system (Fire smoke) SECURITY & BMS WORKS Public Address System Access Control CCTV WLD (water leakage detection) Visitor / employee entry/exit checking equipments Networking (Racks/cabinets/ structured cabling) Intruder system IBMS & system monitoring / Remote Monitoring