BALDEV INFRA PROJECTS (P) LTD Construction of 168 Units Type III T/S Quarters at NMDC Bacheli DAILY SITE REPORT FOR SITE NO. I & II Dated- 20-Jan-12
TODAYS ATTENDANCE OF STAFF (Enter: A = Absent, L = Leave, E = Excused, or P = Present)
WORK MEN DETAILS REJA
COOLIE
MASON
25
12
0
0 18 27 0 7
0 2 3 0 5
SUPERVISOR
OTHERS
TOTAL
REMARKS
1
Sunil Kulkarni (Proj. Mgr)
P
As per attendance
0
38
Co's side, de watering, cleaning of slurry, raft rcc, road cleaning, boulder loading & breaking, sand boulder filling.
2
Kailash Wakode (Engr)
P
16 7 9
1 1 0
1 0 0
0 58 50 16 12
Dept. (Brick making team) SSM Engineers (Murty/Madhav Rao) Shashikant Kanwar Tulsi Dass (Shuttering/centering team) Ramesh Agrawal (Brick making team)
3 4 5 6 7
Pranav Patel (Engr) Prahlad Sharma (Works Mgr) P. L. Khande (Supervisor) N. Kumar (Supervisor) Raju Chapadi (Supervisor) Mukesh Bhaskar (Supervisor) (on leave since 24th Dec)
P P L P P
P
0 bricks made (half size) 4 0 0
16 12 7
66 bricks made (full size)
Electrical shutdown
MACHINERY DETAILS TYPE OF MACHINE
START READING
END READING
TOTAL RUNNING
EX-110 Tractor Mixure RM-800 Dumper 2207 5 HP Diesel pump 2 HP elect pump
35.5
45.7
10.2
1447.7 75427
1447.7 75433
0 6 5 hrs 5 hrs
Sleep No issued by us
ITEM
SUPPLIER
QTY (Cft)
HSD ISSUED
READING AT TIME OF ISSUE 26.9 Hr Mtr not working
8 REMARK
9
Gautam Srivastav (Tract. Driv)
4 hrs Plinth filling at bl-14, loading of soil for shifting, metal loading & misc works local shifting of soil, cement, boulders etc idle metal & soil shifting local at bl-07 at bl-06
10 11 12 13 14 15 16 A 0
Bhola Nag (Dumper Driv) Moti Ram More (Office Boy) Damyanti Bai (Cook) Night Watchmen, Idea Sec (1st Site) Night Watchmen, Idea Sec (2nd Site) Sushant (RM800 Operator) J. P. Wahane (Engr.)
INWARDS METAL, SAND & BOULDERS ONLY
8680
Metal 20 mm (G) Durga st. cru.
Time of Unloading
VEHICLE DIMENSION
VEHICLE NO.
Pit pass No.
Other details No. of trips
300
11.2
14.6x8x2.7
CG-18-H-1069
5672704
1
8681, 83
Sand
P.D. Sing
2x308
12.30, 18
14.6x7.6x2.10
CG-18-H-1091
5671796, 2913
2
8679, 82
Sand
P.D. Sing
2x308
10.50, 17.15
14.6x7.6x2.10
5671791, 2911
2
Remarks
Sr. No
ITEM
SUPPLIER
SIZE
*petrolium
QTY 1ltr
Engine oil
NO'S
QUANTITY 100 0
TARGETED 100 0
ACTUAL ACHIEVED
VEHICLE DIMENSION
REMARK For co's mixure machine
VEHICLE NO.
WORK DETAILS DETAILS Backfilling Excavation Sand & boulder filling
100 0
NEXT DAY TARGET 100 0
REMARKS At bl- 14
15
20
15
20
for 6 rafts at bl-07
13.94
15
13.94
15
5th fl at bl-01, 4 rafts at bl-06, 12 col at bl-09, 6 col & 11 caps at bl-11
PCC
5
5
5
5
ITEM
QTY
Curing pipe 1/2 inch
4 bundle
Sprinkler with stand
3 nos
concrete breaker
1
Details of material CEMENT Bag STEEL (MT) METAL 40 MM (Cft) METAL 20 MM Granite (Cft)
mess expences
191
3 4 5 6 7 8 9
Data card recharge
98
50
29448
339 29109
HSD DETAILS
OPENING
RECEIVED
TOTAL
CONSUMPTION
BALANCE
Sr No.
Particulars
16200 273.34
377 50.53
0 0.00
377 50.53
99 0.60
278 49.93
1 2
Purchased
17850
1561
0.00
1561
159
1402
3
Ex-110
6305.30
4
443
8565
5
Tractor
15015
16
14999
37846 17862 1750
1137 0 378
36709 17862 1372.44
6005
300.00
6305.30
59318
9008
0.00
9008
53640
24075
15015
0.00
157700 340000 70000
115018 17432 6650
36614 17796 1750
1232 66 0
overall position of project
Bl-05 : GF slab complete, ff columns complete. Bl-06 : pb compl for 2 unit, col started, sand/boulder filling/PCC/ rafts started for remaining 2 units. Bl-07 : Excavn done for 2 units, sand/boulder filling / PCC started. Bl-08 : Filling upto pl bot in prog. Bl-09 : Plinth Beam complete, columns started.
Special Remarks and happenings during the day
Pl arrange for the steel shuttering of slab as discussed
Field Er Mr. J.P. Wahane joined today
Bl-10 : Ff slab casting done on 19th Jan. Bl-11 : Ff col in progress. Bl-12 : Shuttering for GF slab in progress. Bl-13 :col for gf complete. Bl-14 :Plinth beams complete, plinth filling in prog.
Out of 42 slabs, 7 slabs complete, 2 are sure in this month, backlog will be of 1 slab as per planning.
SUNIL KULKARNI CHECKED BY
Opening balance
Issued qty
4
diesel pump+mixure machine+vibrator 0+3+0
22110
Bl-01 : SF slab shuttering in prog. Bl-02 : Yet to start. Bl-03 :plinth complete, backfilling in prog. Bl-04 : Gf slab casting done on 8th Jan 12.
Mr. Patel,Khande & P. Sharma REPORT PREPARED BY
29448
for 6 rafts at bl-07
197951 METAL 20 MM Regular (Cft) METAL 12 MM (Cft) SAND (Cft) CC BRICKS NOS Boulders(cft)
DR
B/f Photocopy & courior
Upto date Qty
48410
E 0
2
STOCK POSITION Required for the project 88288 834.48
P P P P P P P L 1 20-Jan-12 CR
1
Total Balance (+ for Dr, - for Cr)
RCC 1:2:4
REQUIREMENT
P 15 TODAYS Expences with balance Particulars
P
NMDC BACHELI SITE
LOCAL PURCHASE/machine/other materials received S.NO 1 2 3 4
20-Jan-12
Attendance
1
CENTRING MISTRI CENTRING HELPER 0
Name of Staff & Designation
Sr No.
Total
4
4 Balance
4 0