BALDEV INFRA PROJECTS (P) LTD Construction of 168 Units Type III T/S Quarters at NMDC Bacheli DAILY SITE REPORT FOR SITE NO. I & II Dated- 20-Jan-12

TODAYS ATTENDANCE OF STAFF (Enter: A = Absent, L = Leave, E = Excused, or P = Present)

WORK MEN DETAILS REJA

COOLIE

MASON

25

12

0

0 18 27 0 7

0 2 3 0 5

SUPERVISOR

OTHERS

TOTAL

REMARKS

1

Sunil Kulkarni (Proj. Mgr)

P

As per attendance

0

38

Co's side, de watering, cleaning of slurry, raft rcc, road cleaning, boulder loading & breaking, sand boulder filling.

2

Kailash Wakode (Engr)

P

16 7 9

1 1 0

1 0 0

0 58 50 16 12

Dept. (Brick making team) SSM Engineers (Murty/Madhav Rao) Shashikant Kanwar Tulsi Dass (Shuttering/centering team) Ramesh Agrawal (Brick making team)

3 4 5 6 7

Pranav Patel (Engr) Prahlad Sharma (Works Mgr) P. L. Khande (Supervisor) N. Kumar (Supervisor) Raju Chapadi (Supervisor) Mukesh Bhaskar (Supervisor) (on leave since 24th Dec)

P P L P P

P

0 bricks made (half size) 4 0 0

16 12 7

66 bricks made (full size)

Electrical shutdown

MACHINERY DETAILS TYPE OF MACHINE

START READING

END READING

TOTAL RUNNING

EX-110 Tractor Mixure RM-800 Dumper 2207 5 HP Diesel pump 2 HP elect pump

35.5

45.7

10.2

1447.7 75427

1447.7 75433

0 6 5 hrs 5 hrs

Sleep No issued by us

ITEM

SUPPLIER

QTY (Cft)

HSD ISSUED

READING AT TIME OF ISSUE 26.9 Hr Mtr not working

8 REMARK

9

Gautam Srivastav (Tract. Driv)

4 hrs Plinth filling at bl-14, loading of soil for shifting, metal loading & misc works local shifting of soil, cement, boulders etc idle metal & soil shifting local at bl-07 at bl-06

10 11 12 13 14 15 16 A 0

Bhola Nag (Dumper Driv) Moti Ram More (Office Boy) Damyanti Bai (Cook) Night Watchmen, Idea Sec (1st Site) Night Watchmen, Idea Sec (2nd Site) Sushant (RM800 Operator) J. P. Wahane (Engr.)

INWARDS METAL, SAND & BOULDERS ONLY

8680

Metal 20 mm (G) Durga st. cru.

Time of Unloading

VEHICLE DIMENSION

VEHICLE NO.

Pit pass No.

Other details No. of trips

300

11.2

14.6x8x2.7

CG-18-H-1069

5672704

1

8681, 83

Sand

P.D. Sing

2x308

12.30, 18

14.6x7.6x2.10

CG-18-H-1091

5671796, 2913

2

8679, 82

Sand

P.D. Sing

2x308

10.50, 17.15

14.6x7.6x2.10

5671791, 2911

2

Remarks

Sr. No

ITEM

SUPPLIER

SIZE

*petrolium

QTY 1ltr

Engine oil

NO'S

QUANTITY 100 0

TARGETED 100 0

ACTUAL ACHIEVED

VEHICLE DIMENSION

REMARK For co's mixure machine

VEHICLE NO.

WORK DETAILS DETAILS Backfilling Excavation Sand & boulder filling

100 0

NEXT DAY TARGET 100 0

REMARKS At bl- 14

15

20

15

20

for 6 rafts at bl-07

13.94

15

13.94

15

5th fl at bl-01, 4 rafts at bl-06, 12 col at bl-09, 6 col & 11 caps at bl-11

PCC

5

5

5

5

ITEM

QTY

Curing pipe 1/2 inch

4 bundle

Sprinkler with stand

3 nos

concrete breaker

1

Details of material CEMENT Bag STEEL (MT) METAL 40 MM (Cft) METAL 20 MM Granite (Cft)

mess expences

191

3 4 5 6 7 8 9

Data card recharge

98

50

29448

339 29109

HSD DETAILS

OPENING

RECEIVED

TOTAL

CONSUMPTION

BALANCE

Sr No.

Particulars

16200 273.34

377 50.53

0 0.00

377 50.53

99 0.60

278 49.93

1 2

Purchased

17850

1561

0.00

1561

159

1402

3

Ex-110

6305.30

4

443

8565

5

Tractor

15015

16

14999

37846 17862 1750

1137 0 378

36709 17862 1372.44

6005

300.00

6305.30

59318

9008

0.00

9008

53640

24075

15015

0.00

157700 340000 70000

115018 17432 6650

36614 17796 1750

1232 66 0

overall position of project

Bl-05 : GF slab complete, ff columns complete. Bl-06 : pb compl for 2 unit, col started, sand/boulder filling/PCC/ rafts started for remaining 2 units. Bl-07 : Excavn done for 2 units, sand/boulder filling / PCC started. Bl-08 : Filling upto pl bot in prog. Bl-09 : Plinth Beam complete, columns started.

Special Remarks and happenings during the day

Pl arrange for the steel shuttering of slab as discussed

Field Er Mr. J.P. Wahane joined today

Bl-10 : Ff slab casting done on 19th Jan. Bl-11 : Ff col in progress. Bl-12 : Shuttering for GF slab in progress. Bl-13 :col for gf complete. Bl-14 :Plinth beams complete, plinth filling in prog.

Out of 42 slabs, 7 slabs complete, 2 are sure in this month, backlog will be of 1 slab as per planning.

SUNIL KULKARNI CHECKED BY

Opening balance

Issued qty

4

diesel pump+mixure machine+vibrator 0+3+0

22110

Bl-01 : SF slab shuttering in prog. Bl-02 : Yet to start. Bl-03 :plinth complete, backfilling in prog. Bl-04 : Gf slab casting done on 8th Jan 12.

Mr. Patel,Khande & P. Sharma REPORT PREPARED BY

29448

for 6 rafts at bl-07

197951 METAL 20 MM Regular (Cft) METAL 12 MM (Cft) SAND (Cft) CC BRICKS NOS Boulders(cft)

DR

B/f Photocopy & courior

Upto date Qty

48410

E 0

2

STOCK POSITION Required for the project 88288 834.48

P P P P P P P L 1 20-Jan-12 CR

1

Total Balance (+ for Dr, - for Cr)

RCC 1:2:4

REQUIREMENT

P 15 TODAYS Expences with balance Particulars

P

NMDC BACHELI SITE

LOCAL PURCHASE/machine/other materials received S.NO 1 2 3 4

20-Jan-12

Attendance

1

CENTRING MISTRI CENTRING HELPER 0

Name of Staff & Designation

Sr No.

Total

4

4 Balance

4 0