UNDER KEEL CLEARANCE (UKC) CALCULATION (To be filed along with Passage Plan D29) Vessel Name:
UACC FALCON
Dock Water Density:
1.025
Date of report:
06/06/2013
LOME
Salt Water Density:
1.025
Date of Transit:
08/06/2013
FWA (in m):
0.332
Port: Arrival / Departure:
ARRIVAL
A. Vessel Characteristics a. Draft 1
b. Vessel Speed and Squat Mean draft of the vessel : 0.00
mtrs; draft corrected (+/-):
2
Trim:
3 4
Max. draft of vessel (a1 + a2): Max. midship draft after Hog/Sag correction: (Refer Table 2 on last page of this form)
5
Gross UKC required in Port Approaches ([10% of max. draft (Aa3 or Aa4 whichever is greater)] :
6
List:
7
Beam:
0.0 32.26
13.40
mtrs
1
Speed of transit:
10.00
knots
0.00
mtrs
2
Squat for confined waters:
1.68
mtrs
13.40
mtrs
3
Squat for open waters:
0.84
mtrs
13.40
mtrs
1.340
mtrs
deg. (port/starboard) mtrs
c. Tide
d. Net UKC Requirement
1
Anticipated tidal current ( from tide table):
2
Anticipated tide ( from tide tables):
Dir. x Rate
1 2
3 Port: Date 6/8/2013
LOME Time 4:08
6/8/2013 6/8/2013 6/8/2013
9:28 15:34 22:08
Height (in mtrs) 1.6 0.9 1.8 0.4
4 5
1.5% of Beam of the vessel: Net UKC required in port approaches / at berth (0.3m or 1.5% of vessel beam, whichever is greater): Net UKC required when underway in Coastal waters: Net UKC required when in Deep Sea: Net UKC required at anchorage / STS / SBM:
0.48
mtrs
0.48
mtrs
2.00 5.00 2.00
mtrs mtrs mtrs
M 32
EXECUTIVE SHIP MANAGEMENT
D 18A Page 2 of 3 (5/13 Rev 5)
B. Calculations and Verification of compliance with Company’s UKC policy Channel
Port Anchorage/STS Without Cargo With Cargo Operation Operation
SBM
Berth
NA
NA
At Sea Coastal Passage Ocean Passage
Date & Time a. Gross UKC Calculations: 1
Least charted depth in meters (from chart):
2
Tide at the time of transit in meters (from Ac2)
0
0.00
0
0
0
0
0
3
Total depth available in meters
0.00
33.00
33.00
0.00
0.00
33.00
50.00
4
Max. draft of the vessel in meters (from Aa3 or Aa4 whichever is greater)
13.40
13.40
13.40
13.40
13.40
13.40
13.40
5
Gross UKC available in meters (Ba3-Ba4)
-13.40
19.60
19.60
-13.40
-13.40
19.60
36.60
6
Gross UKC required in meters (Bb7+Bc4 or Aa5 whichever is greater)
1.34
2.50
5.00
2.50
1.34
3.34
6.34
7
Condition acceptability (Yes/ No)
NO
YES
YES
NO
NO
YES
YES
8
Company’s approval required (Yes/ No)
YES
NO
NO
YES
YES
NO
NO
NA
0
0
NA
NA
0.84
0.84
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.2
0.5
0.5
0.5
0.5
0.5
0.5
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0.20
0.50
0.50
0.50
0.50
1.34
1.34
b. Draft/ Depth Allowances Calculations: 1 Squat allowances in meters (Refer Squat table)
2
Density allowance in meters
3
Sea state allowance in meters (Refer Table 1 on last page of this form)
4
33.00
50.00
Other allowances in meters (1. Storm/Negative surges: Refer Annual Summary of Notices to Mariners-Notice No.15 2. Barometric Pressure/ Wind Effect/Sea bed allowance: Refer Mariner's Handbook & Tide Table introductory pages.)
7
33.00
Seasonal Height Variation *(Information provided at the end of respective Tide Table)
6
33.00
Allowance for heel correction (1% of Beam = Increase of draft due to 1 deg of list/heel)
5
NA
Total allowances in meters (Bb1+Bb2+Bb3+Bb4+Bb5+Bb6)
M 32
EXECUTIVE SHIP MANAGEMENT
c. Net UKC Calculations: 1 Gross UKC available in meters (Ba5) 2 Total allowances in meters (Bb7) 3
Legends: * =The corrections should not be entered for UKC if it has been already accounted for when calculating Ht of Tide
Second Officer
D 18A Page 3 of 3 (5/13 Rev 5)
Master
B. Calculations and Verification of compliance with Company’s UKC policy Channel a. Gross UKC Calculations: 1 Least charted depth in meters (from chart): 2 Tide in meters (from Ac2) 3 Total depth available in meters 4 Max. draft of the vessel in meters (from Aa4) 5 Gross UKC available in meters (Ba3-Ba4) 6 Gross UKC required in meters [(from Aa5) or (Bb5+Bc4)] 7 Condition acceptability (Yes/ No) 8 Company’s approval required (Yes/ No) b. Draft/ Depth Allowances Calculations: 1 Squat allowances in meters 2 Density allowance in meters 3 Sea state allowance in meters 4 Other allowances in meters 5 Total allowances in meters (Ba1+Ba2+Ba3+Ba4) c. Net UKC Calculations: 1 Gross UKC available in meters (Ba5) 2 Total Draft/ Depth allowance in meters(Bb5) 3 Net UKC available in meters (Bc1 – Bc2) 4 Net UKC required (from Ad) 5 Condition acceptability (Yes/ No) 6 Company’s Approval required (Yes/ No)