CV OF MOHAMMAD SHOHRAB ALAM MECHANICAL SUPERVISOR CCC 3RD NGL PROJECT - RUWAIS ABU DHABI - U. A. E. P. O. BOX NO. 224
Mob:00971504247206 Email :-
[email protected]
PERSONAL DATA Date of Birth
:
17.-7.1978
Place of Birth
:
Bhada, Siwan, Bihar
Nationality
:
Indian
Religion
:
Islam
Marital Status
:
Married
Language Known
:
English, Hindi, Urdu and Arabic
Passport Number
:
F-4448127
Date of Issue
:
17.08.2005
Date of Expiry
:
16.08.2015
Place of Issue
:
PATNA
Educational Qualification
:
SSC
Permanent Address
:
Mohd Shohrab Alam Villa- Bhada, Post- Jamo Bazar Dist-Siwan, Bihar, India, Pin-841413. Pi n-841413. Mob- 0091- 9431265277.
Present Address
:
Mohd Shohrab Alam Abu Fazal Enclave Thokar No# 4, Block J, Flat No# 9
3 RD Flore Okhala, Jamaia Nagar. New Delhi, India Mob- 0091- 9718294285.
10 Years Overseas Experience
1.
Company Name
:
Yahya Cost ain L.L.C
:
M/W Foreman.
Period
:
19.04.1997 to 21.11.1998.
Project
:
Ruwi Sult anate of Oman.
Company Name
:
Cost ain Process Eng & Const LTD
Position
:
M/W Foreman.
Period
:
20.02.1999 to 30.07.2000.
Project
:
LNG Plant Das Island Abu Dhabi
Company Name
:
Acmecon Mechanical Division
Position
:
M/W Foreman.
Period
:
05.10.2000 to 02.03.2002.
Project
:
Kkia Project Jeddah.
Company Name
:
Becht el & Co. LLC
Position
:
M/W Foreman.
Period
:
16.09.2002 to 21.08.2004.
Project
:
Aluminum Smelter Sohar oman
Company Name
:
AYTB Co. LTD. (K.S.A)
Position
:
M/W Foreman.
Period
:
01.11.2004 to 10.3.2006.
Project
:
Eastern Pet rochemical Project.
Position
1.
2.
3.
3.
COMPANY WORKED FOR:
4.
Company Name
:
CCI C UAE
Position
:
Mechanical Supervisor.
Project
:
RNGL 3rd Project
Period
:
10.06.2006 to till dat e
Location
:
Ruwais UAE.
JOB DESCRIPTION : :
Construction/Maintenance & Commissioning Job Description.
• • •
• • •
•
•
• • • •
•
Supervised sub-contractor to achieve planed t arget. arget. Monitoring productivity & rechecking the reports a gainst actual. Assisting sub-contractor on finding of front s and solving sub-contractor small issues on the spot. Assisting field engineering on expediting Technical queries. Assisting sub-contractor machinery team on techniques of alignment etc. Rotating Machinery Equipment Assembly, Erection, Leveling, Alignment, Flange Parallelism, Oil Flushing, Pre-commissioning, Commissioning, and st art-Up Such as-: MAN TURBO Flush Gas/Acid Gas and Sour Gas Compressor’s, Turbine’s, Pumps, Fin-fan Cooler’s etc. Static’s Equipment Erection, Leveling and Alignment Such as-: Columns, Vessels, Reactors, Filters, Suckers, Skids, and Packa ges, ges, etc. Internal installation of Columns, Vessels, Rea ctor, Suckers, Such as-: Trays, Down Comers, Seal pens, Outlet collector trays, Lower liquid Distributor trays, Mixing chamber, Liquid collector trays, Quench distributor t rays and Chimney trays etc. Leak test t est of chimney tray, seal pans and down comers. Chemical and catal cata lyst loading of Vessels and Reactors. Fin-fan coolers Assembly, erection, leveling, alignment and belt tensioning. Oil Flushing of MAN TURBO compressors, Turbines and First fill (oil) of all pumps. Experience in various gas t urbine and associated with all kinds of ma chinery equipment including expertise in vibration analysis and NDT inspection Techniques. Boilers/furnace assembly, erection, F/D fan alignment a nd coordination with refectory work contractor etc.
Pipe fabrication (Spooling) Pipe Support fabrication, erection and all further activities related to piping/ pipi ng/ supporting. Steel structure Fabrication, erection, pipe ra cks Building etc. Organization / Distribution of st aff and Manpower’s. Progress and progress report controlling a nd reporting to Project Engineer. …………………………………………………………………………………………………………. Pipe fabrication (Spooling) Pipe Support fabrication, erection and all further activities related to piping/ pipi ng/ supporting. Erection of spools/piping and supports as per piping Isometric & Piping general arrangement/ Standard /Special piping supports drawings. Progress and progress report controlling a nd reporting to Site Engineer. Raising technical queries for any fouling/miss mat ching ching etc. Provide assistance to Piping Supervisor/Foreman’s for critical erection a nd following with them for productivity. Experience with high pressure piping integrity mana gement program s. s. Expertise in developing and updating project specifica tions and standards, design supervision and construction support . Broad scope knowledge of engineering designs and understa ndin nding g of industry codes, registry requirements and sta ndards and construction construction methods . Ability to work well in a t eam environment environment . Strong oral and written communication skills . Excellent analytical and problem solving sk ills . Ability to self-start self-sta rt and follow through tasks . Ensure that all engineering is carried out to t he highest standard and meets the client’s requirements. client’s requirements. Preparation of equipment layouts, piping GADs a nd piping erection and fabrication isometrics fabrication isometrics . Fabrication and erection of piping of various Classes and Grade mat erials . Review and witness Stage Inspections . Preparation of checklist/ balance work to be done for piping syst ems/ loops with conformity to General Arrangement Drawings, P& ID’s, I sometric drawings and support std. etc . Develop and maintai ma intain n engineering standards and specifications related to piping & valves. & valves. Participate in the t he development of project workflows and in-house libraries . Work with other ot her engineering disciplines disciplines on developing Piping deliverables, including plot plot plans, equipment layouts, etc . Manage the project Piping group and co-ordinate the work to ensure that Piping deliverables are developed on time a nd according to schedule . Review designs against Provincial and Federal requirements, project st andar andards, ds, specifications, design criteria, and basic ba sic engineering principles .
•
• • •
•
•
• •
•
• •
•
• • • • •
•
• • •
•
•
•
•
Date:
Place:
A
Md.Shohrab