CV for Mechanical Supervisor

February 9, 2018 | Author: ranjitkumar1977 | Category: Petroleum, Gas Compressor, Metal Fabrication, Pump, Pipe (Fluid Conveyance)
Share Embed Donate


Short Description

Download CV for Mechanical Supervisor...

Description

Curriculum Vitae M.RAVI E-MAIL : [email protected] Mobile No +965-94083735. POST APPLIED FOR : Mechanical Supervisor (Static/Rotating Equipments) CAREER OBJECTIVE Seeking Challenging assignment as a Mechanical Supervisor to associate myself with the organization where there is a chance to exhibit my techno-proficient skills and to be part of the mechanical team that work dynamically towards the growth of the organization in my professional carrier. TECHNICAL QUALIFICATION Diploma in Mechanical Engineering Awarded by state board of Technical Education and Training Andhra Pradesh, INDIA. Professional Qualification Passed in ASNT LEVEL-11 (RT, PT& M.P.T) Profile Total 8 year’s hands on experience in fabrication and erection of tanks and pipelines. I have expertise in installing and testing of rotating equipments in Oil and Gas.

EXPERIENCE SUMMARY Present Employer At present working as Mechanical Supervisor (Static/Rotating Equipment) – projects in Kuwait National Petroleum Company through Ahmadiah Contracting Company W.l.l Kuwait. It is an engineering, procurement and construction contracting company Well established and operating in Kuwait providing detailed engineering, construction, commissioning. From Dec 2009 to till date Project Client Seconded by Position

: : : :

Revamping of Effluent Treatment Facilities In MAA,MAB &SHU Refineries. Kuwait National Petroleum Company. ( KNPC) Ahmadiah Contracting and Trading CO. Kuwait. Mechanical Supervisor (Rot&Equip)

PROJECT OVERVIEW: Engineering, procurement and construction of Revamping of Effluent Treatment Facilities at MAA,MAB &SHU refineries.( Kuwait national Petroleum Company.)

Role and Responsibilities  Construction of atmospheric above ground storage tanks, shell plate erection on going by jacking method.  Coordinating fabrication and erection activities for the tanks.  Coordinating shell course shifting from fabrication yard to tank area.  Preparation/coordination in getting approval of daily inspections from the client.  Getting the mechanical clearance for testing, commissioning of all tanks.  Supervise and manage the subcontractors for the construction of storage tanks and report to engineer.  Monitoring the tankage job as per required by client.  Responsible for the tanks hydro test activities.  Lead and coordinate with the QA/QC in all quality related aspects.  Review the approval documents about Inspection Test Plan of the project to ensure inspection shall be in accordance with the required quality standard and procedures.  Execute and submit inspection documentation works for static and rotating equipments to assure that the required forms used in testing submitted are approved by client representative as per ITP such as: -Installation checklist for static/rotating equipments -Leveling/alignment recording forms for horizontal and vertical package type -Axial/radial, soft foot parallelism forms for pumps and compressors.  Regular surveillance checking at site to verify the preservation requirements for anchor bolts during construction stage.  Check the physical condition of anchor bolts and leveling of foundations before erection of equipments.  Check preservation status of equipments at site.  Ensure to have a preservation log for all the equipments checked and monitored daily/weekly for easily tracking the status.  Involving the erection of cooling tower.  Obtaining a complete check list of the assembling equipment and keep a record of a same  Responsible person for clearance of materials inspection.  Responsible for erection of equipments such as pumps, vessels, tanks and compressors and other equipments as per the approved method statement.  Check equipment orientation before and after erection.  Check the shimming requirements for static and rotating equipments.  Check the condition of pump alignment(axial/radial) without piping prior for preparation for piping installation.  After getting clearance note of civil about foundation ready preparation for alignment and leveling and checked setting of padding plates.

 Responsible for modification works such as RMP,FUP,Chemical and API-CPI separators in existing areas (Inside refinery).  Good knowledge in permit to work system.  Responsible for safe execution of job. Previous Employer From Mar 2007 to Dec 2009 Previous worked as Mechanical supervisor – projects in Gulf Spic Contracting Company W.l.l – Kuwait. It is an engineering, procurement and construction contracting company. PROJECTS WITH GULF SPIC From Dec 08 to Dec 09 Project : Facilities for Moisture control and Dehazing of Gas Oil. Client : Kuwait National Petroleum Company. Seconded by : Gulf Spic Contracting and Trading Co, Kuwait. Position : Mechanical Supervisor PROJECT OVERVIEW: Engineering, procurement and construction of facilities of moisture control and dehazing of gas oil in Kuwait national Petroleum Company by removing the moisture content in diesel and gas oil and export the high speed diesel and gas oil. From Mar 2007 to Dec 2008 Gulf spic contracting company W.l.l . Project : GC-28 Capacity Expansion for Compression and Medium Crude Processing Owner : Kuwait Oil Company. (K.O.C) Client : Technicas Reunidas Position : Mechanical Supervisor PROJECT OVERVIEW: Compression and expansion facilities of modernization of Gathering center of Kuwait Oil Company by upgrading and production capacity almost double the existing capacity and relocation of underground and above ground piping. During the above period I had worked as Mechanical Supervisor and taking care of erection of equipments, related piping and alignment of pumps and also involved in major shutdowns in gathering centre-28.Prepare the bill of materials as per drawings and inspection of materials as per client requirement. Invoice checking of subcontractor.

Role and Responsibilities

 Responsible person for construction activities related to mechanical jobs with maintaining the quality innovation policy of the company.  Review of construction procedures, method statements & construction As-built documents etc.  Responsible for installation of static equipments like pressure vessels, effluent and trim coolers.  Responsible for installations of rotating equipments like centrifugal horizontal and vertical pumps.  Inspect the condition of rotating parts namely shaft, sleeve, impeller, coupling and stationary parts such as casing, stuffing box, distance piece, and bearing housing.  Responsible for piping erection at area (pipe rack and around equipment).  Supervise the fabrication and erection works.  Preparing the daily progress reports.  Preparing weekly ahead detailed work schedule.  Coordinate schedule of testing on piping to both hydrotest group and QC.  Monitoring for clearing of punch item of text packages.  Responsible for erection of piping related to the pumps.  Involving the structural steel support fabrication.  Direct supervise and coordinate activities of the workers engaged in the fabrication and erection of equipments and pipelines.  Good knowledge in permit to work systems.  Responsible for safe execution of job.

PREVIOUS EMPLOYER Company Owner Duration Position

           

: Metal craft contracting company : Reliance industries Ltd, Jamnagar. : May 03– FEB 07 : Mechanical Supervisor

Responsible for pipe line fabrication, welding and erection. Responsible for structural steel fabrication and erection. Responsible for pipe support fabrication and welding. Involved in piping system flushing and testing. Responsible for text pack re-instatement. Prepared daily report and submit to site engineer. Coordinating daily tool box talk with all employees. Planning of material as per shut down period. Responsible for the structural steel fabrication works. Responsible for piping fabrication and erection works. Responsible for rectifying the Q.C punch lists. Preparing the bill of quantity of materials

PERSONAL DETAILS: Father’s Name

:

M.A.V.K. RAJU

Nationality

:

INDIAN

Date of Birth

:

30-06-1983

Marital Status

:

Un-married

Language Known

:

English, Hindi and Telugu

Permanent Address

:

M.A.V.K.RAJU, D.No:4-123, Gantyada Village, Gantyada Mandalam, Vizianagaram -535215 Andhra Pradesh. India

Present Address

:

M. RAVI, Kuwait.

Mobile No

:

+965 – 94083735 +91 – 9490042430

E-mail Id

:

[email protected]

Passport Details Passport Number

: F 6439137

Place of Issue

: Visakhapatnam

Date of Issue

: 11.09.2009

Date of Expiry

: 10.09.2019

DECLARATION: Here by, I declare that all the above mentioned information’s are correct and true to the best of my knowledge. M. RAVI.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF