CURRICULUM VITAE Name : ID Number : Passport No. : Place/ Date of Birth : Age : Sex : Status : Address : Home Telephone Cellular Phone E-mail Website EDUCATION University
: : : :
Firdaus 21.71.03.004.30.11.82.9005 W 138762 Palembang/ November 30, 1982 28 years old Male Married Perum Puri Malaka Blok A No. 23 Tiban Baru, Sekupang, Batam 29422, Indonesia +62778-327482 +62819-90804464/ +6596127094
[email protected] http://id.linkedin.com/in/firdausst
: University of Sriwijaya majoring in Mechanical Engineering, GPA 3.02 of scale 4.00
Courses attended: 1. Aveva Plant Design Management System (PDMS) Training 2. Pipe Stress Analysis using Bentley AutoPIPE XM (In-House Training) by Mr. Kukuh A. Damayanto (formerly Bentley’s Application Engineer, formerly Megaron’s Senior Piping Engineer 3. Piping Estimation (In-House Training) by Mr. Edy Tan (Senior Estimating Engineer, PT Megaron Semesta) 4. CAESAR II Pipe Stress Analysis (certified by COADE - Oil Institute) WORKING HISTORY 1. Project Engineer in Takasago Singapore Pte., Ltd. (www.takasago.com.sg) : March, 2007- July, 2008 Projects Handled: • Piping, HVAC, mechanical, civil & electrical set-up for Panasonic Shikoku Electronics Batam • Piping, HVAC, mechanical, civil & electrical set-up for Hon Foong Batam • Miscellaneous work for Production Line utilites (e.g: Compressed Dry Air line, Electrical Power Point, Exhaust Line & Clean Room Architecture) • Miscellaneous Piping, HVAC & Clean Room maintenance & set-up at Batamindo Industrial Park factories. 2. Mechanical Engineer in PT. Megaron Semesta (Engineering Division of Wascoenergy, www.wascoenergy.com): August 2008 - Now Projects Handled: • Piping Proposals/ Estimation: Global Process Systems: Chemical Injection Skid, MERPRO: Hydrocyclone Package, Veolia: Water Treatment FPSO, Siemens Norway: SRU Package, Custody: Crude Oil Metering System, Premiere Oil: Gajah Baru Condensate Project, Siemens: Water Injection Package, LNG Plant for Energy Equity Epic Sengkang, etc.
•
Tuban Amine Plant Project (PT. Gasuma Federal Indonesia): Pipe Stress Analysis: o Liaise with Piping Designer to assure the piping layout/ routing is safe according to the regulating Code o Preparation and selection the list of Critical Line o Selecting and positioning pipe supports o Calculating nozzle loads for static and rotating equipment o Calculating the effect of pressure relieve valve’s thrust load o Preparing Pipe Stress Analysis Report
•
Tuban LNG Plant Project (PT. Gasuma Federal Indonesia): Pipe Stress Analysis: o Liaise with Piping Designer to assure the piping layout/ routing is safe according to the regulating Code o Preparation and selection the list of Critical Line o Selecting and positioning pipe supports o Calculating nozzle loads for static and rotating equipment o Calculating the effect of pressure relieve valve’s thrust load o Preparing Pipe Stress Analysis Report
•
Gajah Baru Condensate Treatment Package Project (Saipem-Premiere Oil): Preliminary works: o Review customer’s specification for piping (design, materials, fabrication, installation, painting, insulation and test specification) o Liaise with Procurement Department and suppliers in search of proper material procurement thus assuring on-time delivery date. Technically review the vendor’s quotations and assure the compatibility with Approved Material List & specification. Preparation of piping documents: o Liaise with Process Department, using their PFD, P&ID and material balance sheet (generated from hysys) in preparing Line list o Prepare piping special items data sheet (ex: bleed rings, key interlocks, etc) o Prepare Pipe & Fittings MTO (refer to AutoPLANT-generated MTO and manually check the isometric drawing) o Liaise with E&I Engineer in preparation of Interface Connection Schedule and FAT Pipe Stress Analysis: o Liaise with Piping Designer to assure the piping layout/ routing is safe according to the regulating Code o Preparation and selection the list of Critical Line o Selecting and positioning pipe supports o Calculating nozzle loads for pressure vessel and pump o Calculating the effect of pressure relieve valve’s thrust load o Preparing pipe stress analysis report Piping Fabrication Engineering: o Constantly monitor the piping fabrication activities o Liaise with Piping Designer as well as Structural, E&I and Process Engineer to make sure a proper piping arrangement i.e. no “clash” problem o Liaise with client representative (inspector) in terms of piping fabrication
o Liaise with QC Department (QC Piping, QC Material, QC Painting) in terms of piping dimensional integrity, NDT, proceeding Factory Acceptance Test (hydrotest, leak test, bolt torque test,etc), etc. 3. Piping Estimation Engineer in GSI, Gas Services International (Singapore) Pte. Ltd. (www.gasservicesinternational.com): February 2011 – now Projects Handled: • Piping, Pressure Vessel and Structural Proposals/ Estimation: BP Pakistan E&P: Engine Driven Gas Compressors Daru Field Development Project; Enar Petrotech Services Pte. Ltd: Sinjhoro Development Project, Petrochina: Palouge FPF Debottlenecking Project, etc. PROFESSIONAL QUALIFICATIONS Technical: • HVAC: Project Engineering: handling inquiries, designing, making quotations, scheduling, project supervising, maintaining safety & quality, testing, commissioning & troubleshooting •
PROPOSAL ENGINEERING: - Estimating pipe & fittings MTO from 3D model or P&ID, thus pricing - Pressure Vessel Estimation: Head and shell thickness calculation, nozzle, support, internals. - Structure Estimation.
•
PIPING FABRICATION ENGINEERING: - Prepare line list - Prepare hydrotest, NDT, painting and insulation specification - Prepare piping special items data sheet - Prepare Factory Acceptance Test Procedure - Prepare Pipe & Fittings MTO - Prepare Interface Connection Schedule - Liaise with vendor and procurement division for piping RFQ then proceeding technical review
•
PIPE STRESS ANALYSIS: - Preparation and selection the list of Critical Line - Selecting and positioning of pipe supports - Calculating nozzle load for static and rotating equipment - Calculating the effect of pressure relieve valve’s thrust load - Preparing pipe stress analysis report
REFERRALS: 1. Sahrudin Tambunan (Senior Finite Element Analysis Engineer, JP Kenny) E-mail:
[email protected] 2. Kukuh A. Damayanto (Lead Piping Engineer, PT Synergy Engineering) E-mail:
[email protected] 3. Edy Tan (Senior Estimating Engineer, Gas Services International (Singapore) Pte. Ltd) E-mail:
[email protected] Languages: Indonesian (mother tongue) English (fluent both oral and written, TOEFL Score: 535)
Computer Skills: Microsoft Excel,Word, Power Point, Project, AutoCAD, AutoPIPE and CAESAR II INTERESTS Playing futsal , work-out at the gym, watching movies, reading books, singing (formerly a member of college choir) and radio broadcasting (formerly announcer) MOTTO “A tough sailor ain’t come from a quiet sea”