Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment Facility Name: Address:
Phone Number: Fax Number: Number of Molding Employees at this Facility:
Type(s) of Molding Processes at this Facility: Process Table A Injection Molding
Captive Molder (Y/N): Commercial Molder (Y/N):
Process Table B Blow Molding
Date of Assessment:
Process Table C Vacuum Forming
Date of Previous Assessment: Process Table D Compression Molding Process Table E Transfer Molding Process Table F Extrusion Process Table G Equipment Process Table H Part Inspection & Testing Current Quality Certification(s): Date of Re-assessment (if necessary): Personnel Contacted: Name:
Title:
Phone:
Email:
Auditors/Assessors: Name:
Company:
Phone:
Email:
Number of "Not Satisfactory" Findings:
Number of "Needs Immediate Action" Findings:
Number of "Fail" Findings in the Job Audit(s):
Number of Process Table Items not meeting Minimum Requirements:
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
N/A
Section 1 - Management Responsibility and Quality Planning
1.1
1.2
To ensure readily available expertise, there shall be a dedicated and qualified molding person on the site. This individual shall be a full-time employee and the position shall be reflected in the organization chart. A Is there a dedicated and job description shall exist identifying the qualifications qualified molding professional for the position including chemical and molding on-site? knowledge. The qualifications shall include a minimum of 5 years experience in molding operation or a combination of a minimum of 5 years of formal technical education and molding experience.
Does the molder perform advanced quality planning?
The molder shall incorporate a documented advanced quality planning procedure. A feasibility study shall be performed and internally approved for each new part or process. Similar parts can be grouped into part families for this effort as defined by the molder. After the part approval process is approved by the customer, no process changes are allowed unless approved by the customer. The molder shall contact the customer when clarification of process changes is required. This clarification of process changes shall be documented.
Section 1-2, 2 of 79
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
1.3
The molder shall incorporate the use of a documented Failure Mode and Effects Analysis (FMEA) procedure and ensure the FMEAs are updated to reflect current part quality status. The FMEA shall be written for each part or part family or they may be process-specific and Are the molder's FMEA's up to written for each process. In any case, they shall date and reflecting current address all process steps from part receipt to part processing? shipment and all key molding process parameters as defined by the molder. A cross-functional team shall be used in the development of the FMEA. All special characteristics, as defined by the molder and its customers, shall be identified, defined, and addressed in the FMEA.
1.4
The molder shall incorporate the use of a documented Control Plan procedure and ensure the Control Plans are updated to reflect current controls. The Control Plans shall be written for each part or part family or they may be process-specific and written for each process. In any case, they shall address all process steps from part receipt to part shipment and identify all equipment used and all key molding process parameters as defined by the molder. A crossAre molding process Control functional team, including a production operator, shall Plans up to date and reflecting be used in the development of Control Plans, which current processing? shall be consistent with all associated documentation such as work instructions, shop travelers, and FMEAs. All special characteristics, as defined by the molder and its customers, shall be identified, defined, and addressed in the Control Plans. Sample sizes and frequencies for evaluation of process and product characteristics shall also be addressed consistent with the minimum requirements listed in the Process Tables.
Section 1-2, 3 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
To ensure all customer requirements are both understood and satisfied, the molder shall have all related molding and customer referenced standards and specifications available for use and a method to ensure that they are current. Such standards and specifications include, but are not limited to, those relevant documents published by SAE, AIAG, ASTM, General Motors, Ford, and Chrysler. The molder shall have a process to ensure the timely review, distribution, and implementation of all customer and industry engineering standards and specifications and changes based on customer-required schedule. This process shall be executed as soon as possible and shall not exceed two weeks. The molder shall document this process of review and implementation, and it shall address how customer and industry documents are obtained, how they are maintained within the molder, how the current status is established, and how the relevant information is cascaded to the shop floor within the two-week period. The molder shall identify who is responsible for performing these tasks.
1.5
Are all molding related and referenced specifications current and available? For example: SAE, AIAG, ASTM, General Motors, Ford, and Chrysler.
1.6
Are all molding related internal The molder should have a documented process and and external best practices system for maintaining best practices obtained through documented and maintained? lessons learned or from industry knowledge.
1.7
Is there a written process specification for all active processes?
The molder shall have written process specifications for all active processes and identify all steps of the process including relevant operating parameters. Examples of operating parameters include process temperatures, cycle times, etc. Such parameters shall not only be defined, they shall have operating tolerances as defined by the molder in order to maintain process control. All active processes should have a written process specification. These process specifications may take the form of work instructions, job card, start-up sheet, or other similar documents.
Section 1-2, 4 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
1.8
To demonstrate each process is capable of yielding acceptable product, the molder shall perform product capability studies for the initial validation of each process, after relocation of any process equipment, and after a major rebuild of any equipment. The molder shall define what constitutes a major rebuild. Initial product capability studies shall be conducted for all molding processes per line as defined in scope of Has a valid product capability work and in accordance with customer requirements. study been performed initially Capability study techniques shall be appropriate for and after process change? the molding product characteristics, e.g., molding thickness, part weight, etc. Any specific customer requirements shall be met. In the absence of customer requirements, the molder shall establish acceptable ranges for measures of capability. An action plan shall exist to address the steps to be followed in case capability indices fall outside customer requirements or established ranges.
1.9
The analysis of products and processes over time can yield vital information for defect prevention efforts. The molder shall have a system to collect, analyze, and react to product or process data over time. Does the molder collect and Methods of analysis shall include ongoing trend or analyze data over time, and historical data analysis of special product or process react to this data? Are records parameters/characteristics. The molder shall available? determine which parameters/characteristics to include in such analysis. All process control and testing records must be retained for a minimum of one calendar year after the year in which they were created.
1.10
Are internal assessments being completed on an annual basis, at a minimum, incorporating AIAG Molding System Assessment?
The molder shall conduct internal assessments on an annual basis, at a minimum, using the AIAG Molding System Assessment. Concerns shall be addressed in a timely manner.
Section 1-2, 5 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
1.11
The quality management system shall include a documented process for reprocessing that shall include authorization from a designated individual. The reprocessing procedure shall describe product characteristics for which reprocessing is allowed as Is there a system in place to well as those characteristics for which reprocessing is authorize reprocessing and is not permissible. All reprocessing activity shall require it documented? a new processing control sheet issued by qualified technical personnel denoting the necessary molding modifications. Records shall clearly indicate when and how any material has been reprocessed. The Quality Manager or a designee shall authorize the release of reprocessed product.
1.12
Does the Quality Department review, address, and document customer and internal concerns?
1.13
The molder shall define a process for continual improvement for each molding process identified in the Is there a continual scope of the Molding System Assessment. The improvement plan applicable process shall be designed to bring about continual to each process defined in the improvement in quality and productivity. Identified scope of the assessment? actions shall be prioritized and shall include timing (estimated completion dates). The molder shall show evidence of program effectiveness.
1.14
Does the Quality Manager or designee authorize the disposition of material from quarantine status?
The quality management system shall include a process for documenting, reviewing, and addressing customer concerns and any other concerns internal to the molder. A disciplined problem solving approach shall be used.
The Quality Manager or designee is responsible for authorizing and documenting appropriate personnel to disposition quarantine material.
Section 1-2, 6 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
1.15
There shall be procedures or work instructions available to molding personnel covering the molding process. These procedures or work instructions shall Are there procedures or work include methods of addressing potential emergencies instructions available to (such as power failure), equipment start-up, equipment molding personnel that define shut-down, product segregation (See 2.8), product the molding process? inspection, and general operating procedures. These procedures or work instructions shall be accessible to shop floor personnel.
1.16
The molder shall provide employee training for applicable molding operations. All employees, including backup and temporary employees, shall be trained. Documented evidence shall be maintained Is management providing showing the employees trained and the evidence shall employee training for molding? include an assessment of the effectiveness of the training. Management shall define the qualification requirements for each function, and ongoing or followup training shall also be addressed.
1.17
Is there a responsibility matrix to ensure that all key management and supervisory functions are performed by qualified personnel?
The molder shall maintain a responsibility matrix identifying all key management and supervisory functions and the qualified personnel who may perform such functions. It shall identify both primary and secondary (backup) personnel for the key functions (as defined by the molder). This matrix shall be readily available to management at all times.
Section 1-2, 7 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
1.18
1.19
Question
Is there a preventive maintenance program? Is maintenance data being utilized to form a predictive maintenance program?
Requirements and Guidance
Objective Evidence
The molder shall have a documented preventive maintenance program for key process equipment (as identified by the molder). The program shall be a closed-loop process that tracks maintenance efforts from request to completion to assessment of effectiveness. Equipment operators shall have the opportunity to report problems, and problems shall also be handled in a closed-loop manner. Company data, e.g., downtime, quality rejects, first time-through capability, recurring maintenance work orders, and operator-reported problems, shall be used to improve the preventive maintenance program. Maintenance data shall be collected and analyzed as part of a predictive maintenance program.
Has the molder developed a The molder shall develop and maintain a critical spare critical spare parts list, and are parts list and shall ensure the availability of such parts the parts available to minimize to minimize production disruptions. production disruptions?
Section 1-2, 8 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
Section 2 - Floor and Material Handling Responsibility Does the facility ensure that the data entered in the receiving system matches the information on the customer's shipping documents?
Documented processes and evidence of compliance shall exist, e.g., shop travelers, work orders, etc. The facility shall have a detailed process in place to resolve receiving discrepancies.
2.2
Is product clearly identified and staged throughout the molding process?
Procedures for part and container identification help to avoid incorrect processing or mixing of lots. Appropriate location and staging within the facility also help to ensure that orders are not shipped until all required operations are performed. Customer product shall be clearly identified and staged throughout the molding process. Non-molded, in-process, and finished product shall be properly segregated and identified. All material shall be staged in a dedicated and clearly defined area.
2.3
Is molder using adequate There shall be a procedure that ensures a FIFO FIFO system for material and system is utilized. product?
2.4
Is lot traceability and integrity maintained throughout all processes?
2.1
Out-going lot(s) shall be traceable to the incoming lot(s). The discipline of precisely identifying lots and linking all pertinent information to them enhances the ability to do root cause analysis and continual improvement.
Section 1-2, 9 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
2.5
Question
Are procedures adequate to prevent movement of nonconforming product into the production system?
Requirements and Guidance
Objective Evidence
The control of suspect or non-conforming product is necessary to prevent inadvertent shipment or contamination of other lots. Procedures shall be adequate to prevent movement of non-conforming product into the production system. Procedures shall exist addressing proper disposition, product identification and tracking of material flow in and out of hold area. Non-conforming hold area shall be clearly designated to maintain segregation of such material.
Section 1-2, 10 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
Is there a system to identify trap points in the entire process to reduce risk of mixed parts (inappropriate, unfinished or improperly molded parts)?
The molder shall have documented procedures to identify and monitor trap points for each process/equipment. Monitoring of potential trap points shall occur for every part changeover.
2.7
Are containers free of inappropriate material?
Containers handling customer product shall be free of inappropriate material. After emptying and before reusing containers, containers shall be inspected to ensure that all parts and inappropriate material have been removed. The source of inappropriate material shall be identified and addressed. This is to ensure that no nonconforming molded parts or inappropriate material contaminate the finished lot.
2.8
Unplanned or emergency downtime greatly raises the risk of improper processing. Operators shall be trained in material handling, containment action, and product Are operators trained in segregation in the event of an equipment emergency material handling, containment including power failure. Training shall be documented. action and product Work instructions specifically addressing potential segregation in the event of an types of equipment emergencies and failures shall be equipment emergency accessible to and understood by equipment operators. including power failure? These instructions shall address containment/reaction plans related to all elements of the process. Evidence shall exist showing disposition and traceability of affected product.
2.9
Is the handling, storage and packaging adequate to preserve product quality?
2.6
The molder's in-process handling and shipping process shall be assessed for risk of part damage or other quality concerns.
Section 1-2, 11 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Special Process: Molding System Assessment (General Facility Overview)
Assessment
Question Number
Question
Requirements and Guidance
Objective Evidence
2.10
Are plant cleanliness, housekeeping, environmental and working conditions conducive to control and improved quality?
Plant cleanliness, housekeeping, environmental, and working conditions shall be conducive to controlling and improving quality. The molder should evaluate such conditions and their affect on quality. A housekeeping policy shall be clearly defined and executed.
2.11
Are process control parameters monitored per frequencies specified in Process Tables?
Process control parameters shall be monitored per frequencies specified in Process Tables. Computer monitoring equipment with alarms and alarm logs satisfy the verification requirement. A designated floor person shall verify the process parameters.
2.12
There are documented reaction plans to both out of Are out of control/specification control and out of tolerance process parameters. parameters reviewed and There is documented evidence that reaction plans are reacted to? followed.
2.13
Are Test Frequencies performed as specified in Process Tables?
2.14
Is product test equipment verified?
Test Frequencies shall be performed as specified in Process Tables. Refer to Process Tables
Test equipment shall be verified/calibrated per applicable customer specific standard or per an applicable consensus standard, e.g., ASTM, SAE, ISO, NIST, etc. Verification/calibration results shall be internally reviewed, approved and documented. Refer to Process Tables for frequency of checks.
2.15
Lighting of inspection area
Lighting in the inspection area shall be sufficient to allow the evaluation of all part surfaces. The lighting shall be arranged to preclude spot lighting, glare or shadows. There can be no moving or distracting reflections on the surfaces to be evaluated.
Section 1-2, 12 of 79
N/A
Satisfactory
Not Satisfactory
Needs Immediate Action
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question #
Job Audit Question
Related Molding System Assessment Question #
Customer or Internal Requirement
Job (Shop) Order or Reference Documentation Requirement
3.1
Is contract review and advanced quality planning, FMEA, Control Plans, etc., in place and performed by qualified individuals?
1.1 1.2 1.3 1.4 1.6
N/A
3.2
Does the molder have the proper customer specifications for the part?
1.5
N/A
3.3
Is there documented evidence of Receiving Inspection?
2.1
3.4
Is material identification (part numbers, lot numbers, contract numbers, etc.) maintained throughout the molding process?
2.2 2.3 2.4
3.5
Is the proper procedure or process specification used? Refer to Process Tables for specific parameters. List parameters that were verified in this audit in the spaces provided below.
1.5 1.6 2.1 2.11 2.13
Job Audit 13 of 79
Actual Condition (Objective Evidence)
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question #
Job Audit Question
Related Molding System Assessment Question #
Customer or Internal Requirement
Job (Shop) Order or Reference Documentation Requirement
Actual Condition (Objective Evidence)
Process #1: Process #2:
3.6
3.6.1
What are the product inspection requirements?
1.5 2.13 2.14
Each part may have one or more requirements determined by the molding specification. Parts must meet each requirement. List each requirement below and validate. (Listed below are some examples)
Requirement: Weight Test Method: Test frequency or quantity: Selection of samples: Specification: Job Audit 14 of 79
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question #
3.6.2
Job Audit Question
Related Molding System Assessment Question #
Customer or Internal Requirement
Requirement: Color Test Method(s): Test frequency or quantity: Selection of samples: Specification:
3.6.3
Requirement: Gloss Test Method: Test frequency or quantity: Selection of samples: Specification:
3.6.4
Requirement: Flash Test Method(s): Test frequency or quantity: Selection of samples: Specification:
Job Audit 15 of 79
Job (Shop) Order or Reference Documentation Requirement
Actual Condition (Objective Evidence)
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question # 3.6.5
Job Audit Question
Related Molding System Assessment Question #
Customer or Internal Requirement
Requirement: Dimension Test Method: Test frequency or quantity: Selection of samples: Specification:
3.6.6
Requirement: Appearance Test Method: Test frequency or quantity: Selection of samples: Specification:
3.6.7
Requirement: Customer Specific Test Method(s): Test frequency or quantity: Selection of samples: Specification:
Job Audit 16 of 79
Job (Shop) Order or Reference Documentation Requirement
Actual Condition (Objective Evidence)
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question #
Job Audit Question
Related Molding System Assessment Question #
Customer or Internal Requirement
Operator or Inspector Responsibilities 1.4 1.6 2.2 2.3 2.11
3.7
Were appropriate process steps signed off?
3.8
Were all inspection steps, as documented in the Control Plan performed?
3.9
Were steps/operations performed that were not documented in the Control Plan?
1.2 1.4 1.6
3.10
If additional steps were performed, were they authorized?
1.2 1.4 1.6 1.10 1.16
3.11
Does the governing specification allow reprocessing or rework?
1.5 1.10
1.2 1.4
Job Audit 17 of 79
Job (Shop) Order or Reference Documentation Requirement
Actual Condition (Objective Evidence)
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
Section 3 - Job Audit - Finished Product Review Job Identity: Customer: Shop Order Number: Part Number: Part Description: Molding Requirements:
Question #
Job Audit Question
Related Molding System Assessment Question #
3.12
If the order was certified, did the certification accurately reflect the process performed?
2.11 2.13
3.13
Was the certification signed by an authorized individual?
1.16
3.14
Are the parts and containers free of inappropriate objects or contamination?
2.6
Customer or Internal Requirement
Packaging Requirements 3.15
Are packaging requirements identified?
2.6 2.7 2.9
3.16
Are parts packaged to minimize mixed parts or damaged (for example, work flow or over-pack of container)?
2.6 2.7 2.9
Shipping Requirements 3.17
Were the parts properly identified?
2.3 2.9
3.18
Were the containers properly labeled?
2.3 2.9 Job Audit 18 of 79
Job (Shop) Order or Reference Documentation Requirement
Actual Condition (Objective Evidence)
Pass / Fail / N/A
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE A - Injection Molding All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
A1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity).
Once per lot
A1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
Manual
Once per lot
2.0
Storage & Handling (If Applicable)
A2.1
1.4 2.3 2.11 2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
FIFO - per Lot Shelf life - pull for use
A2.2
1.4 2.11 2.12
Environment temperature controlled
Automatic
Continuous monitoring by controller or manual verification daily
A2.3
1.4 1.6 2.7 2.11 2.12
Handling of partial containers to ensure no contamination (closed container, clean environment)
Automatic/Manual
Continuous
A2.4
1.4 1.6 2.7 2.11 2.12
Partial container quantity
Automatic/Manual
Per Container
PT A 19 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE A - Injection Molding All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 3.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Material Drying
A3.1
1.4 2.11 2.12
Dryer temperature per resin manufacturer guidelines (per material)
Automatic
Continuous monitoring by controller
A3.2
1.4 2.11 2.12
Dryer time per resin manufacturer guidelines (per material)
Manual
Per Resin Manufacturer Guidelines
A3.3
1.4 2.11 2.12
Drying equipment (dryer dedicated or clean procedure in place)
Manual
Material change
A3.4
1.4 2.11 2.12
Dew point
Automatic
Continuous monitoring by controller
A3.5
1.4 2.11 2.12
Moisture analysis, if applicable, per Resin Manufacturer Guidelines
Manual
At start-up and once per shift*
4.0
Recycle (regrind) Material (If Applicable)
A4.1
1.4 1.11 2.11 2.13
Recycle ratio (per print, inspection standard or manufacturer guidelines). Verified by feed pressure, weight or volume
Automatic
Once every 8 hours and at every part change over
A4.2
1.4 1.11 2.11 2.12
Dedicated regrind equipment or cleaning procedure in place
Manual
Material change
A4.3
1.4 1.11 2.11 2.12
Fines management (de-dusting)
Automatic/Manual
Material change
A4.4
1.4 1.11 2.11 2.12
Move regrind to IMM (contamination)
Automatic/Manual
Start-up and continuous
PT A 20 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE A - Injection Molding All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 5.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Color Management
A5.1
1.4 2.11 2.12
Pigment blending - percent loading, if applicable
Automatic/Manual
Start-up and continuous
A5.2
1.4 2.11 2.12
Color change procedure
Manual
Continuous
6.0
Molding Process
A6.1
1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up
Manual
Start-up and restart after long down time event
A6.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part style)
Manual
Start-up and restart and after long down time event
A6.3
1.4 1.15 2.11 2.12
Startup check (verify process settings against setup sheet)
Manual
At start-up, and after long down time event
A6.4
1.4 1.15 2.11 2.12
Startup check - Secondary Equipment (De-gate, assembly equipment, welders, etc.)
Manual
At start-up, and after long down time event
A6.5
1.4 1.15 2.11 2.12
Mold surface temperature
Automatic/Manual
Continuous if automatic, or at start-up and after down time event
A6.6
1.4 1.15 2.11 2.12
Plastication - Temperature (barrel, nozzle, hot manifold if applicable), Automatic screw RPM, and back pressure
PT A 21 of 79
Continuous
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE A - Injection Molding All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
A6.7
1.4 1.15 2.11 2.12
Plastication - Melt temperature
N/A
Start-up
A6.8
1.4 1.15 2.11 2.12
Plastication - Screw recovery time
N/A
Continuous
A6.9
1.4 1.15 2.11 2.12
Fill - Screw velocity or velocity profile
Automatic
Continuous
A6.10
1.4 1.15 2.11 2.12
Fill - Fill time and peak pressure
N/A
Continuous
A6.11
1.4 1.15 2.11 2.12
Hold - Hold pressure and hold time
Automatic
Continuous
A6.12
1.4 1.15 2.11 2.12
Hold - Cushion
N/A
Continuous
A6.13
1.4 1.15 2.11 2.12
Hold - Cavity pressure (if applicable)
N/A
Continuous
A6.14
1.4 1.15 2.11 2.12
Temperature Control Cooling - Coolant inlet temperature and cooling Automatic time
PT A 22 of 79
Continuous
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE A - Injection Molding All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
A6.15
1.4 1.15 2.11 2.12
Part weight (if applicable)
Manual
Once every 8 hours*
A6.16
1.4 1.15 2.11 2.12
First piece approval
Manual
Start-up, and restart after down time event
A6.17
1.4 1.15 2.11 2.12
Material purge/evacuation of barrel - included in unplanned and downtime procedures
Manual
End of run or long downtime
A6.18
1.4 1.15 2.11 2.12
Shut down procedures
Manual
End of production or run
7.0
Quality Control
A7.1
1.4 2.11 2.12
Part weight
Manual
Start-up and once every 4 hours. For safety critical parts, start-up and once every hour
A7.2
1.4 2.11 2.12
Dimensions
Manual
Per cavity, start-up and once every 8 hours
A7.3
1.4 2.11 2.12
Appearance (vs. boundary sample or per instruction)
Manual
Per cavity, start-up and once every 8 hours
A7.4
1.4 2.11 2.12
Physical properties (if applicable)
Manual
Per cavity, start-up and once every 8 hours
PT A 23 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
B1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity).
Once per lot
B1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
Manual
Once per lot
2.0
Storage & Handling
B2.1
1.4 2.3 2.11 2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
FIFO - per Lot Shelf life - pull for use
B2.2
1.4 2.11 2.12
Environment temperature and humidity controlled (if applicable)
Automatic
Continuous monitoring by controller or manual verification daily
B2.3
1.4 1.6 2.7 2.11 2.12
Partial container handling to ensure no contamination (closed container, clean environment)
Automatic/Manual
Continuous
B2.4
1.4 1.6 2.7 2.11 2.12
Partial container quantity
Automatic/Manual
Per container
3.0
Material Drying (If Applicable)
B3.1
1.4 2.11 2.12
Dryer temperature per resin manufacturer guidelines (per material)
Automatic
Start-up and continuous by controller
B3.2
1.4 2.11 2.12
Drying time per resin manufacturer guidelines (per material)
Manual
Start-up and once every 8 hours PT B 24 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
B3.3
1.4 2.11 2.12
Drying equipment (dryer dedicated or clean procedure in place)
Manual
Material change
B3.4
1.4 2.11 2.12
Dew point
Automatic
Continuous by controller
B3.5
1.4 2.11 2.12
Moisture content
Manual
Start-up and once every 8 hours
4.0
Recycle/Regrind Material (If Applicable)
B4.1
1.4 1.11 2.11 2.13
B4.2
Recycle ratio (per print, inspection standard or manufacturer guidelines). Verified by feed pressure, weight or volume. No regrind Automatic of fluorine-treated parts.
Once every 8 hours and at every part change-over
1.4 1.11 2.11 2.12
Regrind equipment (dedicated or cleaning procedure in place)
Manual
Material change
B4.3
1.4 1.11 2.11 2.12
Ethylene Vinyl Alcohol (EVOH) particle size and distribution
Manual
Start-up
B4.4
1.4 1.11 2.11 2.12
Fines management (de-dusting)
Automatic/Manual
Material change
B4.5
1.4 1.11 2.11 2.12
Prevention of contamination when transporting or feeding regrind to the blow mold machine
Automatic/Manual
Start-up and continuous
PT B 25 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 5.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Color Management (If Applicable)
B5.1
1.4 2.11 2.12
Pigment blending - percent loading
Automatic/Manual
Start-up and continuous
B5.2
1.4 2.11 2.12
Color change procedure
Manual
At color change
6.0
Molding Process
B6.1
1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up
Manual
Start-up and restart after long down time event
B6.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part quantity)
Manual
Start-up and restart and after long down time event
B6.3
1.4 1.15 2.11 2.12
Environment temperature for parison
Automatic
Continuous by controller or manual verification daily
B6.4
1.4 1.15 2.11 2.12
Verify molding machine settings including but not limited to barrel and die/head temperature settings, parison thickness or thickness profile, pre-blow pressure and time, blow air pressure and time, mold close speed and clamp pressure
Manual
Start-up and restart after long down time event
B6.5
1.4 1.15 2.11 2.12
Verify secondary equipment
Manual
Start-up and restart after long down time event
B6.6
1.4 1.15 2.11 2.12
Cooling water temperature and flow rate
Automatic/Manual
Continuous if automatic, or at start-up and after down time event.
PT B 26 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
B6.7
1.4 1.15 2.11 2.12
Verify post mold cooling temperature or pressure and time
Manual
Start-up
B6.8
1.4 1.15 2.11 2.12
First piece approval
Manual
Start-up, and restart after down time event
B6.9
1.4 1.15 2.11 2.12
Material purge/evacuation of barrel
Manual
End of run or long downtime
B6.10
1.4 1.15 2.11 2.12
Shut down procedures
Manual
End of production or run
7.0
Fluorine/Sulfination Treatment (If Applicable)
B7.1
1.4 1.15 2.11 2.12
Start-up check
Manual
Start-up and restart after long down time event
B7.2
1.4 1.15 2.11 2.12
Carrier gas
Automatic
Continuous
B7.3
1.4 1.15 2.11 2.12
Volume
Automatic
Continuous
B7.4
1.4 1.15 2.11 2.12
Treatment time
Automatic
Continuous
PT B 27 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
B7.5
1.4 1.15 2.11 2.12
Neutralization and wash cycle
Actual Condition
Monitoring Frequency
Minimum Requirement
Start-up and once every 8 hours
Manual
PT B 28 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment
Version 1, 3/2014
PROCESS TABLE B - Blow Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 8.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Quality Control
B8.1
1.4 2.11 2.12
Part weight
Manual
Start-up and once every 4 hours. For safety critical parts, start-up and once every hour
B8.2
1.4 2.11 2.12
Wall thickness (if applicable)
Manual
Start-up and once every 4 hours
B8.3
1.4 2.11 2.12
Dimensions
Manual
Start-up and once every 4 hours
B8.4
1.4 2.11 2.12
Appearance
Manual
Start-up and once every 4 hours
B8.5
1.4 2.11 2.12
Physical properties (if applicable)
Manual
Start-up and once every 4 hours
B8.6
1.4 2.11 2.12
Layer thickness and thickness uniformity - (multi-layer only)
Manual
Start-up and once every 24 hours. For safety critical parts, start-up and once every 8 hours
B8.7
1.4 2.11 2.12
Pinch-off integrity
Manual
Start-up and once every 24 hours. For safety critical parts, start-up and once every 8 hours
PT B 29 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Receiving Inspection
C1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity).
C1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
2.0
Manual
Storage & Handling
C2.1
1.4 2.3 2.11 2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife.
Automatic/Manual
C2.2
1.4 2.11 2.12
Environment contamination (dust) controlled (if applicable)
Automatic/Manual
PT C 30 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
C2.3
1.4 1.6 2.7 2.11 2.12
Environment humidity and temperature controlled (if applicable)
Automatic
C2.4
1.4 1.6 2.7 2.11 2.12
Partial containers handling to ensure no contamination (closed container, clean environment)
Automatic/Manual
C2.5
1.4 1.6 2.7 2.11 2.12
Plastic Sheet Stacking
Manual
3.0
C3.1
Forming Process 1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up PT C 31 of 79
Manual
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part quantity)
Manual
C3.3
1.4 1.15 2.11 2.12
Startup check (verify process settings against setup sheet)
Automatic / Manual
C3.4
1.4 1.15 2.11 2.12
Heating distance (between heater and sheet)
Manual
C3.5
1.4 1.15 2.11 2.12
Sheet heating time and temperature (heating cycle, intensity)
Manual
C3.6
1.4 1.15 2.11 2.12
Startup check - Secondary Equipment (trimming, assembly)
Manual
PT C 32 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.7
1.4 1.15 2.11 2.12
Sheet forming temperature per film supplier guidelines
Automatic/Manual
C3.8
1.4 1.15 2.11 2.12
Mold temperature per film supplier guidelines
Automatic/Manual
C3.9
1.4 1.15 2.11 2.12
Clamping frame closing pressure
Automatic
C3.10
1.4 1.15 2.11 2.12
Mold close speed
Automatic
C3.11
1.4 1.15 2.11 2.12
Plug temperature, start time and speed (if applicable)
Automatic
PT C 33 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.12
1.4 1.15 2.11 2.12
Sheet pre-stretching sequence and time (if applicable)
Automatic
C3.13
1.4 1.15 2.11 2.12
Vacuum level, start time, evacuation speed and duration
Automatic
C3.14
1.4 1.15 2.11 2.12
Pressure level, start time and duration (if applicable)
Automatic
C3.15
1.4 1.15 2.11 2.12
Cooling temperature and time
Automatic
C3.16
1.4 1.15 2.11 2.12
Ejection air (compressed) pressure and time
Automatic
PT C 34 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE C - Vacuum Forming All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
C3.17
1.4 1.15 2.11 2.12
First piece approval
Manual
C3.18
1.4 1.15 2.11 2.12
Shut down procedures
Manual
4.0
Quality Control
C4.1
1.4 2.11 2.12
Dimensions
Manual
C4.2
1.4 2.11 2.12
Appearance (vs. boundary sample or per instruction)
Manual
C4.3
1.4 2.11 2.12
Physical properties (if applicable)
Manual
PT C 35 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Once per lot
Once per lot
FIFO - per Lot Shelf life - pull for use
Continuous by controller or manual verification daily
PT C 36 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous by controller or manual verification daily
Continuous
Continuous
Start-up and restart after long down time event PT C 37 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up, and after long down time event
At start-up, and after long down time event
At start-up
At start-up
At start-up, and after long down time event
PT C 38 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up, and after long down time event
At start-up, and after long down time event
At start-up, and after long down time event
At start-up, and after long down time event
At start-up, and after long down time event
PT C 39 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up, and after long down time event
At start-up and every 8 hours
At start-up and every 8 hours
At start-up, and after long down time event
At start-up, and after long down time event
PT C 40 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE C - Vacuum Forming
etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Start-up, and restart after down time event
End of production or run
Per cavity, start-up and once every 8 hours Per cavity, start-up and once every 8 hours Per cavity, start-up and once every 8 hours
PT C 41 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Receiving Inspection
D1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity, temperature recording).
D1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
2.0
Manual
Compounding (if applicable)
D2.1
1.4 2.1 2.13
Purging all equipment and feeding system to avoid cross contamination.
D2.2
1.4 2.1 2.13
Process parameter verification: - For SMC, Doctor box blade height, glass chopper speed, additives, Manual carrier film speed, compaction pressure etc. - For rubber, mixer RPM, temperature, additives etc. PT D 42 of 79
Manual
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
D2.3
1.4 2.1 2.13
Glass fiber distribution and density verification(for SMC).
Manual
D2.4
1.4 2.1 2.13
Compound property verification when applicable: - For SMC, viscosity, initial sheet thickness etc. - For rubber preform, elongation, tensile strength, compression set, pre-cure rate, or rheology etc.
Manual
3.0
Storage & Handling
D3.1
1.4 2.11 2.12
Using a FIFO (First In - First Out) system for compound/preform, shelf life storage.
Manual
D3.2
1.4 2.11 2.12
Environment temperature and humidity for preform storage (if applicable).
Automatic
D3.3
1.4 2.11 2.12
Compound floor time (e.g.., sheet rolls in SMC and rubber compound).
Manual
PT D 43 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
D3.4
1.4 2.11 2.12
Prevention of contamination by lubricants such as silicone, mold release such as calcium carbonate or oil from the pressurization system.
Manual
D3.5
1.4 1.6 2.7 2.11 2.12
Partial containers handling to ensure no contamination (closed container, clean environment)
Automatic/Manual
D3.6
1.4 2.11 2.12
Sheet shrinkage confirmation (for SMC)
Manual
4.0
D4.1
Molding Process 1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up
PT D 44 of 79
Manual
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part style)
Manual
D4.3
1.4 1.15 2.11 2.12
Startup check (verify process settings against setup sheet)
Manual
D4.4
1.4 1.15 2.11 2.12
Cavity surface temperature verification
Automatic/Manual
D4.5
1.4 1.15 2.11 2.12
Verification of preform size, or shape, or both
Manual
D4.6
1.4 1.15 2.11 2.12
Verification of charge pattern (for SMC)
Manual
PT D 45 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.7
1.4 1.15 2.11 2.12
Cavity surface cleanliness (no debris)
Manual
D4.8
1.4 1.15 2.11 2.12
Mold closing speed
Automatic
D4.9
1.4 1.15 2.11 2.12
Cavity temperature
Automatic
D4.10
1.4 1.15 2.11 2.12
Post molding cooling (for SMC) - prevent deformation
Manual
D4.11
1.4 1.15 2.11 2.12
First piece approval
Manual
PT D 46 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
D4.12
1.4 1.15 2.11 2.12
5.0
Shut down procedure
Manual
Quality Control
D5.1
1.4 2.11 2.12
Part weight
Manual
D5.2
1.4 2.11 2.12
Dimensions
Manual
D5.3
1.4 2.11 2.12
Appearance
Manual
D5.4
1.4 2.11 2.12
Physical properties (if applicable)
Manual
PT D 47 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE D - Compression Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
PT D 48 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Once per lot
Once per lot
End of run or long downtime, material change At start-up, and after long down time event, material change
PT D 49 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Hourly
Per production lot
Pull for use
Continuous and manually verify daily
Pull for use PT D 50 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Every eight hours
Continuous
Per lot (just before use)
Start-up and restart after long down time event
PT D 51 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
At start-up
At start-up, and after long down time event
At startup and re-start
Each cycle
Each cycle
PT D 52 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Each cycle
Continuous
Continuous
Each cycle
Start-up, and restart after down time event
PT D 53 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
End of production or run
Start-up and once every 4 hours. For safety critical parts, start-up and once every hour Per cavity, start-up and once every 8 hours Per cavity, start-up and once every 8 hours Per cavity, start-up and once every 8 hours
PT D 54 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
BLE D - Compression Molding
tc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
PT D 55 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Receiving Inspection
E1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity, temperature recording).
E1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
2.0
E2.1
Manual
Compounding and Preforming (if applicable) 1.4 2.1 2.13
Purging all equipment and feeding system to avoid cross contamination.
PT E 56 of 79
Manual
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E2.2
1.4 2.1 2.13
3.0
Compound property verification when applicable - For rubber and one part epoxy; preform, elongation, tensile strength, compression set, pre-cure rate, or rheology etc.
Manual
Storage & Handling
E3.1
1.4 2.11 2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife.
Automatic/Manual
E3.2
1.4 2.11 2.12
Environment temperature and humidity for storage (if applicable).
Automatic
E3.3
1.4 2.11 2.12
Temperature control during shipment from material supplier to cold storage area in plant (if applicable i.e.; one part epoxies).
Automatic
PT E 57 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E3.4
1.4 2.11 2.12
Material container remains sealed during warm up to room temperature (supplier recommendation).
E3.5
1.4 2.11 2.12
Time exposed to room temperature when removed from cold storage area for production. Allowable usage time after room temperature is Automatic/Manual reached.
E3.6
1.4 1.6 2.11 2.12
Partial container handling to ensure no contamination (closed container, clean environment)
Automatic/Manual
E3.7
1.4 1.6 2.11 2.12
Partial container quantity
Automatic/Manual
4.0
Molding Process
PT E 58 of 79
Manual
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.1
1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up
Manual
E4.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part style)
Manual
E4.3
1.4 1.15 2.11 2.12
Startup check (verify process settings against setup sheet)
Manual
E4.4
1.4 1.15 2.11 2.12
Mold cavity temperatures; variation between each cavity and set temperatures
Automatic
E4.5
1.4 1.15 2.11 2.12
Verification of preform size, or shape, or both
manual
PT E 59 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.6
1.4 1.15 2.11 2.12
Plasticization - Temperature (resin chamber), Transfer Speed, and Transfer Pressure
Automatic
E4.7
1.4 1.15 2.11 2.12
Fill - Fill time and peak pressure
Automatic
E4.8
1.4 1.15 2.11 2.12
Hold - Hold pressure and hold time
Automatic
E4.9
1.4 1.15 2.11 2.12
Cure Time
Automatic
E4.10
1.4 1.15 2.11 2.12
Mold Closing speed
Automatic
PT E 60 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.11
1.4 1.15 2.11 2.12
Cavity surface cleanliness (no debris)
manual
E4.12
1.4 1.15 2.11 2.12
Pre-heat of components - If Insert molding required
Automatic
E4.13
1.4 1.15 2.11 2.12
Pre-heat of resin pellets or compound - If applicable (per manufacturers recommendations)
Automatic
E4.14
1.4 1.15 2.11 2.12
Hold - Cavity pressure (if applicable)
Automatic
E4.15
1.4 1.15 2.11 2.12
Part weight (if applicable)
Manual
PT E 61 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E4.16
1.4 1.15 2.11 2.12
First piece approval
Manual
E4.17
1.4 1.15 2.11 2.12
Shut down procedures
Manual
5.0
Quality Control
E5.1
1.4 2.11 2.12
Part weight
Manual
E5.2
1.4 2.11 2.12
Dimensions
Manual
PT E 62 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE E - Transfer Molding All requirements given below are subordinate to customer specific requirements.
The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify mo *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
E5.3
1.4 2.11 2.12
Appearance (vs. boundary sample or per instruction)
Manual
E5.4
1.4 2.11 2.12
Physical properties (if applicable)
Manual
PT E 63 of 79
Actual Condition
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Once per lot
Once per lot
End of run or long downtime, material change
PT E 64 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Per production lot
FIFO - per Lot Shelf life - pull for use
Continuous monitoring by controller or manual verification daily Continuous monitoring (i.e., by chart recorder)
PT E 65 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Time stamp on container from time out of cold storage to when container is opened Continuous monitoring by controller or manual verification
Continuous
Per Container
PT E 66 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Start-up and restart after long down time event
At start-up
At start-up, and after long down time event
Continuous, at start-up and after down time event.
Continuous
PT E 67 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
Continuous
Continuous
Continuous
Continuous
PT E 68 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Continuous
Continuous
Continuous
Continuous
Once every 8 hours*
PT E 69 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Start-up, and restart after down time event
End of production or run
Start-up and once every 4 hours. For safety critical parts, start-up and once every hour Per cavity, start-up and once every 8 hours
PT E 70 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
TABLE E - Transfer Molding
c. When performing the job audit, the auditor shall verify molder is conforming to customer requirements.
Monitoring Frequency
Minimum Requirement
Actual Condition
Per cavity, start-up and once every 8 hours Per cavity, start-up and once every 8 hours
PT E 71 of 79
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE F - Extrusion All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 1.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Receiving Inspection
F1.1
1.4 2.1 2.13
Incoming material assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (i.e., melt flow, specific Manual gravity).
Once per lot
F1.2
1.4 2.1 2.13
Incoming components assessment procedure, covering onsite testing or acceptance of supplier testing, with criteria (if applicable).
Manual
Once per lot
2.0
Storage & Handling
F2.1
1.4 2.11 2.12
Stock rotation system in place for First in/First out (FIFO) and shelflife
Automatic/Manual
FIFO - per Lot Shelf life - pull for use
F2.2
1.4 2.11 2.12
Environment temperature and humidity controlled (if applicable)
Automatic
Continuous monitoring by controller or manual verification daily
F2.3
1.4 1.6 2.11 2.12
Partial container handling to ensure no contamination (closed container, clean environment)
Automatic/Manual
Continuous
F2.4
1.4 1.6 2.11 2.12
Partial container quantity
Automatic/Manual
Per Container
PT F 72 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE F - Extrusion All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 3.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Material Drying (If Applicable)
F3.1
1.4 2.11 2.12
Dryer temperature per resin manufacturer guidelines (per material)
Automatic
Start-up and continuous by controller.
F3.2
1.4 2.11 2.12
Dryer time per resin manufacturer guidelines (per material)
Manual
Start-up and once every 8 hours
F3.3
1.4 2.11 2.12
Drying equipment (dryer dedicated or clean procedure in place)
Manual
Material change
F3.4
1.4 2.11 2.12
Dew point
Automatic
Continuous by controller
F3.5
1.4 2.11 2.12
Moisture content
Manual
Start up and once every 8 hours
Recycle ratio (per print, inspection standard or manufacturer guidelines). Verified by feed pressure, weight or volume.
Automatic
Once every 8 hours and at every part change-over
Regrind equipment (dedicated or cleaning procedure in place)
Manual
Material change
4.0
Recycle/Regrind Material (if Applicable)
F4.1
1.4 1.11 2.11 2.13
F4.2
1.4 1.11 2.11 2.12
PT F 73 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE F - Extrusion All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
F4.3
1.4 1.11 2.11 2.12
Fines management (de-dusting)
Automatic/Manual
Material change
F4.4
1.4 1.11 2.11 2.12
Prevention of contamination when transporting or feeding regrind to the extrusion machine.
Automatic/Manual
Start-up and continuous
5.0
Color Management (If Applicable)
F5.1
1.4 2.11 2.12
Pigment blending - percent loading
Automatic/Manual
Start-up and continuous
F5.2
1.4 2.11 2.12
Color change procedure
Manual
At color change
6.0
Extrusion Process
F6.1
1.4 1.15 2.11 2.12
There shall be a standardized startup procedure/checklist that defines things to do at start-up
Manual
Start-up and restart after long down time event
F6.2
1.4 1.15 2.11 2.12
Production plan (machine, mold, materials, part quantity)
Manual
Start-up and restart after long down time event
F6.3
1.4 1.15 2.11 2.12
Verify molding machine settings including but not limited to barrel and head/die temperature settings, screw speed, screw cooling temperature (if applicable), as well as settings for down stream processes
Manual
Start-up and restart after long down time event
F6.4
1.4 1.15 2.11 2.12
Verify secondary equipment
Manual
Start-up and restart after long down time event
PT F 74 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE F - Extrusion All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement
Actual Condition
Monitoring Frequency
Minimum Requirement
F6.5
1.4 1.15 2.11 2.12
Mold surface temperature
Automatic/Manual
Continuous if automatic, or at start-up and after down time event.
F6.6
1.4 1.15 2.11 2.12
Extrusion Head Pressure
Automatic
Start-up and continuous
F6.7
1.4 1.15 2.11 2.12
Vacuum level (if applicable)
Automatic
Start-up and continuous
F6.8
1.4 1.15 2.11 2.12
Coolant inlet temperature (if applicable)
Automatic
Start-up and continuous
F6.9
1.4 1.15 2.11 2.12
First piece approval
Manual
Start-up, and restart after down time event
F6.10
1.4 1.15 2.11 2.12
Material purge/evacuation of barrel - included in unplanned and downtime procedures
Manual
End of run or long downtime
F6.11
1.4 1.15 2.11 2.12
Shut down procedures
Manual
End of production or run
PT F 75 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE F - Extrusion All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. *If minimum requirements are not met, provide supporting records to justify actual conditions.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Type of Control
Minimum Requirement 7.0
Actual Condition
Monitoring Frequency
Minimum Requirement
Quality Control
F7.1
1.4 2.11 2.12
Thickness
Manual
Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every hour
F7.2
1.4 2.11 2.12
Layer thickness/thickness uniformity (multi-layer only)
Manual
Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every 4 hours.
F7.3
1.4 2.11 2.12
Layer adhesion (multi-layer only)
Manual
Per cavity, start-up and once every 8 hours. For safety critical parts, start-up and once every hour
F7.4
1.4 2.11 2.12
Dimensions
Manual
Per cavity, start-up and once every 8 hours
F7.5
1.4 2.11 2.12
Appearance (vs. boundary sample or per instruction)
Manual
Per cavity, start-up and once every 8 hours
F7.6
1.4 2.11 2.12
Physical properties (if applicable)
Manual
Per cavity, start-up and once every 8 hours
PT F 76 of 79
Actual Condition
Observation/ Comments
(Pass / Fail / N/A)
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE G - Equipment All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. * When historical results show capability, test frequency may be reduced.
Item #
Related Molding System Assessment Question #
1.0
Equipment Type
Injection Molding
Blow Molding
Vacuum Forming
Compression Molding
Transfer Molding
Extrusion
Verification Frequency
Calibration / Certification Frequency *
PROCESS EQUIPMENT
G1.1
2.14
Mold Temperature Controller
X
X
X
X
X
X
Once per shift
N/A
G1.2
2.14
Filters, if applicable
X
X
X
X
X
X
Once per month or per preventive maintenance
N/A
G1.3
2.14
Thermocouple
X
X
X
X
X
X
G1.4
2.14
Injection Mold Machine
X
G1.5
2.14
Mold
X
G1.6
2.14
Blow mold machine
G1.7
2.14
Vacuum molding machine
G1.8
2.14
Compression molding machine
G1.9
2.14
Extrusion machine
G1.10
2.14
Dryer
X
X
X
G1.11
2.14
Regrinder
X
X
X
G1.12
2.14
Hot Runner Controller
G1.13
2.14
G1.14 G1.15
Per Preventive Maintenance
Annual
Per Preventive Maintenance
Every 5 years
Per Preventive Maintenance
N/A
Per Preventive Maintenance
Every 5 years
Per Preventive Maintenance
N/A
Per Preventive Maintenance
N/A
X
Per Preventive Maintenance
Every 5 years
X
Per Preventive Maintenance
N/A
Per Preventive Maintenance
N/A
X
Per Preventive Maintenance
N/A
Cavity Pressure Sensor
X
Per Preventive Maintenance
N/A
2.14
Hydraulic Pressure Transducer
X
Per Preventive Maintenance
N/A
2.14
Valve Gate Controller, if applicable
X
Per Preventive Maintenance
N/A
X
X
X
X
X
X X X
X
X X
PT G 77 of 79
Included in Preventative Maintenance Plan
Comment
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE G - Equipment All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to customer requirements. * When historical results show capability, test frequency may be reduced.
Item #
Related Molding System Assessment Question #
2.0
Equipment Type
Injection Molding
Blow Molding
Vacuum Forming
Compression Molding
Transfer Molding
Extrusion
Verification Frequency
Calibration / Certification Frequency *
X
Per Preventive Maintenance
N/A
SECONDARY EQUIPMENT
G2.1
2.14
Generic fixtures (cooling, heat forming, if applicable)
X
X
G2.2
2.14
Conveyers
X
X
X
X
X
X
Per Preventive Maintenance
N/A
G2.3
2.14
Degater/Trim Operation
X
X
X
X
X
X
Per Preventive Maintenance
N/A
G2.4
2.14
Cutter
X
Per Preventive Maintenance
N/A
G2.5
2.14
Robot
X
Per Preventive Maintenance
At Installation
G2.6
2.14
Oven, if applicable
X
Per Preventive Maintenance
Annual
G2.7
2.14
Cooling Fan, if applicable
X
X
Per Preventive Maintenance
Annual
G2.8
2.14
End of arm tooling
X
X
X
X
X
X
X
X
X
X
X
X
X
Per Preventive Maintenance
N/A
X
X
Per lot
Annual
At start up and per shift
Every 6 months
Before each use
Annual
Before each use
Annual
At start up
Annual
MINIMUM REQUIRED TESTING CAPABILITY
3.0 G3.1
2.14
Cure Testing, if applicable
G3.2
2.14
Leak Testing, if applicable
X
G3.3
2.14
Color
X
G3.4
2.14
Gloss
X
G3.5
2.14
Weight
X
X
G3.6
2.14
Dimensions
X
X
X
X
X
X
At start up
Every 6 months
G3.7
2.14
Moisture
X
X
X
X
X
X
Per Manufacturer Guidelines
Every 6 months
G3.8
2.14
Performance, if applicable
X
X
X
X
X
X
Per Manufacturer Guidelines
Annual
X
X X X X
PT G 78 of 79
Included in Preventative Maintenance Plan
Comment
CQI-23
Special Processes: Molding System Assessment Version 1, 3/2014
PROCESS TABLE H - Part Inspection and Testing All requirements given below are subordinate to customer specific requirements. The customer may have additional requirements, e.g., inspection testing, greater frequencies, etc. When performing the job audit, the auditor shall verify molder is conforming to specifications or other requirements. Note that not all tests are applicable to all molding processes.
Item #
Related Molding System Assessment Question #
Category/Process Steps
Dimension, Weight, Appearance, 1.0
Monitoring Frequency
Minimum Requirement
General Dimensions Appearance Performance
H1.1
1.4 2.9
Procedures are in place to prevent damage to the finish or part during the inspection and packaging processes
100%
H1.2
1.4
Appearance (flash, color and gloss, short shots, splay/burns, blister, sink marks, gate vestige, and other molding defects) of the molding shall be verified per specification and applications manual
First off by quality and 100% by operator
H1.3
1.4
Cracks, Weld line/Knit lines, and Whitening/ stress mark
First off and last off
H1.4
1.4
Part identification
First off
H1.5
1.4
Manufacturing information
Daily Production Meeting Review
H1.6
1.4
Dimensional check (e.g., Go-no go, Plug and Ring gage)
First off and once per shift
H1.7
1.4
Wall thickness
Per process table
H1.8
1.4
General - Weight, Resin, Components, Porosity/Voids (if applicable)
First off
H1.9
1.4
Performance
Per customer specifications
H1.10
1.4
Environmental
Per customer specifications
PT H 79 of 79
Actual Condition
Observation/Comments
(Pass / Fail / N/A)