DATE : 06.11.02
REVISION : 00
TITLE : Job Safety Analysis Worksheet
Job Safety Analysis Worksheet Lembar Analisa Keselamatan Kerja Reference No.: No. Referensi:
Contract No.: No. Kontrak:
Division, Department / Contractor Company: Divisi, Departemen / Perusahaan Kontraktor:
COM-TS-TK-TKS Managers, coordinators, and supervisors
Title of Person who does Job: Jabatan orang yang Mengerjakan Pekerjaan: Job: Pekerjaan:
Production Line / Project: Lini Produksi / Proyek:
Telkomsel- TINEM Project
New / Activites Revision: Baru / Revisi Aktivitas :
New
Logistic, SITAC, CME, and Implementation Activity
Work Location: Lokasi Kerja:
Site RAGUKLAMPITAN (JPA024)
Date: Tanggal:
2-Aug-07 Signature / Tanda Tangan
Name, position and signature of the JSA team members. Nama, jabatan dan tanda tangan dari anggota tim JSA Hadi Suprayitno
:
CME Coordinator
(
Signature / Tanda Tangan
Name, position and signature of the person reviewed and approved: Nama, jabatan dan tanda tangan dari orang yang telah meninjau dan menyetujui:
Arief Wibisono yohanes ( Area manager Mid Java & DIY )
Distribution: Line Manager, Corporate Safety Distribusi: Manager Lini, Corporate Safety Scoring Table of Effect "E", Probability "P" and Frequency "F" Tabel Penilaian Akibat "E", Kemungkinan "P" dan Frekwensi "F" Scoring Penilaian
1 2 3 6 7 10 40
Risk Assessment Score "R" Angka Penilaian Risiko "R"
Effect "E" Akibat "E" Harm Luka
Probability "P" Kemungkinan "P" Unlikely Kecil kemungkinan
Sickness Sakit
Not normal Tidak biasa Possible Mungkin
Frequency "F" Frekwensi "F" Seldom (yearly) Jarang (setahun sekali) Sometimes (monthly) Kadang-kadang (sebulan sekali) Weekly Seminggu sekali Regularly (daily) Teratur (setiap hari)
Expected can happen Diperkirakan bisa terjadi Expected will happen Diperkirakan akan terjadi
Always Selalu Continuously Terus menerus
Serious invalidity Cacat berat Fatal Fatal Catastrophe Bencana
Basic Job Steps Langkah Dasar Pekerjaan
)
Potential Hazards Bahaya Potensial
E
P
F
R
a. Site Acquisition
- Community problem
7
10
2
19
b. Technical site survey
- neighbour problems that close with
7
6
1
14
7 3
6 6
1 1
14 10
6 6
1 1
10 10
3
1
11
R=E+P+F
R < 10
Low risk Risiko rendah Medium risk Risiko sedang
10 R < 19
High risk Risiko tinggi
19 R
Solutions / Risk Control Plans Solusi / Rencana Pengendalian Risiko
SITAC Activity
site
Use the right permit procedure, held on appropriate community sociallization, make sure that all problem which related with all CME work are clear before CME activity started.That problems including land and access clearing from tree
LOGISTIC Activity a. Material unloading
- Hit by fallen heavy material - twisted muscle
Use the right procedure and methods, use the relevant PPE Use the following Dop : - Ergonomic : ( Dop 06-16 )
a. Material unwraping -
- injured due too using tools
checking
- scratched by wraping wood
3 3
c. Material lifting
- hit by fallen materials and scratched
7
Author : BE Printed Date : 11/12/2013
- Loading and unloading : ( Dop 06-33 ) - Safety sign : ( Dop 06-46 ) Use The relevant PPE - Manual Handling : ( Dop 09-01 ) Use The relevant PPE
BE/027/Int/0095 1 of 12
DATE : 06.11.02
REVISION : 00
TITLE : Job Safety Analysis Worksheet Job Safety Analysis Worksheet (continued) Lembaran Analisa Keselamatan Kerja (lanjutan) Basic Job Steps Langkah Dasar Pekerjaan
Reference No.: No. Referensi: Potential Hazards Bahaya Potensial
E
P
F
R
Solutions / Risk Control Plans Solusi / Rencana Pengendalian Risiko
a. Site Survey
- Neighbour problem (near site)
b. soil test ( sondir and boring)
- Injury due to using tools
7 7
1 3
1 1
9 11
Use the right permit procedure and appropriate community sociallization Use the manual, use PPE, use the right methods
7 10 3
3 3 6
2 1 2
12 14 11
CME Activity Pre Reconstruction Requirments
Civil, Mechanical, Electrical works a. Tower Foundation construction - Exavation
- fall into exavation area - Hesped up by landslide - Exavation waste soil
use the right methods with appropriate supervision, provide a safety area signs Prepare a proper area for that soil exavation
- Steel bar reinforcement preparation
- Injury due to using tools
1
6
2
9
work carefully and use glove and safety shoes
- Formwork / Bekisting
- Injury due to using tools - Fall from height
3 7
6 3
2 1
11 11
work carefully and use glove and safety shoes, need appropriate supervision
- Concrete Pouring
- Injury due to using tools
3
1
1
5
Use the right methos, use glove, safety shoes, need appropriate supervision too
- Forms stripping and soil bacfilling
- Injury due to using tools
3
3
1
7
Use the right methos, use glove, safety shoes, need appropriate supervision too
10 10
10 10
1 1
21 21
Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear
10 10
10 10
1 1
21 21
Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear
10 10
10 10
1 1
21 21
Recommended to be done by quilified personals. Use the right methods and PPE need appropriate supervision work carefully, use helmet, make sure that erection area are clear
10 3 3
6 6 3
1 3 1
17 12 7
Avoid rainy when installation
- Injury due to using tools
3
3
1
7
- Injury due to using tools
3 7 10
1 3 1
1 1 1
5 11 12
- Injury due to using tools
1
3
1
5
- Shocked by Lightning
7
3
1
11
- Scratched
3
3
1
7
Work carefully and use safety glove
- Backfilling and soil compaction
- Injury due to using tools
- Fence construction
- Injury due to using tools - Injury due to using tools
3 3 3
1 1 1
7 5 5
Recommended check every single equipments, use the right methods, use safety shoes, gloves, prepare good skafolding
- Paving block Installation
3 1 1
b. Tower Construction - Tower erection
- Fall from height - hit by fallen materials
- Ascesorris Installation
- Fall from height - hit by fallen materials
- Tower painting
- Fall from height - hit by fallen materials - ahocked by lightning - Dehidration - Scratched
prepare dringkin water, Work carefully and use glove
c. Base frame construction - base frame foundation construct
work carefully, use the right methods and relevant PPE
d.Base Frame Installation - Base frame member installation
- Fall from height - Electric Shock when using bore tool
work carefully, use the right methods Recommended to be done by quilified personals. Use the right methods and relevant PPE
e. Grounding Installation - Tower, base frame and fence grounding
Check the equipment always, use the right methods Avoid working when rainy day
f. Fence, paving and Yard
Author : BE Printed Date : 11/12/2013
BE/027/Int/0095 2 of 12
DATE : 06.11.02
REVISION : 00
TITLE : Job Safety Analysis Worksheet
Job Safety Analysis Worksheet (continued) Lembaran Analisa Keselamatan Kerja (lanjutan)
Reference No.: No. Referensi:
Basic Job Steps Langkah Dasar Pekerjaan
Potential Hazards Bahaya Potensial
E
P
F
R
Solutions / Risk Control Plans Solusi / Rencana Pengendalian Risiko
f. KWH meter installation, and PLN
- Injury due to using tools
1
3
1
5
work carefully, and check every equipments that used
- Shocked by Electricity
10
10
1
21
Work carefully, recommended to not working at rainy day
- Fall from height
10
3
1
14
Use relevant PPE, prepare good stair
Connection
Author : BE Printed Date : 11/12/2013
BE/027/Int/0095 3 of 12
SITE ID : 0 SITE NAME : 0
HEALTH & SAFETY CHECKLIST Item Nr. Description I.
Risk Rating
Finding
Score
GENERAL
1001
Emergency call numbers displayed on site (police, hospital, fire brigade)
E
U
8
1002
Fire estinguisher is available on site (if required)
M
U
2
1003
First aid kit & First Aider is available on site
H
U
4
1004
Health & Safety related issues (e.g. accident/incident) has been reported to project management
H
U
4
1005
Health & Safety responsible person on site
H
U
4
1006
Risk assessment and job safety analysis (JSA) are conducted with appropriate control and submitted to NSN representatives and EPM system.
H
U
4
1007
Safety sign is available on site (signboards)
M
U
2
1008
Personnel on site has a copy or understand the objectives of Nokia Siemens Networks Health & Safety Policy
M
U
2
1009
Barriers to access the site have been erected.
H
U
4
H
U
4
H
N/A
H
U
1010 1011 1012
Team understands the Nokia Siemens Networks Safe working practices & procedures. Electromagnetic Radiation Hazards are known by personnel on site. Daily prestart briefing must be conducted prior to commencement of work activities.
Total Score General II.
4 38
SITE ACCESS
1101
Access by unauthorized persons to site is prevented.
H
U
4
1102
Access to site is in safe condition for every circumstances
M
U
2
1103
Designated walkpath routes free of tripping and sliping hazards
M
U
2
1104
Emergency exits are clearly visible and free of obstacles
M
U
2
1105
Access by unauthorized persons to site is prevented.
H
U
4
1106
Access lighting to BTS is working and sufficient
H
U
4
Total Score Site Access
November 2007
Observation
Print date: 11/12/2013
18
NSN-PSI-002 Health and Safety Inspection
SITE ID : 0 SITE NAME : 0
III.
PERSONNEL
1201
All personnel have undergone health assessment prior to work on site.
H
U
4
1202
Personnel on site must be fit to work
H
U
4
H
U
4
H
U
4
1203 1204
Personnel must be competent to perform work safely (Safety trained) Individuals are supervised according to their capabilities and the degree of risk of the task
1205
No underage workers employed
E
U
8
1206
General public individuals shall not be allowed on site without safety Induction or PPE.
H
U
4
1207
Personnel from other companies and contractors, not under the responsibility of the assessed subcontractor, shall be advised about the Safety requirements of working on site.
M
U
2
Total Score Personel IV.
30
WORKING TOOLS & EQUIPMENTS
1301
Hand tools are in good and safe condition
H
U
4
1302
Hand tools are used properly
M
U
2
1303
Machinery tools & rigging equipment are in good and safe condition
H
U
4
1304
Power tools are in good and safe condition
M
U
2
1305
Lifting equipment must be safe & checked prior to use.
H
U
4
Total Score Working Tools & Equipments V.
12
PERSONAL PROTECTIVE EQUIPMENT
1401
Personal Protective Equipment is standardize, functioning and maintained
H
U
4
1402
All personnel on site are using Hard Hat (helmet).
H
U
4
1403
All personnel on site are using Safety Shoes
H
U
4
E
U
8
H
U
4
1405 1406
All personnel working at height are using the full body harness per NSN specifictions. All personnel are using additional specific required PPE according to the work hazard
Total Score Personal Protective Equipment VI.
12
ANTENNA/FEEDER ACCESS
1501
Safe access to antenna & feeder and other are enabled
H
U
4
1502
Pole ladder reaching working height on antenna level
H
U
4
1503
Positions of safety systems (ladders, anchor points, platforms, and etc) is practical and safe for use
M
U
2
1504
Radiation meter on site.
H
N/A
1505
EMF Hazards are clearly marked on site.
M
N/A
Total Score ANTENNA/FEEDER ACCESS
November 2007
Print date: 11/12/2013
6
NSN-PSI-002 Health and Safety Inspection
SITE ID : 0 SITE NAME : 0 VII.
1601 1602 1603
MATERIAL HANDLING Appropriate storage system is in place Loading area is clearly defined, marked and free from obstacles. Site is clear from hazardous substances (or under controlled storage) in line with MSDS
M
U
2
M
U
2
M
U
2
Total Score Material Handling
6
122
SUMMARY OF INSPECTION SCORING
Item / Area
Maximum Score
Score
I.
GENERAL
42
38
II.
SITE ACCESS
18
18
III.
PERSONNEL
30
30
IV.
WORKING TOOLS & EQUIPMENTS
12
12
V.
PERSONAL PROTECTIVE EQUIPMENT
12
12
VI.
ANTENNA/FEEDER ACCESS
12
6
VII.
MATERIAL HANDLING
6
6
132
122
92%
A
B
B/A*100
OVERALL RATING
Total
Project Baseline Health & Safety Performance Indicator: Maximum of 30% of total score is acceptable
November 2007
Print date: 11/12/2013
NSN-PSI-002 Health and Safety Inspection
Observation
November 2007
Print date: 11/12/2013
NSN-PSI-002 Health and Safety Inspection
November 2007
Print date: 11/12/2013
NSN-PSI-002 Health and Safety Inspection
122
r: Maximum of 30% of total score is acceptable
November 2007
Print date: 11/12/2013
NSN-PSI-002 Health and Safety Inspection
DATE : 14.07.03
REVISION : 00
TITLE : Hazards Identification Sheet / Lembar Identifikasi Bahaya
P.T. SIEMENS INDONESIA
Hazards Identification Sheet Lembar Identifikasi Bahaya Reference No. : No. Referensi :
Contract No. No. Kontrak
GL - COM - TKS - 0001 - 00
: :
Division, Department / Contractor Company : Divisi, Departemen / Perusahaan Kontraktor :
COM - TKS
Production Line / Project : Lini Produksi / Proyek :
Telkomsel - National Region
Title of Person who does Job : Jabatan orang yang Mengerjakan Pekerjaan :
Managers, Coordinators, and Supervisors
New / Revision Baru / Revisi
: :
Revision - 01
: :
February 15, 2006
Job Pekerjaan
: :
Work Location : Lokasi Kerja :
Logistic, SITAC, CME, and Implementation Activity Date Tanggal
On site
Name, position and signature of the Hazards Identification team members. Nama, jabatan dan tanda tangan dari anggota tim Identifikasi Bahaya.
Signature / Tanda tangan
Moerhadi
:
QHSE Manager for Telkomsel
(
)
Didiet Priatmadji
:
Tinem OSP QHSE Officer
(
)
Atri Bolivar
:
Tinem BMN PM
(
)
Ishak Halim
:
Tinem OSP PM
(
)
Name, position and signature of the person reviewed and approved : Nama, jabatan dan tanda tangan dari orang yang telah meninjau dan menyetujui :
Distribution: Line Manager, Corporate Safety Distribusi : Manager Lini, Corporate Safety
( Herman Santoso ) COM Safety Representative
Scoring Table of Effect "E", Probability "P" and Frequency "F" Tabel Penilaian Akibat "E", Kemungkinan "P" dan Frekwensi "F" Scoring Penilaian
1
Effect "E" Akibat "E" Harm Luka
3 6 7 10 40
Serious invalidity Cacat berat Fatal Fatal Catastrophe Bencana Potential Hazards Bahaya Potensial
)
( K. H. Koesters GPM Tinem BMN
)
Risk Assessment Score "R" Angka Penilaian Risiko "R"
Probability "P" Kemungkinan "P" Unlikely Kecil kemungkinan
Not normal Tidak biasa Possible Mungkin
Frequency "F" Frekwensi "F" Seldom (yearly) Jarang (setahun sekali) Sometimes (monthly) Kadang-kadang (sebulan sekali) Weekly Seminggu sekali Regularly (daily) Teratur (setiap hari)
Expected can happen Diperkirakan bisa terjadi Expected will happen Diperkirakan akan terjadi
Always Selalu Continuously Terus menerus
2 Sickness Sakit
( Karsten Isenbeck GPM Tinem OSP
E
P
F
R
7
3
1
11
7
1
1
9
R=E+P+F
Low risk Risiko rendah
Medium risk Risiko sedang
High risk Risiko tinggi
R < 10
10 R < 19
19 R
Solutions / Risk Control Plans Solusi / Rencana Pengendalian Risiko
Machinery Permesinan
Soil Test - Sondir & boring
Define the right and safe place.
Excavation work : - Excavator back hoe
Author : BE Printed Date : 11/12/2013 187773339.xls.ms_office
Define the right and safe place, make sure the excavation area is clear.
Sheet / Lembar 10 / 12 BE/096/Int/0186 10 of 12
Concrete work : - Ready mix truck
3
1
1
5
- Ready mix pump
3
1
1
5
- Molen / Concrete mixing
3
1
1
5
- Vibrator
1
1
1
3
1 1
1 3
1 1
3 5
- Mattock/Hoe (cangkul) - Electric Drill (bor listrik)
1 3
6 3
1 1
8 7
- Tackle (katrol) - Electric Saw (gergaji listrik)
7 7
3 3
1 1
11 11
- Underbrush & rural area, far from town
1
3
1
5
- Hill, gulch area (bukit, jurang)
7
3
1
11
Work carefully, prepare first aid kit, safety sign, relevant PPE and provide JSA (if necessary).
- Work at hight / tower
10
10
1
21
Work Carefully, use safety harness and other relevant PPE, safety sign and provide JSA.
- Inside Shelter
3
1
1
5
- Machine operator (operator mesin)
7
3
1
11
License permit (SIM, if required), proper training and PPE.
- Tower erector
10
10
1
21
Proper training, provide right PPE.
- Shelter constructor - M&E installer - BTS installer - BTS inspector/troubleshooter - BTS commisioner
1 10 1 7 1
3 3 3 6 1
1 1 1 1 1
5 14 5 14 3
Work Carefully, use relevant PPE.
- Microwave installer - Microwave inspector/troubleshooter - Microwave commisioner
10 10 10
6 6 3
1 1 1
17 17 14
Work Carefully, use safety harness, safety shoes, gloves.
- Survery (SITAC / CME)
3
6
1
10
Health check, personal medication, provide appropriate communication equipment, transportation and first aids.
- Sondir & Boring
7
3
1
11
Work Carefully, check Equipment, right technique.
- Tower foundation excavation
10
6
1
17
Check equipment, right technique, work carefully, safety signs and provide relevant PPE.
- Tower erection
10
10
1
21
Done by qualified personnel, provide safety signs, safety harness and other relevant PPE.
- Shelter installation
1
3
1
5
- M&E installation - Fencing & Paving block installation
10 1
3 3
1 1
14 5
Supervise, define the right and safe place.
Maintenance, define the right and safe place.
Other: - Compactor - Genset
Maintenance, define the right and safe place.
Equipment Perlengkapan
Check Equipment, routine maintenance.
Workplace Tempat Kerja
Appropriate communication equipment and transportation, local information briefing, provide JSA (if necessary).
Use relevant PPE, safety sign and provide JSA.
Workers Pekerja
Work Pekerjaan
Author : BE Printed Date : 11/12/2013 187773339.xls.ms_office
Work Carefully, Check Equipment, right technique, safety signs.
Sheet / Lembar 11 / 12 BE/096/Int/0186 11 of 12
- BTS installation - BTS inspection/troubleshooting
1 7
3 6
1 1
5 14
- BTS commisioning
1
1
1
3
- Microwave installation - Microwave inspection/troubleshooting
10 10
6 6
1 1
17 17
- Microwave commisioning
10
3
1
14
- Material Storage
1
6
1
8
Provide segregate area for storage, safety signs.
- Handling of waste
1
6
1
8
Provide waste disposal box and label it, keep the area always clean.
Work Carefully, Check Equipment, right technique.
Housekeeping Housekeeping
Author : BE Printed Date : 11/12/2013 187773339.xls.ms_office
Sheet / Lembar 12 / 12 BE/096/Int/0186 12 of 12
View more...
Comments