CUSTOMER GASCO PLANT LOCATION RUWAIS ABU DHABI GAS INDUSTRIES LTD. (GASCO)
PROJECT RUWAIS 4th NGL TRAIN
PROJECT No. 5248
Agreement No. 13524801
Doc. No. 5248-00-FA-4049 5248-00-FA-4049
EARLY WORKS CONSTRUCTION INTERFACE PLAN
Rev. 1
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
Table of Cont ent s 1.
INTRODUCTION .............................................................................................................3 1.1 Purpose.................................................................................................................3 Purpose.................................................................................................................3
1.2 1.3 1.4 1.5 1.6 1.7
Objective..............................................................................................................3 Objective..............................................................................................................3 Definitions and Abbreviations ..............................................................................3 Scope....................................................................................................................4 Scope ....................................................................................................................4 References ...........................................................................................................4 Responsibilities ....................................................................................................5 Correspondence ...................................................................................................6
2.
LIST OF CONTACTS.......................................................................................................6
3.
GASCO – PROJECT MANAGEMENT TEAM......................................................................6
4.
GASCO – MAJOR PROJECTS GROUP .............................................................................7
5.
CONTRACTORS CONTRACTORS E&P / SUPPORT UPPORT LOCATI L OCATIONS ONS...............................................................7
5.1 5.2
Seoul.....................................................................................................................7 Seoul .....................................................................................................................7 Abu Dhabi .............................................................................................................7
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
1.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
INTRODUCTION
1. 1
PURPOSE
The purpose of t his plan is i s t o outl out l i ne CO CONTRA TRACTOR TORS maj or i nt erf aces wit wi t h other ot her Companies, Companies, Governmental Bodies and Entities required during the execution of the NGL4 Works on the Ruwais Facilit acil it y sit sit e and and the t he buil buil ding and and operat operat ion of t he Proj Proj ect Camp.
1. 2
OBJECTIVE
The The plan identi f ies t he nam names es of t he maj maj or int erf ace ace pa part rt ies, ies, brief scope cope an and d reason reason for t he interface plus the interface contact details. This document will be treated as a live plan which will be maintained and up dated as necessary.
1. 3
DEFINITIONS AND ABBREVIATIONS
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
1. 4
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
SCOPE
This plan pl an addresses addresses t he maj or i nt erf aces requi red t o support support CONTRA TRACTOR TORS scope execut ion as agreed under the Contract. The scope in broad terms will cover the following categories:
The The locati on and and C Cam amp p cons const ruct ion / ope operat rat ion. Security Access to the Ruwais Facilities for manpower, plant, equipment and materials. GASCO cont r oll ed areas wit wi t hin hi n the t he Ruwais Ruwais Facil Facil it y Ot her St akeholders akeholders wit hin t he Ruwais Facilit acil it y e.g. Takreer, Borouge, orouge, et c. CONTR NTRAC ACTO TOR R Operat per at i ons wit wi t hin hi n t he R Ruwai uwais s Facil aci l i t y Ot her Con Contt ract ors
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
1. 6
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
RESPONSIBILITIES
1.6.1 1.6. 1 Const onst ruct ion Dir ector ect or Contractors Construction Director will be the main contact and focal point for all int erf aces wit wi t h the t he CO COMPANY onsit onsit e represent represent atives at ives.. He is the f ocal ocal point of t he site and responsible for all the Construction activities on the site. He will ensure t his procedure procedure is implement implemented ed on on t he Proj Proj ect. 1.6. 1. 6.2 2 Const onst ruct i on Manager anager Will be responsible for the execution of works associated with the Temporary Facil aci l i t i es incl uding udi ng t he C Camp amp t hrough hr ough t he designat ed SUB SUBC CONTR NTRAC ACTO TOR RS.
1.6. 1. 6.3 3 Const onst r uct i on Int erf ace Manager anager (CIM (CIM)) Will be the main contact and focal point for all CONTRACTOR interfaces. The CIM will be tasked with ensuring all the necessary documentation has been identified,
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
1.6. 1. 6.6 6 COMPAN ANY Y Int erf er f ace Coordi oor dinat nat or Wi l l provi de ass assi st ance t o t he CO CONTRA TRACTOR TORS CIM on all i nt erf ace mat t ers. 1. 7
CORRESPONDENCE
Al l off ici al corres corr esponde pondence, nce, bot both h in i n and out wil l be t hrough hrough t he CO CONTRA TRACTOR TOR’ S designated designated representative – The Construction Director.
2.
LIST OF CONTACTS
At t achment A is a li st ing of t he personnel and cont act det ail s where wher e CO CONTRAC TRACTOR TOR has ident ident if ied an interf ace ace requiremen requirementt .
3.
GASCO – PROJECT MANAGEMENT TEAM
The CO CONTRAC TRACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace wi w i t h t he PRO PROJEC JECT MAN MANAG AGE EMENT TEAM TEAM t ypi call cal l y
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
4.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
GASCO – MAJOR PROJECTS GROUP
The CO CONTRAC TRACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace w wii t h MAJO MAJOR R PROJEC JECTS GROUP t ypical ypi calll y on t he following but not limited to: 1. Access ccess t o t he C CO OMPAN ANY Y Exis xi st ing Operat Operat i ng Facil Facil i t ies – pers per sonnel, plant pl ant and equipment 2. Access ccess t o operat i onal areas ar eas such as Trains Trai ns 1,2 1, 2 & 3 3. Ass Assi st ance f or Securi ecur i t y of CONTRAC TRACTO TOR RS Areas wit wi t h rel r elat at i on t o GAS GASCO plant 4. H2S monit ori ng 5. HSE Induct Induc t i ons 6. Permit to work system 7. Vehicl e Checks Checks f or compl i ance wit h GA GASCO requi r ement s 8. Early work demoli demoli t ion isolat isolat ions
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
6.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
SUBCONTRACTORS
CONTRAC NTRACTOR TOR wi l l have a number numb er i nt erf er f aces wit wi t h key SUB SUBC CONTRAC ACTOR TORS per f ormi or ming ng the t he execution of part of the Works in accordance with Contract requirements. They will be fully supervised, controlled and they will comply with all the Contract requirements. The maj maj or SU SUBCONTRA TRACTS t ypicall ypi call y wil wi l l be as f oll ows but not l i mit mi t ed t o: 1. Pioneer Camp 2. Sit e Temporar Temporary y Facil Facil it ies and and Earl Early y Works Works 3. Topo & Geot Geot ech Sur Surveys veys 4. Civil & Buildings 5. Mechanical echani cal – t wo (2) : East ast and Wes Westt Scope spl splii t 6. E&I
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
8.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
CNIA
The CONTRACTOR will require to interface with CNIA typically on the following but not limited to: 1. CONTRAC ACTO TOR R’ S camp l ocat i on appr app r oval 2. CONTRAC ACTO TOR R’ S per sonnel oil oi l f i eld el d passes passes 3. CONTRAC ACTO TOR R’ S vehi cl e oil oi l f i eld el d passes passes 4. CONTRAC ACTO TOR R’ S camer came r a oil oi l f i eld el d passes passes 5. CONTRAC TRACTO TOR R’ S designat ed camera camer a / phot ographer s oil oi l f i eld el d pass passes
9.
POLICE
The CO CONTRA TRACTOR TOR wil l require requi re t o int erf ace wit h PO POLIC LICE E t ypicall y on t he foll f oll owing but not
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
11. 11 .
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
HEALTH AUTHORITY ABU DHABI
The CONTRACTOR will require to interface with HAAD typically on the following but not limited to: 1. HAAD will be inspecting and provide approvals on the use of the completed Clinic in the Camp. 2. HAAD will be inspecting and provide approvals on the use of the completed Clinic in the Site Temporary Facilities. 3. HAAD has t o app approve rove any medical medical personnel personnel t o be used used on the t he P Proj roj ect (t ypicall y doctors doct ors and nurses).
12. 12 .
HOSPITAL(S)
CONTRAC TRACTOR TOR wil wi l l est est abli sh arr ang angement ement s wit wi t h bot h local l ocal hospit als and Abu Abu Dhabi Dhabi Ci Ci t y hos hospit als f or use use in case case of emergen emergency cy sit sit uat uat ions during the t he li f e of t he Proj Proj ect.
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
6. Installation of the new HP Flare line under the existing lines which run to the TAKREER jetty 7. Permits to work 8. Cooling ooli ng wat water er works All the above will require utilization of the TAKREER PTW system. All necessary personnel will be trained accordingly in advance of any work.
15. 15 .
BOROUGE
The CO CONTRAC TRACTOR TOR wil wi l l r equir e t o int erf ace wit h BO BOROUGE t ypicall ypi call y on the t he fol f olll owing owi ng but not limited to: 1. Transportation of permanent equipment received via the Ruwais Port, through, adj acent acent or over t he Boroug Borouge e exist exist ing facil faci l it ies – depending depending upon upon the t he fi nal agreed agreed Ruwa uwais is Fac Facilil it y int i nterna ernall rout ing.
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD.
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
1. Equipment , columns and vess vessels shipment shipment s to t he port . 2. Offloading 3. Transportation to site
19. 19 .
ABU DHABI PORT AUTHORITY
The CO CONTR NTRAC ACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace wi t h ABU ABU DHA DHAB BI POR PORT AUTHO AUTHOR RITY typi t ypical calll y on the following but not limited to: 1. Port or t pass passes 2. Cust ust oms clear cl earance ance 3. Onward shippi hip ping ng to to R Ruwais uwais where wher e necess necessary
20
AIRPORT(S)
th
RUWAIS 4 NGL TRAIN
GASCO
Petrofac GS CONTRACTOR
CONSTRUCTION INTERFACE PLAN Agreement No. 13524801
ABU DHABI GAS INDUSTRIES LTD. 1.
23. 23 .
Doc. No. . 5248-00-FA-4049 5248-00-FA-4049
Rev. 1
Advise dvise and and seek seek approvals approvals f or overl and mat materi eri al / equipment shipment s class classif ied as ODCs.
ETISALAT
The CONTRACTOR will require to interface with ETISALAT typically on the following but not limited to: 1. Supply uppl y of t he IT and Communicat Communicat ions connecti connect i vit y f or t he JV and GA GASCO Camp. 2. Supply of t he IT and Communicat ommunicat ions connect connect ivi t y for f or t he Sit e Temporary Temporary Facil Facilit it ies.
24. 24 .
VENDORS
The CO CONTRA TRACTOR TOR wil wi l l requi r e tto o int erf ace wit h V VE ENDORS t ypicall ypi call y on the t he foll f oll owing owi ng but not limited to: 1. Vendors required assisting construction in the physical completion of systems ready for t urnover t o Pr e-Commiss e-Commissioni ioni ng / Commissioni ommissioni ng.
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Company GASCO PMT
GASCO RUWAIS ( EU )
CONTRACTOR - Seoul ( Petrofac )
Last Update : 17th Dec 2009
Contact Name
Designation
Office Telephone
Raafat Fayek
Major Projects manager (Ruwais) (Ruwais) Not Available
Abdul Aziz Al Badi
SR.Project Manager
Assaad Abdallah
Project Coordinator
Jose Luis Gameiro
Project Manager
Bob Al Borzi
Project Manager
Hisham Mansour
Project Manager
Firose Hassan
Secretary
A. Moussa
Major Projects Co-ordination Department Superintendent
Cyril Pereira
Senior Operations Engineer
Kurt Reeves
Project Director
Mobile
Email Address
0097 009715 150 0 - 61 38 38 734 734
fayek fayek.r .raa aafa fat@ t@ru ruwa wais is3n 3ngl gl.a .ae e
Not Available Not Available Not Available Not Available Not Available Not Available
0097 009715 150 0 - 4443 444360 608 8
alba albadi di@g @gas asco co.a .ae e
Not Available Not Available +82 2 2005 8493
0097 009715 150 0 - 6227 622749 495 5
aabd aabdal alllah@g ah@gas asco co.a .ae e
0097 009715 150 0 - 6689 668969 690 0
jlga jlgame meiiro@g ro@gas asco co.a .ae e
0097 009715 150 0 - 6412 641214 140 0
bbor bborzi zi@g @gas asco co.a .ae e
0097 009715 150 0 - 8121 812179 798 8
hish hisham am.m .man anso sour ur@a @aje jes. s.ae ae
0097 009715 150 0 - 57258 5725868 68
firo firos. s.ha hass ssan an@r @ruw uwai ais3 s3ng ngl. l.ae ae
0097150-4152770
[email protected]
0097150-6721765
cperei reira@ga @gasco.ae
+971 50 633 6196
[email protected]
Christopher Joyce
Project Controls Manager
+82 2 2005 8491
[email protected]
Vivek Tandon
Lead Project Coordinator - Mech.
+82 2 2005 8400
[email protected]
Utkarsh D.Kulkarni
Senior Engineer - Process
+82 2 2005 8429
[email protected]
N.S.S. Venkateswaran Kiran Sheth
Principal Engineer - Instrument
+82 2 2005 8424
Principal Engineer - Electrical
+82 2 2005 8425
[email protected] om
[email protected]
S.Thilagaraj
Project Procurement Manager
+82 2 2005 8428
[email protected] om
Prasad Pradhan
Senior Buyer
+82 2 2005 8432
[email protected]
Poulose Moolan
Project Engineer
+82 2 2005 8433
[email protected]
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Company
Last Update : 17th Dec 2009
Contact Name
Designation
Office Telephone
Mobile
Email Address
T.Chandra
Lead Engineer - Civil
+82 2 2005 8419
[email protected]
Umerfarook Deshmukh
Planning Engineer
+82 2 2005 8418
Umerfarook.Deshmukh@petrofac. com
V. Saibaba
Project Manager
+82 2 2005 8974
[email protected]
Sardana Yuvraj
Interface Manager
+82 2 2005 8402
[email protected]
Bachir Chaaya
Junior Project Engineer
+82 2 2005 8421
Vijaykumar Nair
Lead Document Controller
+82 2 2005 8417
Pradeep Agrawal
Project Accountant
+82 2 2005 8430
Deputy Project Director
+82 2 2005 7200
Bachir.Chaaya@petrofacemirates. ae Nair.Vijaykumar@petrofacemirate s.ae
[email protected]
+82 2 2005 8430 CONTRACTOR - Seoul (GS )
Tom Yu
[email protected]
Deputy Site Manager
+82 2 2005 7240
+82 19 334 3135
[email protected]
Soo-Kang Shim
Construction Planner-1
+82 2 2005 7291
+82 10-8634-8537
[email protected]
Jung-Ho Lee
Construction Planner-2
+82 2 2005 7243
+82 10 2834 8288
[email protected]
Yong-Kyu Lee
Discipline SI (CSA)
Chan-Hee Chang
+82 2 728 1264
+82 11 9558 4946
[email protected]
Discipline SI (Mechanical)
+82 2 2005 7249
+82 11 788 4853
[email protected]
Yoon-Tae Kim
Discipline SI (Piping)
+82 2 2005 7285
+82 11 363 7912
[email protected]
Eun-Kyun Shin
Discipline SI (Instrument)
+82 2 2259 3467
+82 10 6600 4302
[email protected]
Myung-Ha Kim
Discipline SI (QA/QC)
+82 2 2259 5131
Duk-In Eum
Robert Berry Hee-Byum No
CONTRACTOR - Abu Dhabi
+82 10 5898 5505
Milad Azar
[email protected]
HSSE Manager
+82 2 2005 9915
+82 10 2901 2251
[email protected]
Project Procurement Manager
+82 2 2005 8403
+82 10 8752 3136
[email protected]
Commercial & Contract Manager
+971 2 656 1107
[email protected]
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Company
Last Update : 17th Dec 2009
Contact Name
Designation
Dick Dick Cunn Cunnin ingh gham am
Dire Direct ctor or Con Const stru ruct ctio ion n Sup Suppo port rt
Archana Matte
Project Secretary
+971 2 656 1026 +971 2 656 1078
Mobile
Email Address Dick.Cunningham@petrofacemirat es.ae Archana.Matte@petrofacemirates. ae
Gopala Goud
S/C Project Engineer
+971 2 656 1008
[email protected]
Altaf Khan
Dy. Project Director
+971 2 656 1014
[email protected]
Avi Avina nash sh Gosav osavii
Proj rojects ects & Cons Consttruct ructio ion n Sup Support port Manager Admin. Manager
Dineshkar Singh Katoch Nigel Butler
Sub Contracts Manager Contracts Engineer
+971 2 656 1036
[email protected]
+971 2 656 1038
[email protected]
+971 2 656 1076
[email protected]
+971 2 656 1113
Jeganathan.Kumaresan@petrofac .com
[email protected]
Jeganathan Kumaresan Kaly Kalyan ana a Kum Kumar ar T.
Seni Senior or Plan Planni ning ng Engi Engine neer er
+971 2 656 1052
Rohit Bakshi
Senior QA Engineer
+971 2 656 1053
[email protected]
Roy Hanks
Construction Director
+971 2 656 1086
[email protected]
Brow Brown n Vij Vijay ay Kuma Kumarr
Depu Deputy ty Mana Manage gerr - Log Logis isti tics cs
+971 6 518 4590
[email protected]
Brian Stewart
HSSE Manager
+971 2 656 1061
[email protected]
+971 2 656 1017
[email protected]
+971 2 656 1068
Muhammad.Khan@petrofacemirat es.ae
Marc Taylor (Support Procurement Manager Member) Muhammad Khan Finance Manager (Support Member)
SUBCONTRACTORS
Office Telephone
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Last Update : 17th Dec 2009
Company
Contact Name
Designation
Office Telephone
Mobile
Email Address
CB&I
Naaman M Farah
CB&I Project Manager
Not Available
0097 009715 150 0 - 6587 658763 637 7
nfar nfarah ah@C @CB BI.co I.com m
Nael Salloum
General Services Manager
Not Available
0097 009715 150 0 - 4569 456961 613 3
nsal nsallloum@ oum@C CBI. BI.com com
DODSAL
Ezzat Aziz
Construction Manager
Not Available
0097 009715 150 0 - 457 45768 6866 66
ezza ezzat. t.fa fahm hmy@ y@do dods dsal aldx dxb. b.ae ae
ACC
Nabil Karmi
Tech & Commercial Manager
02 - 4109810
Tony Shaheen
Project Manager
02 - 4109810
050 6125502
[email protected]
Chehade M. Zinati
Tender & Estimate Manager
02 - 6771225
050 6610078
[email protected]
050 7318516
[email protected]
IMECO
Souhel Salloum Anil Ramachandran
Head of Tendering Tendering Engineer
02 - 6444700 02 - 6440445
CNIA POLICE
Gayathi
02 - 8082300
MUNICIPALITY
Madina Zayed Office
02 - 8988888
Abu Dhabi
02 - 6777929
HEALTH AUTHORITY ABU DHABI HOSPITAL(S)
Ruwais Adnoc Al Mafrak Musaffah
02 - 6022340 02 - 5823100
[email protected]
050 7125604
[email protected]
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Company
Last Update : 17th Dec 2009
Contact Name
Designation
Al Noor, AD
Office Telephone
Mobile
02 - 67272222
Central Hospital, AD
02 - 621 46666
Al Jazira, AD
02 - 6214800
NMC, AD
02 - 6332255
Emergency CIVIL DEFENCE
Madina Zayed Office
TAKREER
Sharif Abd El-Rahma
998 02 - 88440004 Engineering Development Section Head
Cyril Prem Kumar
BOROUGE IRSHAD ADNOC RUWAIS PORT ABU DHABI PORT AUTHORITY AIRPORT(S)
Email Address
Norman Grant
Construction Manager
Sultan Al Shehhi
Sr. Project Manager
0097150-4152770
ssharif@ rif@ttakree reer.c r.com
Not Available
0097150-5986504
[email protected]
Not Available
Not Available
[email protected]
Not Available
0097 009715 1500-61 6166 6686 868 8
sult sultan an.a .allsheh shehhi hi@b @bor orou ouge ge..com com
Not Available
GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population
Company
Last Update : 17th Dec 2009
Contact Name
Designation
Office Telephone
Mobile
Email Address
Abu Dhabi Dubai ABU DHABI ELECTRICITY & WATER AUTHORITY TRAVEL POLICE DEPARTMENT
Police HQ, AD
02 - 446 1461 02 - 808 2300
Emergency ELIXER
ETISALAT VENDORS LOCAL SUPPLIERS
02 - 4461461
999
Ahmed Habib
Ruwais Plant Manager
Not Available
0097 009715 150 0 - 615 61509 0932 32
Ahme Ahmed. d.Ha Habi bib@ b@el elix ixie ier. r.ae ae
Froilan Manez
Senior Engineer
Not Available
Not Available
[email protected]