CUSTOMER GASCO PLANT LOCATION RUWAIS ABU DHABI GAS INDUSTRIES LTD. (GASCO)

PROJECT RUWAIS 4th NGL TRAIN

PROJECT No. 5248

Agreement No. 13524801

Doc. No. 5248-00-FA-4049 5248-00-FA-4049

EARLY WORKS CONSTRUCTION INTERFACE PLAN

Rev. 1

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

Table of Cont ent s 1.

INTRODUCTION .............................................................................................................3 1.1 Purpose.................................................................................................................3 Purpose.................................................................................................................3

1.2 1.3 1.4 1.5 1.6 1.7

Objective..............................................................................................................3 Objective..............................................................................................................3 Definitions and Abbreviations ..............................................................................3 Scope....................................................................................................................4 Scope ....................................................................................................................4 References ...........................................................................................................4 Responsibilities ....................................................................................................5 Correspondence ...................................................................................................6

2.

LIST OF CONTACTS.......................................................................................................6

3.

GASCO – PROJECT MANAGEMENT TEAM......................................................................6

4.

GASCO – MAJOR PROJECTS GROUP .............................................................................7

5.

CONTRACTORS CONTRACTORS E&P / SUPPORT UPPORT LOCATI L OCATIONS ONS...............................................................7

5.1 5.2

Seoul.....................................................................................................................7 Seoul .....................................................................................................................7 Abu Dhabi .............................................................................................................7

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

1.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

INTRODUCTION

1. 1

PURPOSE

The purpose of t his plan is i s t o outl out l i ne CO CONTRA TRACTOR TORS maj or i nt erf aces wit wi t h other ot her Companies, Companies, Governmental Bodies and Entities required during the execution of the NGL4 Works on the Ruwais Facilit acil it y sit sit e and and the t he buil buil ding and and operat operat ion of t he Proj Proj ect Camp.

1. 2

OBJECTIVE

The The plan identi f ies t he nam names es of t he maj maj or int erf ace ace pa part rt ies, ies, brief scope cope an and d reason reason for t he interface plus the interface contact details. This document will be treated as a live plan which will be maintained and up dated as necessary.

1. 3

DEFINITIONS AND ABBREVIATIONS

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

1. 4

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

SCOPE

This plan pl an addresses addresses t he maj or i nt erf aces requi red t o support support CONTRA TRACTOR TORS scope execut ion as agreed under the Contract. The scope in broad terms will cover the following categories:













The The locati on and and C Cam amp p cons const ruct ion / ope operat rat ion. Security Access to the Ruwais Facilities for manpower, plant, equipment and materials. GASCO cont r oll ed areas wit wi t hin hi n the t he Ruwais Ruwais Facil Facil it y Ot her St akeholders akeholders wit hin t he Ruwais Facilit acil it y e.g. Takreer, Borouge, orouge, et c. CONTR NTRAC ACTO TOR R Operat per at i ons wit wi t hin hi n t he R Ruwai uwais s Facil aci l i t y Ot her Con Contt ract ors

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

1. 6

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

RESPONSIBILITIES

1.6.1 1.6. 1 Const onst ruct ion Dir ector ect or Contractors Construction Director will be the main contact and focal point for all int erf aces wit wi t h the t he CO COMPANY onsit onsit e represent represent atives at ives.. He is the f ocal ocal point of t he site and responsible for all the Construction activities on the site. He will ensure t his procedure procedure is implement implemented ed on on t he Proj Proj ect. 1.6. 1. 6.2 2 Const onst ruct i on Manager anager Will be responsible for the execution of works associated with the Temporary Facil aci l i t i es incl uding udi ng t he C Camp amp t hrough hr ough t he designat ed SUB SUBC CONTR NTRAC ACTO TOR RS.

1.6. 1. 6.3 3 Const onst r uct i on Int erf ace Manager anager (CIM (CIM)) Will be the main contact and focal point for all CONTRACTOR interfaces. The CIM will be tasked with ensuring all the necessary documentation has been identified,

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

1.6. 1. 6.6 6 COMPAN ANY Y Int erf er f ace Coordi oor dinat nat or Wi l l provi de ass assi st ance t o t he CO CONTRA TRACTOR TORS CIM on all i nt erf ace mat t ers. 1. 7

CORRESPONDENCE

Al l off ici al corres corr esponde pondence, nce, bot both h in i n and out wil l be t hrough hrough t he CO CONTRA TRACTOR TOR’ S designated designated representative – The Construction Director.

2.

LIST OF CONTACTS

At t achment A is a li st ing of t he personnel and cont act det ail s where wher e CO CONTRAC TRACTOR TOR has ident ident if ied an interf ace ace requiremen requirementt .

3.

GASCO – PROJECT MANAGEMENT TEAM

The CO CONTRAC TRACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace wi w i t h t he PRO PROJEC JECT MAN MANAG AGE EMENT TEAM TEAM t ypi call cal l y

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

4.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

GASCO – MAJOR PROJECTS GROUP

The CO CONTRAC TRACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace w wii t h MAJO MAJOR R PROJEC JECTS GROUP t ypical ypi calll y on t he following but not limited to: 1. Access ccess t o t he C CO OMPAN ANY Y Exis xi st ing Operat Operat i ng Facil Facil i t ies – pers per sonnel, plant pl ant and equipment 2. Access ccess t o operat i onal areas ar eas such as Trains Trai ns 1,2 1, 2 & 3 3. Ass Assi st ance f or Securi ecur i t y of CONTRAC TRACTO TOR RS Areas wit wi t h rel r elat at i on t o GAS GASCO plant 4. H2S monit ori ng 5. HSE Induct Induc t i ons 6. Permit to work system 7. Vehicl e Checks Checks f or compl i ance wit h GA GASCO requi r ement s 8. Early work demoli demoli t ion isolat isolat ions

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

6.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

SUBCONTRACTORS

CONTRAC NTRACTOR TOR wi l l have a number numb er i nt erf er f aces wit wi t h key SUB SUBC CONTRAC ACTOR TORS per f ormi or ming ng the t he execution of part of the Works in accordance with Contract requirements. They will be fully supervised, controlled and they will comply with all the Contract requirements. The maj maj or SU SUBCONTRA TRACTS t ypicall ypi call y wil wi l l be as f oll ows but not l i mit mi t ed t o: 1. Pioneer Camp 2. Sit e Temporar Temporary y Facil Facil it ies and and Earl Early y Works Works 3. Topo & Geot Geot ech Sur Surveys veys 4. Civil & Buildings 5. Mechanical echani cal – t wo (2) : East ast and Wes Westt Scope spl splii t 6. E&I

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

8.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

CNIA

The CONTRACTOR will require to interface with CNIA typically on the following but not limited to: 1. CONTRAC ACTO TOR R’ S camp l ocat i on appr app r oval 2. CONTRAC ACTO TOR R’ S per sonnel oil oi l f i eld el d passes passes 3. CONTRAC ACTO TOR R’ S vehi cl e oil oi l f i eld el d passes passes 4. CONTRAC ACTO TOR R’ S camer came r a oil oi l f i eld el d passes passes 5. CONTRAC TRACTO TOR R’ S designat ed camera camer a / phot ographer s oil oi l f i eld el d pass passes

9.

POLICE

The CO CONTRA TRACTOR TOR wil l require requi re t o int erf ace wit h PO POLIC LICE E t ypicall y on t he foll f oll owing but not

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

11. 11 .

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

HEALTH AUTHORITY ABU DHABI

The CONTRACTOR will require to interface with HAAD typically on the following but not limited to: 1. HAAD will be inspecting and provide approvals on the use of the completed Clinic in the Camp. 2. HAAD will be inspecting and provide approvals on the use of the completed Clinic in the Site Temporary Facilities. 3. HAAD has t o app approve rove any medical medical personnel personnel t o be used used on the t he P Proj roj ect (t ypicall y doctors doct ors and nurses).

12. 12 .

HOSPITAL(S)

CONTRAC TRACTOR TOR wil wi l l est est abli sh arr ang angement ement s wit wi t h bot h local l ocal hospit als and Abu Abu Dhabi Dhabi Ci Ci t y hos hospit als f or use use in case case of emergen emergency cy sit sit uat uat ions during the t he li f e of t he Proj Proj ect.

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

6. Installation of the new HP Flare line under the existing lines which run to the TAKREER  jetty 7. Permits to work 8. Cooling ooli ng wat water er works All the above will require utilization of the TAKREER PTW system. All necessary personnel will be trained accordingly in advance of any work.

15. 15 .

BOROUGE

The CO CONTRAC TRACTOR TOR wil wi l l r equir e t o int erf ace wit h BO BOROUGE t ypicall ypi call y on the t he fol f olll owing owi ng but not limited to: 1. Transportation of permanent equipment received via the Ruwais Port, through, adj acent acent or over t he Boroug Borouge e exist exist ing facil faci l it ies – depending depending upon upon the t he fi nal agreed agreed Ruwa uwais is Fac Facilil it y int i nterna ernall rout ing.

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD.

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

1. Equipment , columns and vess vessels shipment shipment s to t he port . 2. Offloading 3. Transportation to site

19. 19 .

ABU DHABI PORT AUTHORITY

The CO CONTR NTRAC ACTO TOR R wil wi l l r equir equi r e t o int i nt erf er f ace wi t h ABU ABU DHA DHAB BI POR PORT AUTHO AUTHOR RITY typi t ypical calll y on the following but not limited to: 1. Port or t pass passes 2. Cust ust oms clear cl earance ance 3. Onward shippi hip ping ng to to R Ruwais uwais where wher e necess necessary

20

AIRPORT(S)

th

RUWAIS 4 NGL TRAIN

GASCO

Petrofac GS CONTRACTOR

CONSTRUCTION INTERFACE PLAN Agreement No. 13524801

ABU DHABI GAS INDUSTRIES LTD. 1.

23. 23 .

Doc. No. . 5248-00-FA-4049 5248-00-FA-4049

Rev. 1

Advise dvise and and seek seek approvals approvals f or overl and mat materi eri al / equipment shipment s class classif ied as ODCs.

ETISALAT

The CONTRACTOR will require to interface with ETISALAT typically on the following but not limited to: 1. Supply uppl y of t he IT and Communicat Communicat ions connecti connect i vit y f or t he JV and GA GASCO Camp. 2. Supply of t he IT and Communicat ommunicat ions connect connect ivi t y for f or t he Sit e Temporary Temporary Facil Facilit it ies.

24. 24 .

VENDORS

The CO CONTRA TRACTOR TOR wil wi l l requi r e tto o int erf ace wit h V VE ENDORS t ypicall ypi call y on the t he foll f oll owing owi ng but not limited to: 1. Vendors required assisting construction in the physical completion of systems ready for t urnover t o Pr e-Commiss e-Commissioni ioni ng / Commissioni ommissioni ng.

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Company GASCO PMT

GASCO RUWAIS ( EU )

CONTRACTOR - Seoul ( Petrofac )

Last Update : 17th Dec 2009

Contact Name

Designation

Office Telephone

Raafat Fayek

Major Projects manager (Ruwais) (Ruwais) Not Available

Abdul Aziz Al Badi

SR.Project Manager 

Assaad Abdallah

Project Coordinator 

Jose Luis Gameiro

Project Manager 

Bob Al Borzi

Project Manager 

Hisham Mansour 

Project Manager 

Firose Hassan

Secretary

A. Moussa

Major Projects Co-ordination Department Superintendent

Cyril Pereira

Senior Operations Engineer 

Kurt Reeves

Project Director

Mobile

Email Address

0097 009715 150 0 - 61 38 38 734 734

fayek fayek.r .raa aafa fat@ t@ru ruwa wais is3n 3ngl gl.a .ae e

Not Available Not Available Not Available Not Available Not Available Not Available

0097 009715 150 0 - 4443 444360 608 8

alba albadi di@g @gas asco co.a .ae e

Not Available Not Available +82 2 2005 8493

0097 009715 150 0 - 6227 622749 495 5

aabd aabdal alllah@g ah@gas asco co.a .ae e

0097 009715 150 0 - 6689 668969 690 0

jlga jlgame meiiro@g ro@gas asco co.a .ae e

0097 009715 150 0 - 6412 641214 140 0

bbor bborzi zi@g @gas asco co.a .ae e

0097 009715 150 0 - 8121 812179 798 8

hish hisham am.m .man anso sour ur@a @aje jes. s.ae ae

0097 009715 150 0 - 57258 5725868 68

firo firos. s.ha hass ssan an@r @ruw uwai ais3 s3ng ngl. l.ae ae

0097150-4152770

[email protected]

0097150-6721765

cperei reira@ga @gasco.ae

+971 50 633 6196

[email protected]

Christopher Joyce

Project Controls Manager

+82 2 2005 8491

[email protected]

Vivek Tandon

Lead Project Coordinator - Mech.

+82 2 2005 8400

[email protected]

Utkarsh D.Kulkarni

Senior Engineer - Process

+82 2 2005 8429

[email protected]

N.S.S. Venkateswaran Kiran Sheth

Principal Engineer - Instrument

+82 2 2005 8424

Principal Engineer - Electrical

+82 2 2005 8425

[email protected] om [email protected]

S.Thilagaraj

Project Procurement Manager

+82 2 2005 8428

[email protected] om

Prasad Pradhan

Senior Buyer

+82 2 2005 8432

[email protected]

Poulose Moolan

Project Engineer

+82 2 2005 8433

[email protected]

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Company

Last Update : 17th Dec 2009

Contact Name

Designation

Office Telephone

Mobile

Email Address

T.Chandra

Lead Engineer - Civil

+82 2 2005 8419

[email protected]

Umerfarook Deshmukh

Planning Engineer

+82 2 2005 8418

Umerfarook.Deshmukh@petrofac. com

V. Saibaba

Project Manager

+82 2 2005 8974

[email protected]

Sardana Yuvraj

Interface Manager

+82 2 2005 8402

[email protected]

Bachir Chaaya

Junior Project Engineer

+82 2 2005 8421

Vijaykumar Nair

Lead Document Controller

+82 2 2005 8417

Pradeep Agrawal

Project Accountant

+82 2 2005 8430

Deputy Project Director

+82 2 2005 7200

Bachir.Chaaya@petrofacemirates. ae Nair.Vijaykumar@petrofacemirate s.ae [email protected]

+82 2 2005 8430 CONTRACTOR - Seoul (GS )

Tom Yu

[email protected]

Deputy Site Manager

+82 2 2005 7240

+82 19 334 3135

[email protected]

Soo-Kang Shim

Construction Planner-1

+82 2 2005 7291

+82 10-8634-8537

[email protected]

Jung-Ho Lee

Construction Planner-2

+82 2 2005 7243

+82 10 2834 8288

[email protected]

Yong-Kyu Lee

Discipline SI (CSA)

Chan-Hee Chang

+82 2 728 1264

+82 11 9558 4946

[email protected]

Discipline SI (Mechanical)

+82 2 2005 7249

+82 11 788 4853

[email protected]

Yoon-Tae Kim

Discipline SI (Piping)

+82 2 2005 7285

+82 11 363 7912

[email protected]

Eun-Kyun Shin

Discipline SI (Instrument)

+82 2 2259 3467

+82 10 6600 4302

[email protected]

Myung-Ha Kim

Discipline SI (QA/QC)

+82 2 2259 5131

Duk-In Eum

Robert Berry Hee-Byum No

CONTRACTOR - Abu Dhabi

+82 10 5898 5505

Milad Azar

[email protected]

HSSE Manager

+82 2 2005 9915

+82 10 2901 2251

[email protected]

Project Procurement Manager

+82 2 2005 8403

+82 10 8752 3136

[email protected]

Commercial & Contract Manager  

+971 2 656 1107

[email protected]

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Company

Last Update : 17th Dec 2009

Contact Name

Designation

Dick Dick Cunn Cunnin ingh gham am

Dire Direct ctor or Con Const stru ruct ctio ion n Sup Suppo port rt

Archana Matte

Project Secretary

+971 2 656 1026 +971 2 656 1078

Mobile

Email Address Dick.Cunningham@petrofacemirat es.ae  Archana.Matte@petrofacemirates. ae

Gopala Goud

S/C Project Engineer  

+971 2 656 1008

[email protected]

Altaf Khan

Dy. Project Director  

+971 2 656 1014

[email protected]

 Avi  Avina nash sh Gosav osavii

Proj rojects ects & Cons Consttruct ructio ion n Sup Support port Manager   Admin. Manager 

Dineshkar Singh Katoch Nigel Butler

Sub Contracts Manager   Contracts Engineer 

+971 2 656 1036

[email protected]

+971 2 656 1038

[email protected]

+971 2 656 1076

[email protected]

+971 2 656 1113

Jeganathan.Kumaresan@petrofac .com [email protected]

Jeganathan Kumaresan Kaly Kalyan ana a Kum Kumar ar T.

Seni Senior or Plan Planni ning ng Engi Engine neer  er 

+971 2 656 1052

Rohit Bakshi

Senior QA Engineer  

+971 2 656 1053

[email protected]

Roy Hanks

Construction Director  

+971 2 656 1086

[email protected]

Brow Brown n Vij Vijay ay Kuma Kumarr

Depu Deputy ty Mana Manage gerr - Log Logis isti tics cs

+971 6 518 4590

[email protected]

Brian Stewart

HSSE Manager  

+971 2 656 1061

[email protected]

+971 2 656 1017

[email protected]

+971 2 656 1068

Muhammad.Khan@petrofacemirat es.ae

Marc Taylor (Support Procurement Manager  Member) Muhammad Khan Finance Manager  (Support Member)

SUBCONTRACTORS

Office Telephone

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Last Update : 17th Dec 2009

Company

Contact Name

Designation

Office Telephone

Mobile

Email Address

CB&I

Naaman M Farah

CB&I Project Manager 

Not Available

0097 009715 150 0 - 6587 658763 637 7

nfar nfarah ah@C @CB BI.co I.com m

Nael Salloum

General Services Manager 

Not Available

0097 009715 150 0 - 4569 456961 613 3

nsal nsallloum@ oum@C CBI. BI.com com

DODSAL

Ezzat Aziz

Construction Manager 

Not Available

0097 009715 150 0 - 457 45768 6866 66

ezza ezzat. t.fa fahm hmy@ y@do dods dsal aldx dxb. b.ae ae

ACC

Nabil Karmi

Tech & Commercial Manager

02 - 4109810

Tony Shaheen

Project Manager

02 - 4109810

050 6125502

[email protected]

Chehade M. Zinati

Tender & Estimate Manager

02 - 6771225

050 6610078

[email protected]

050 7318516

[email protected]

IMECO

Souhel Salloum Anil Ramachandran

Head of Tendering Tendering Engineer

02 - 6444700 02 - 6440445

CNIA POLICE

Gayathi

02 - 8082300

MUNICIPALITY

Madina Zayed Office

02 - 8988888

Abu Dhabi

02 - 6777929

HEALTH AUTHORITY ABU DHABI HOSPITAL(S)

Ruwais Adnoc Al Mafrak Musaffah

02 - 6022340 02 - 5823100

[email protected]

050 7125604

[email protected]

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Company

Last Update : 17th Dec 2009

Contact Name

Designation

Al Noor, AD

Office Telephone

Mobile

02 - 67272222

Central Hospital, AD

02 - 621 46666

Al Jazira, AD

02 - 6214800

NMC, AD

02 - 6332255

Emergency CIVIL DEFENCE

Madina Zayed Office

TAKREER

Sharif Abd El-Rahma

998 02 - 88440004 Engineering Development Section Head

Cyril Prem Kumar 

BOROUGE IRSHAD ADNOC RUWAIS PORT ABU DHABI PORT AUTHORITY AIRPORT(S)

Email Address

Norman Grant

Construction Manager 

Sultan Al Shehhi

Sr. Project Manager 

0097150-4152770

ssharif@ rif@ttakree reer.c r.com

Not Available

0097150-5986504

[email protected]

Not Available

Not Available

[email protected]

Not Available

0097 009715 1500-61 6166 6686 868 8

sult sultan an.a .allsheh shehhi hi@b @bor orou ouge ge..com com

Not Available

GASCO NGL4 Project Construction Interface Plan Appendice A Listing of Interface Contacts Under Population

Company

Last Update : 17th Dec 2009

Contact Name

Designation

Office Telephone

Mobile

Email Address

 Abu Dhabi Dubai ABU DHABI ELECTRICITY & WATER AUTHORITY TRAVEL POLICE DEPARTMENT

Police HQ, AD

02 - 446 1461 02 - 808 2300

Emergency ELIXER

ETISALAT VENDORS LOCAL SUPPLIERS

02 - 4461461

999

Ahmed Habib

Ruwais Plant Manager 

Not Available

0097 009715 150 0 - 615 61509 0932 32

Ahme Ahmed. d.Ha Habi bib@ b@el elix ixie ier. r.ae ae

Froilan Manez

Senior Engineer 

Not Available

Not Available

[email protected]

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF