Connection Fees for Kahramaa

December 29, 2016 | Author: Ming Ella | Category: N/A
Share Embed Donate


Short Description

Download Connection Fees for Kahramaa...

Description

CONNECTION FEES TABLES

A. Electricity 1. Residential

B. Water 1. Residential

2.

Charity, NGOs, and Community Services

2.

Charity, NGOs, and Community Services

3.

Commercial & Investment

3.

Commercial & Investment

4.

Leisure

4.

Leisure

5.

Other Cases

5.

Meter Fees

6.

Meter Fees

A.

Electricity

A.1

Residential CUTOUT Size (Amp’s) 35/50 75 100 150 200 250 300 350 400

FEES (QR) per CUTOUT 920 1,400 1,900 2,760 3,700 4,600 5,520 6,440 7,400 Table 1

TRANSFORMER Size (KVA) 500 800 1000 1250 1600

FEES (QR) per TRANSFORMER 12,750 20,400 25,500 31,900 40,800 Table 2

A.2

Charity, NGOs, and Community Services: CUTOUT Size (Amp’s) 35/50 75 100 150 200 250 300 350 400

FEES (QR) per CUTOUT 3,690 6,580 7,370 11,000 14,730 18,400 22,000 25,770 29,450 Table 3

TRANSFORMER Size (KVA) 500 800 1000 1250 1600

FEES (QR) per TRANSFORMER 51,000 81,600 102,000 127,500 163,200 Table 4

A.3

Commercial & Investment CUTOUT Size (Amp’s) 35/50 75 100 150 200 250 300 350 400

FEES (QR) per CUTOUT 4,410 7,000 14,200 21,300 28,350 35,430 42,520 49,600 56,690 Table 5

TRANSFORMER Size (KVA) 500 800 1000 1250 1600

FEES (QR) per TRANSFORMER 98,200 157,000 196,350 245,440 314,160 Table 6

A.4

Leisure:

CUTOUT Size (Amp’s) 35/50 75 100 150 200 250 300 350 400

FEES (QR) per CUTOUT 44,350 66,500 88,700 133,000 177,400 221,750 266,100 310,450 354,800 Table 7

TRANSFORMER Size (KVA) 500 800 1000 1250 1600

FEES (QR) per TRANSFORMER 614,470 983,150 1,228,900 1,536,170 1,966,300 Table 8

A.5

Other Cases: CUTOUT Size (Amp’s) 35/50 75 100 150 200 250 300 350 400

FEES (QR) per CUTOUT 118,200 177,300 236,500 354,700 473,000 591,000 709,000 827,600 945,800 Table 9

TRANSFORMER Size (KVA) 500 800 1000 1250 1600

FEES (QR) per TRANSFORMER 1,638,000 2,620,900 3,276,100 4,095,200 5,241,800 Table 10

A.6

Meter Fees:

KWH METER FEES TABLE: METERS Replacing/Upgrading Meter (same phase) Meter Upgrading from single Phase to 3-Phase New Meter (Single Phase) New Meter (3-Phase) Table 11

FEES (QR) per METER 100 200 200 400

When the Customer provides any connection equipment, the connection fees are as follow: For Residential category, KM is responsible to provide all the connection equipment, and the connection fees for this category are as mentioned in Table 2. However, for other categories the fees will be reduced by the provided equipment cost at the Kahramaa price. Transformer Cost (Based on the CF Model Inputs) QR 42.000

B

Water:

B.1

Residential:

Pipe Size (mm) 15 22 28 42 54 80 100

FEES (QR) per Pipe Size 300 960 1,920 3,520 6,400 20,800 38,400 Table 12

B.2

charity, NGOs and Community Services

Pipe Size (mm) 15 22 28 42 54 80 100

FEES (QR) per Pipe Size 345 1,000 2,000 3,800 6,900 22,400 41,400 Table 13

B.3

Commercial & Investment:

Pipe Size (mm) 15 22 28 42 54 80 100

FEES (QR) per Pipe Size 360 1,000 2,000 4,000 7,000 23,330 43,070 Table 14

B.4

Leisure:

Pipe Size (mm) 15 22 28 42 54 80 100

FEES (QR) per Pipe Size 1,300 3,900 7,700 14,200 25,700 83,700 154,500 Table 15

B.5

Meter Fees:

WATER METER FEES TABLE: METERS as per Pipe Size (mm) 15,22,28 & 42 54,80 & 100 150,200,250 & 300

FEES (QR) per Meter 300 1,000 4,000 Table 16

View more...

Comments