CONFINED SPACE RESCUE PLAN Area inc charge:
Confined space location
Schedule start date
Area inc charge phone number:
Unit : TPS
16-09-2016
Shutdown engineer:
TPS BOILER Furnace
Description of equipment Cooling tower Description of the work: Cleaning and Inspection and maintenance of column and column internals (Maintenance includes cleaning, welding, grinding, radiography) Describe the confined space Height : 55m
Depth:
Width/diameter : 8 m
Material of construction Concrete and CS
Describe the entry point: Descibe entry point : Type of the entry Vertical
Describe Access to primary entry point
Horizontal
Location of entry point Ground level Top of space
Side of space
Platform area scaffolding space
Above
Type of opening Manway
Dyked area
Open top Other
Pipe
More than one opening
-------------------------MSDS reviewed for above chemicals
Trays Scaffolds
Standpipe
Sumps
1 Fan and fills
Is there vehicle access? Yes
--Hydrocarbon--
Yes
NO
List of rescue equipment in use or near entry point 60 min SCBA air mask Full body harness Wristlet
List of chemicals entrants could possibly be exposed to and signs and symptoms of exposure
pole No
Area map attached?
Mech retrieval device—other
Describe means of communication from firehouse to attendant Through unit operating personnel (walkie Talkie, talk back system, telephone)
Describe means of attendant communication with emergency response group 1. MCP -219 2. Through unit operating personnel (walkie Talkie, talk back system, telephone)
Describe any special PPE likely to be required by the emergency response group NIL Describe any special requirement for the emergency response group
Reviewed with incident Commander? Incident Commander (CPNM): Sign Date: Comments:
Authorization signature
Area in charge Name Sign Shutdown engineer Name Sign