CONCRETING PROCEDURE.doc

December 20, 2017 | Author: Akhilesh Kumar | Category: Construction Aggregate, Concrete, Building, Engineering, Materials
Share Embed Donate


Short Description

Download CONCRETING PROCEDURE.doc...

Description

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

WORK PROCEDURE FOR CONCRETING

CLIENT

: GAIL (INDIA) LIMITED

CONSULTANT

: TRACTEBEL ENGINEERING

CONTRACTOR

: JAIHIND PROJECTS LTD

JAIHIND PROJECTS LTD PREPARED BY

CHECKED BY

GAIL / TRACTEBEL REVIEWED BY

APPROVED BY

NAME DESIGNATION SIGN DATE

DOCUMENT NO.

REV

CONCRETING

Page 1 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

CONTENT

SR.

1.0

DESCRIPTION

PAGE NO.

1

Purpose

3

2

Scope

3

3

Reference

3

4

Equipment

3

5

Material

3

6

Method

4

7

Field Quality Control

5

8

Tolerance

5

9

Safety

6

10

Documentation

6

11

ITP

7

12

Inspection Reports

8 - 10

PURPOSE

DOCUMENT NO.

REV

CONCRETING

Page 2 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

The purpose of this procedure is to prepare the sequential system on concreting activity the desired product. 2.0

SCOPE The procedure covers the work method of keeping for all concerting works as per specification.

3.0

REFERENCE a) b) c) d)

4.0

Contract Specification IS 10262 & IS 456 IS 383 IS 1786

GTS / Z / 02 – 0004

EQUIPMENTS Mixer machine, Weigh Batcher, Vibrator, cube moulds, slump cone, CTM, Thermometer etc.

5.0

MATERIAL

5.1

Water: Water used in concerting shall be clean and free from injurious amount of acid, alkalis, organic matter or other harmful substance, which may be deleterious to concrete. Potable water shall be considered, as satisfactory test on water sample will be carried out in accordance with IS-3025 and they shall fulfill all the guidelines and requirements of IS-456, Water shall be of same type.

5.2

Coarse Aggregates: Coarse aggregates shall conform in all respect to IS-383 Aggregates shall from a source approved by TE. Aggregates shall consist of naturally occurring stone (crushed or uncrushed) gravel. These shall be stony dark, durable clean and free from adherent coating and other deleterious material. Maximum quantity of harmful material in aggregates shall not exceed the limit defined in IS-383. Aggregate testing shall be done as per GTS/Z/02/2004.

5.3

Fine Aggregates: These shall comply with the requirement of IS-283 Zone IV sand shall not be used. Fine aggregates shall consist of material resulting from natural disintegration of rock and which has been deposited by stream, crushed stone, sand or grave the grading of the fine aggregate shall be such as to produce the max conc. Density compatible with the desired workability. Fine aggregates shall be from approved source only.

5.4

Cement: The cement shall be ordinary confirming to IS 269. Test certificate of the cement consignment s Shall be submitted to TE/GAIL and one lot of the cement shall be tested approved lab during designed mix.

5.4

Reinforcement Steel:

DOCUMENT NO.

REV

CONCRETING

Page 3 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

Reinforcement steel shall be used in RCC shall complete with IS 1786. 5.5

Admixture It shall be of approved make and shall not contained chloride or other corrosive agents.

6.0

METHOD Reinforcement design is to be establishing based on workability, durability requirements given in IS 456 for each grade of concrete taking into account the type I cement. Minimum cement. Minimum cement content, maximum W/C ratio confirming to exposure conditions as per specification. Submit pour card to TE/GAIL before concreting and the same should get signed before start of concreting. Beaching of cement and aggregates shall be done by mass or it should be converted into volume in consultation with TE/GAIL with specific request in writing. Concrete mixing will be done in the mixer as per spec. The water to be added in concrete shall be adjusted based on moisture contents in fine and coarse aggregates. During hot and cold weather, suitable method to reduce the loss of water by evaporation in hot weather and hit loss in cold weather will be adopted as per procedure set out in IS 7861. Ready mixed concrete will be used wherever it is feasible fulfilling all the requirements specified and IS 4926 – 1976 and approval to TE/GAIL. Ready – mixed concrete plants and transit mixer shall be used after taking approval of TE/GAIL. Concrete placing will be done by pumping / manually whatever it is feasible. The compaction of concrete will be done by immersion type needle vibrator, which shall be inserted in concrete in vertical position. Use of form vibrators is permitted where specifically required. Vibration will be applied systemically to cover all area immediately after placing concrete and will be stopped when the concrete flattens and takes up a glistening appearance, the rise of entrapped air ceases, the course aggregate blends in to the surface but does not completely disappear. The vibrator will be slowly withdrawn to ensure closing the hole resulting from insertion. Unless otherwise approved continuous concreting shall be done to the full thickness of foundation rafts. Concrete shall not fall from a height of more than 1.5 m to avoid segregation. Curing of concreting approved water shall start after 8 hours of placement of concrete and in hot weather after 4 hours concrete will be cured for minimum period of seven days. The workability of concrete shall be checked by the Site Engineer. Temperature of concrete shall be measured and shall not exceed 30° centigrade at the time of placing. The prepared surface shall be inspected and certified in pour card.

DOCUMENT NO.

REV

CONCRETING

Page 4 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

If surface is not up to the acceptable standard necessary rectification / repairing shall be done as per TE approved procedure on exposed concrete surface of foundation, beam, column, wall etc. All blemishes and defects if any will be rectified immediately after the remove of formwork. Construction joints shall be provided as per the specification. Curing and protection of concrete shall be done as per TE specification. Cover to reinforcement shall be provided as per IS 456/APPROVED Drawing. Pre cast concrete shall be done as per the specification. Grouting shall be done as per specification. Water retaining structures shall be done as per the specification. Tolerance of concrete surface shall be as per specification. Concrete work shall commence after complete checking of reinforcement, formwork, staging, insert & other futures. Formwork & de-shuttering shall be done as per specification. 7.0

FIELD QUALITY CONTROL Testing of cement : If desired by Owner’s representative. Cement will again be tested at laboratory. Test certificate of each approved batch shall be presented. Testing of aggregates: Weekly or 100 Cum intervals (whichever is less) grading grading of aggregate will be tested. Testing of water as per as per IS 456. Testing of Concrete : Frequency of sampling of concrete will be as per IS 1199, Page no. 44 & GTS/Z/02/004 clause no. 3.2.4 & 3.2.5 steel cube of size 150 x 150 x 150 mm. Workability of Concrete : Slump Test will be done to check the workability of concrete.

8.0

TOLERENCE Accuracy of Batching : Cement, Aggregates & Water ± 2% by the weight of each ingredient in each batch. No hand mixed is permitted. Quality of cover block shall be as per grade of concrete.

9.0

SAFETY

DOCUMENT NO.

REV

CONCRETING

Page 5 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

THULENDI PHULPUR PIPELINE PROJECT 18 “ OD X 71.2 KMS

JAIHIND PROJECTS LTD.

All required PPE’s shall be used and barication shall be done for trenches and outer edges of the slab shall be barricaded deep excavation are shall be barricaded properly. 10.0

DOCUMENTATION Inspection Report Inspection & Test Plan

: :

As per attached format As per attached format

NOTE: In case of any conflict between this procedures and contract specification the letter supersedes this procedure.

DOCUMENT NO.

REV

CONCRETING

Page 6 of 6 JPL/GAIL/TPPL/QC/WP/CIVIL/05

00

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF