Compliance Statement

March 13, 2023 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Compliance Statement...

Description

 

METHOD STATEMENT

 

FOR INSTALLATION & TESTING OF PPR PIPES & FITTINGS 

Doc No:AAC-1719-MST-PLUM-002  

REV: 01

Date: 01-01-2014

COMPLIANCE STATEMENT METHOD STATEMENT FOR INSTALLATION & TESTING OF PPR PIPES & FITTINGS Submittal Ref No: AAC-1719-MST-PLUM-002/01 Sl.no

Description

Reply

1

Enumerate procedure for jointing the valves and other accessories required.

2

Provide sleeves on all pipes that pass through the wall, sleeve material shall be as per project specification.

Comply.Installation Please find attached mockup.shop drawing will submitted seperately Noted & comply. Installation 6.2(r)

3

Pressure test should be done upon completion of one system at the specified area.

4

Provide detail procedure of installation of PPR pipes inside the shaft.

5

Provide tables for schedule of supports indicating size and distance.

Noted & comply. Installation 6.2(o)&6.4 Comply.Installation 6.3 Attached.

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF