Completion Equipment

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Well life cycle roles and responsibilities Production technology (basis for well design) ‹ ‹ ‹

z

Drilling Engineer (well bore and structure detail design and construction ‹ ‹

z

Selection of suitable well type Reservoir well bore interface Tubing and casing size and quality

Construction of well bore and structure Installation of completion

Production Operations (well conduit detail design and maintenance of well) ‹ ‹ ‹ ‹

Selection of components Acceptance of constructed asset Operate well Maintain availability of well Copyright 2001 SIEP B.V

z

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 1

Completion categories based on the reservoir wellbore interface

Production

Casing

casing Cement

Cement Cap

Casing

Liner

rock

shoe

hanger

Productive

Slotted

formation

liner Perforations Sump

Openhole

Rubble or

interval

gravel

Damaged

UNCEMENTED

PERFORATED

COMPLETION

LINER COMPLETION

COMPLETION Dr No TCM 6198

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

zone

OPENHOLE

Completion functional requirements z Provide z Protect

optimum flowing conditions casing

z Downhole

emergency isolation

downhole chemical injection

z Permit

downhole measurement

z Isolate

producing zones

Copyright 2001 SIEP B.V

z Permit

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 2

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 3

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 4

Copyright 2001 SIEP B.V

Bowl type tubing head

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 5

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Permanent Packer

zSimple

slip and packer design

zCapable

of withstanding high tensile forces and differential pressures

zRelatively zIndicated

large through bore

when:

‹Differential pressure across packer exceeds 5000 psi ‹Temperature

is present

‹Infrequent

workovers are expected Copyright 2001 SIEP B.V

‹H2S

exceeds 225 deg F

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 6

Permanent Packer Characteristics zTop

and bottom slips

zPacker

element (solid / complex)

zAnti-extrusion zRatch-latch

rings for element

mechanism to hold

set zMilling

required to recover

zDesigned

for milling – lock rings

Copyright 2001 SIEP B.V

etc

S h e l l EP Le Le a r n i n g

Packer Setting Options zMechanical ‹Rotation ‹Compression ‹Tension

zHydraulic ‹Pressure

applied to tubing or annulus

‹Differential pressure acts on setting tool (permanent packer) or internal setting sleeve (retrievable packer) ‹Preferred

method for deep / deviated wells

‹Mechanical

setting mechanism using wireline setting tool

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Copyright 2001 SIEP B.V

zElectrical

Completion Design.ppt, page 7

F

Hydraulically Set Packers zPacker

set using internal pressure (against tubing plug)

zPressure

acts through port (A) on setting piston (B)

zShear

E D

pin (C) breaks C

zSetting

sleeve drives bottom slips (D) up against cone (E)

zElement

(F) and upper slips energised then slips break and bite into casing

B

Copyright 2001 SIEP B.V

A

S h e l l EP Le Le a r n i n g

Anchor Latch

•Anchors the completion tubing to the packer •Creates a static seal between the tubing and the packer •Allows the packer to be run with the completion (one run) •Can be rotated out of the packer

Copyright 2001 SIEP B.V

•Can be re-installed with a straight push into the packer

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 8

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Polished Bore Receptacle (PBR)

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 9

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 10

Advantage of having Seal Area above Packer

Tubing d

Max. Dia.

D

Seal Area

D

Packer

Copyright 2001 SIEP B.V

Casing

S h e l l EP Le Le a r n i n g

Monobore Completion 9 5/ 8 ” Casing, 8.54” ID TRSCSSV Landing Nipple, 5.750” ID

7” Tubing, 5.963” ID

Flow Coupling Seal Stem, 6.023” ID Liner PBR, 7.50” ID Back Packer/Liner Hanger

Copyright 2001 SIEP B.V

7” Liner

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 11

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Blowout Kuwait

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 12

Copyright 2001 SIEP B.V

Wireline retrievable safety valve

S h e l l EP Le Le a r n i n g

z

Limitation of valve

z

Hydrate depth

z

Cratering depth

z

Collapse limitation of tubing

z

Scaling, wax, asphaltenes

z

KO point

z

Risk assessment

z

Subsidence

z

Earthquake Copyright 2001 SIEP B.V

Where in the string do we put the SCSSV?

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 13

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Safety Valve Landing Nipple Control line Lock profile Honed bore Non welded shoulder to protect C/L while RIH Honed bore Dr. No. TCM7803

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

Copyright 2001 SIEP B.V

19/04/2006

Completion Design.ppt, page 14

Copyright 2001 SIEP B.V

Integral annulus safety valve

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 15

Ways of providing a circulation route z Sliding z Side

side door

pocket mandrel tubing

z Tubing

punch

Copyright 2001 SIEP B.V

z Coiled

S h e l l EP Le Le a r n i n g

Reverse v forward circulation z Potentially z Less

pressure on surface equipment

z Natural z Better

direction for the flow of the lighter hydrocarbons

sweep of hydrocarbons out of tubing

damage to the casing due to jetting at the SSD

z Hydrocarbons

disposed of through normal flowline

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Copyright 2001 SIEP B.V

z No

corrosive well fluids kept off casing

Completion Design.ppt, page 16

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 17

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 18

Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Permanent downhole gauge

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 19

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 20

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 21

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 22

Copyright 2001 SIEP B.V

Xmas Trees

S h e l l EP Le Le a r n i n g

Copyright 2001 SIEP B.V

Xmas Trees

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 23

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 24

Copyright 2001 SIEP B.V Copyright 2001 SIEP B.V

S h e l l EP Le Le a r n i n g

S h e l l EP Le Le a r n i n g

© 1999 Shell International Exploration and Production B.V.

19/04/2006

Completion Design.ppt, page 25