8 Cairo Inspection Company Eng. Ibrahim Eldesoky ASNT –NDT-LEVEL III ASME AUTHORIZED INSPECTOR

The purpose of RP 578 is to provide guidelines for a material and QA system to verify the composition and alloy components within the piping system are consistent with the specified construction materials to minimize the potential for release of toxic or hazardous liquids or vapors.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

2

RP 578 also provides guidelines for material control and material verification programs on ferrous and non-ferrous alloys of new and existing systems specifically covered by B 31.3 (New Process Piping) and API 570 (In Service inspection) during: Construction Installation Maintenance Inspection

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

3

RP 578 applies to metallic alloy materials purchased for use: Directly by the owner. Indirectly through vendors, fabricators, or contractors. Includes the supply, fabrication and erection of these materials.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

4

1.2 Alloy Substitutions in Carbon Steel Systems When determining if carbon steel systems require material verification, the owner/user should consider what effect the process stream could have on a substituted alloy material. Substitutions of hardenable alloy materials in carbon steel systems have resulted in failure and loss of containment.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

5

Examples: Wet H2S Hydrofluoric acid And sulfuric acid

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

6

1.3 Roles and Responsibilities Consideration should be given to the roles and responsibilities that each group involved in the material verification program has. Groups within the operating plant or shops of contractors, vendors or fabricators should have roles and responsibilities clearly defined and documented. Groups can include:  Purchasing  Engineering  Warehousing/receiving  Operations  Reliability  Maintenance  Inspection Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

7

2.0 References Refer to the listed referenced publications in Section 2.

3.0 Definitions Refer to section 3 for definitions related to Material Verification Programs.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

8

4.0 Extent of Verification 4.1 General The owner/user should establish a written material verification program indicating the extent and type of PMI testing to be conducted during construction of:  New piping systems  Retroactively on existing piping systems  Maintenance and repair  Alterations

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

9

A.

The owner/user should consider performing a high percentage of examinations for higher-risk systems. B. Lower risk-systems could have random sampling performed. C. Material substitution problems tend to be random and small sampling may not locate all substitutions.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

10

4.2 New Construction Q/A Material Verification Program Covers shop and field fabrication of alloy pipe.  Prior to being put into service.  Is restricted to pressure containing boundaries.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

11

4.2.1 Responsibilities The owner/user or designee is responsible for: A. Determining the extent of examination needed. B. Verify implementation and conduct of the program is performed in accordance with RP 578. C. Verify that alloy materials placed into service are as specified. D. Documentation of the material program is in accordance with this recommended practice. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

12

4.2.2 Material Verification Test Procedure Review When PMI testing is performed by the material supplier or third-party agency; the owner/user should review and approve the adequacy of the material verification program and testing procedure of the fabricator or material supplier prior to testing.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

13

4.2.3 Scheduling of Material Verification Testing PMI testing should be conducted at a time that ensures that proper alloy materials have been used in the fabrication of an identifiable assembly.

4.2.4 Mill Test Report Although this is an important part of a material QA program, MTRs should not be considered a substitute for PMI testing.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

14

4.2.5 Components Covered in a Material Verification Program

Examples: a. pipe lengths b. pipe fittings c. flanges d. special forgings e. processes valves and RVs f. instruments h. weld overlays or cladding i. bolting j. expansion joints and bellows

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

15

4.2.6 PMI Testing of Welding Consumables  Should PMI one electrode or wire sample form each lot or package of alloy weld rods.  Should compare remainder of the lot to sample to verify markings are correct. Because of alloying elements in flux, PMI testing of weld metal is an acceptable alternative provided it is conducted immediately after welding or during the welding process.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

16

4.2.6.1 Longitudinal Pipe and Fitting Welds Should receive random PMI of the base metal and weld metal.

4.2.6.2 Autogenous welds If required, it only necessary to test the base metals.

4.2.7 PMI testing of Components Supplied by a Distributor A higher degree of PMI testing should be performed due to the potential for material mix-ups. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

17

4.3 Material Verification Program For Existing Piping Systems Section covers alloy piping in service where material verification programs were not in accordance with 4.2  Material verification is limited to pressure containing components and attachments welds.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

18

4.3.1 Responsibilities The owner/user is responsible for:  Determining if a retroactive material verification program is required for existing piping systems.  Prioritizing the piping systems to receive retroactive PMI testing.  Determining the extent of PMI testing required.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

19

4.3.2 Prioritizing piping systems for retroactive PMI Testing When determining if retroactive PMI testing is necessary, the owner/user should consider the following: a. likelihood of material mix up b. consequence of a failure c. reason for alloy specification d. related historical data- non-conformance report Owner/user should establish a methodology for prioritizing PMI testing. Methodology may be based on a qualitative or quantitative risk analysis. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

20

4.3.2.1 Carbon Steel Substitutions in Low Alloy Steel Systems. Historically, low alloy steel has the greatest number of material non-conformances with serious consequences.

4.3.2.2 Other Factors to Consider When Prioritizing Piping Systems Site specific or experienced-based factors should be considered when prioritizing piping systems. Factor to consider: A. Constructions and maintenance practices. B. Reasons for the alloy specification Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

21

4.3.3 Component Prioritization Factors Piping components may have a higher likelihood or inadvertent substitutions of a non-specific material. Examples are: a. warm up and bypass lines on pumps or check valves. b. small diameter piping systems. c. valves and other removable devices d. thermowells e. bolting f. piping as apart of a packaged system g. components without an ASTM stamp Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

22

4.3.4 Factors to Consider when Determining the Extent of PMI testing a. Historical inspection material verification records. b. Number of plant modifications. c. Material control during original fabrication. d. Material verification program during construction and fabrication. e. Consequence of release. f. Likelihood of corrosion/degradation.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

23

4.4 Material Verification Program as Element of Maintenance Systems Concepts in 4.2 and API 570 should be reviewed and applied as applicable.

4.4.1 Responsibilities It is the owner/user’s responsibility to verify programs are designed and implemented to support the MI of alloy piping. A material verification procedure should also be written to address the repair of piping systems during maintenance outages. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

24

4.4.2 Control of Incoming Materials and Warehousing PMI testing can be as part of receiving function or performed at the supplier’s location (as a condition of release for shipment). Material verification in the warehouse should be regarded as a QA practice to minimize potential discrepancies during subsequent PMI testing but should not be regarded as an alternative to PMI testing of fabricated systems when required. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

25

4.4.3 Maintenance Repairs of Piping Systems  Important to consider PMI testing of the repair materials.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

26

5.1 Material Verification Program Test Method Objectives Methods of RP 578 are intended to ID alloy materials and not intended to establish the exact conformance of material to a particular spec. Depending on the test method used, PMI testing may identify the nominal composition of the material. ID of materials by visual stamps/markings alone should not be considered a substitute for PMI testing. Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

27

5.2 PMI Test Methods Portable x- ray fluorescence portable optical emission spectroscopy laboratory chemical analysis There are also alloy-sorting techniques may be appropriate. These techniques can include magnetic testing to differentiate between ferritic and austenitic.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

28

5.2.1 Portable X-ray Fluorescence 5.2.2 Portable Optical Emission Spectrometry 5.2.3 Chemical Laboratory Chemical Analysis 5.2.4 Other Qualitative Tests 5.2.4.1 Chemical Spot Testing 5.2.4.2 Resistivity Testing 5.2.4.3 Other Techniques

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

29

5.3 Equipment Calibration Calibrate or verify the test equipment as specified by the equipment manufacturer PMI test procedure should provide frequency interval. If the manufacturer does not provide calibration procedures, the owner/user should establish them. Procedures should include calibration verification using certified standards.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

30

5.4 Equipment Precision Should be consistent with established test objectives (see 5.1). When composition is required, the owner/user should establish the acceptable precision and repeatability.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

31

5.6 Safety Issues Should consider electrical arching and hot spots. Consider appropriate electrical and hot work permits. Take safety precautions when handling chemicals used in chemical spot testing.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

32

6.0 Evaluation of PMI Test Results 6.1 Material Acceptance Methods Confirmation of materials by the use of relevant material specifications (e.g. ASME Sec II or ASTM). Materials can be classified through qualitative sorting techniques.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

33

When PMI testing indicates alloying elements are outside the material specification ranges, the owner/ user can choose to allow the use of the materials provide a knowledgeable person confirms that the material will perform satisfactorily in the service. If portable or qualitative PMI testing leads to a potential rejection, a more accurate analysis may be used to determine component acceptance.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

34

6.2 Dissimilar Metal Welds And Weld Overlays When testing dissimilar welds, consider the effects of dilution, which occurs during, weld deposition.

6.3 Follow-Up PMI Testing After Discovery Of A Nonconformity If a representative sample is rejected, all of that lot should be considered suspect and more extensive inspection should be conducted of the remaining lot.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

35

7 Marking and Record-keeping

7.1 Materials Identification Process Acceptable examples: a. Color coding by alloy b. Stamp marking c. Documentation of PMI results and test locations

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

36

7.1.1 Color Coding/Marker If visual identification (color coding or marking) is required by the material verification program, records of the alloy material/ color-code combinations should be maintained by the owner/user. Color-coding is not a substitute for permanent manufacturers markings required by ASTM or other material specs.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

37

7.1.2 Marking or Components Documentation process should specify one of the following: If the marking system is to remain for the expected life of the component. the marking system is only to be temporary.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

38

7.2 Material Certifications. Should not be considered a substitute for PMI testing. 7.3 Shop And Field PMI Test Documentation

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

39

7.4 New And Existing Piping System Documentation Records of results for PMI testing should be kept as long as the piping system exists in its original location. Should consider PMI testing prior to placing relocated components into service for piping that has no records of material verification

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

40

7.5 PMI Test Records Test records should contain: a. Reference to the PMI test procedure(s) used. b. Date of testing. c. Test instruments identification number or serial number (where appropriate)

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

41

d. Name of each person and company performing the test. e. Results of the test. f. Basis and action for resolving and documenting PMI test including those that have been left in service. g. Documentation of the criteria used for prioritization of piping systems and the extent of PMI testing performed.

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

42

7.6 PMI Test Procedures Should include: Techniques used Equipment calibration Qualification requirements for PMI test performed The testing methodology Documentation requirements

Cairo Inspection Company (CIC)

Www. CIC-Egypt.com

Eng. Ibrahim Eldesoky

43

7.7 Traceability To Field Components The information in 7.5 should be reported in such a manner that they are traceable to the point of installation.