PROJECT NAME & LOGOS
CHECK LIST FOR: Video surveillance system (CCTV)Testing and commissioning
Form No:
(Pre-Commissioning – Visual Inspection)
SUBCONTRACTOR
Rev. No : 0 Page
CONTRACTOR
X
SECTION OF WORK: Electrical
LOCATION:
LEVEL:
WIR No.: Checked by
ITEM
STAGE
S/C
CONT
: 1 of 1
Checked by
Cons.
1. Commi Commissionin ssioning g procedures procedures reviewed reviewed 2. Opera Operation tion and maintenanc maintenancee informa information tion 3. Sys System tem Comple Completen teness ess M E T S Y S V T C C F O
g n i n o i s s i m m o C e r P
4. Locat Location ion of Control Control Equipments Equipments (accessibl (accessible) e) 5. Cont Control rol panel environm environmental ental condition conditionss as per manufacturer’s guidelines 6. Ensure that cables in the control room, Racks, to the cameras are to be properly arranged and dressed. 7. Ensure that all NSMs, Cameras & Monitors are properly tagged. 8. Ensure that all the cables from Camera to the Network Switch are properly terminated and clearly tagged. 9. Ensure that distribution of cameras to Network Switch is to be done as per approved drawing. 10. Camera Location by each camera is to be clearly indicated on the monitor during viewing. 11. Focusing of the camera to be adjusted by proper positioning to obtain optimum result/image 12. Ensure that the camera Enclosure power supply installed properly 13.be Ensure supply outlets for CCTV system to fed bythat UPSPower (Optional). 14. Check the NSMs are connected to the security network LAN.