Check List Piping Layout

November 1, 2020 | Author: Anonymous | Category: N/A
Share Embed Donate


Short Description

Download Check List Piping Layout...

Description

Project Name: Job No.: Client: Date : DD/MM/YYYY Drawing Title : PIPING GENERAL ARRANGEMENT DRAWING Notes: 1. This checklist is intended for checking of layout drawings. 2. As a minimum, the checklist shall be completed for the first issue of the layout drawing. Drawing No. :

3. Items like Fire and Gas detectors and other E, I & T items (e.g. JBs, switch boards, lighting fittings, etc.) need not be shown in Piping Layouts. Sr. No Check Points Y/N Remarks DESIGN 1 Plant North is shown. Grade and paving levels and paving extents are shown. 2 (Dimensions of paving not required.) 3 Equipment and instrument tag nos. are indicated as per P&ID. All equipments are shown with locating coordinates/dimensions 4 and elevations (centerline, BTL, u/s of base plate, etc.). All equipment nozzles and vendor package terminal points are 5 clearly identified and tagged. All tie-in points and battery limits are clearly identified and 6 tagged and coordinates/elevations are indicated. All lines are identified by line numbers and major locating 7 dimensions & elevation are given. Flow directions and slope symbols are indicated as per the 8 P&IDs. All secondary pipe supports (standard & special) are indicated 9 and tagged and the locating dimensions marked. All primary pipe supports are identified by appropriate symbols 10 (e.g. guide, axial stop, etc.). Laydown/dropdown areas, space for exchanger tube removal and 11 maintenance access areas are identified. All buildings/shelters/technological structures are located with 12 coordinates/dimensions. Names/tag nos and overall dimensions are given. Structural grid numbers of pipe racks, buildings and shelters are 13 shown. Piperacks and sleepers are shown with locating 14 coordinates/dimensions, widths, TOS elevations and tag numbers (if applicable). The cross sections of piperacks, multi-level technological 15 structures, culverts, etc., are shown wherever required. All platforms and ladders/staircases are located with dimensions 16 and elevations are marked. DRAFTING

17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

The drawing border conforms to the Project specifications or Company standards, as applicable. Drafting conventions e.g. font types/sizes, text styles, line types, coordinate/dimension styles, layer structure, etc. are as per the Project specifications or Company CAD standards, as applicable. Drawing title, drawing number and revision number in the title block are as per the TDR. Electronic file name is indicated at appropriate location on the drawing. Revision block contains initials of the originator, checker and approver (both Discipline & Project). Drawing scale is stated in the title block and graphic scale (bar scale) is shown. The drawing scale conforms to the Project specifications or Company standards, as applicable. All general notes are checked and the units for dimensions, coordinates & levels are given in the notes. Legend for applicable symbols is shown (e.g. pipe supports, new/existing facilities, demolition, scope cloud, etc.). Reference drawing numbers and titles are listed and checked. List shall include unit plot plan and piping key plan as a minimum. Status stamp (e.g. “For Construction”) is shown. Revision clouds, along with revision number triangles are marked properly, if applicable. “Hold” clouds, if applicable, are properly marked and the list of “Holds” is indicated. Key plan is shown and the applicable area/unit of the plot plan is highlighted. Match line co-ordinates and drawing limits are clearly marked and are consistent with the Key Plan drawing. Continuation drawing numbers are correctly written. Prepared By Checked By Back Checked By Final Checked By

Name: Designation: Revision number: Date:

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF