FibeAir IP 10 Installation & Commissioning Procedure

Chapter 1: Installation FibeAir1500 SP Acceptance & Commissioning Procedure

Rev1.0

Proprietary and Confidential

General This chapter provides instructions for the installation of the FibeAir IP-10 IDU at the customer site.

Installation Requirements Required Tools The following tools are required to install the IDU: Philips screwdriver (for mounting the IDU to the rack and grounding screw) Flathead small screwdriver (for PSU connector) Sharp cutting knife (for wire stripping) Crimping tool for ground cable lug crimping (optional: if alternative grounding cable is used).

Installing the IDU in a 19"/ETSI Rack The FibeAir IP-10 IDU is installed in a standard 19" ETSI rack as shown in the following illustration. As shown in the illustration, four screws, supplied with the installation kit, are used to secure the IDU to the rack. .

Grounding the IDU The following illustration shows how the IDU is grounded to the rack.

FibeAir IP 10 installation & Commissioning Procedure

Page 2 of 29

Proprietary and Confidential

A grounding wire is connected below the IDU-RFU interface using a single screw with two washers.

IDU Grounding Notes The IDU is suitable for installation in a Common Bonding Network (CBN). Only copper wire should be used. Connector and connection surfaces must be plated. Bare conductors must be be coated with antioxidant before crimp connections are made to the screws. FibeAir provides a ground for each IDU, via a one-hole mounted lug onto a single-point stud.

Power Supply Notes When selecting a power source, the following must be considered: DC power can be from -40.5 VDC to -72 VDC. Recommended: Availability of a UPS (Uninterrupted Power Source), battery backup, and emergency power generator. The power supply must have grounding points on the AC and DC sides. The user power supply GND must be connected to the positive pole in the IDU power supply.

Power supply grounding should be in accordance with the following illustration:

FibeAir IP 10 installation & Commissioning Procedure

Page 3 of 29

Proprietary and Confidential

Interface Descriptions The following photo shows the different IDU ports and their functions.

FibeAir IP 10 installation & Commissioning Procedure

Page 4 of 29

Proprietary and Confidential

Installation of E1 Protection Patch Panel In IP-10 protection configurations, a protection patch panel is used to connect the units and provide protection switching.

IP-10 E1 protection Patch panel should be installed between the IP 10 IDUs.

Chapter 2: Commissioning FibeAir IP 10 installation & Commissioning Procedure

Page 5 of 29

Proprietary and Confidential

Configuring the IDU After the system is installed, Before start the antenna alignment is performed, the next step is IDU setup and configuration.

Cable Require for Login IP 10 IDU 1. Web –Ethernet Cross Cable (Both side RJ45) 2. CLI / Hyper Terminal – Serial Cable RS232 (9 pin cable Male to Female).

Default Setting for IP 10 Default IP of the IDU = 192.168.1.1 / 255.255.255.0 User Name – admin Password – admin

Log in Through the Web (Internet Explorer) interface. 1. Login :-Connect the cross cable on IDU port No 7 and give the IP to Laptop 192.168.1.10 / 255.255.255.0

Configure the IP into Laptop Go to Start – Settings -- Network Connection – Local area connection.

FibeAir IP 10 installation & Commissioning Procedure

Page 6 of 29

Proprietary and Confidential

Click on the local area connection, then following window will open.

Click on the Properties. Then following window will open

FibeAir IP 10 installation & Commissioning Procedure

Page 7 of 29

Proprietary and Confidential

Select the TCP/IP and click the properties button, then the following window will come

Define the IP as per the requirement then click ok.

FibeAir IP 10 installation & Commissioning Procedure

Page 8 of 29

Proprietary and Confidential

2. Connectivity Verification:- Verify the connection with Ping command Ping 192.168.1.1 If getting the Reply then it’s ok Go to start and click on the run then type there CMD then click on ok. Command window will open Then type the command

Example:H:\>ping 192.168.1.1 Pinging 192.168.1.1 with 32 bytes of data: Reply from 192.168.1.1: bytes=32 time Management, Click on the management then right side window will open. Configure the IP, Subnet Mask and Management setting as per the Plan Then click to apply.

FibeAir IP 10 installation & Commissioning Procedure

Page 12 of 29

Proprietary and Confidential

6. Configure Date, Time and System Info :Go to Configuration > General > Unit Parameters, Click on the unit Parameters then right side window will open. Configure the Current Date, Time, System Name (Link Site A to Site B) & Location (site Name) Subnet Mask and Management setting as per the Plan .Then click to apply.

FibeAir IP 10 installation & Commissioning Procedure

Page 13 of 29

Proprietary and Confidential

7. Configure Capacity License :Go to Configuration > General > Licensing, Click on Licensing then right side window will open. Configure the License Code on the license code field as per the details. Click on the Apply, Then system will take the reset.

Example:-we need to put the activation code as per the details. Customer 

Device ID 

Tata Teleservices LTD.

F278201073

Tata Teleservices LTD. 

F278201137 

Capacity  IP‐10 IDU Capacity  50Mbps IP‐10 IDU Capacity  50Mbps 

Activation code  073073M7IA8S6RHN2 1370DTPD6AMNBNEK0 

After the reset when the IDU comes please configure the MRMC Script. Go to Configuration > Radio > MRMC, Click on MRMC right side window will open. Configure the MRMC Script as per the details Click on the Apply, Then system will take the reset.

FibeAir IP 10 installation & Commissioning Procedure

Page 14 of 29

Proprietary and Confidential

8. Configure 1+1 protection :Before Configure the protection Please Enable the protection Port 3 (Ethernet Port No 3) as per the below details.

Go to Configuration > Interfaces > Ethernet Port, Click on Ethernet Port then right side window will open. Enable the Port No 3 and click on the Apply Same process to be done for the 2nd IP 10 IDU

After enabling the port of Both the IDU connect the Cross Cable (Rj45) FibeAir IP 10 installation & Commissioning Procedure

Page 15 of 29

Proprietary and Confidential

Between Ports No 3 to 3, Then do the following Step.

Go to Configuration > Protection > 1+1 protection, Click on 1+1 protection then right side window will open. Select enable and click on the Apply

FibeAir IP 10 installation & Commissioning Procedure

Page 16 of 29

Proprietary and Confidential

9. Configure E1 :Go to Configuration > Interface > E1 Port, Click on E1 port then right side window will open. There we have two option Select all and Enable One by One as per the requirement. Example:- Select All

Example:-Enable One by One Go to Configuration > Interface > E1 Port, Click on E1 port then right side window will open. Then Click on the +Sign in front of E1 No, then Enable the E1 and click on the apply. There we have two option Select all and Enable One by One as per the requirement.

FibeAir IP 10 installation & Commissioning Procedure

Page 17 of 29

Proprietary and Confidential

10. Configure Wayside Channel :Go to Configuration > Interface > wayside channel, Click on wayside channel then right side window will open. Select Wayside AdminEnable, Capacity-As per the plan, other as per the plan. Sign in front of E1 No, then Enable the E1 and click on the apply.

FibeAir IP 10 installation & Commissioning Procedure

Page 18 of 29

Proprietary and Confidential

11. Perform Soft Reset :Go to Diagnostics & Maintenance > Reset, Click on Reset then right side window will open. Then Click on the reset,

FibeAir IP 10 installation & Commissioning Procedure

Page 19 of 29

Proprietary and Confidential

Log in through the CLI (Hyper Terminal) Interface. 1. Create Hyper T Connection :Click on the Start

Go to Start > programs > Accessories > Communication > Hyper terminal, Click on the hyper Terminal Following window will come

FibeAir IP 10 installation & Commissioning Procedure

Page 20 of 29

Proprietary and Confidential

Define the any name in the name and click on the ok.

Then Select the Com port of the computer and click on the Ok.

Then Select the Port Speed (115200).Data Bit (8), Priority (None) Stop Bits (1) and Flow Control (None) Click on the ok. Then the following window will come.

FibeAir IP 10 installation & Commissioning Procedure

Page 21 of 29

Proprietary and Confidential

Go the file and click on the properties .

Then define the Emulation as VT100, click on the ok.

Then following window will come there we have to press the Enter 2 times. Then will have the option for User name /Password.

User name – admin Password – admin

FibeAir IP 10 installation & Commissioning Procedure

Page 22 of 29

Proprietary and Confidential

After that we can get the prompt. Example:-

IP-10 login: admin Password: After entering the password following option will come IP-10 :/>

2. CLI Command :1. Check the IP Address IP-10 :/> get management/networking/ip-address/ip-address↵ 192.168.1.10

2. Change the IP Address IP-10:/> set management/networking/ip-address/ip-address 192.168.1.20↵ You may lose remote management connection to the unit if this value is changed incorrectly. Are you sure? (Yes/no):yes ↵

FibeAir IP 10 installation & Commissioning Procedure

Page 23 of 29

Proprietary and Confidential

3. Check Subnet Mask IP-10 :/> get management/networking/ip-address/subnet-mask ↵ 255.255.255.0 4. Change Subnet Mask IP-10 :/> set management/networking/ip-address/subnet-mask 255.255.255.0↵ 5. Check default gateway IP-10 :/> get management/networking/ip-address/default-gateway↵ 0.0.0.0 6. Change default gateway IP-10:/> set management/networking/ip-address/default-gateway 192.168.1.10↵

7. Check management port IP-10:/> get management/networking/number-of-ports↵ 3 8. Check Vlan ID IP-10:/> get management/networking/vlan↵ 1 9. Create Vlan IP-10:/> set management/networking/vlan 2↵ 10. Check Management Type IP-10:/> get management/networking/type↵ in-band 11. Change Management Type IP-10:/> set management/networking/type out-of-band↵ IP-10:/> set management/networking/type in-band↵

FibeAir IP 10 installation & Commissioning Procedure

Page 24 of 29

Proprietary and Confidential

12. Check Management Capacity IP-10:/> get management/networking/capacity↵ 2mbps 13. Change Management Capacity IP-10:/> set management/networking/capacity↵ 128kbps 1mbps 256kbps 2mbps 512kbps 64kbps IP-10:/> set management/networking/capacity 128kbps↵ 14. Management port auto negotiation setting IP-10:/> get management/networking/auto-negotiation↵ IP-10:/> set management/networking/auto-negotiation off on IP-10:/> set management/networking/auto-negotiation off↵ 15. Management port Duplex Setting IP-10:/> get management/networking/duplex↵ full-duplex IP-10:/> set management/networking/duplex full-duplex half-duplex IP-10:/> set management/networking/duplex full-duplex↵ 16. Management Ports Rate(Mbps) Setting IP-10:/> get management/networking/ethernet-rate↵ 100mbps IP-10:/> set management/networking/ethernet-rate 10 100mbps 10mbps IP-10:/> set management/networking/ethernet-rate 10mbps↵ IP-10:/> set management/networking/ethernet-rate 100mbps↵ 17. Set to Default Configuration IP-10:/> /management/mng-services/cfg-service/set-to-default↵ You are about to set the unit configuration to its default values. This operation will take effect only after a unit reset. Are you sure? (yes/no):no↵

FibeAir IP 10 installation & Commissioning Procedure

Page 25 of 29

Proprietary and Confidential

18. Show the event Log IP-10:/> /management/mng-services/event-service/event-log/show↵

19. Clear the Event Log IP-10:/management/mng-services/event-service/event-log> clear↵ You are about to clear the unit's event log. Are you sure? (yes/no):yes↵ 20. Showing current Alarm IP-10:/> /management/mng-services/alarm-service/alarm-current/show↵ Date&Time

Severity AlarmName

Origin

Text

IP-10:/> get /management/mng-services/alarm-service/alarm-current/mostsevere↵ Cleared 21.Clear PM Report IP-10:/management/mng-services/pm-service> clear-entire-pm↵ Warning: This command will clear all performance monitors. Are you sure? (yes/no):yes↵

IP-10:/> /management/mng-services/pm-service/clear-entire-pm↵ Warning: This command will clear all performance monitors. Are you sure? (yes/no):yes↵ 22. Check and update Date and Time IP-10:/> get management/mng-services/time-service/time-and-date↵ 27-11-2008,11:42:38 IP-10:/> set management/mng-services/time-service/time-and-date 27-112008,11:50:01↵

23. Install the license IP-10:/> set platform/license/license-code 12345678910↵

FibeAir IP 10 installation & Commissioning Procedure

Page 26 of 29

Proprietary and Confidential

24. Check and change remote End IP Address, Subnet mask, Gateway IP-10:/> get platform/remote-idu/remote-ip-address↵ 192.168.1.20 IP-10:/> set platform/remote-idu/remote-ip-address 192.168.1.10↵

IP-10:/> get platform/remote-idu/remote-subnet-mask↵ 255.255.255.0 IP-10:/> set platform/remote-idu/remote-subnet-mask 255.255.255.0↵

IP-10:/> get platform/remote-idu/remote-default-gateway↵ 192.168.1.10 IP-10:/> set platform/remote-idu/remote-default-gateway 192.168.1.20↵

25. Set remote ATPC IP-10:/> get platform/remote-idu/remote-atpc-admin↵ enable IP-10:/> set platform/remote-idu/remote-atpc-admin disable↵

IP-10:/> get platform/remote-idu/remote-atpc-ref-rx-level↵ -50 IP-10:/> set platform/remote-idu/remote-atpc-ref-rx-level -55↵ IP-10:/> set platform/remote-idu/remote-atpc-ref-rx-level -50↵ 26.Remote management Vlan configuration,Type,Network id

IP-10:/> get platform/remote-idu/remote-management-vlan↵ 1 IP-10:/> set platform/remote-idu/remote-management-vlan 2↵

IP-10:/> get platform/remote-idu/remote-management-type↵ in-band IP-10:/> set platform/remote-idu/remote-management-type out-of-band↵

FibeAir IP 10 installation & Commissioning Procedure

Page 27 of 29

Proprietary and Confidential

IP-10:/> get platform/remote-idu/remote-link-id↵ 1 IP-10:/> set platform/remote-idu/remote-link-id 2↵ 27. Remote RX level IP-10 :/> get platform/remote-idu/remote-rx-level↵ -38 IP-10:/> get platform/remote-idu/remote-communication↵ up 28.Protection Enable Disable IP-10:/> get platform/mate-idu/protection-admin↵ disable IP-10:/> set platform/mate-idu/protection-admin disable enable IP-10:/> set platform/mate-idu/protection-admin enable↵

Radio Command Line

29. Set TX/RX Frequency IP-10:/> get radio/rfu/tx-freq↵ 14515000 IP-10:/> set radio/rfu/tx-freq 14515000↵ IP-10:/> get radio/rfu/rx-freq↵ 14935000 IP-10:/> set radio/rfu/rx-freq 14935000↵

30. Mute TX IP-10:/> get radio/rfu/mute-tx↵ disable IP-10:/> set radio/rfu/mute-tx disable enable

FibeAir IP 10 installation & Commissioning Procedure

Page 28 of 29

Proprietary and Confidential

IP-10:/> set radio/rfu/mute-tx enable↵ 31. Check TX/RX LEVEL IP-10:/> get radio/rfu/tx-level-status↵ 22 IP-10:/> get radio/rfu/rx-level↵ -39

32. Check RFU Serial ,Part No and Software IP-10:/> get radio/rfu/serial-number↵ FC527553 IP-10:/> get radio/rfu/part-number↵ IP-10:/> get radio/rfu/software-version-number↵ C1.64_B5