Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
During an evaluation of the currently installed network, the IT staff performs a gap analysis to determine whether the existing network infrastructure can support the desired new features. At which stage of the Cisco Lifecycle Services approach does this activity occur? Prepare Phase Plan Phase Design Phase Implement Phase Operate Phase Optimize Phase
Scoring Rule For: correctness of response 2 points for Option 2 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
Which stage of the Cisco Lifecycle Services strategy is usually completed before an organization issues a Request For Proposal (RFP) or Request For Quotation (RFQ)? Prepare Phase Plan Phase Design Phase Implement Phase Operate Phase Optimize Phase
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What is the purpose of SNMP? to facilitate the exchange of information between devices and the NMS to monitor and control managed network devices to report user logins to a monitoring station to verify traffic throughout the network and keep a log of all activity
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
During an analysis of a customer network, several possible opportunities for network improvement are identified. At which stage of the Cisco Lifecycle Services does this process occur? Prepare Phase Plan Phase Design Phase
Implement Phase Optimize Phase Operate Phase
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What provides the initial data for the Optimize Phase? performance monitoring business goals technical goals RFP
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option
Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
Which two statements are true regarding the response to an RFQ? (Choose two.) The response should be brief. It should strictly conform to the formatting requirements specified by the RFQ. Only the items that the contracting company will be addressing should be answered. The response helps the customer compare pricing with other potential contractors. The response is more complicated than a response to a RFP. RFP.
Scoring Rule For: correctness of response Option 2 and Option 4 are correct. 1 point for each correct option. 0 points if more options are selected than required. Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What are two disadvantages of using a bottom-up approach instead of a top-down approach to network design? (Choose two.) It can result in an inappropriate network design. d esign. A new design cannot be implemented right away. It does not take into account accou nt the business goals of the company. This approach is not commonly practiced and a nd is therefore not as well known. It requires tedious and time-consuming meetings with the customer to de velop an understanding of the organization.
Scoring Rule For: correctness of response Option 1 and Option 3 are correct. 1 point for each correct option. 0 points if more options are selected than required. Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What is a business constraint that may impact the WAN WAN design of a company? company policy regarding specific operating systems on LAN devices current monitoring protocols implemented on end-user devices non-availability of end users during implementation company policy requiring the use of specific ven dor networking equipment due to partnerships
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What is the purpose of preparing a business case? to justify the financial investment in implementing the technology change to provide an example of a previous job done in the RFP to define the technical requirements of the network to define timelines and critical milestones
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What is the purpose of creating a prioritized list of technical requirements? defines the project scope determines the business profitability creates a feasibility report for analysis ana lysis identifies existing and new user groups
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
A network engineer is analyzing the network of a potential client company to identify problems and determine whether a network upgrade or addition is needed. Which role in the sales team is this engineer assuming? post-sales field engineer pre-sales engineer account manager network designer
Scoring Rule For: correctness of response 2 points for Option 2 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
Which two statements best describe the responsibilities of an account manager? (Choose two.) acts as the primary point of contact between the company and the client directs the sales teams and support personnel provides technical support to critical clients selects the equipment and technologies to be used for the client solution acts as the network design lead
Scoring Rule For: correctness of response Option 1 and Option 2 are correct. 1 point for each correct option. 0 points if more options are selected than required. Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
What is the purpose of system-level acceptance testing? to develop an installation plan for the newly designed network to train end users and support personnel on the newly installed network to check that the newly installed network ne twork meets the business goals and design requirements to justify the financial investment required to implement the technology chang e
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
A network engineer working for a contracting company is informed of a pre-bid meeting with a potential client. What purpose does the network engineer have for attending the pre-bid meeting? to submit request for proposal responses to discuss proposed installation and monitoring plans to perform system-level acceptance tests on the current network to clarify project scope and timelines not included in the original request for proposal to create a business case outlining reasons for financial investment in a network upgrade
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item. What is a business constraint that may impact the WAN WAN design of a company?
company policy regarding specific operating systems on LAN devices current monitoring protocols implemented on end-user devices non-availability of end users during implementation company policy requiring the use of specific ven dor networking equipment due to partnerships
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option What is a purpose of establishing a network baseline? It provides a statistical average for network performance. It manages the performance of network devices. It creates a point of reference for future network evaluations. It checks the security configuration of network devices.
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option
When should a network baseline be performed within the stages of the Cisco Lifecycle Services? Prepare Phase Plan Phase Design Phase Implement Phase Operate Phase
Scoring Rule For: correctness of response 2 points for Option 5 0 points for any other optio
Which two items help identify business goals and priorities before a new network project starts? (Choose two.) installation
motivation profitability trustworthiness customer satisfaction
Scoring Rule For: correctness of response Option 3 and Option 5 are correct. 1 point for each correct option. 0 points if more options are selected than required.
What are two benefits of using a top-down approach instead of a bottom-up approach to network design? (Choose two.) incorporates organizational requirements allows for a quick response to a design request requires less time up front to create a network d esign clarifies design goals from the perspective of applications and ne twork solutions facilitates a design by using devices and technologies that are based on previous experience
Scoring Rule For: correctness of response Option 1 and Option 4 are correct. 1 point for each correct option. 0 points if more options are selected than required.
Which software component is installed on network dev ices that are managed through SNMP? management agents management stations network management protocol Management Information Base (MIB)
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option
During an analysis of a customer network, several possible opportunities for network improvement are identified. At which stage of the Cisco Lifecycle Services does this process occur? Prepare Phase Plan Phase Design Phase Implement Phase Optimize Phase Operate Phase
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option
During an analysis of a customer network, several possible opportunities for network improvement are identified. At which stage of the Cisco Lifecycle Services does this process occur? Prepare Phase Plan Phase Design Phase Implement Phase Optimize Phase Operate Phase
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option What are two disadvantages of using a bottom-up approach instead of a top-down approach to network design? (Choose two.) It can result in an inappropriate network design. d esign. A new design cannot be implemented right away. It does not take into account accou nt the business goals of the company. This approach is not commonly practiced and a nd is therefore not as well known. It requires tedious and time-consuming meetings with the customer to de velop an understanding of the organization.
Scoring Rule For: correctness of response Option 1 and Option 3 are correct. 1 point for each correct option. 0 points if more options are selected than required.
Which two statements best describe the responsibilities of an account manager? (Choose two.) acts as the primary point of contact between the company and the client directs the sales teams and support personnel provides technical support to critical clients selects the equipment and technologies to be used for the client solution acts as the network design lead
Scoring Rule For: correctness of response Option 1 and Option 2 are correct. 1 point for each correct option. 0 points if more options are selected than required.
A network engineer working for a contracting company is informed of a pre-bid meeting with a potential client. What purpose does the network engineer have for attending the pre-bid meeting? to submit request for proposal responses to discuss proposed installation and monitoring plans to perform system-level acceptance tests on the current network to clarify project scope and timelines not included in the original request for proposal to create a business case outlining reasons for financial investment in a network upgrade
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
A major corporation has decided to hire someone to upgrade their network infrastructure. A network consulting company wants the job. What document must the network consulting company obtain to learn about the business goals, the project scope, the requirements for the new network and the expected deliverables? Business Case Project Plan Request for Proposal Request for Comments
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
A corporation (client) wants a network upgrade and is putting out a request for services to various network consulting companies (contractors). A RFQ is required. Which statement is true concerning the RFQ? sent from the contractors to the client in response to a RFP sent from the client to the contractors along with the RFP to provide more specific technical details sent from the client to the contractors in place of a RFP when the technical specifications of a project are known sent from the contractors to the client outlining reasons for financial investments for the network upgrade
Scoring Rule For: correctness of response 2 points for Option 3 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Which stage of the Cisco Lifecycle Services involves proactive management to identify and resolve issues before the organization is affected? Prepare Phase Plan Phase Design Phase Implement Phase Operate Phase Optimize Phase Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
Why is it important to prioritize business goals when developing network design? to ensure that the least expensive technologies techn ologies are implemented first to simplify the configuration, administration, and monitoring of the newly installed network to anticipate the effects of changes and growth of the business to adhere to the best o pportunities to contribute to the success of the business
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Which two items help identify business goals and priorities before a new network project starts? (Choose two.) installation motivation profitability trustworthiness customer satisfaction Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
A network engineer working for ABC company is writing a response to an RFP for a network upgrade and must create an executive summary. Which statement describes the basic components of an executive summary? quick overview of the problem, the recommended solution, and the justification for ABC company doing the job detailed description of the solution, including but not limited to, timelines, turnover schedule, warranty information, and emergency recovery information detailed description of costs including, the cost of software and hardware components, licensing requirements, labor cost, and other applicable fees multiple page document containing additional information such as detailed lists of equipment required, diagrams, company background information, and insurance coverage
Scoring Rule For: correctness of response 2 points for Option 1 0 points for any other option Max Value = 2
Close Window
All contents copyright ©2001-2008 Cisco Systems, Inc. All rights reserved. Privacy Statement and Trademarks. Close Window
Item Information Page - Domain Knowledge - Weighted Score
Below you will find the question as it was p resented during the exam and the scoring rules associated with the item.
In a network management architecture, which statement best describes a management agent? communication protocol used between a management station and managed device standardized database that a device keeps about itself concerning network performance parameters host with the management application loaded that is used by the administrator to monitor and configure network devices software running on a managed device to collect network information and allow that device to be managed by a management station
Scoring Rule For: correctness of response 2 points for Option 4 0 points for any other option Max Value = 2