CAE Studio 5D Planner  CAE’s CAE’ s successor to Mine2-4D

Detailed Mine Planning or Open Pit and Underground Operations CAE Mining has taken the lead in developing CAE Studio 5D Planner, CAE’s CAE’s successor to Mine2-4D, the highly  popular solution or mine design and scheduling. Whilst maintaining its popular process-oriented approach, CAE Mining has made improvements in usability, usability, processing and data management. Some o the biggest improvements are a result o upgrading CAE Studio 5D Planner’s platorm platorm to CAE Studio. CAE Studio 5D Planner incorporates many o CAE Studio’s eatures including stunning 3D visualization and a completely revamped, comprehensive data management system.

Key enhancements: • • •

• • •

Conceptualise CAE Studio 5D Planner provides an advanced mine design system  within a ull 3D environment. environment. Its object-oriented object-oriented 3D design interace interace allows digitizing in multiple viewpoints in real time. Interrogation o block  models during the design stage allows economic criteria to be used in the design o production excavations.

Brand new Control Panel with “Smart” Workow Streamlined Project Setup Integrated 3D Visualizer with Dynamic Connectivity to Gantt Chart Production Scheduler (EPS) Redeveloped and enhanced Open Pit module Brand new Project Manager based on CAE MineTrust MineTrust technology  Integration with Hard Dollar project costing sotware (cost as the 5th dimension)

Control CAE Studio 5D Planner is integrated with a ull Gantt Chart Production Scheduler (EPS), placing all data rom design, block model interrogation, sequence and schedule in a single database. This results in a single source o the truth, eliminating the need or manual creation o schedules and reducing errors.

Create

Collaborate

CAE Studio 5D Planner maximizes the use o automated processes to eliminate many repetitive tasks normally associated with Mine Planning. This dramatically speeds up the planning process allowing or thorough scenario investigation leading to the optimal mine plan.

CAE Studio 5D Planner includes the new Project Manager, which uses CAE MineTrust MineTrust database technology to manage spatia l geological, design and survey data or a multi-user, multi-role environment. environment. In addition, multiple options to present and distribute mining inormation are available, rom spreadsheet reports and Gantt charts through to dynamic 3D animations and even PDF3D documents.

cae.com/mining

Inside CAE Studio 5D Planner  Underground Flexible design types make it easy to customise mine development and production stopes or any  mining method. Derived Activities model other  mining tasks, such as drilling and backfll, to be incorporated into your schedule. By creating a database o standard design defnitions, design consistency is maintained throughout a project mine site or company. Changes in the database are automatically applied to the design.

Open Pit Strategic planning data contained in imported models can be used by CAE Studio 5D Planner  to defne more detailed designs and schedules resulting in medium term and budget plans that honour the optimized long term plan. Designs can be as detailed as required making CAE Studio 5D Planner suitable or easibility studies or more detailed budget planning. 3D Mining blocks are automatically generated by  intersecting pushback boundaries, topographical suraces, bench defnitions and blast or pseudo blast outlines.

 Activity Sequencing Using CAE Studio 5D Planner’s leading methodology, a design can be automatically  sequenced quickly and easily. Changes to the design do not require manual re-sequencing. Manual link creation is also possible and the sequence can be “tested” at the click o a button.

Geological Model Depletion  All development a nd extraction ca n be interrogated against a block model. Development can be “depleted” rom the model ensuring it is not double-counted within a stope or mining area when calculating the production tonnes and grade.

Naming Conventions  The fle naming convent ion can be built up rom attri butes and then split out to create a summary structure in the Gantt Chart Production Scheduler (EPS). It can mimic the actual mine naming convention allowing a better understanding o  the schedule and improve communication to others. Real time animated 3D graphical representations o the mine plan in EPS simpliy planning and reporting.

Functions within EPS include:

Calendars Multiple calendars can be applied to both resources and activities e.g. development and backfll crews working on dierent shit systems. It is possible to schedule shutdown or  non-work periods and defne multiple reporting calendars or  dierent purposes.

Resources Resources can be either equipment or labour and can be assigned to mining activities. Resource levelling allows the creation o a resource based schedule where advance and production rates are dictated by resource availability and relative work priorities.

Prices/Costs Prices and costs can be profled over time to reect the  variations i n planned revenue, cost and cash ow. Available integration with Hard Dollar, industry-leading project cost estimation and control sotware, allows or multiple detailed cost scenarios based on a cost database.

Production Scheduler  •

•

•

•

•

Activities can be Rate-driven or Duration-driven or Cyclic (e.g. drill/charge/blast/muck), where each stage in the cycle can have its own resources Actuals can be entered and tracked and compared to multiple schedule baselines with real time visibility o the impact on the remaining schedule and period quantities Resource availabilities may be profled over time, which will be taken into account during resource levelling A dynamic and customisable summary view (Crosstab) always shows the period quantities o the schedule, making it easy to see the impact o adjustments or delays on the bottom line. Tonnages, grades and other base properties are dynamically calculated and powerul grouping, fltering and pivot table unctions allows or easy reporting with copy-paste exporting to Excel.

Global ofces AUSTRALIA Perth Level 3, 41-43 Ord Street West Perth WA 6005  Tel +61 8 6462 0900 Brisbane Level 15, 120 Edward Street Brisbane, Queensland, 4000  Tel +61 7 3248 0000 BRAZIL Belo Horizonte Alameda da Serra, 360 – 7 o andar Vila de Serra – Nova Lima – MG 34000-000  Tel +55 31 3264 9377 CANADA Montreal 3200 Guenette Saint-Laurent, Quebec H4S 2G5 Canada  Tel +1 514 341 2000 ext. 2404 Sudbury 866 Newgate Avenue, Unit 2 Sudbury, Ontario P3A 5J9  Toll-ree: 1 800 240 6941  Tel +1 705 688 0101 CHILE Santiago Santa Magdalena, 75 Ocina 903, Providencia Santiago 751-0038  Tel +56 2 2334 5952 COLOMBIA Calle 29 N° 41 - 105 O. 1206 Edicio Soho Medellín, Antioquia  Tel +57 - 4 - 403 17 75 INDIA New Delhi 601, Elegance Tower Jasola District Centre New Delhi - 110 025 India  Tel +91 11 41290000 KAZAKHSTAN Karaganda 201, 2 Lenin Street 100012, Karaganda Republic o Kazakhstan  Tel +7 7212 425138 MEXICO Callejón del Capulín #101, esquina con Avenida Torreón, centro Histórico Zacatecas, Zac. C.P. 98000  Tel +52 492 22 122 PERU Lima Av. Manuel Olguín, 335 Ocina 503  Torre Link Tower Surco, Lima - Peru  Tel +51 1 434 2727 SOUTH AFRICA Johannesburg 9 Fricker Road Illovo Boulevard, Illovo Johannesburg, 2196 Republic o South Arica  Tel +27 11 772 7960 UNITED KINGDOM Wells Unit A, Underwood Business Park  Wookey Hole Road, Wells, Somerset BA5 1AF United Kingdom  Tel +44 1749 683 350 UNITED STATES OF AMERICA Denver 10901 W. Toller Drive #205 Littleton, CO 80127 United States  Tel +1 303 985 7713