Agenda • Arrival/Welcome • Safety Orientation • Facility Tour • Presentation on Basic Wellhead and API Requirements • Lunch • Stack-up of MBU-LR Speed Head System/Conventional
Wellhead System/Overview of Frac Tree Equipment • Discussion | Q&A
Conventional Assemblies • Include the casing head, casing hangers, spool sections, tubing head, tubing hanger, valves and fittings • Provides safe and adequate means for supporting and attaching blowout control equipment during drilling • Provides sealing between casing strings and a connection for the Christmas tree • Requires manipulation of BOP’s with each added section • Tubulars suspended on “slips”
Casing Heads
O-Ring Groove Test Port
C2 Casing Head (With FPO’s)
C2-BP Casing Head (With Two Lockscrews)
Available with Threaded or Slip-on and Welded bottoms
C2 Casing Head (With LP Outlets and Baseplate)
Tubing Heads
Test Port
CTH Tubing Head (With Secondary Bushing)
CTH Tubing Head (With integral bottom)
Slip Type Casing Hangers
C2 Casing Hanger. Standard automatic sliptype casing hanger. Used to suspend medium casing loads (50% joint strength) in C2 & C2BP Casing Heads
C1 Casing Hanger and H Plate. Non-Automatic sliptype hanger. Used to suspend light to medium casing loads in C2 & C2BP Casing Heads
C9 Casing Hanger. Heavy duty automatic slip-type casing hanger. Used to suspend high casing loads in C9 & C9BP Casing Heads
Mandrel Hangers
One Piece Mandrel Hanger
Fluted Mandrel Hanger
Tubing Hangers and Tubing Head Adapters BPV Threads BPV Threads
CTH-2W CTH-2W wrap around hanger with BO2 coupling and BO2 tubing head adapter
CTH-EN with EN tubing head adapter
BPV Threads
T40 Hanger with T40 tubing head adapter
Multi-bowl Wellhead Systems 11” 10M 11” 5M
MBS
MBU
Multi-bowl Wellhead Systems Lock-Ring
Threaded-on Flange
2” LP
3” LP Landing Ring
20” Casing
13-3/8” Casing 9-5/8” Casing 5-1/2” Casing MBU-T
MBU-LR
‘HPS’ Elastomer Secondary Seals Interference fit provides pressure energized seal. No plastic packing required. Springs in corners prevent extrusion
Large ID interference provides sealing on rough casing
Type ‘P’ Elastomer Seal Metal retainer rings prevent extrusion
Seal energized against casing with plastic packing injection
‘Dovetail’ Elastomer Seals Commonly used as test plug and large O.D. seals Dovetail shape locks seal into groove
Tapered edges help prevent extrusion
Wide seal surface provides improved sealing
Type ‘S’ Elastomer Seal Metal springs in corners to prevent extrusion
OD bump provides interference fit allowing seal to be pressure energized
Lockscrews
Threaded Lockscrew
Integral Lockscrew
API Ring Gaskets
R Gasket 5,000 PSI
RX Gasket 5,000 PSI
BX Gasket 10,000-15,000 PSI
Frac Valve Comparison • •
DS-BSFC 7-1/16” 10M Valve
Two Seat Seal Rings An Inner and Outer Seal Ring That are Both Lip Sealed and Pressure and Spring Energized
CW FL-R 7-1/16” 10M Valve
Frac Valves
Detail of Seat with Seals
7-1/16” 10M Detail of Seat with Seals
Wellhead/Christms Tree Safety
Potential Leaks • Bonnet/Body • Stem • Body Fittings
Wellhead/Christmas Tree Safety “Line of Fire”
• Test or injection fittings • Lockscrews
Wellhead/Christmas Tree Safety Hidden Pressure
Wellhead/Christmas Tree Safety
One-Piece for lower pressures
Two-Piece for higher pressures
Wellhead/Christmas Tree Safety Back Pressure Valves
Wellhead/Christmas Tree Safety Body Fitting
API Flange Bolting • Flanges under pressure see a separation force equal to
the pressure times the area inside the ring gasket. F=PxA • This separation force is contained by the flange bolting. Thus, larger flanges and higher pressure flanges have larger bolts and/or more bolts. • As the bolt diameter increases the amount of make up torque goes up. • API 6A publishes recommended make-up torques for API bolting.
f = 0.07 Xylan Coated f = 0.13 Standard Lubricant
Casing Effects During Frac Suspension point in wellhead
Top of cement
Initial Hanging Weight
Cold frac fluid causes casing to contract increasing load on slip
Pressure causes casing to balloon increasing load on slip
Specification for Wellhead and Christmas Tree Equipment
• API Specification 6A • Twentieth Edition, October 2010 • ISO 10423:2009 (Modified), Petroleum and
Natural Gas Industries- Drilling and Production Equipment- Wellhead and Christmas Tree Equipment
API 6A Basic Contents 435 Pages • Design and performance • Materials • Welding • Quality control • Equipment marking • Storing and shipping • Equipment specific requirements • Repair and remanufacture • Various Annexes covering purchasing guidelines, design,
testing, etc.
API 6A Product Specification What does it mean? 6A-U-EE-1.5-1-1
PR – Performance Requirement
API Spec 6A Temperature Class
Material Class
PSL – Product Specification Level
Temperature Class • Determined by the maximum flowing temperature in
the wellhead or the mud circulating temperature and the minimum seasonal external temperature. • API Designations o K ………… -750F to 1800F o L ………… -500F to 1800F o N ……….. -500F to 1400F o P ………… -200F to 1800F o S ………… o T ………… o U ………… o V ………… o X ………… o Y …………
00F to 1400F 00F to 1800F 00F to 2500F 350F to 2500F 00F to 3500F* 00F to 6500F* * Non-standard Ratings
Material Class
CO2 Partial Pressure
H2S Partial Pressure 0 to < 0.05 psia
0.05 to 0.5 psia
> 0.5 to 1.5 psia
> 1.5 psia
0 to < 7 psia
AA Non-sour Non-corrosive
EE-0.5 or DD-0.5 Sour Non-corrosive
EE-1.5 or DD-1.5 Sour Non-corrosive
EE-NL or DD-NL Sour Non-corrosive
7 to 30 psia
BB Non-sour Slightly Corrosive
EE-0.5 Sour Slightly Corrosive
EE-1.5 Sour Slightly Corrosive
EE-NL Sour Slightly Corrosive
> 30 to < 200 psia
CC Non-sour Moderate to Highly Corrosive
FF-0.5 Sour Moderate to Highly Corrosive
FF-1.5 Sour Moderate to Highly Corrosive
FF-NL Sour Moderate to Highly Corrosive
> 200 psia
CC or HH Non-sour Highly Corrosive
FF-0.5 or HH-0.5 Sour Highly Corrosive
FF-1.5 or HH-1.5 Sour Highly Corrosive
FF-NL or HH-NL Sour Highly Corrosive
Product Specification Level (PSL) • PSL 1, PSL2, PSL3, PSL3G, PSL4 • Quality control requirements such as material
certifications, NDE, etc. that increase with the severity of service. • API 6A Annex A provides purchasing guidelines for selecting the proper PSL of Primary Equipment o Tubing Heads o Tubing Hangers o Tubing Head Adapters o Lower Master Valves
Performance Requirement (PR) • Cycle testing of the designs • Cycles may include pressure, loads, open-close, etc.
depending on product being tested • PR1 is minimum API cycle requirements found in the equipment section of the Specification 6A • PR2 adds additional cycles
Standard Materials for API 6A Materials Classification Body, End and Outlet Connections Material Class
Mandrel Hangers 2K, 5K, 10K
15K
AA
4130 60K (CMS-102)
4130 75K (CMS-103)
4140 110K (CMS-106)
BB
4130 60K (CMS-102)
4130 75K (CMS-103)
17-4 PH (CMS-303)
CC
410SS (CMS-301)
410SS (CMS-301)
17-4 PH (CMS-303) 4130 80K (CMS-104) Or 4140 80K (CMS-105)
DD
4130 60K (CMS-102)
4130 75K (CMS-103)
EE-XX
4130 60K (CMS-102)
4130 75K (CMS-103)
FF-XX
410SS (CMS-301)
410SS (CMS-301)
17-4 PH (CMS-303) Or Inconel 718 (CMS-304)
HH-XX
------
------
Inconel 718 (CMS-304)
Bull Plugs, Valve Removal Plugs and Back-Pressure Valves
4130 60K (CMS-102)
Product Plan - Quality Control Requirements for Wellhead Bodies and Assemblies The following chart details the Quality Control Requirements for all bodies. Applies to Casing and Tubing Heads, Cross-Over Connectors, Tubing Head Adapters, Top Connectors Tees and Crosses, Adapter and Spacer Spools, Casing and Tubing Hangers, Flanged Connectors Threaded Connectors, Other End Connectors.
Parameter
PSL 1
PSL2
PSL3
Tensile Testing
CMS-002 and Material Spec
Impact Testing
CMS-004
Chemical Testing
CMS-002 and Material Spec
Hardness Testing
CIR-002
CIR-002
CIR-002
Process Router & EPS
Dimensional
CIR-001
CIR-001
CIR-001
Process Router & EPS
CMS-002 and Material CMS-002 and Material Spec Spec
Comments Compare MTR to Material Spec Section 8.0 & EPS
CMS-004
CMS-004 Compare MTR to Material Spec
CMS-002 and Material CMS-002 and Material Spec Spec
CIR-004 or
CIR-004 or
CIR-004 or
TTM-WI-7.5.1
TTM-WI-7.5.1
TTM-WI-7.5.1
Traceability
Heat Traceable
Heat Traceable
Visual Exam
CIR-003
CIR-003
---
CNT-002 or
CNT-002 or
Surface NDE
--CNT-004
CNT-004
Thread Gauging
Compare MTR to Material Spec
End and Outlet Connection Threads Gauge 100%
Heat Traceable & Heat PSL-1/2-Trace by heat numbers Lot PSL-3-Trace by serial numbers
Process Router & EPS
Volumetric NDE
---
---
CNT-005
Prior to Machining
Weld NDE
---
CNT-008
CNT-008
Process Router & EPS, if applicable
Marking
MD Drawing
MD Drawing
MD Drawing
Serialization
---
---
Each component
Hydrostatic Test
CTS-001
CTS-001
CTS-001
Assembly Traceability
CTS-001
CTS-001
CTS-001
Process Router & EPS Work Order-sequential number PSL-3 – Chart Recorder Required
PSL-1/2- Record heat number of body PSL 3- Record heat and serial number Set Out Reports
Assembly Serialization
---
API Monogram
TTM-MSP-A-1
Work Order-sequential Work Order-sequential number number TTM-MSP-A-1
TTM-MSP-A-1
Process Router Process Router & EPS
Impact Testing Minimum Average Impact Value Transverse Direction - Ft-Lb (J)
Temperature Classification
Test
PSL 1
PSL 2
PSL 3
K
-75 (-60)
15 (20)
15 (20)
15 (20)
L and N*
-50 (-46)
15 (20)
15 (20)
15 (20)
P
-20 (-29)
--
15 (20)
15 (20)
S
0 (-18)
--
--
15 (20)
T
0 (-18)
--
--
15 (20)
U
0 (-18)
--
--
15 (20)
V
0 (-18)
--
--
15 (20)
Cactus Record Requirements Bodies, End and Outlet Connections, Mandrel Tubing Hanger and Casing Hanger
PSL-1
PSL-2
PSL-3*
Material Test Reports: Chemical analysis, tensile test, impact test (if required) and hardness test
X
X
X
Weld Process Records: WPS, WPQR and WQR
X
X
X
Welding Process Records: Welder identification, weld procedures, filler material type, post-weld heat treatments
X
NDE personnel Qualification Records for Weld Metal Corrosion Overlay on Bodies
X
X
X
Hardness Test
X
X
Actual Hardness
Dimensional Inspection NDE Records: Surface NDE, Weld Volumetric NDE, and Repair Weld NDE Volumetric NDE Heat Treatment COC Non-Metallic Seals
X
PSL-1
X
X
X
X X
PSL-2
PSL-3
Batch Traceability, Cure date certification, Shelf-life expiration date certification Bullplugs, Valve-Removal Plugs and BackPressure Valves
Assembled Equipment Records Pressure Test Records: Actual test pressure, holding period duration
X Material Test Reports : Chemical analysis, tensile test, impact test, and hardness test
PSL-1
PSL-2
PSL-3*
X
X
Pressure Test Records: Hydrostatic Test Chart
X
Assembly Traceability Record
X
*All required records for PSL3 components & assemblies shall reference the specific part serial number.
Records to be Furnished to Customer Bodies, End and Outlet Connections, Mandrel Tubing Hanger and Casing Hanger
PSL-1
PSL-2
PSL-3*
--
--
--
PSL-1
PSL-2
PSL-3
--
--
--
PSL-1
PSL-2
PSL-3*
Certificate of Compliance – stating that equipment conforms to PSL 3 of API Spec 6A and the temperature and material class
--
--
X
Pressure Test Records: Actual test pressure, holding period duration
--
--
X
Pressure Test Records: Hydrostatic Test Chart
--
--
X
Assembly Traceability Record
--
--
X
No records are required
Non-Metallic Seals No records are required
Assembled Equipment Records