Buffer Profile and Buffer level Determination for Demand Driven MRP
Demand Driven MRP DDMRP Explained Key Elements Case Studies FAQ Business Case Site Map Demand Driven MRP Transforming Parts and Materials Availability for ERP, Lean and TOC implementations
Buffer Profiles and Buffer Level Determination A DDMRP Recap: There are 5 major elements to Demand Driven MRP (DDMRP): 1. 2. 3. 4. 5.
Strategic Inventory Positioning This page’s focus: Buffer Profile and Buffer Level determination Dynamic Buffers Demand Driven Planning Highly Visible and Collaborative Execution
So we’ve decided “Where” – now we have to determine “How Many” … so Buffer Profiles enter the picture Before we talk profiles, it’s important to understand the basic Buffer concept for Demand Driven MRP. We view an inventory buffer in terms of 5 zones:
At the core are the intuitive 3 zones … Green (plenty), Red (Problem) and Yellow (Build or buy more). You’re familiar with the typical inventory sawtooth pattern of inventory being consumed then replenished … well, we’re looking for that pattern superimposed on the zones. So for example, Inventory at TOG (Top of Green) is consumed until it reaches Yellow … which means it’s entering the rebuild zone and any time after that, an order should be placed. If the inventory reaches Red, that’s the expedite zone and someone needs to move heaven and earth if necessary to get inventory in before there’s a stock-out. Above the top of green (TOG) is the blue “too much” zone. And below the red is, sadly, “Out.” Now, in the original form of this Replenishment model, the Green, Red and Yellow zones were equal. www.beyondmrp.com/demand-driven-mrp-portal/demand-driven-mrp-5-elements/demand-driven-mrp-buffer-profiles/
1/3
12/15/13
Buffer Profile and Buffer level Determination for Demand Driven MRP
But in fact, it makes much more sense to consider the elements that have an effect on the size of the 3 zones; for example, if a part has high variability it probably makes sense to have a larger Red zone than just 33%. So we have two things in play here: the relative proportion of the zones, and the actual quantity (stock levels) involved. It’s the relative proportion of the zones that is considered to be the Buffer Profile. Now, it’s neither practical not necessary to have unique profiles for every part; we group them into common profile characteristics. The elements involved here are: 1. The type … purchased, manufactured, or distributed. 2. Variability of supply and variability of demand. (We use categories of low, medium, high.) 3. Lead time. (We use categories of short, medium, long.) 4. Whether the Minimum Order Quantity (MOQ) is significant. Now, one group might be (for example) Purchased parts with long lead times and high variability. Another, Manufactured parts with medium lead times and low variability. The parts within a Group might have no other connection with each other beyond the common characteristics that place them within the Group. And, the actual quantities associated with one part’s Buffer in contrast to another’s can be very different. For example, this is a single profile being applied to 3 different parts:
To determine the levels, we can apply both Group Traits – traits related to the Group as a whole – and Individual Traits. Group Traits include the order cycle, demand variability and supply variability. Individual traits include average daily usage (ADU), which is a smoothed calculation over a carefully chosen www.beyondmrp.com/demand-driven-mrp-portal/demand-driven-mrp-5-elements/demand-driven-mrp-buffer-profiles/
2/3
12/15/13
Buffer Profile and Buffer level Determination for Demand Driven MRP
time horizon; fixed and cumulative lead times; minimum order quantity and etc. The average daily usage is a key data point. For example, the “standard” Yellow zone calculation is often based on the ADU over the lead time, and the Green and a portion of the Red zone (the Red Base) are similarly calculated with reference to the ADU. The other portion of the Red zone addresses safety stock, and is influenced by variability. Now, the initial set-up isn’t necessarily a “forever” set-up; lead times change, variability changes, new markets and products emerge, others fade. There can be causes for parts to change Groups. And causes for the Buffers to be re-determined. We deal with these in the next section, “Dynamic Buffers.”
Search this site: Search
Contact Information Contact information for BeyondMRP.com
Orlicky’s Material Requirements Planning Orlicky's Material Requirements Planning 3rd Edition, by Carol Ptak and Chad Smith, contains the most extensive description and explanation of Demand Driven MRP. Read This Review!
Orlicky's Material Requirements Plan... Carol Ptak, Chad S...
Privacy Information
Contact
Disclaimer
Privacy
© Copyright 2011 BeyondMRP.com - All Rights Reserved.
www.beyondmrp.com/demand-driven-mrp-portal/demand-driven-mrp-5-elements/demand-driven-mrp-buffer-profiles/
3/3
View more...
Comments