BU 05 VD 305 MA DSH 3301 010,02 Dry Gas Seal Data Sheet for 05 330 PKU 1

Share Embed Donate


Short Description

Dry Gas Seal Data Sheet...

Description

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants P.O. No.: 05-POR-MA-305-119

BUSHEHR PETROCHEMICAL COMPANY

Document Title: Dryy gas g seal datasheet for 05-330-PKU-1

REV.:

2

Document No.:BU-05-VD-305-MA-DSH-3301-010

Page

1 of

2 3

D gas seall d Dry datasheet h ffor 05-330-PKU-1 (CRFP Plant)

(1) As per Vendor's clarification (Clarification_Sheet for BU-05-VD-305-MA-DSH-3301-010-02) item 3, "The external source gas as primary seal gas is N2. We use N2 with 7 barg to startup and shutdown. For the detail information,please see the PID" But, According to MOM item 1.126, Nitrogen shall not be used as primary seal gas during compressor startup. So Vendor's reply is not acceptable and Condition and type of External source gas as primary seal gas during compressor start up and after compressor shutdown should be specified. (Regarding previous agreements, fuel gas is available for further use.)

Code1

□ (Approved ) No comment and the document is released for Manufacturing

Code2

□ (Approved with comments) Vendor shall correct, revise and resubmit the document. The document is released for manufacturing

Code3

□ (commented) Vendor shall correct, revise and resubmit the document

Code4

□Not Acceptable Quality (Rejected)

(2) Impact test report (upon material A410) shall be submitted for Purchaser review and approval accordingly.

Date: 28 March 2015 Dept: MA Signature: M.S. CODE 3

2 1 0

2015-3-10 2014-12-15 2014-6-11

Rev.

Date

Status

IFA IFA IFA

DUAN WEINA DUAN WEINA DUAN WEINA

ZHOU HUI ZHOU HUI ZHOU HUI

Purpose of Issue

PRE’D

CHC’D

APP’D

AUT’D

Gas Sweetening, Sulphur Recovery, C2 Recovery, Fractionation and Inter Connection Pipeline Between Plants P.O. No.: 05-POR-MA-305-119

BUSHEHR PETROCHEMICAL COMPANY

Document Title: Dryy gas g seal datasheet for 05-330-PKU-1

REV.:

2

Document No.:BU-05-VD-305-MA-DSH-3301-010

Page

2 of

32

REVISION TABLE REV 1 2 3 4

00

01

02

×

×

03

04

05

06

07

REV

00

01

02

03

04

05

06

07

Page 3 of 3 PROJECT:

Bushehr Petrochemical Company(H2088) REV

MAX.SHAFT DIAMETER AT MAIN SEAL:

270.0 mm

SEAL SIZE:

PDGS10/300‐ZT1‐U

PRELIMINARY DRAWING No:

PDGS10/300‐ZT2‐U

300

GAS SEAL TYPE: DIRECTION OF ROTATION:

PDGS bi-directional

Tandem with int.labyrinth ARRANGEMENT: TEST PROCEDURE: EBI Standard BARRIER TO PROCESS: not in scope of supply

SEPARATION SEAL TYPE:

Labyrinth

ARRANGEMENT:

GAS SEAL PERFORMANCE: CASE

(A) (B) (C)

barg Ԩ

Normal 3891 Propane 4.1 79.5

CDR 3844 Propane 4.1 82.2

MAX 3980 Propane 4.1 79.8

Flare pressure

barg

3.002

3.002

3.002

Buffer gas Pressure Gas temperature Velocity across int.Laby.

Flow across int.labyrinth

N2 N2 Air barg 3.002 3.002 3.002 0.2 Ԩ 20 20 20 100 m/s 3 3 3 Nl/min 504/526 504/526 504/526 exp./gar. exp./gar. exp./gar. exp./gar. exp./gar. exp./gar. exp./gar. exp./gar. exp./gar. Nl/min 2/3 2/3 2/3 0 0 Nl/min 501/522 501/522 501/522

Secondary seal leakage

Nl/min

Speed Primary seal gas Pressure Gas temperature

rpm

Consumption of buffer gas

(B) (S)

Primary seal leakage

4

5

6

Double

Static 0

Test dyn. Test stat. 0 Air Air 100

100

0

0

N2(external)

3/4

3/4

3/4

3/6

0/0

GAS SEAL DESIGN CONDITIONS: DESIGN PRESSURE (DYNAMIC): DESIGN PRESSURE (STATIC):

30 30

barg barg

MAXIMUM DEPRESSURIZATION RATE unlimited bar/min BALANCING: ISO1940-Q2,5(EBI standard)

SEPARATION SEAL PERFORMANCE: CASE Dynamic

(D)

Speed Separating gas *Pressure Gas temperature

rpm

Gas flow to separation seal

Nl/min

barg Ԩ

SEAL ELEMENT BEHIND THE SEAT: SECONDARY SEAL ELEMENTS:

METAL PARTS: SPRINGS: LABYRINTHS: SCREWS:

REMARKS:

Ԩ Ԩ Ԩ Ԩ mm barg barg

SEPARATION SEAL DESIGN CONDITIONS: Static

3891 0 N2 0 0.0071 0 20 0 exp./gar. exp./gar. 976/1104 0

GAS SEAL MATERIALS: SEAT(ROTATING): SEAL FACE (STATIONARY): DYNAMIC SEAL ELEMENT:

GAS INLET TEMPERATURE(min.): -50 GAS INLET TEMPERATURE(max.): 160 MATERIAL DESIGN TEMPERATURE(min. -50 MATERIAL DESIGN TEMPERATURE(max 230 AXIAL MOVEMENT: ±5.5 ALLOWABLE FLARE PRESSURE:NORMAL: 0.2 MAX: 3

DESIGN PRESSURE (DYNAMIC): DESIGN PRESSURE (STATIC): GAS INLET TEMPERATURE(min.): GAS INLET TEMPERATURE(max.):

10.5 barg 10.5 barg -20 Ԩ 100 Ԩ **SEPARATION GAS CONTROL SYSTEM: Flow control (*)ASSUMED (**)RECOMMENDED

SEPARATION SEAL MATERIALS: SILICON CARBIDE WITH DLC-COATED SILICON CARBIDE WITH DLC-COATED FILLED PTFE,SPRING ENERGIZED FILLED PTFE,SPRING ENERGIZED FILLED PTFE,SPRING ENERGIZED 1.4006 (ASTM 410) 2.4669 (ASTM Alloy N07750) ALMg4,5Mn(Aluminium alloy AA5083) A4-70 (ASTM A193 Gr. B8M)

METAL PARTS: LABYRINTH:

1.4006(ASTM 410) ALMg4,5Mn(Aluminium alloy AA5083)

SEALING ELEMENTS: FKM FLUOROCARBON

SCREWS:

A4-70 (ASTM A193 Gr.B8M)

SOP=22barg; Flare pressure=4barg(Flare pressure was change into 4bara by customer in Jan.2015)

Revision

GAS SEAL DATA SHEET