BRITISH STANDARD

Noise and vibration control on construction and open sites Part 3. Code of practice applicable to surface coal extraction by opencast methods

ICS 17.140.20; 17.160; 73.020

NO COPYING WITHOUT BSI PERMISSION EXCEPT AS PERMITTED BY COPYRIGHT LAW 

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

Not for Resale

| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | | |

BS 5228 : Part 3 : 19 199 97

                    `   ,   ,         `   ,         `   ,   ,         `   ,   ,         `             `             `         `   ,         `         -

 

BS 5228 : Part 3 : 1997

Committees responsible for this British Standard The preparation of this British Standard was entrusted by Technical Committee B/209, General building codes, to Subcommittee B/209/17, Noise control on open sites, upon which the following bodies were represented:

 Association  Associa tion of Cons Consultin ulting g Engi Engineer neerss British Aggregate Construction Materials Industries British Coal Corporation British Compressed Air Society Building Employers' Confederation Chartered Institute of Environmental Health Concrete Society Construction Health and Safety Group Construction Plant-Hire Association Department of the Environment (Building Research Establishment) Department of the Environment (Pollution Control and Waste Directorate) Federation of Civil Engineering Contractors Federation of Dredging Contractors Federation of Piling Specialists Institution of Civil Engineers Limited Sand and Gravel Association                     `   ,   ,         `   ,         `   ,   ,         `   ,   ,         `             `             `         `   ,         `         -

This British Standard, having been prepared under the direction of the Sector Board for  Building and Civil Engineering, was published under the authority of the Standards Board and comes into effect on 15 May 1997 ©

BSI 1997

 Amendments  Amendmen ts issued since publication  Amd.. No.  Amd

Date

Text affect affected ed

First published as BS 5228 May 1975 First published published as BS 5228 : Part 3 May 1984 Second edition May 1997 The following BSI references relate to the work on this standard: Committee reference B/209/17 Draft for comment 96/101066 DC ISBN 0 580 26874 8 Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

Not for Resale

 

BS 5228 : Part 3 : 1997

Contents

Page Committees responsible

Inside front cover  

Foreword

ii

Code of practice Introduction

1

1   Scope

1

2   References

1

3   Definitions

1

4   Legislation

1

5   Site Site plan planni ning ng and and pr prac acti tica call meas measur ures es to re redu duce ce nois noise e and and vibr vibrat atio ion n

1

6   Limitations on emission of noise and vibration from sites

4

 Annexes  A    (informative) Legislative detail

5

B   (informative) Coal processing, storage and distribution

5

List of references

 

Inside back cover 

`    , `  `  `  `    ,   , `    ,   , `    , `    ,   , `  -

Copyright British Standards Institution  BSI Provided by IHS under license© with BSI 1997 No reproduction or networking permitted without license from IHS

  Not for Resale

i

 

BS 5228 : Part 3 : 1997

Foreword This Part of BS 5228, which has been prepared by Subcommittee B/209/17, covers the control of noise and vibration from surface coal extraction by opencast methods. It supersedes BS 5228 : Part 3 : 1984, which is withdrawn. BS 5228 refers to the need for the protection of persons living and working in the  vicinity  vici nity of such sites sites and those work working ing on the sites, from noise and vibrati vibration. on. It recommends procedures for noise and vibration control in respect of construction and demolition operations and aims to assist architects, contractors and site operatives, designers, developers, engineers, and local authority environmental health officers and  planners,  plann ers, regarding regarding the control of noise and vibration. vibration. Noise and vibration can cause disturbance to processes and activities in neighbouring buildings, and in certain extreme circumstances vibration can cause or contribute to building damage. Noise and vibration can be the cause of serious disturbance and inconvenience to anyone exposed to it and in certain circumstances noise and vibration can be a hazard to health. The Environmental Protection Act 1990 [1] in England and Wales (and Scotland by virtue of the Environment Act 1995 [2]) contains provisions for the abatement of nuisances caused by noise and vibration. The provisions of the Environmental Protection Act 1990 [1] are extended to vehicles, machinery and equipment in streets by the Noise and Statutory Nuisance Act 1993 [3], the Control of  Pollution Act 1974 [4] in England, Wales and Scotland, and the Pollution Control and Local Government (Northern Ireland) Order 1978 [5] in Northern Ireland. The 1974 and 1990 Acts (sections 73(1) and 79(7), respectively) and the 1978 Order (Article 53(1)) define `noise' as including `vibration'. It should be noted that BS 6472 covers the human response to vibration in structures and BS 7385 : Part 1 covers the measurement and evaluation of structural vibration. BS 7385 : Part 2 contains guidance on damage levels from groundborne vibration. NOTE. An item dealing with the vibratory loading of structures is being processed within ISO/TC 98/SC/2, Safety of structures. This is being monitored by BSI. `    , `  `  `  `    ,   , `    ,   , `    , `    ,   , `  -

BS 5228 consists of the following Parts: Part 1

 

Part 2

 

Part 3

 

Part 4

 

Part 5

 

Code of prac practice tice for bas basic ic in informatio formation n and procedures procedures fo forr noi noise se and vibration vibratio n control Guide to noise noise an and d vibra vibration tion ccontrol ontrol legisla legislation tion fo forr con constructi struction on and demolition, demolit ion, including road constr construction uction and maintenance maintenance Code of pra practice ctice applicable to su surface rface coal extraction by ope opencast ncast  methods  met hods Code of prac practice tice fo forr noise noise and vibration control applicable to pilin piling g operations Code of pra practice ctice applicable to su surface rface mineral mineral extr extraction action excluding excluding coal1)

BS 5228 : Part 1 is common to all the types of work covered by this and the other Parts of BS 5228, which should be read in conjunction with Part 1. Other Parts will be published in due course as and when required by industry.

1)

In preparation.

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

ii

 

© Not for Resale

BSI 1997

 

BS 5228 : Part 3 : 1997

 Attention is drawn to the Contro  Attention Controll of Pollution Pollution Act 1974 [4] (Part III(Noi III(Noise)) se)),, the Environmental Protection Act 1990 [1] (Part III (Statutory Nuisances and Clean Air)), the Health and Safety at Work etc. Act 1974 [6] (in Northern Ireland, the Pollution Control and Local Government (Northern Ireland) Order 1978 [5] and the Health and Safety at Work (Northern Ireland) Order 1978 [7]), and to the Noise at Work Regulations, SI 1790 [8] and Ireland), 19901989 Statutory Rules 147the [9].Noise at Work Regulations (Northern Compliance with a British Standard does not of itself confer immunity  from legal obligations.

`    , `  `  `  `    ,   , `    ,   , `    , `    ,   , `  -

Summary of pages This document comprises a front cover, an inside front cover, pages i to iv, pages 1 to 6, an inside back cover and a back cover.

Copyright British Standards Institution Provided by IHS under license© withBSI BSI 1997 No reproduction or networking permitted without license from IHS

  Not for Resale

iii

 

--`,``-`-`,,`,,`,`,,`---

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

iv 

 

blank Not for Resale

 

BS 5228 : Part 3 : 1997

Code of practice

Introduction

3 Definitions Definitions

Opencast coal sites can pose a greater diversity of   problems of noise and vibration control compared with most other types of industrial activity for the

For the purposes of this Part of BS 5228, the definitions given in BS 5228 : Part 1 apply together  with the following.

following reasons: a) apart from some ancillary operations, they are carried out entirely in the open and can extend over a wide area; b) they are of variable duration from a few months to several years and in some cases sites in adjacent areas can follow one another in succession over a prolonged period. c) a wide variety of activities are carried out involving the following phases: 1) geological and geotechnical exploration; 2) preliminary operations to establish the site; 3) soil stripping and removal of overburden; 4) coaling, coal preparation, storage and dispatch;

3.1 overburden The material overlying the coal, including topsoil and subsoil. NOTE. Economic deposits of other minerals may occur in the overburden.

3.2 baffle mound  A temporary dump usually formed from topsoil or  subsoil, for the purpose of reducing noise from the site and to provide a visual screen.

4 Legislation It should be noted that opencast coal mining is governed by a wide variety of legislative instruments and government policy statements. Policy regarding the working of opencast coal is set out in a series of  guidance notes on mineral planning. The most important of these is MPG 3 [10], which was revised in July 1994 and expanded to cover all aspects of the coal industry. Other important notes are MPG 1 [11], dealing with general principles, MPG 9 [12], which contains some guidance on vibration levels associated with blasting, and MPG 11 [13], on noise from surface mineral workings.

5) backfilling and final site restoration; 6) rehabilitation of final land form to public amenity, agriculture or other subsequent development; d) a wide range of earth-moving and specialized  plant is employed, the use of which varies significantly at different phases and times and at different heights and depths within the site.

1 Scope This Part of BS 5228 gives recommendations for  good practice for measures to control noise and  vibration, enabling coal to be extracted economically by opencast methods with the minimum of  disturbance to the community.

The legislative framework consists of several elements, the most important of which is the Coal Industry Act 1994 [14], passed in July 1994. Other key legislation includes the Coal Industry Nationalisation  Act 1946 [15], the Opencast Coal Act 1958 [16] and the Town and Country Planning Act 1990 [17]. (See annex A for detailed legislative information.)

5 Site planning and practical measures to reduce noise and vibration

2 References 2.1 2.1 Normati Normative ve reference reference This Part of BS 5228 incorporates, by dated or  undated reference, provisions from other   publications. These normative references are made at the appropriate places in the text and the cited  publications are listed on the inside back cover. For  dated references, only the edition cited applies; any subsequent amendments to or revisions of the cited  publication apply to this Part of BS 5228 only when incorporated in the amendment by reference or  revision. For undated references, the latest edition of  the cited publication applies together, with any amendments.

5.1 General Prior to making an application for planning  permission, an applicant should discuss with the Mineral Planning Authority (MPA) and the appropriate department of the local authority (see annex A) the predicted noise and vibration levels from the proposed site and the control measures to be implemented. This will highlight at an early stage any noise and vibration issues that should be addressed. The predicted noise and vibration levels and proposed control measures should be included in the application documentation. Local residents and other interested parties should also be consulted at this stage.

2.2 Informative references This Part of BS 5228 refers to other publications that  provide information or guidance. Editions of these  publications current at the time of issue of this standard are listed on the inside back cover, but reference should be made to the latest editions. --`,``-`-`,,`,,`,`,,`---

Copyright British Standards Institution  BSI Provided by IHS under license© with BSI 1997 No reproduction or networking permitted without license from IHS

  Not for Resale

1

 

BS 5228 : Part 3 : 1997

5.2 Site planning In planning the working of the site, consideration should be given to the effect of the proposed working method and site layout on adjacent sensitive  premises. Where necessary, alternative methods or  arrangements which have the least impact of  emissions of noise and vibration should be employed if economically economically viable. 5.3 Location of site elements With due consideration of the topography of the area  and natural screening effects, care should be taken in the siting of the following: a) access points;

Due to the highly visible and intrusive nature of  operations involved in the construction and removal of overburden mounds, they should always be sited as far from noise-sensitive premises as possible. Their height should be restricted where appropriate. During construction of an overburden mound, the faces nearest to noise-sensitive premises should be  progressively raised to form an effective baffle so that the bulk of tipping is carried out behind those faces. Similarly, those faces should be retained for as long as practicable during removal of the mounds to  provide screening for the bulk of the removal operations. Internal haul roads should be located as far as  practicable from noise-sensitive premises and be appropriately screened. The roads should have easy gradients and gradual turns to reduce noise emission from vehicles and mobile plant.

b) limit of excavation; c) baffle mounds; d) acoustic fences; e) overburden mounds;

Overburden mounds should be located as far from noise-sensitive premises as is reasonable, except where they are used as baffle mounds.

f) internal haul roads; g) plant yards and maintenance facilities;

Site amenities, plant yards, maintenance areas, coal screening/wa scree ning/washing shing plants, stocking stocking and loading facilities should be sited remote from and be screened from noise-sensitive premises.

h) coal screening and washing plants; i) pumps, generators and static plant;  j) stocking areas and loading facilities; k) off-site coal haulage routes; l) site amenities and car parking.  Access points should be located with due regard to the proximity of noise-sensitive premises. The location and design of access points have to be agreed with the highway authority and the MPA. The limit of excavation is determined by a wide range of geological and engineering constraints such as the location, nature and quality of the coal, the characteristics and stability of the strata and the existence of faults and other features. In addition to these constraints, further reductions to the limit of 

Where coal is to be transported from the site by road, the route should be carefully selected to minimize the impact on noise-sensitive premises even if this results in an increased haulage distance. 5.4 Working methods The phasing of the works and the working methods will have a major bearing on the control of noise. The following are of special importance: a) depth of the coal seams; b) direction of working; c) height, method of construction and location of 

excavation should be considered, forexcavation example, toarea   provide additional space around the for baffle mounds or other screening methods or to utilize fully the natural screening effects of the existing existin g topography. topography.

overburden mounds; d) location, gradient and screening of site roads;

Baffle mounds should be sited so as to provide  protection to noise-sensitive premises and should be extended in length beyond the limits of the premises to be protected. To obtain the best protection, they should be sited to obscure the line of sight to the noise sources and to maximize the path differences. Guidance on the noise reduction to be expected from baffle mounds and similar barriers may be found foun d in annex annex D of BS 5228 5228 : Part Part 1 : 199 1997. 7.

g) rate of production;

Where protection to noise-sensitive premises is required and where construction of a baffle mound is impracticable, the provision of another type of  acoustic barrier should be considered. Visual considerations should be taken into account.

e) plant to be employed; f) working hours; h) use and control of blasting. Working methods should be adopted that allow for  early screening of noise-sensitive premises from the subsequent subseq uent operations. operations. Where practi practicable, cable, noisy static site elements should be located to take advantage of the screening effects of overburden and soil mounds mounds.. Once the limit of excavation and the maximum depth of the coal seams to be extracted have been determined in accordance with 5.3 with  5.3,, a direction of  working and phasing of operations can be deployed that reduces the transmission of noise from the site.

--`,``-`-`,,`,,`,`,,`---

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

2

©  BSI

  Not for Resale

1997

 

BS 5228 : Part 3 : 1997

There is a wide range of variables that influence these activities therefore it is not possible to be  prescriptive for individual sites and a commonsense approach should be adopted. For example, it may be useful to retain an area of high ground within an excavation area oflatter a site stages to screen site phase activities until the of aother particular of an operation, whereas in other cases the material from the high ground may be more effectively utilized as screening material in an earlier phase of  the operation. operation. 5.5 Selection of plant The characteristics of noise and vibration emissions from each item of plant, and their collective effect, should be assessed during the selection process for  the acquisition of plant. Consideration should be given to the selection of   plant with the least impact in terms of noise and  vibration. Where electric plant is to be deployed on site, consideration should be given to the installation of a  mains supply in preference to on-site generators. Information concerning sound power levels for  specific items of plant may be found in tables 10 and 11 of anne annex x C of BS 5228 : Part Part 1 : 199 1997. 7. 5.6 Deployment of plant The movement of plant on and off the site should be restricted as far as practicable to within the agreed working hours for the site. The time taken to carry out noisy operations near  occupied properties outside the site should be reduced to as short a period as possible. 5.7 Working hours The restriction of working hours for any operation where emissions of noise and vibration may have an adverse effect on the occupants of sensitive premises should be considered in preference to the by road sterilization of coal reserves. Coal haulage from such sites should be limited to between 0700 hours and 1900 hours, unless local circumstances require otherwise.

5.9 Operation of plant Efficient exhaust silencers and/or enclosures should be fitted to all engines and all plant should be maintained in efficient working order. Consideration should be given to the provision of  acoustic enclosures (see BS 5228 : Part 1),  particularly when fixed plant is operated near  noise-sensitive premises. Dragline buckets should be emptied as close to spoil heaps as possible, taking care to keep the clanging of chains on buckets to a minimum. Doors of diesel powered excavators should generally be kept closed. Plant should be parked as far as possible from noise-sensitive premises and engines should be started one by one. Excessive and unnecessary revving of engines should be avoided at all times.                     `   ,   ,         `   ,         `   ,   ,         `   ,   ,         `             `             `         `   ,         `         -

 Audible reversing warning systems on dump trucks should be of a type which, whilst ensuring that they give proper outside warning, have a minimum impact on persons opencast coal sites.noise When reversing, dump trucks should travel in a direction away from noise-sensi noise-sensitive tive premis premises es whenev whenever  er   possible. Consideration should be given to the employment of other reversing warning systems to reduce the impact of noise outside opencast coal sites, provided the chosen systems conform to applicable regulations, including those related to Health and Safety. The construction of baffle mounds adjacent to noise-sensitive premises should not be carried out at night. It may also be necessary to restrict this operation to times other than early mornings or late evenings, to avoid undue disturbance to local residents. Fixed noise sources such as generators and pumps,  particularly those operating for 24 h each day, should be sited as far from noise-sensitive premises as is reasonable or, when site conditions permit, should be sited within the excavation. When this is impracticable they should be enclosed within baffle mounds or acoustic enclosures. Pumps should be electrically driven and sound-reduced  plant should be employed for electric power  generation.

5.8 5.8 Train Training ing and super supervision vision Operatives should be trained to employ proper  techniques to keep site noise and vibration to a  minimum. Effective supervision and a commitment by all concerned should provide the best and most effective way of achieving the objectives of this standard. Site working should be carried out strictly in accordance with the conditions of planning  permission and the recommendations of this

Routine servicing, maintenance and testing of plant should be carried out whenever possible within a   properly screened plant yard. For the larger items of   plant such as main excavators that are serviced and maintained at their working positions, care should be taken to avoid disturbance from noise at sensitive locations locatio ns particularly particularly during unsocia unsociable ble hours.

standard, which should be enforced by site supervision.  A programme of self monitoring should be implemented to ensure that site working conforms to these conditions and recommendations. Copyright British Standards Institution  BSI Provided by IHS under license© with BSI 1997 No reproduction or networking permitted without license from IHS

  Not for Resale

3

 

BS 5228 : Part 3 : 1997

5.10 Blasting Blasting can be an emotive issue for residents around an opencast site. Good liaison between operator and residents is essential to prevent unnecessary anxiety. Wherever possible the operator  should inform each resident of the proposed times of  blasting and of any deviation from this programme in advance of the operations. On each day that blasting takes place it should be restricted as far as practicable to regular periods. Blasthole drilling can cause excessive noise emissions particularly when carried out at or near  ground level and close to the site boundary. The choice of appropriate drilling rigs such as down-the-hole hammers or hydraulic drifters as opposed to compressed air drifters will reduce the impact of noise emissions from this activity. `    , `  `  `  `    ,   , `    ,   , `    , `    ,   , `  -

Each blast should be carefully designed to maximize its efficiency and reduce the transmission of noise and vibration. vibration. Initiation using detonating fuse on the surface may cause problems associated with air overpressure. This can be avoided by adopting the technique of  down-the-hole initiation or, if this is not possible, can be alleviated using exposed lines of detonating fuse with a reasonable thickness of selected overburden. Groundborne vibration can lead to concern being expressed by residents around opencast sites usually over the likelihood of damage to property, albeit that even the most cosmetic of plaster cracking is extremely unlikely. This problem can be mitigated by the adoption of  good blasting techniques which may include consideration of the following measures:

 All of these activities generate noise and vibration. The major sources are the crushing and screening  processes, the reception and disposal hoppers, mobile site plant and road and rail traffic. Coal disposal sites are areas of major industrial activity which may need to be located at least 400 m from noise-sensitive premises. If there are any noise-sensitive premises in close  proximity, effective screening of mobile plant and traffic by baffle mounds is required and proper   provision should be made for the effective insulation of fixed plant and equipment, such as the use of  lined chutes and properly designed acoustic enclosures.

6 Limitations on emission of noise and  vibration  vibra tion from fro m sites Opencast coal extraction and associated works can take place in remote to semi-urban area conditions. Each site and situation should be considered for  noise and vibration control on its own merits. When the site is adjacent to noise-sensitive premises it may be necessary to impose conditions including specific noise limits, with such other conditions imposed as determined by the Secretary of State for Energy or  Mineral Planning Authority as appropriate. Guidance regarding criteria for the setting of noise and vibration control targets can be found in clause 8 clause  8 of  of BS 5228 : Part 1 : 1997. Guidance on vibration levels associated with blasting is given within MPG 9 [12] and for noise from surface mineral workings within MPG 11 [13]. Limitations on working hours for the site, or part of  it, and the restriction of the noisier activities to less sensitive times or days, can be employed as means of limiting the impact of noise and vibration from opencast coal sites.

a) reduction of instantaneous charge weights; b) the judicious use of short delay detonators; c) decking of explosive charges within boreholes; d) ensuring that the maximum free (fragmented or  open) face is available for each shot; e) adequate stemming with appropriate material such as sized gravel or stone chippings. 5.11 Coal disposal sites  After coal is excavated from an opencast site it may be taken to a coal disposal site. This can be located within an opencast site, adjacent to an opencast site or at some distance, near main line rail and road facilities, and can serve more than one site. At a coal disposal site any, all or a combination of the following can take place: coal washing, crushing, screening, blending, storage in hoppers or on the ground in bunds and dispatch from the disposal  point by rail or road vehicles. (See annex B.)

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

4

©  BSI

  Not for Resale

1997

 

BS 5228 : Part 3 : 1997

 Ann  A nnex exes es

 Annex  Ann ex A (infor (informat mative ive) ) Legislative detail Before 1984 the British Coal Corporation's sites were authorized by the Secretary of State for Energy. Since then for all opencast sites a planning permission has been required from the appropriate Mineral Planning  Authorit  Auth ority y (MPA) (MPA) or or,, on appe appeal, al, from the Secretar Secretary y of  State for the Environment in England or the Secretary of State for Scotland or Wales as appropriate. The operator therefore makes a planning application to the relevant MPA, either the County Council in shire counties, the Metropolitan Council in the former  Metropolitan Counties, or the District Council in Scotland. Mineral planning authority will also be exercised by new unitary authorities being created in Scotland, Wales and parts of England. Before making a planning application, the operator  often undertakes extensive drilling and other  explorations to prove the coal reserves. These operations are now governed by clause 22 clause 22 of  of the Town

 Almost all coal in Grea  Almost Greatt Brit Britain ain is vested vested in the Coal  Authority  Auth ority, a non-depar non-departmen tmental tal public public body created created by the Coal Industry Act 1994 [14]. The authority is responsible for managing the non-operational aspects of the UK coal industry.  All future future coal mining operation operationss will require a lease lease and licence from the Coal Authority under Part II of  the Coal Industry Act 1994 [14]. Sites licensed by the British Coal Corporation before 31st October 1994 under Section 36 (2) of the 1946 Act (as amended by the Coal Industry Act 1990) [15], can, however, continue operations during the validity of those licences. Sites contained in the 1994 privatization  packages  pack ages have lice licences nces granted by the Governm Government. ent. The previous limitation of 250 000 t on the amount of  coal extracted from any one licensed opencast site was removed rem oved by the 1994 Act.  Applicants  Applican ts for licences licences are resp responsi onsible ble for securing securing the  planning  plan ning permissi permission on and othe otherr consents consents needed needed to work the coal, including rights to occupy the land and to disturb other minerals. Many opencast sites win significant quantities of other minerals, principally seams of fireclay beneath the coal seams. These operations also require planning permission.

and Country Planning General Development Order 1988 [18]. Coal operators also require a licence from the Coal Authority (see further in this annex) if  they wish to explore for coal. Since July 1988 almost all the British Coal Corporation's site applications and many larger sites applied for by other operators have been accompanied by an Environmental Statement. These are required under the Town and Country Planning (Assessment of  Environmental Effects) Regulations 1988 [19], which implemented the 1985 EC Environmental Assessment Directive [20]. The Environmental Statement examines the environmental implications of the proposed operations (noise, dust, visual impact, traffic, etc.) on the local community as well as the impact on the ecology and landscape of the site. The MPA considers the application and, if satisfied that the proposals are acceptable in planning and environmental terms, approves it subject to conditions governing the site operations and restoration.

 Annex  Ann ex B (infor (informat mative ive) ) Coal processing, storage and distribution When coal is delivered by road to a disposal point it generally arrives at elevated discharge hoppers into which coal is tipped from the lorries after they have  passed  pass ed over a weig weigh h bridge. bridge. The coal falls through a large grid screen into the hopper and is conveyed by a screw conveyor into roller crushers, usually diesel driven, which reduce the coal size. It may then pass through a coal washing  plant before  plant before being carried carried by belt conveyor conveyorss into the coal screening house.                     `   ,   ,         `   ,         `   ,   ,         `   ,   ,         `             `             `         `   ,         `         -

Here the coal is conveyed to the top of the building before falling through a series of shaking screens of  diminishing size where the required sized coal is removed to separate storage facilities.

If the planning application is refused or not determined by the MPA, the operator may appeal to the Secretary of State for the Environment, Wales or Scotland as appropriate. A public inquiry is held under an Inspector, and following the Inspector's report the Secretary of State grants or refuses permission.

The sized, washed and blended coal is then conveyed to the main storage area where it is laid down in layers and levelled using one or more diesel loader/dozers.

 After an open  After opencast cast site rece receives ives planning perm permissi ission on an authorization from the local authority is also needed for the coal loading operations, which are Part B  processe  proc essess in acco accordan rdance ce with the Regulatio Regulations ns under  Part 1 of the Environmental Protection Act 1990 [1].

When required for the market, the coal is dug out using a diesel loader and loaded into a reclaim hopper. From here a belt conveyor takes the coal to elevated storage hoppers from which either road vehicles or  railway wagons are loaded by gravity.

Copyright British Standards Institution  BSI Provided by IHS under license© with BSI 1997 No reproduction or networking permitted without license from IHS

  Not for Resale

5

 

`    , `  `  `  `    ,   , `    ,   , `    , `    ,   , `  -

Copyright British Standards Institution Provided by IHS under license with BSI No reproduction or networking permitted without license from IHS

6

 

blank Not for Resale

 

BS 5228 : Part 3 : 1997

List of references  (see clause   2)

Normative references BSI publications BRITISH STANDARDS INSTITUTION, London

BS 5228 : BS 5228 : Part 1 : 1997

   

Noise contr control ol on construction construction and open sites Code of practi practice ce for basic infor information mation and proced procedures ures for nois noisee control

Informative references BSI publications BRITISH STANDARDS INSTITUTION, London

BS 6472 : 1992

 

Guide to evalua evaluation tion of human exposu exposure re to vibrat vibration ion in buildi buildings ngs (1 Hz to 80 Hz)

BSBS 7385 : : Part 1 : 1990   7385

 

BS 7385 : Part 2 : 1993

 

Evalua Evaluation tionmeasu and measu measuremen t for ons vibrat vibration ionevalua in buildi buildings Guide for measuremen rementrement t of vibrati vibrations and evaluation tionngs of their  effects on buildings Guide to damage levels from groundborne groundborne vibration vibration

Other publications [1] GREAT BRITAIN. Environmental Protection Act 1990. London: The Stationery Office [2] GREAT BRITAIN. Environment Act 1995. London: The Stationery Office [3] GREAT BRITAIN. Noise and Statutory Nuisance Act 1993. London: The Stationery Office [4] GREAT BRITAIN. Control of Pollution Act 1974. London: The Stationery Office [5] NORTHERN IRELAND. Pollution Control and Local Government (Northern Ireland) Order 1978. Belfast: The Stationery Statione ry Office [6] GREAT BRITAIN. Health and Safety at Work etc. Act 1974. London: The Stationery Office [7] NORTHERN IRELAND. Health and Safety at Work (Northern Ireland) Order 1978. Belfast: The Stationery Office [8] GREAT BRITAIN. Noise at Work Regulations, 1989 SI 1790. London: The Stationery Office [9] NORTHERN IRELAND. Noise at Work Regulations (Northern Ireland), 1990 Statutory Rules 147. Belfast: The Stationery Statione ry Office [10] DEPARTM DEPARTMENT ENT OF THE ENVIR ENVIRONMENT ONMENT/WELSH /WELSH OFFICE. OFFICE.  Opencast coal mining. Mineral Planning Guidance Note MPG 3. London: The Stationery Office, 1988 [11] DEPARTM DEPARTMENT ENT OF THE ENVIR ENVIRONMENT ONMENT/WELSH /WELSH OFFICE. OFFICE.  General considerations and the Development  Plan System. Mineral Planning Guidance Note MPG 1. London: The Stationery Office, 1988 [12] DEPARTM DEPARTMENT ENT OF THE ENVIR ENVIRONMENT ONMENT/WELSH /WELSH OFFICE. OFFICE.  Planning and Compensation Act 1991:  Interim  Inter im Order Permissio Permissions ns (IDOs) Condition Conditionss. Mineral Planning Guidance Note MPG 9. London: The Stationery Statione ry Office, 1992 [13] DEPARTM DEPARTMENT ENT OF THE ENVIR ENVIRONMENT ONMENT/WELSH /WELSH OFFICE. OFFICE.  The control of noise at surface mineral workings. Mineral Planning Guidance Note MPG 11. London: The Stationery Office, 1993 [14] GREAT BRITAIN. Coal Industry Act 1994. London: The Stationery Office [15] GREAT BRITAIN. Coal Industry Nationalisation Act 1946. London: The Stationery Office [16] GREAT BRITAIN. Opencast Coal Act 1958. London: The Stationery Office [17] GREAT BRITAIN. Town and Country Planning Act 1990. London: The Stationery Office                     `   ,   ,         `   ,         `   ,   ,         `   ,   ,         `             `             `         `   ,         `         -

[18] GREAT BRITAIN. Town and Country Planning General Development Order 1988. London: The Stationery Office [19] GREAT BRITAIN. Town and Country Planning (Assessment of Environmental Effects) Regulations 1988. London: The Stationery Office [20] EUROPEAN COMMISSION. COMMISSION. Council Directi Directive ve 85/337/EEC.  Environmental assessment  (1985) Copyright British Standards Institution  BSI Provided by IHS under license© with BSI 1997 No reproduction or networking permitted without license from IHS

Not for Resale

 

| | | | | | | | | | | | | | | | | | | | | | | |

BSI 389 Chiswick High Road London W4 4AL

BSI Ð British Standards Institution BSI is the independent national body responsible for preparing British Standards. It  presents  pres ents the UK view on standard standardss in Euro Europe pe and at the internat internationa ionall level. level. It is incorporated by Royal Charter. Revisions

|| | | | | | | | | | | | | | | | | | | | | | | | | | | | |

British Standards are updated by amendment or revision. Users of British Standards should make sure that they possess the latest amendments or editions.

|| | | | | | | | | | | | | | | | | | | | | | | | | | | | | | || | | | | | | | | | | | | | | | | | | | | | | | | | | | | | || | | | | | | |

otherwise requested requested.. Information on standards

It is the constant aim of BSI to improve the quality of our products and services. We would be grateful if anyone finding an inaccuracy or ambiguity while using this British Standard would inform the Secretary of the technical committee responsible, the identity of which can be found on the inside front cover. Tel: 020 8996 9000. Fax: 020 8996 7400. BSI offers members an individual updating service called PLUS which ensures that subscribers automatically receive the latest editions of standards. Buying standards

Orders for all BSI, international and foreign standards publications should be addressed to Customer Services. Tel: 020 8996 9001. Fax: 020 8996 7001. In response to orders for international standards, it is BSI policy to supply the BSI implementation of those that have been published as British Standards, unless

BSI provides a wide range of information on national, European and international standards through its Library and its Technical Help to Exporters Service. Various BSI electronic information services are also available which give details on all its  products  prod ucts and services. services. Contac Contactt the Inform Information ation Centre. Centre. Tel: Tel: 020 8996 711 7111. 1. Fax: 020 8996 7048. Subscribing members of BSI are kept up to date with standards developments and receive substantial discounts on the purchase price of standards. For details of  these and other benefits contact Membership Administration. Tel: 020 8996 7002. Fax: 020 8996 7001. Copyright

Copyright subsists in all BSI publications. BSI also holds the copyright, in the UK, of  the publications of the international standardization bodies. Except as permitted under the Copyright, Designs and Patents Act 1988 no extract may be reproduced, stored in a retrieval system or transmitted in any form or by any means ± electronic,  photocopy  photo copying, ing, recor recording ding or otherwise otherwise ± with without out prior written permissi permission on from BSI. This does not preclude the free use, in the course of implementing the standard, of  necessary details such as symbols, and size, type or grade designations. If these details are to be used for any other purpose than implementation then the prior  written permission of BSI must be obtained. If permission is granted, the terms may include royalty payments or a licensing agreement. Details and advice can be obtained from the Copyright Manager. Tel: 020 8996 7070.

--`,``-`-`,,`,,`,`,,`---

Copyright British Standards Institution Provided by IHS under license with BSI Not for Resale

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF