Note File No. W1/DEE-I/AP-181X-LB 04 /SKLM/2010 Subject:- Srikakulam Dist:- PMGSY-Ph-IX- AP18- IX LB 04 - Construction of bridge @0/640km on R/f Veeraghattam to Telgam :Est. Cost Rs. 435.56 lakhs
Ref :- Lr.2434/10/Missing Bridges/T4 dated 19.10.2010 of the SE, P.R, Srikakulam Submitted, Sir, Please peruse the reference cited wherein the SE (PR)Srikakulam has submitted estimate for the work "Construction of bridge @0/640km on R/f Veeraghattam to Telgam" Est. Cost Rs.435.56 lakhs for according technical sanction The details are as given below 1 Name of the Circle
: Srikakulam
2 Name of the District
: Srikakulam
3 Name of the Division
: Palakonda
4 Name of the Constituency
: Palakonda
5 Name of the Mandal
: Veeraghattam
6 Name of the work
: Construction of bridge @0/640km on R/f Veeraghattam to Telgam (9 Vents of 16.50m) : Lr No P-17024/1/2010. RC-GoI-Ministary of R.D New Delhi dt 09.9.2010.
7 Clearance Reference & date of GOI 8 Administrative sanction Ref. No. & date
: GO Ms No 330 dt 17.9.2010 of PR & RD (Progs II) Dept
9 Package No
: AP18- IX LB 04
10 Whether cleared by STA or Not?
Yes Cleared
11 Name of the Grant
: PMGSY -PHASE-IX
12 Admn sanction Cost ( Rs Lakhs)
: 435.56
MORD share
107.54
State share
328.01
13 Estimate Cost
: 435.56
14 Length of the existing road 15 Habitations Benefited
: : : : vottigedda
16 Bridge proposed now at with streams name if any 17 Bridge Design approval Ref
: Not approved
18 Hydraulic particulars of canal
: 101.47
RCL HFL
:
Bottom of Deck proposed
: 100.87
MFL
: 100.27
OFL
: 99.34
AVG.BED SLOPE
: 0.0006
ROAD CREST LEVEL
: 101.47
Maximum design discharge Design velocity at MFL Catchment area
297.57Sq km
Type of foundation
Well foundation
Soil particulars
Rock is available at a depth i.e., at 13.0 m
Expansion joint
As per MOST
Bearings
As per MOST
deck slab
As per MOST
Grade of concrete proposed in the estimate Wearing coat
VRCC M30
Approach slab
VRCC M30
FLY WINGS
SUPER STRUCTURE AND DECK SLAB, GIRDERS
VRCC M25
PIER
VRCC M20
ABUTMENT
VRCC M20
Hammer head block
VRCC M25
Abutment bed block and backing wall
: VRCC M25
Well steining
VRCC M15
Well curb
VRCC M25
Pier and abutment well caps
VRCC M20
Top plugging
VRCC M15
bottom plugging
VRCC M20
width of the structure proposed
: 7.50m wide
19 Whether inspection report of SE/EE : Yes (of SE) is furnished
20 SSR & DATA used for preparation Estimate
: Common SSR 2010-11 & Asper AP Revised Standard DATA with 18% OH & CP including 4% VAT & No Provision for cost of water for road work and CD works asper DATA
21 Rates of Cement, steel, Bitumen Item
:
Cement
:
Steel Fe-415
Rate
Unit
Date
4600.00
MT
Oct'10
:
34500.00
MT
Oct'10
Steel MS
:
40000.00
MT
Oct'10
Bitumen 60/70
:
30962.96
MT
01.10.10
Emulsion (RS-1)
:
23727.96
MT
01.10.10
Emulsion (SS-1)
:
23225.08
MT
01.10.10
22 Provisions made in the estimate Description
Quantity Rate
Unit
Amount
Construction of bridge FOUNDATIONS Earth work for foundation above water level
3200.00
59.29 cum
189722.00
Sand filling
2310.00
170.57 cum
394017.00
83.88
2929.37 cum
245716.00
660.00
3599.04 cum
2375366.00
PCC M-10 for foundation PCC M-15 for footings of wing walls SUB STRUCTURE
62066.98 MT
Cutting edge for Abutments-2 Nos & Piers -8 Nos
8.00
RCC M-25 for Well curb
170
4778.68 cum
812376
1350
3789.35 cum
5115623
RCC M20 for Bottom plug
530
4162.3 cum
2206019
RCC M20 for top plug
100
3472.16 cum
347216
RCC M20 for well cap
481
4122.61 cum
1982975
RCC M-15 for Well Stening
496536.00
Sinking of 7m dia well for Abutments (2 Nos) up to 3m depth in cleyey soils-2X3m
6
11034.53 Rmt
66207
3 to 10m depth in clayey soils-2X9m
18
16226.04 Rmt
292069
up to 3m depth in Hard rock-2x1.5m
3
20087.66 Rmt
60263
up to 3m depth in cleyey soils-8X3m
24
7579.06 Rmt
181897
3 to 10m depth in clayey soils-8X9m
72
16086.08 Rmt
1158198
up to 3m depth in Hard rock-8X1.5m
12
18625.33 Rmt
223504
RCC M-15 for sub structure , abutments and wing walls
183.00
3789.35 cum
693451.00
RCC M-15 for sub structure , abutments and wing walls
195.00
3789.35 cum
738923.00
RCC M-25 for Bed blocks & backing walls sub structure Below WL
158.00
5079.68 cum
802589.00
550.80
5079.68 cum
2797888.00
54.00
Ls
314820.00
VRCC M-30 Design mix for Wearing coat over deck slab
203.00
4474.92 cum
908409.00
VRCC M30 Design mix Approach slab
465.00
4400.20 cum
2046093.00
VRCC M-25 Design mix for Hand railings
324.66
1364.33 Rmt
442943.00
CC M-15 for Leveling below approach slab
231.75
3480.32 cum
806564.00
Rough stone revetment
33.32
913.70 cum
30444.00
Rough stone for toe wall
12.00
913.70 cum
10964.00
Filter material
17.00
480.02 cum
8160.00
165.14
324.31 cum
53557.00
Filter medial
56.00
1571.25 cum
87990.00
Weep holes
115.20
235.07 rmt
27080.00
Draingage spouts
36.00
LS
32000.00
Expansion joints
85.00
LS
380000.00
Sinking of 6m dia well for Piers-8Nos
SUPER STRUCTURE VRCC M-25 Design mix for T-beam girder sla Neoprene bearings
Back filling
Supply and laying of Steel Fe-415 For Foundation Mts For Sub Structure For Super Structure
95.00
43622.56 MT
4144143.00
57.00
43720.87 MT
2492090.00
151.00
44467.11 MT
6714534.00 39680338.00
sub total
Other provisions made in the estimate Provision towards VAT@4%
4%
1587214
As per calculation sheet
510032
Provision towards Pre-survey & DPR preparation charges
LS
400000
Road furniture
LS
30000
Provision for Mastic pads
LS
80000
Provision for earthen embankment
LS
50000
Unforseen items
LS
662416
Provision towards Seigneorage charges
Grand total
43000000
REMARKS & OBSERVATIONS NOTED:-
1) The designs are not approved. The SE has proposed High Level Bridge of 9VX16.50m span with well foundation as approved in DPR and the same has been considered for tender purpose. 2) The other provisions viz.,Pre-survey& DPR charges, Road furnitue, Mastic pads & earten embankment are allowed as per DPR 3) with the above provisions the estimate is put up for technical sanction for Rs.430.00 lakhs against A/s of Rs.435.56 Lakhs
W1
DEE -1
GENERAL ABSTRACT
PACKAGE NO : AP18 IX -LB O4 NAME OF WORK :- Con.of bridge at 640m across Vottigedds on R/f Veeraghattam @ 87/8 km to Telgam (9 vents of 16.5m span) S.No. Desription Amount PART - A Construction of Bridge (9 Vents of 16.50m span)
39838317 39838317
VA @ 4%
1593533
Seionarage charges ( As per caluculation) Provision towards preparation charges
Pre-survey
&
510032 DPR
LS
400000
Road furniture
LS
30000
Provision for Mastic pads
LS
80000
Provision for earthen embankment
LS
50000
Unforseen items
LS
498118
PART - A TOTAL
43000000
PART-B Maiantance for 5 Years PART-A+B: Total
1089000 44089000
Administratively sanctioned under PMGSY Phase IX for Rs.435.56 lakhs vide Go Ms No.330 dated 17.09.10 of PR & RD (Progs.II) dept. Technically sanctioned for Rs.430.00 Lakhs and assigned TSR No. 10-11 dated 23.10.10
/
Sdxxx Engineer-in-Chief, PR, PMGSY,Hyderabad
RBR_FNDN
RATE ANALYSIS( SSR 2010-11) NAME OF WORK :- Con.of bridge at 640m across Vottigedds on R/f Veeraghattam @ 87/8 km to Telgam (9 vents of 16.5m span) Sl. S. No
No.
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
1
Earthwork in excavation in Ordinay Soil for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD including contractors profit & Over head charges but excluding Seigonarage charges & VAT Above water Level.Upto 3 m depth
1
Note : Classifications of Earth Work Specification are as per 302.2.1(a) of MORD . (B) Mechanical Means i
Upto 3 m depth Unit = cum Taking output = 240 cum a) Labour Mate
day
-
Mazdoor (Unskilled) b) Machinery
day
8.32
196.00
1630.72
Hydraulic Excavator 1 cum bucket capacity
hour
6.00
1808.50
10851.00
Cost of dewatering where required, upto 5% of (a+b)
0.00
Total ( a+b)
12481.72
c&d) Overheads & Contractors Profit @ 14%Excluding VAT
14%
1747.44
Cost for 240 cum = a+b+c+d Rate per cum = (a+b+c+d)/240
14229.16 59.29
Note : 1. Cost of dewatering upto 5% of a+b may be added, where required, up to 10 per cent of labour cost. Assessment for dewatering shall be made as per site conditions.
Filling in foundation trenches as per drawing and technical specification Clause 305.3.9 MORD excluding Seigonarage charges & VAT
2
I
Sand filling Unit = cum a) Labour Mate Mazdoor (Unskilled) b) Material Sand for blindage Basic rate c&d) Overheads & Contractors Profit @ 14%Excluding VAT e) Add conveyance charges Sand Rate per cum = a+b+c+d Note : Cost of transportation of good quality earth has not been included.
day
-
day
0.31
196.00
cum
1.00
70.00
60.76 70.00 130.76
14.00% cum
1.00
18.31 21.50
21.50 170.57
Only labour for carrying carted earth with a lead of 50 m to the foundation pits has been taken in the rate. The cost of carted earth may be worked out separately if the same is not available from the adjoining area.
Backfilling of foundation trenches shall normally be done with excavated earth. The cost of this operation is included in item 11.1. Only in case the excavated earth is not of suitable quality, sand filling or backfilling with carted earth may be resort to.
484
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
1012.00
1 3
Providing concrete for plain/reinforced concrete PCC (1:3:6) nominal Mix M10 in open foundations using 40 mm nominal size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD ncluding contractors profit & Over head charges but excluding Seigonarage charges & VAT.for Levelling course below foundation
I P.C.C grade M 10 (i) Nominal mix 1:3:6
Unit = cum (a) Material Cement
t
0.22
4600.00
cum
0.45
220.00
99.00
cum
0.900
695.00
625.50
kl
1.2
0.00
0.00
day day day
0.1 1.39
258.00 196.00
25.80 272.44
Mechanical concrete mixer 0.4/0.28 cum capacity fitted with water measuring hour device and preferably also with load cell.
0.40
345.00
138.00
0.13
345.00
44.85
Coarse sand 40 mm aggregate Water (b) Labour Mate Mason (1st Class) Mazdoor (Unskilled) (c) Machinery
hour Water tanker 6 kl capacity (d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT g) Add conveyance charges Coarse sand 40 mm aggregate Rate per cum = a+b+c+d+e+f+g 4
4.00%
88.70 2306.29
14.00%
322.88
cum
0.45
21.50
9.68
cum
0.900
322.80
290.52 2929.37
Providing concrete for plain/reinforced concrete P.C.C grade M 15 (Design Mix) MORTH 12.8 A in open foundations using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2100 MORTH. including contractors profit & Over head charges but excluding Seigonarage charges & VAT
II
P.C.C grade M 15 (Design Mix) MORTH 12.8 A Unit = cum (a) Material Cement
t
0.28
4600.00
Coarse sand 40 mm aggregate
cum
0.45
220.00
99.00
cum
0.54
695.00
375.30
20 mm aggregate
cum
0.27
1125.00
303.75
10 mm aggregate
cum
0.09
770.00
69.30
kl
1.2
0.00
0.00
Water
1265.00
(b) Labour Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
485
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA
hour
0.40
584.57
233.83
1
(c) Machinery
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
4.00%
111.30
Basic rate
2893.72
e&f) Overheads & Contractors Profit @ 14%Excluding VAT g) Add conveyance charges of material Coarse sand 40 mm aggregate 20 mm aggregate 10 mm aggregate Rate per cum = a+b+c+d+e+f+g
14.00%
405.12
cum cum
0.45 0.54
21.50 322.80
9.68 174.31
cum
0.27
322.80
87.16
cum
0.09
322.80
29.05 3599.04
t
1.05
40000.00
42000.00
kg
20.00
33.00
660.00
Note : Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works. Providing and laying cutting edge of Mild Steel weighing 40kg per metre for well foundation complete as per drawing and technical specification 1204, 1900 MORTH
5
Unit = 1 MT (a) Material Structural steel in plates, angles etc including 5% wastage Nuts & bolts (b) Labour Mate
day
-
Fitter
day
5.50
258.00
1419.00
Blaksmith
day
5.50
237.00
1303.50
Welder
day
5.50
237.00
1303.50
Mazdoor (Unskilled)
day
17.82
196.00
3492.72
Electrodes, cutting gas and other consumables @ 10% cost of (a) hour above Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT Rate per cum = a+b+c+d+e+f+g
0.10
42660.00
4266.00 54444.72
14.00%
7622.26 62066.98
Providing and laying reinforced cement concrete R.C.C M 25 Grade (Design Mix) using 20 & 10 mm HBG Metal in well foundations including cost, and conveyance of all materials to site and all labour charge mechanically mixed as per drawing and technical specifications Clauses 1200,1500 & 1700 MORTH including contractors profit & Over head charges but excluding Steel , Seigonarage charges & VAT
6
For Well Curb Unit =cum A Case I : Using Concrete Mixer. (a) Material Cement II
t
0.403
Coarse sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20
kl
1.2
0.00
Water
4600.00
1853.80
0.00 2837.50
(b) Labour Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44 298.24
c) Machinery Concrete mixer 0.4/0.28 cum capacity
hour/ cum
0.4
345.00
138.00 138.00
486
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
2
3
4
5
1
Total (a+b+c)
Amount Rs. 6 3273.74
d) Formwork @ 20% on (a+b+c)
654.75
20.00%
Basic rate
3928.49
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
549.99
g) Add conveyance charges of material Coarse sand
cum
0.45
21.50
9.68
20 mm aggregate
cum
0.54
322.80
174.31
10 mm aggregate
cum
0.36
322.80
Rate per cum = a+b+c+d+e+f+g 7
116.21 4778.68
Providing concrete for plain/reinforced concrete P.C.C grade M 15 (Design Mix) for Well Stening using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Seigonarage charges & VAT
II
P.C.C grade M 15 (Design Mix) Unit = cum (a) Material Cement
t
0.28
4600.00
Coarse sand
cum
0.45
220.00
99.00
40 mm aggregate
cum
0.54
695.00
375.30
20 mm aggregate
cum
0.27
1125.00
303.75
10 mm aggregate
cum
0.09
770.00
69.30
kl
1.2
0.00
0.00
Water
1265.00
(b) Labour Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA
hour
0.40
584.57
233.83
(c) Machinery
d) Formwork @10% on cost of material, labour and machinery (a+b+c) Basic rate
10.00%
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
278.24 3060.66 428.49
g) Add conveyance charges of material Coarse sand
cum
0.45
21.50
9.68
40 mm aggregate
cum
0.54
322.80
174.31
20 mm aggregate
cum
0.27
322.80
87.16
10 mm aggregate
cum
0.09
322.80
Rate per cum = a+b+c+d+e+f+g 8
29.05 3789.35
Plain/reinforced cement concrete R.C.C grade M 20 (Design Mix) using 40mm, 20 mm & 10 Graded HBG Metal aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawingscomplete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Steel ,Seigonarage charges & VAT for Bottom Plug
V R.C.C grade M 20 (Design Mix) (MORTH): (A)
Unit = cum Taking out put-15 cum (a) Material Cement Coarse sand
t
5.550
4600.00
25530.00
cum
6.750
220.00
1485.00
487
RBR_FNDN S. No
Description
1
2
Unit
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
40 mm aggregate
cum
5.400
695.00
3753.00
20 mm aggregate
cum
5.400
1125.00
6075.00
10 mm aggregate
cum
2.700
770.00
2079.00
kl
18.6
8.30
154.38
Mate
day
0.000
196.00
0.00
Mason (1st Class)
day
1.500
258.00
387.00
Mason 2nd Class
day
-
Mazdoor (Unskilled)
day
20.900
196.00
4096.40
Concrete mixer 0.4/0.28 cum capacity
hour
6.000
345.00
2070.00
Generator 33 KVA
hour
6.000
584.57
3507.42
light crane 3 tonnes capacity for handling tremie pipe
hour
6.000
280.00
Admixture (b) Labour
(c) Machinery
Basic rate
1680.00 50817.20
Add 5% cost of material & labour towards cost of forming sump, protective bunds, chiselling and making arrangements for under water concreting with tremie pipe
0.00%
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
0.00
7114.41
14.00%
g) Add conveyance charges of material Coarse sand
cum
6.750
21.50
145.13
40 mm aggregate
cum
5.400
322.80
1743.12
20 mm aggregate
cum
5.400
322.80
1743.12
10 mm aggregate
cum
2.700
322.80
Rate per 15 cum = a+b+c+d+e+f+g Rate per cum=( a+b+c+d+e+f+g)/15 9
871.56 62434.54 4162.30
Providing concrete for plain/reinforced concrete P.C.C grade M 15 (Design Mix) MORTH 12.8 A using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2100 MORTH. including contractors profit & Over head charges but excluding Seigonarage charges & VAT for Top Plug
II
P.C.C grade M 15 (Design Mix) MORTH 12.8 A Unit = cum (a) Material Cement
t
0.28
4600.00
Coarse sand
cum
0.45
220.00
99.00
40 mm aggregate
cum
0.54
695.00
375.30
20 mm aggregate
cum
0.27
1125.00
303.75
10 mm aggregate
cum
0.09
770.00
69.30
kl
1.2
0.00
0.00
Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA
hour
0.40
584.57
233.83
Water
1265.00
(b) Labour
(c) Machinery
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
0.00%
Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT g) Add conveyance charges of material Coarse sand 40 mm aggregate
0.00
2782.42 14.00% cum cum
0.45 0.54
389.54 21.50 322.80
9.68 174.31
488
RBR_FNDN S. No
Description
1
2
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
cum
0.27
322.80
87.16
cum
0.09
322.80
29.05 3472.16
t
5.120
4600.00
23552.00
Coarse sand
cum
6.750
220.00
1485.00
40 mm aggregate
cum
0.000
0.00
0.00
20 mm aggregate
cum
8.100
1125.00
9112.50
10 mm aggregate
cum
5.400
770.00
4158.00
kl
0
8.30
0.00
Mate
day
0.000
196.00
0.00
Mason (1st Class)
day
1.500
258.00
387.00
Mason 2nd Class
day
-
Mazdoor (Unskilled)
day
20.860
196.00
4088.56
Concrete mixer 0.4/0.28 cum capacity
hour
6.000
345.00
2070.00
Generator 33 KVA
hour
6.000
584.57
3507.42
light crane 3 tonnes capacity for handling tremie pipe
hour
0.000
280.00
20 mm aggregate 10 mm aggregate Rate per cum = a+b+c+d+e+f+g
10
Unit
Note : Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works. Plain/reinforced cement concrete R.C.C grade M 20 (Design Mix) using 20 mm & 10 Graded HBG Metal aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawingscomplete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204 MORD and 1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Steel ,Seigonarage charges & VAT for WELL CAP
V R.C.C grade M 20 (Design Mix) (MORTH): (A)
Unit = cum Taking out put-15 cum (a) Material Cement
Admixture (b) Labour
(c) Machinery
Basic rate
0.00 48360.48
d) Formwork @ 4% on cost of material, labour and machinery (a+b+c)
4.00%
1934.42
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
7041.29
g) Add conveyance charges of material Coarse sand
cum
6.750
40 mm aggregate
cum
0.000
0.00
0.00
20 mm aggregate
cum
8.100
322.80
2614.68
10 mm aggregate
cum
5.400
322.80
1743.12
21.50
Rate per 15 cum = a+b+c+d+e+f+g Rate per cum=( a+b+c+d+e+f+g)/15 11
145.13
61839.12 4122.61
Sinking of 7 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Clayey soil Depth below bed level upto 3.00 m Rate of sinking =0. 22m per hour (a) Labour Mate
day
-
Sinker(skilled)
day
1.50
258.00
387.00
Sinking helper (semi skilled)
day
3.18
237.00
753.66
489
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
4.50
1725.00
7762.50
1
(c) Machinery Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories hour Consumables in sinking @ 10% of (b) Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT
0.10
776.25 9679.41
14.00%
1355.12
Rate per cum = a+b+c+d+e+f+g 12
11034.53
Sinking of 7 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Clayey soil beyond 3.00 m up to 10m depth Rate of sinking =0.17m per hour (a) Labour Mate
day
-
Sinker(skilled)
day
2.00
258.00
516.00
Sinking helper (semi skilled)
day
4.26
237.00
1009.62
Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories Air compressor with numatic chiesel attachment for cutting hard clay hour
6.00
1725.00
10350.00
3.25
370.00
1202.50
Consumables in sinking @ 10% of (b)
0.10
(c) Machinery
hour
Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT
1155.25 14233.37
14.00%
1992.67
Rate per cum = a+b+c+d+e+f+g 13
16226.04
Sinking of 7 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Hard rock Depth below bed level upto 3.00 m Rate of sinking =0.17m per hour (a) Material Gelatin 80% Detonator electric (b) Labour
kg
7.00
60.00
420.00
Nos.
30.00
3.00
90.00
Mate
day
-
Driller
day
2.00
237.00
474.00
Blaster
day
0.25
237.00
59.25
Mazdoor (skilled)
day
4.00
237.00
948.00
Mazdoor (un skilled)
day
19.50
196.00
3822.00
Driver
day
0.50
237.00
118.50
Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories Air compressor with numatic chiesel attachment for cutting hard clay hour
6.00
1725.00
10350.00
2.00
370.00
740.00
Consumables in sinking @ 10% of (b)
0.10
(c) Machinery
Basic rate
hour
1109.00 17620.75
490
RBR_FNDN S. No
Description
Unit
2
3
1
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
Quantity
Rate Rs.
4
5
14.00%
6 2466.91
Rate per cum = a+b+c+d+e+f+g 14
Amount Rs.
20087.66
Sinking of 6 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Clayey soil Depth below bed level upto 3.00 m Rate of sinking =0. 33m per hour (a) Labour Mate
day
-
day
1.50
258.00
387.00
day
2.40
237.00
568.80
(c) Machinery Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories hour Consumables in sinking @ 10% of (b)
3.00
1725.00
5175.00
Sinker(skilled) Sinking helper (semi skilled)
Basic rate e&f) Overheads & Contractors Profit @ 14%Excluding VAT
0.10
517.50 6648.30
14.00%
930.76
Rate per cum = a+b+c+d+e+f+g 15
7579.06
Sinking of 6 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Clayey soil beyond 3.00 m up to 10m depth Rate of sinking =0.17m per hour (a) Labour Mate Sinker(skilled)
day
-
day
3.00
258.00
774.00
day
4.80
237.00
1137.60
Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories Air compressor with numatic chiesel attachment for cutting hard clay hour
6.00
1725.00
10350.00
2.00
370.00
Consumables in sinking @ 10% of (b) Basic rate
0.10
Sinking helper (semi skilled) (c) Machinery
hour
14110.60
e&f) Overheads & Contractors Profit @ 14%Excluding VAT Rate per cum = a+b+c+d+e+f+g 16
740.00 1109.00
14.00%
1975.48 16086.08
Sinking of 6 m external diameter well (other than numatic type of sinking) thorugh all types of strata namely sandy soils , clayey soils and rock as shown against each case complete as per drawing and technical specifications 1207 MORTH
Unit = Running meter Taking out put-1m Hard rock Depth below bed level upto 3.00 m Rate of sinking =0.17m per hour (a) Material Gelatin 80%
kg
4.00
60.00
240.00
Nos.
18.00
3.00
54.00
Mate
day
-
Driller
day
2.00
237.00
474.00
Detonator electric (b) Labour
491
RBR_FNDN S. No
Description
1
2
Unit
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
Blaster
day
0.25
237.00
59.25
Mazdoor (skilled)
day
4.00
237.00
948.00
Mazdoor (un skilled)
day
13.56
196.00
2657.76
Hire & running charges of crane with grab bucket of 0.75 cum hour capacity & accessories
6.00
1725.00
10350.00
Air compressor with numatic chiesel attachment for cutting hard clay
hour
2.00
370.00
740.00
Consumables in sinking @ 10% of (b)
hour
0.10
(c) Machinery
1109.00
Basic rate
16338.01
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
2287.32
Rate per cum = a+b+c+d+e+f+g 17
18625.33
Providing concrete for plain/reinforced concrete P.C.C grade M 15 (Design Mix) in Sub structure using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2200 MORTH including contractors profit & Over head charges but excluding Seigonarage charges & VAT
II
P.C.C grade M 15 (Design Mix) Unit = cum (a) Material Cement
t
0.28
4600.00
Coarse sand
cum
0.45
220.00
99.00
40 mm aggregate
cum
0.54
695.00
375.30
20 mm aggregate
cum
0.27
1125.00
303.75
10 mm aggregate
cum
0.09
770.00
69.30
kl
1.2
0.00
0.00
Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA
hour
0.40
584.57
233.83
Water
1265.00
(b) Labour
(c) Machinery
d) Formwork @ 10% on cost of material, labour and machinery (a+b+c)
10.00%
278.24
Basic rate
3060.66
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
428.49
g) Add conveyance charges of material Coarse sand
cum
0.45
21.50
9.68
40 mm aggregate
cum
0.54
322.80
174.31
20 mm aggregate
cum
0.27
322.80
87.16
10 mm aggregate
cum
0.09
322.80
Rate per cum = a+b+c+d+e+f+g
18
i
29.05 3789.35
Note : Needle Vibrator is an item of minor T & P which is already included in overhead charges. Hence not added in rate analysis of cement concrete works.
Providing reinforced concrete Reinforced Cement Concrete M 30 grade ( Design Mix) approach slab using 0.05 tones/cum reinforcement and formwork complete as per drawing and technical specifications Clauses1500, 1600, 1700 & 2704 MORTH including contractors profit & Over head charges but excluding cost of Steel ,Seigonarage charges & VAT
R.C.C. Grade M30 Design Mix
Case 1 : Using Concrete Mixer
492
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
1
3
4
5
6
Unit = cum (a) Material Cement
t
0.407
4600.00
1872.20
Coarse sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20
kl
1.2
0.00
0.00
Water (b) Labour Mate
day
-
Mason (1st Class)
day
0.1
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Bhisti
day
0.15
196.00
0.00
hr / cum
0.4
345.00
138.00
584.57
233.83
t
0.05
0.00
0.00
(c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA Steel
hour 0.4
(d) Formwork @ 3% on (a+b+c)
2.00%
70.52
Basic rate
3596.49
e&f) ) Overheads & Contractors Profit @ 14%Excluding VAT g) Add conveyance charges of material
14.00%
503.51
Coarse sand 20 mm aggregate
cum
0.45
21.50
9.68
cum
0.54
322.80
174.31
10 mm aggregate Rate per cum = a+b+c+d+e+f
cum
0.36
322.80
116.21 4400.20
Providing and laying reinforced cement concrete R.C.C M 25 Grade (Design Mix) using 20 & 10 mm HBG Metal in superstructure including cost, and conveyance of all materials to site and all labour charge mechanically mixed as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD including contractors profit & Over head charges but excluding Steel , Seigonarage charges & VAT
19
R.C.C M 25 Grade (Design Mix) Unit =cum A Case I : Using Concrete Mixer. (a) Material Cement II
t
0.400
Coarse sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20
kl
1.2
0.00
0.00
Water
4600.00
1840.00
(b) Labour Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
hour/ cum hour
0.40
345.00
138.00
0.40
584.57
233.83
c) Machinery Concrete mixer 0.4/0.28 cum capacity Generator 33 KVA d) For formwork and staging add the following percentage of (a+b+c): Case I : (I) For solid slab super-structure (MORTH) (i) Height upto 5m d)
Formwork and staging of (a+b+c)
20.00%
698.75
e&f) Overheads & Contractors Profit Rate per cum = (a+b+c+d+e+f)
493
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
1
Height 5m to 10m d)
Formwork and staging of (a+b+c)
25.00%
Basic cost
4192.52
e&f) Overheads & Contractors Profit @ 14%Excluding VAT g) Add conveyance charges of material cum Coarse sand cum 20 mm aggregate cum 10 mm aggregate Rate per cum = a+b+c+d+e+f+g P.C.C. M 15 ordinary grade (1:2.5:5) leveling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211 MORD including contractors profit & Over head charges but excluding Seigonarage charges & VAT
20
14.00%
586.95
0.45 0.54
21.50 322.80
0.36
322.80
9.68 174.31 116.21 5079.68
Nominal mix (1:2.5:5) / PCC M 15 using Concrete Mixture Unit = cum (a) Material Cement
t
0.275
4600.00
1265.00
Coarse sand
cum
0.48
220.00
105.60
40 mm aggregate
cum
0.54
695.00
375.30
20 mm aggregate
cum
0.27
1125.00
303.75
10 mm aggregate
cum
0.09
770.00
69.30
Mate
day
-
Mason (1st Class0
day
0.10
258.00
25.80
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA.
hour
0.40
584.57
233.83
(b) Labour
c) Machinery
Basic cost
2789.02
d&e) Overheads & Contractors Profit @ 14%Excluding VAT
390.46
14.00%
f) Add conveyance charges of material Coarse sand
cum
0.48
21.50
10.32
40 mm aggregate
cum
0.54
322.80
174.31
20 mm aggregate
cum
0.27
322.80
87.16
10 mm aggregate
cum
0.09
322.80
Rate per cum = a+b+c+d+e+f 21
(i)
29.05 3480.32
Providing and laying cement concrete wearing course M30 grade desin mix using 20 & 10 mm HBG Metal including cost, and conveyance of all materials to site and all labour charge mechanically mixed using 0.075 t/Cum reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3 MORD including contractors profit & Over head charges but excluding cost of Steel , Seigonarage charges & VAT
Unit = cum (a) Material Cement
t
0.407
4600.00
1872.20
Sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20
Water
kl
1.2
0.00
0.00
HYSD bar reinforcement including binding wire (Rate as per item 13.2) except OH & CP (b) Labour
t
0.075
0.00
0.00
Mate
day
-
Mason (1st Class)
day
0.10
258.00
25.80
494
RBR_FNDN S. No
Description
1
2
Unit
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
Mazdoor (Unskilled)
day
1.39
196.00
272.44
Mazdoor (Unskilled) for cleaning deck slab concrete surface
day
0.15
196.00
29.40
Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00
Generator 33 KVA.
hour
0.40
584.57
233.83
c) Machinery
(d) Formwork @ 3% of cost of concrete
3.00%
106.66
Basic cost
3662.03
e&f) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
512.68
g) Add conveyance charges of material Coarse sand
cum
0.45
21.50
9.68
20 mm aggregate
cum
0.54
322.80
174.31
10 mm aggregate
cum
0.36
322.80
Rate per cum = a+b+c+d+e+f+g Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 MORDincluding contractors profit & Over head charges but excluding Seigonarage charges & VAT
22
I
Unit = cum Taking output = 10 cum Granular material (a) Material Granular material (b) Labour Mate Mazdoor (Unskilled) (c) Machinery Plate compactor / power rammer Water Tanker Basic cost d&e) Overheads & Contractors Profit @ 14%Excluding VAT f) Add conveyance charges of material Granular material
23
116.21 4474.92
cum
12.000
50.50
606.00
day day
7.280
196.00
1426.88
hour hour
2.500 0.050
40.00 345.00
100.00 17.25 2150.13
14.00%
cum
12.000
301.02
66.00
792.00
Cost for 10 cum of granular backfill = a+b+c+d+e+f
3243.15
Rate per cum = (a+b+c+d+e+f)/10
324.31
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8 MORD including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = cum Taking output = 10 cum (a) Material Filter media as per specification
cum
12.000
880.00
10560.00
(b) Labour Mate
day
-
Mazdoor (Unskilled)
day
7.320
196.00
1434.72
Mazdoor (Skilled)
day
1.000
258.00
258.00
hour
0.060
345.00
c)
Machinery
Water Tanker of 6 KL capacity Basic cost d&e) Overheads & Contractors Profit @ 14%Excluding VAT f) Add conveyance charges of material Filter media as per specification Cost for 10 cum of granular backfill = a+b+c+d+e+f
20.70 12273.42
14.00% cum
12.000
1718.28 143.40
1720.80 15712.50
495
RBR_FNDN S. No
Description
Unit
Quantity
Rate Rs.
2
3
4
5
1
Rate per cum = (a+b+c+d+e+f)/10
Amount Rs. 6 1571.25
Note : Suitable Grade of Filter media shall be proposed as per Specification in said IRC. 24
Providing and laying filter material underneath pitching in slopes complete as per drawing and technical specification Clause 1302 MORD/2504 MORTH including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = cum (a) Material Graded stone aggregate of required size passing through 22.4mm cum seive
1.200
50.50
60.60
(b) Labour Mate
day
-
Mazdoor (Unskilled)
day
1.050
196.00
205.80
Mazdoor (Skilled)
day
0.250
258.00
64.50
hour
0.060
345.00
c)
Machinery
Water Tanker of 6 KL capacity Basic cost d&e) Overheads & Contractors Profit @ 14%Excluding VAT f) Add conveyance charges of material Filter media as per specification
20.70 351.60
14.00% cum
1.200
49.22 66.00
Cost for 1 cum = a+b+c+d+e+f
79.20 480.02
Note : Suitable Grade of Filter media shall be proposed as per Specification in said IRC. 25
Supplying, fitting and placing HYSD bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 MORD / Sections for Bars below 36 mm dia including over laps and wastage, where they are not welded.including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = t (a) Material HYSD bars including 5 per cent overlaps and wastage
Binding wire
t
1.050
34500.00
36225.00
kg
6.000
52.00
312.00 36537.00
(b) Labour for cutting, bending, shifting to site, tying, and placing in position Mate
day
-
Blacksmith
day
2.000
237.00
474.00
Mazdoor (Unskilled)
day
6.840
196.00
1340.64 1814.64
Total (a+b)
38351.64
c&d) Overheads & Contractors Profit @ 14%Excluding VAT
14.00%
5369.23
Rate per t = a+b+c+d 26
43720.87
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded. including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = t (a) Material HYSD bars including 5 per cent for overlaps and wastage
Binding wire
t
1.05
34500.00
kg
6.00
52.00
36225.00 312.00 36537.00
(b) Labour for cutting, bending, shifting to site, tying and placing in position Mate
day
-
496
RBR_FNDN S. No
Description
1
2
Unit
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
Blacksmith
day
2.00
237.00
474.00
Mazdoor (Unskilled)
day
6.40
196.00
1254.40 1728.40
Total (a+b) c&d) Overheads & Contractors Profit @ 14%Excluding VAT
38265.40 5357.16
14.00%
Rate per t = a+b+c+d Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202 MORD for Bars below 36 mm dia including over laps and wastage, where they are not welded.including contractors profit & Over head charges but excluding Seigonarage charges & VAT
27
Unit = t (a) Material HYSD bars including 5 per cent for laps and wastage Binding wire
43622.56
t
1.05
34500.00
kg
8.00
52.00
36225.00 416.00 36641.00
(b) Labour for cutting, bending, tying and placing in position Mate
day
-
Blacksmith/ Rod Binder
day
3.00
237.00
711.00
Mazdoor (Unskilled)
day
8.44
196.00
1654.24 2365.24
Total (a+b)
39006.24
c&d) Overheads & Contractors Profit @ 14%Excluding VAT 28
i
5460.87
14.00%
Rate per t = a+b+c+d Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts of size 0.25X0.275m not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD.including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = Running m Taking output = 4x12 m Span = 48 m (a) M 25 grade R.C.C. Sub Analysis for Rate of Concrete (a) Material Cement
44467.11
t
0.40
4600.00
1840.00
Coarse sand
cum
0.45
220.00
99.00
20 mm aggregate
cum
0.54
1125.00
607.50
10 mm aggregate
cum
0.36
770.00
277.20 2823.70
(b) Labour Mate
day
Mason (1st Class)
day
0.12
258.00
30.96
Mazdoor (Unskilled)
day
2.09
196.00
409.64 440.60
c) Machinery Concrete mixer 0.4/0.28 cum capacity
hour
0.40
345.00
138.00 138.00
Total (a+b+c)
3402.30
d) Formwork @ 12%
12.00%
408.28
Total (a+b+c+d) Add conveyance charges of material Coarse sand
3810.58 cum
0.45
143.40
64.53
497
RBR_FNDN S. No
Description
1
2
20 mm aggregate 10 mm aggregate No. of vertical posts = (6+1) 4 = 28 nos
Unit
Quantity
Rate Rs.
Amount Rs.
3
4
5
6
cum
0.54
143.40
77.44
cum
0.36
143.40
51.62 193.59
Cross-sectional area of vertical post = 0.25x0.275 = 0.069 sqm
Concrete in vertical posts = 0.069x28x1.00 = 1.932 cum Hand rail in 3 tiers = 3x48 = 144 m Cross-sectional area = 0.17x0.175 = 0.03 sqm Concrete in hand rails = 0.03 x 144 = 4.32 cum Total concrete = 1.932+4.32 = 6.252 cum (b) HYSD bar reinforcement (Rate as per item 13.2) Basi cost c&d) Overheads & Contractors Profit @ 14%Excluding VAT
cum
6.252
3810.58
23823.72
t
1.36
39006.24
53048.49 76872.21
14.00%
cum Add conveyance charges of material Cost for 48 m = (a+b+c+d) Rate per m = (a+b+c+d)/48 Note : 1. 48 m length is the total linear length adding both sides of 2x12 m span
6.252
10762.11 193.59
1210.32 88844.64 1850.93
2. Quantities of material have been adopted from standard plans of MORTH vide drawing No SD/202 29
Providing weep holes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7 MORD including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Unit = Nos Taking output = 30 Nos Sub-analysis Cement mortar 1:3 (1 cement : 3 sand) Unit = cum (a) Material Cement Sand Conveyance of sand excluding 14% (b) Labour Mate Mazdoor (Unskilled) Total material and labour = (a+b)
t
0.48
4600.00
2208.00
cum
1.05
220.00
231.00
cum
1.05
18.86
19.80
day
-
day
0.2
196.00
39.20 2498.00
(a) Material AC pipe 100 mm dia including wastage @ 5 per cent. Average length of weep hole is taken as one metre for the purpose of estimating
m
MS clamps Collar for AC pipe (average taking 10% of above pipe rate)
Nos.
Cement mortar 1:3 (For rate refer to item 11.5 I) (b) Labour Mate Mason 1st Class Mazdoor (Unskilled) Basic cost c&d) Overheads & Contractors Profit @ 14%Excluding VAT
cum
31.500
177.00
5575.50
30.000
10.00
300.00
10.00%
17.70
1.77
0.050
2498.00
124.90
129.00
day
-
day
0.500
258.00
day
0.280
196.00
866.05
14.00%
Cost for 30 Nos = (a+b+c+d) Rate per No = (a+b+c+d)/30 30
54.88 6186.05
7052.10 235.07
Rough stone 225 mm th Dry Packing for Aprons and Revetments Section 1300 MORD Unit = cum (a) Material Rough Stone (Including small stone for wedging)
cum
1.20
138.00
165.60
498
RBR_FNDN S. No 1
Description
Unit
Quantity
Rate Rs.
Amount Rs.
2
3
4
5
6
day
0.35
258.00
90.30
day
1.05
196.00
205.80
(b) Labour Mason 1st Class Mazdoor (Unskilled) Basic cost c&d) Overheads & Contractors Profit @ 14%Excluding VAT
461.70 64.64
14.00%
Add conveyance charges of material Rough Stone
cum
1.20
322.80
Rate per cum = a+b+c+d
387.36 913.70
Datas thirty (30) approved Sdxxx Engineer-in-Chief,P.R, PMGSY
Hyderabad
499
NAME OF WORK :- Con.of bridge at 640m across Vottigedds on R/f Veeraghattam @ 87/8 km to Telgam (9 vents of 16.5m span)
S.No
Description
Bridge Abstract Estimate QuantityUnit Rate
1 Earth work in excavation of foundation of structure as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material as per MORTH specification no. 304 in ordinary soils upto SDR soils by manual means.
3200.00 cum
2 3 PCC ( 1 : 3 : 6 ) nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed. Placed in foundation and compacted including curing complete as per approved drawing & technical specification as per MORT&H spn.no2100. 4 Vibrated cement concrete in Open foundation complete as per Drawing and technical specifications as per MORT&H specification Nos.1500, 1700 & 2100 VCC M-15- Footings of wing walls. 5 Providing and Laying Cutting Edge of Mile Steel weighing 40 kg per metre for Well Foundation complete as per approved Drawing and Technical Specification.
Per
Amount
59.29
1 cum
189722
83.88 cum
2,929.37
1 cum
245716
660.00 cum
3,599.04
1 cum
2375365
62,066.98
1 MT
496536
8.00
MT
6 Vibrated Reinforced Cement Concrete in well foundation complete as per approved Drawing and Technical Specifications and as per MoRTH specification Nos. 1200, 1500 & 1700 M-25 for Well Curb.
170.00 cum
4,778.68
1 cum
812375
7 Plain Vibrated Cement Concrete in well foundation complete as per approved Drawing and Technical Specification and as per MoRTH nos 1200, 1500 & 1700,--M-15-Well Steining.
1350.00 cum
3,789.35
1 cum
5115629
8 Plain Vibrated Cement Concrete in well foundation complete as per approved Drawing and Technical Specification and as per MoRTH spn.Nos.1200, 1500 & 1700,---M-20. Bottom Plug Concrete to be placed using tremie pipe.
530.00 cum
4,162.30
1 cum
2206020
9 Sand filling in wells complete as per approved drawing and technical specifications as per MORTH specification No. 1207. 10 Providing concrete for plain/reinforced concrete P.C.C grade M 15 (Design Mix) MORTH 12.8 A using 40 to 10 mm size Graded HBG aggregate, including cost, and conveyance of all materials to site and all labour charge mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause1500, 1700 & 2100 MORTH. including contractors profit & Over head charges but excluding Seigonarage charges & VAT for Top Plug 11 Vibrated Reinforced Cement Concrete in well foundation complete as per approved Drawing and Technical Specifications and as per MoRTH specification Nos. 1200, 1500& 1700,---M-20Well Cap.
2310.00 cum
170.57
1 cum
394008
100.00 cum
3,472.16
1 cum
347216
481.00 cum
4,122.61
1 cum
1982974
11 Vibrated Reinforced Cement Concrete in well foundation complete as per approved Drawing and Technical Specifications and as per MoRTH specification Nos. 1200, 1500& 1700,---M-20Well Cap. 12 Sinking of 7 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per approved drawing and technical specifications. Depth of sinking is reckoned from bed level . For Abutments Clayey soils upto 3M depth 3m to 10m depth Hard rock upto 3M depth
6.00 18.00
Rm Rm
11,034.53 16,226.04
1 Rm 1 Rm
66207 292069
3.00
Rm
20,087.66
1 Rm
60263
24.00 72.00
Rm Rm
7,579.06 16,086.08
1 Rm 1 Rm
181897 1158198
12.00
Rm
18,625.33
1 Rm
223504
20.00 cum 138.00 cum
5,079.68 5,079.68
101594 700995
15 Vibrated cement concrete in Open foundation complete as per Drawing and technical specifications as per MORT&H specification Nos. 1500, 1700 & 2100 VCC M-15- substructure for abutments & wing walls.
183.00 cum
3,789.35
1 cum 1 cum 1 cum
16 Vibrated cement concrete in Open foundation complete as per Drawing and technical specifications as per MORT&H specification Nos. 1500, 1700 & 2100 VCC M-15- substructure for abutments & wing walls.
195.00 cum
3,789.35
1 cum
738924
550.80 cum
5,079.68
1 cum
2797886
324.66
1,850.93
1 Rm
600923
13 Sinking of 6 m external diameter well (other than pneumatic method of sinking) through all types of strata namely sandy soil, clayey soil and rock as shown against each case, complete as per approved drawing and technical specifications. Depth of sinking is reckoned from bed level . For Piers. Clayey soils upto 3M depth 3m to 10m depth Hard rock upto 3M depth 14 Vibrated Reinforced Cement Concrete in Substructure complete as per approved Drawing and technical specifications as per MORT&H Nos. 1500, 1700 & 2200 VRCC M-25Substructure Bed blocks & backing walls. Bed blocks & backing walls Over Piers Hammer head type
693452
17 Providing and laying reinforced cement concrete R.C.C M 25 Grade (Design Mix) using 20 & 10 mm HBG Metal in superstructure including cost, and conveyance of all materials to site and all labour charge mechanically mixed as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 MORD including contractors profit & Over head charges but excluding Steel , Seigonarage charges & VAT T-beam girder slabs 18 Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-tocentre spacing between vertical posts of size 0.25X0.275m not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD.including contractors profit & Over head charges but excluding Seigonarage charges & VAT
Rm
0.25X0.275m not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3 MORD.including contractors profit & Over head charges but excluding Seigonarage charges & VAT 19 PCC M15 grade levelling course below approach slab complete as per approved drawing and technical specification as per MORT&H spn no.2700. reinforced concrete Reinforced 20 Providing Cement Concrete M 30 grade ( Design Mix) approach slab using 0.05 tones/cum reinforcement and formwork complete as per drawing and technical specifications Clauses1500, 1600, 1700 & 2704 MORTH including contractors profit & Over head charges but excluding cost of Steel ,Seigonarage charges & VAT 1500, 1700 & 2100,---M-30-grade
231.75 cum
3,480.32
1 cum
806565
465.00 cum
4,400.20
1 cum
2046092
21 Providing and laying cement concrete wearing coat M30 grade excluding reinforcement and fabrication charges complete as per approved drawing and technical specifications as per M.O.T.Drg.No.BD.1/69 as per MORT&H specification spn.1500, 1600, 1700, 2702.
203.00 cum
4,474.92
1 cum
908408
22 Supplying ,fitting and placing uncoated HYSD barreinforcement in super structure complete as per drawing approved and Technical Specifications as per MoRTH specification No.1600 & 2200 SUPER STRUCTURE.
151.00
MT
44,467.11
1 MT
6714534
23 Supplying ,fitting and placing uncoated HYSD barreinforcement in sub structure complete as per drawing approved and Technical Specifications as per MoRTH specification No.1600 & 2200 SUB STRUCTURE.
57.00
MT
43,720.87
1 MT
2492090
24 Supplying ,fitting and placing uncoated HYSD barreinforcement in foundations complete as per drawing approved and Technical Specifications as per MoRTH specification No.1600 & 2200 FOUNDATIONS.
95.00
MT
43,622.56
1 MT
4144143
25 Providing rough stone revetment 225 mm thick using 225mm size rough stonevariety of all materials tosite, labour charges etc., complete as per MORD specification 1300 for rivetment
33.32 cum
913.70
1 cum
30445
26 Providing rough stone revetment 225 mm thick using 225mm size rough stonevariety of all materials tosite, labour charges etc., complete as per MOST specification Toe wall.
12.00 cum
913.70
1 cum
10960
27 Providing filter material underneath pitching in slopes complete as per MOST specification Nos.305, 309 & 2504.
17.00 cum
480.02
1 cum
8160
28 Backfilling behind abutments, wing walls and returnwall complete as per drawing and technical as per MORT&H specification No.2200. CI 710.1.4 of IRC :78.
165.14 cum
324.31
1 cum
53557
29 Providing and laying of filter media with Granular materials /stone curshed aggregates satisfying the requirements laid down in clause 2054.2.2 of MORTH Specifications to a thickness of not lessthan 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to
56.00 cum
1,571.25
1 cum
87990
Granular materials /stone curshed aggregates satisfying the requirements laid down in clause 2054.2.2 of MORTH Specifications to a thickness of not lessthan 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specifications and as per MORT&H specification Nos.2200 and CI.710.1 . 30 Providing weep holes in plain/ reinforced concrete abutment,wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards drawing face. Complete as per drawing and technical specifications and as per MORT&H specification No.2706 & 2200.
115.20
Rm
235.07
31 Suplying, fitting and fixing in position true to line and level elastomeric neoprene bearing confirming to IRC: 83 (Part-II ) ,section IX and Clause 2005 of MoRTH Specifications complete including all accessories as per approved drawing and Technical Specifications and MORTH Spn.2000 & 2200 size 630x220x61mm.
54.00
no
LS
39111497 314820
32
36.00
no
LS
32000
85.00
Rm
LS
380000
1 RM
27080
ECV
Drainage spouts complete as per drawing and technical specifications and as per drg no. BD/1-69A. 33 Providing Strip seal type expansion Joints as per manufactures specification including all labour charges etc.,complete
34 Unforseen items
LS
Total
39838317 Approved for Rs.396,80,338/Sdxxx Engineer-in-Chief,P.R, PMGSY Hyderabad
Calculation of seionarage charges S.No Item
Quantity (finished item)
Unit
Rate
Amount
Material
Qty (collected)
Rate
Seignorage Amount
CD Works High level bridge E/w 3200.00 PCC (1:3:6) for foundations 83.88
Earth Metal
3200.00 75.49
22.00 50.00
70400.00 3775.00
Sand
37.75
40.00
1510.00
2882.4600
Metal
2594.21
50.00
129711.00
PCC M15
. 2524.75
Sand Metal
1297.11 2019.80
40.00 50.00
51884.00 100990.00
Back filling with gravel
182.14
Sand Gravel
1211.88 218.57
40.00 22.00
48475.00 4808.00
Sand filling
2310.00
Sand
2310.00
40.00
92400.00
Rivetment
45.32
Metal
54.38
50.00
2719.00
Filter media Total Seignorage amount
56.00
Metal
67.20
50.00
3360.00 510032.00
R.C.C M 20/25/30
Cum Cum
0.00 0.00
LEAD CHARGES(SSR 2010-11) PACKAGE NO : AP18 IX -LB O4 NAME OF WORK :- Con.of bridge at 640m across Vottigedds on R/f Veeraghattam @ 87/8 km to Telgam (9 vents of 16.5m span) Sl. No.
Particulars
1
2
Average Lead
3
Lead Charges
Net Cost of lead
Total Rate Per Cum
4
5
6
1
60-63 mm size HBG metal (IRC&MOST)
15.00
143.40
143.40
143.40
2
50 - 55 mm size HBG metal (IRC&MOST)
15.00
143.40
143.40
143.40
3
40-45 mm size HBG metal (IRC&MOST)
15.00
143.40
143.40
143.40
4
22.40 mm size HBG metal (IRC&MOST)
15.00
143.40
143.40
143.40
3
40-45 mm size HG M/Cmetal (IRC&MOST)
15.00
143.40
143.40
143.40
4
22.40 mm size HG M/C metal (IRC&MOST)
15.00
143.40
143.40
143.40
5
13.22 mm size HG M/C metal (IRC&MOST)
15.00
143.40
143.40
143.40
6
11.20 mm size HG M/C metal (IRC&MOST)
15.00
143.40
143.40
143.40
7
5-7 mm sizeHG M/C metal (IRC&MORTH)
15.00
143.40
143.40
143.40
8
2.36 mm to 5mm HG M/C
15.00
143.40
143.40
143.40
8
2.36 mm down and Stone Dust
15.00
143.40
143.40
143.40
9
Gravel
6.00
66.00
66.00
66.00
10
Sand for blindage
1.00
21.50
21.50
21.50
11
Bitumen
96.00
288.00
288.00
288.00
12
Emulsion (SS - 1)
96.00
288.00
288.00
288.00
13
Emulsion (RS - 1)
96.00
288.00
288.00
288.00
14
40 mm size HBD metal (SS 5)
37.00
322.80
322.80
322.80
15
20 mm size HBD metal (SS 5)
37.00
322.80
322.80
322.80
16
12 mm size HBD metal (SS 5)
37.00
322.80
322.80
322.80
17
10 mm size HBD metal (SS 5)
37.00
322.80
322.80
322.80
18
Sand for Mortar
1.00
21.50
21.50
21.50
19
Rough stone SS revetment 225 mm th
37.00
322.80
322.80
322.80
20
Stone spalls (Grading I material )
37.00
322.80
322.80
322.80
21
1200 mm dia RCC NP3 pipes ( plain ended)
85.00
22
1000 mm dia RCC NP3 pipes ( plain ended)
85.00
624.70
624.70
624.70
23
900 mm dia RCC NP3 pipes ( plain ended)
85.00
602.60
602.60
602.60
24
700 mm dia RCC NP3 pipes ( plain ended)
85.00
284.90
284.90
284.91
25
600 mm dia RCC NP3 pipes ( plain ended)
85.00
331.70
331.70
331.71
Certified that the above leads are correct and nearest to the work site to best of my knowledge
1
COST OF MATERIALS (SSR-2010-11) PACKAGE NO : AP18 IX -LB O4 NAME OF WORK :- Con.of bridge at 640m across Vottigedds on R/f Veeraghattam @ 87/8 km to Telgam (9 vents of 16.5m span) Sl. No.
Particulars
1
2
1
Initial Rate
Final IR Blasting charges
Machine Total Rate Per crushing Cum charges
3
4
5
60-63 mm size HBG metal (IRC,MORTH & MORD)
360.00
360.00
70.00
430.00
2
50 - 55 mm size HBG metal (IRC,MORTH & MORD)
390.00
390.00
70.00
460.00
3
40-45 mm size HBG metal (IRC,MORTH & MORD)
500.00
500.00
70.00
570.00
4
22.40 mm size HBG metal (IRC,MORTH & MORD)
950.00
950.00
70.00
1020.00
5
40-45 mm size HG M/C metal (IRC,MORTH & MORD)
500.00
500.00
70.00
125.00
695.00
6
22.40 mm size HG M/C metal (IRC,MORTH & MORD)
950.00
950.00
70.00
237.50
1257.50
7
13.22 mm size HG M/C metal (IRC,MORTH & MORD)
690.00
690.00
70.00
172.50
932.50
8
11.20 mm size HG M/C metal (IRC,MORTH & MORD)
560.00
560.00
70.00
140.00
770.00
9
5-7 mm size HG M/c metal (IRC&MORTH)
430.00
430.00
70.00
107.50
607.50
10
2.36 mm to 5mm HBG M/C
260.00
260.00
70.00
65.00
395.00
11
2.36 mm down and Stone Dust
236.00
236.00
236.00
12
Gravel
50.50
50.50
50.50
13
Sand for blindage
70.00
70.00
70.00
14
Bitumen
29772.08
30962.96
30962.96
15
Emulsion (SS - 1)
22331.81
23225.08
23225.08
16
Emulsion (RS - 1)
22815.35
23727.96
23727.96
17
40 mm size HBG metal (SS 5)
500.00
500.00
70.00
125.00
695.00
18
20 mm size HBG metal (SS 5)
844.00
844.00
70.00
211.00
1125.00
19
12 mm size HBG metal (SS 5)
688.00
688.00
70.00
172.00
930.00
20
10 mm size HBG metal (SS 5)
560.00
560.00
70.00
140.00
770.00
21
Rough stone 225 mm th SS revetment
71.00
71.00
67.00
138.00
22
Rough stone 300 mm th SS revetment
95.00
95.00
67.00
162.00
23
Stone spallsStone spalls (Grading I material )
210.00
210.00
70.00
280.00
24
Sand for Mortar
220.00
220.00
220.00
25
Cement
4600.00
4600.00
4600.00
26
Steel HYSD
34500.00
34500.00
34500.00
27
Steel MS
40000.00
40000.00
40000.00
28
1200 mm dia RCC NP3 pipes ( plain ended)
29
1000 mm dia RCC NP3 pipes ( plain ended)
4885.00
4885.00
30
900 mm dia RCC NP3 pipes ( plain ended)
4885 3920
3920.00
3920.00
31
700 mm dia RCC NP3 pipes ( plain ended)
2370.00
2370.00
2370.00
32
600 mm dia RCC NP3 pipes ( plain ended)
1915.00
1915.00
1915.00
33
1000 mm dia RCC NP3 collars
866.00
866.00
866.00
34
900 mm dia RCC NP3 collars
693.00
693.00
693.00
35
700 mm dia RCC NP3 collars
594.00
594.00
594.00
36
600 mm dia RCC NP3 collars
466.00
466.00
466.00
Certified that the materials are obtained from blasting Certified that the materials are obtained are Machine crushed
6
7
lead charges of 2010-11 Metal
lead 0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Rate including CP & OH 19.10 19.10 26.70 40.20 48.80 57.40 66.00 74.60 83.20 91.80 100.40 109.00 117.60 126.20 134.80 143.40 152.00 160.60 169.20 177.80 186.40 195.00 203.60 212.20 220.80 229.40 238.00 246.60 255.20 263.80 272.40 279.60 286.80 294.00 301.20 308.40 315.60 322.80 330.00 337.20 344.40 351.60 358.80 366.00
Gravel & Sand
lead 0.25 0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42
Rate including CP & OH 21.50 21.50 21.50 30.20 40.20 48.80 57.40 66.00 74.60 83.20 91.80 100.40 109.00 117.60 126.20 134.80 143.40 152.00 160.60 169.20 177.80 186.40 195.00 203.60 212.20 220.80 229.40 238.00 246.60 255.20 263.80 272.40 279.60 286.80 294.00 301.20 308.40 315.60 322.80 330.00 337.20 344.40 351.60 358.80
pipes 1000
lead 0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Rate 128.70 128.70 128.70 128.70 128.70 128.70 134.90 141.10 147.30 153.50 159.70 165.90 172.10 178.30 184.50 190.70 196.90 203.10 209.30 215.50 221.70 227.90 234.10 240.30 246.50 252.70 258.90 265.10 271.30 277.50 283.70 289.90 296.10 302.30 308.50 314.70 320.90 327.10 333.30 339.50 345.70 351.90 358.10 364.30
pipes 900
lead 0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Rate 106.60 106.60 106.60 106.60 106.60 106.60 112.80 119.00 125.20 131.40 137.60 143.80 150.00 156.20 162.40 168.60 174.80 181.00 187.20 193.40 199.60 205.80 212.00 218.20 224.40 230.60 236.80 243.00 249.20 255.40 261.60 267.80 274.00 280.20 286.40 292.60 298.80 305.00 311.20 317.40 323.60 329.80 336.00 342.20
pipes 600
0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Rate 60.90 60.90 60.90 60.90 60.90 60.90 63.70 66.50 69.30 72.10 74.90 77.70 80.50 83.30 86.10 88.90 91.70 94.50 97.30 100.10 102.90 105.70 108.50 111.30 114.10 116.90 119.70 122.50 125.30 128.10 130.90 133.70 136.50 139.30 142.10 144.90 147.70 150.50 153.30 156.10 158.90 161.70 164.50 167.30
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
373.20 380.40 387.60 394.80 402.00 409.20 416.40 423.60 430.80 438.00 445.20 452.40 459.60 466.80 474.00 481.20 488.40 495.60 502.80 510.00 517.20 524.40 531.60 538.80 546.00 553.20 560.40 567.60 574.80 582.00 589.20 596.40 603.60 610.80 618.00 625.20 632.40 639.60 646.80 654.00 661.20 668.40 675.60 682.80 690.00 697.20 704.40 711.60 718.80 726.00
43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92
366.00 373.20 380.40 387.60 394.80 402.00 409.20 416.40 423.60 430.80 438.00 445.20 452.40 459.60 466.80 474.00 481.20 488.40 495.60 502.80 510.00 517.20 524.40 531.60 538.80 546.00 553.20 560.40 567.60 574.80 582.00 589.20 596.40 603.60 610.80 618.00 625.20 632.40 639.60 646.80 654.00 661.20 668.40 675.60 682.80 690.00 697.20 704.40 711.60 718.80
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
370.50 376.70 382.90 389.10 395.30 401.50 407.70 413.90 420.10 426.30 432.50 438.70 444.90 451.10 457.30 463.50 469.70 475.90 482.10 488.30 494.50 500.70 506.90 513.10 519.30 525.50 531.70 537.90 544.10 550.30 556.50 562.70 568.90 575.10 581.30 587.50 593.70 599.90 606.10 612.30 618.50 624.70 630.90 637.10 643.30 649.50 655.70 661.90 668.10 674.30
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
348.40 354.60 360.80 367.00 373.20 379.40 385.60 391.80 398.00 404.20 410.40 416.60 422.80 429.00 435.20 441.40 447.60 453.80 460.00 466.20 472.40 478.60 484.80 491.00 497.20 503.40 509.60 515.80 522.00 528.20 534.40 540.60 546.80 553.00 559.20 565.40 571.60 577.80 584.00 590.20 596.40 602.60 608.80 615.00 621.20 627.40 633.60 639.80 646.00 652.20
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
170.10 172.90 175.70 178.50 181.30 184.10 186.90 189.70 192.50 195.30 198.10 200.90 203.70 206.50 209.30 212.10 214.90 217.70 220.50 223.30 226.10 228.90 231.70 234.50 237.30 240.10 242.90 245.70 248.50 251.30 254.10 256.90 259.70 262.50 265.30 268.10 270.90 273.70 276.50 279.30 282.10 284.90 287.70 290.50 293.30 296.10 298.90 301.70 304.50 307.30
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
733.20 740.40 747.60 754.80 762.00 769.20 776.40 783.60 790.80 798.00 805.20 812.40 819.60 826.80 834.00 841.20 848.40 855.60 862.80 870.00 877.20 884.40 891.60 898.80 906.00 913.20 920.40 927.60 934.80 942.00 949.20 956.40 963.60 970.80 978.00 985.20 992.40 999.60 1006.80 1014.00 1021.20 1028.40 1035.60 1042.80 1050.00 1057.20 1064.40 1071.60 1078.80 1086.00
93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142
726.00 733.20 740.40 747.60 754.80 762.00 769.20 776.40 783.60 790.80 798.00 805.20 812.40 819.60 826.80 834.00 841.20 848.40 855.60 862.80 870.00 877.20 884.40 891.60 898.80 906.00 913.20 920.40 927.60 934.80 942.00 949.20 956.40 963.60 970.80 978.00 985.20 992.40 999.60 1006.80 1014.00 1021.20 1028.40 1035.60 1042.80 1050.00 1057.20 1064.40 1071.60 1078.80
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
680.50 686.70 692.90 699.10 705.30 711.50 717.70 723.90 730.10 736.30 742.50 748.70 754.90 761.10 767.30 773.50 779.70 785.90 792.10 798.30 804.50 810.70 816.90 823.10 829.30 835.50 841.70 847.90 854.10 860.30 866.50 872.70 878.90 885.10 891.30 897.50 903.70 909.90 916.10 922.30 928.50 934.70 940.90 947.10 953.30 959.50 965.70 971.90 978.10 984.30
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
658.40 664.60 670.80 677.00 683.20 689.40 695.60 701.80 708.00 714.20 720.40 726.60 732.80 739.00 745.20 751.40 757.60 763.80 770.00 776.20 782.40 788.60 794.80 801.00 807.20 813.40 819.60 825.80 832.00 838.20 844.40 850.60 856.80 863.00 869.20 875.40 881.60 887.80 894.00 900.20 906.40 912.60 918.80 925.00 931.20 937.40 943.60 949.80 956.00 962.20
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
310.10 312.90 315.70 318.50 321.30 324.10 326.90 329.70 332.50 335.30 338.10 340.90 343.70 346.50 349.30 352.10 354.90 357.70 360.50 363.30 366.10 368.90 371.70 374.50 377.30 380.10 382.90 385.70 388.50 391.30 394.10 396.90 399.70 402.50 405.30 408.10 410.90 413.70 416.50 419.30 422.10 424.90 427.70 430.50 433.30 436.10 438.90 441.70 444.50 447.30
144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193
1093.20 1100.40 1107.60 1114.80 1122.00 1129.20 1136.40 1143.60 1150.80 1158.00 1165.20 1172.40 1179.60 1186.80 1194.00 1201.20 1208.40 1215.60 1222.80 1230.00 1237.20 1244.40 1251.60 1258.80 1266.00 1273.20 1280.40 1287.60 1294.80 1302.00 1309.20 1316.40 1323.60 1330.80 1338.00 1345.20 1352.40 1359.60 1366.80 1374.00 1381.20 1388.40 1395.60 1402.80 1410.00 1417.20 1424.40 1431.60 1438.80 1446.00
143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192
1086.00 1093.20 1100.40 1107.60 1114.80 1122.00 1129.20 1136.40 1143.60 1150.80 1158.00 1165.20 1172.40 1179.60 1186.80 1194.00 1201.20 1208.40 1215.60 1222.80 1230.00 1237.20 1244.40 1251.60 1258.80 1266.00 1273.20 1280.40 1287.60 1294.80 1302.00 1309.20 1316.40 1323.60 1330.80 1338.00 1345.20 1352.40 1359.60 1366.80 1374.00 1381.20 1388.40 1395.60 1402.80 1410.00 1417.20 1424.40 1431.60 1438.80
144 145 146 147 148 149 150
990.50 996.70 1002.90 1009.10 1015.30 1021.50 1027.70
144 145 146 147 148 149 150
968.40 974.60 980.80 987.00 993.20 999.40 1005.60
144 145 146 147 148 149 150
450.10 452.90 455.70 458.50 461.30 464.10 466.90
194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243
1453.20 1460.40 1467.60 1474.80 1482.00 1489.20 1496.40 1503.60 1510.80 1518.00 1525.20 1532.40 1539.60 1546.80 1554.00 1561.20 1568.40 1575.60 1582.80 1590.00 1597.20 1604.40 1611.60 1618.80 1626.00 1633.20 1640.40 1647.60 1654.80 1662.00 1669.20 1676.40 1683.60 1690.80 1698.00 1705.20 1712.40 1719.60 1726.80 1734.00 1741.20 1748.40 1755.60 1762.80 1770.00 1777.20 1784.40 1791.60 1798.80 1806.00
193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242
1446.00 1453.20 1460.40 1467.60 1474.80 1482.00 1489.20 1496.40 1503.60 1510.80 1518.00 1525.20 1532.40 1539.60 1546.80 1554.00 1561.20 1568.40 1575.60 1582.80 1590.00 1597.20 1604.40 1611.60 1618.80 1626.00 1633.20 1640.40 1647.60 1654.80 1662.00 1669.20 1676.40 1683.60 1690.80 1698.00 1705.20 1712.40 1719.60 1726.80 1734.00 1741.20 1748.40 1755.60 1762.80 1770.00 1777.20 1784.40 1791.60 1798.80
244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293
1813.20 1820.40 1827.60 1834.80 1842.00 1849.20 1856.40 1863.60 1870.80 1878.00 1885.20 1892.40 1899.60 1906.80 1914.00 1921.20 1928.40 1935.60 1942.80 1950.00 1957.20 1964.40 1971.60 1978.80 1986.00 1993.20 2000.40 2007.60 2014.80 2022.00 2029.20 2036.40 2043.60 2050.80 2058.00 2065.20 2072.40 2079.60 2086.80 2094.00 2101.20 2108.40 2115.60 2122.80 2130.00 2137.20 2144.40 2151.60 2158.80 2166.00
243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292
1806.00 1813.20 1820.40 1827.60 1834.80 1842.00 1849.20 1856.40 1863.60 1870.80 1878.00 1885.20 1892.40 1899.60 1906.80 1914.00 1921.20 1928.40 1935.60 1942.80 1950.00 1957.20 1964.40 1971.60 1978.80 1986.00 1993.20 2000.40 2007.60 2014.80 2022.00 2029.20 2036.40 2043.60 2050.80 2058.00 2065.20 2072.40 2079.60 2086.80 2094.00 2101.20 2108.40 2115.60 2122.80 2130.00 2137.20 2144.40 2151.60 2158.80
294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343
2173.20 2180.40 2187.60 2194.80 2202.00 2209.20 2216.40 2223.60 2230.80 2238.00 2245.20 2252.40 2259.60 2266.80 2274.00 2281.20 2288.40 2295.60 2302.80 2310.00 2317.20 2324.40 2331.60 2338.80 2346.00 2353.20 2360.40 2367.60 2374.80 2382.00 2389.20 2396.40 2403.60 2410.80 2418.00 2425.20 2432.40 2439.60 2446.80 2454.00 2461.20 2468.40 2475.60 2482.80 2490.00 2497.20 2504.40 2511.60 2518.80 2526.00
293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342
2166.00 2173.20 2180.40 2187.60 2194.80 2202.00 2209.20 2216.40 2223.60 2230.80 2238.00 2245.20 2252.40 2259.60 2266.80 2274.00 2281.20 2288.40 2295.60 2302.80 2310.00 2317.20 2324.40 2331.60 2338.80 2346.00 2353.20 2360.40 2367.60 2374.80 2382.00 2389.20 2396.40 2403.60 2410.80 2418.00 2425.20 2432.40 2439.60 2446.80 2454.00 2461.20 2468.40 2475.60 2482.80 2490.00 2497.20 2504.40 2511.60 2518.80
344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393
2533.20 2540.40 2547.60 2554.80 2562.00 2569.20 2576.40 2583.60 2590.80 2598.00 2605.20 2612.40 2619.60 2626.80 2634.00 2641.20 2648.40 2655.60 2662.80 2670.00 2677.20 2684.40 2691.60 2698.80 2706.00 2713.20 2720.40 2727.60 2734.80 2742.00 2749.20 2756.40 2763.60 2770.80 2778.00 2785.20 2792.40 2799.60 2806.80 2814.00 2821.20 2828.40 2835.60 2842.80 2850.00 2857.20 2864.40 2871.60 2878.80 2886.00
343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392
2526.00 2533.20 2540.40 2547.60 2554.80 2562.00 2569.20 2576.40 2583.60 2590.80 2598.00 2605.20 2612.40 2619.60 2626.80 2634.00 2641.20 2648.40 2655.60 2662.80 2670.00 2677.20 2684.40 2691.60 2698.80 2706.00 2713.20 2720.40 2727.60 2734.80 2742.00 2749.20 2756.40 2763.60 2770.80 2778.00 2785.20 2792.40 2799.60 2806.80 2814.00 2821.20 2828.40 2835.60 2842.80 2850.00 2857.20 2864.40 2871.60 2878.80
394 395 396 397 398 399 400
2893.20 2900.40 2907.60 2914.80 2922.00 2929.20 2936.40
393 394 395 396 397 398 399
2886.00 2893.20 2900.40 2907.60 2914.80 2922.00 2929.20
pipes 700
0.5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
Rate 67.70 67.70 67.70 67.70 67.70 67.70 71.00 74.30 77.60 80.90 84.20 87.50 90.80 94.10 97.40 100.70 104.00 107.30 110.60 113.90 117.20 120.50 123.80 127.10 130.40 133.70 137.00 140.30 143.60 146.90 150.20 153.50 156.80 160.10 163.40 166.70 170.00 173.30 176.60 179.90 183.20 186.50 189.80 193.10
44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93
196.40 199.70 203.00 206.30 209.60 212.90 216.20 219.50 222.80 226.10 229.40 232.70 236.00 239.30 242.60 245.90 249.20 252.50 255.80 259.10 262.40 265.70 269.00 272.30 275.60 278.90 282.20 285.50 288.80 292.10 295.40 298.70 302.00 305.30 308.60 311.90 315.20 318.50 321.80 325.10 328.40 331.70 335.00 338.30 341.60 344.90 348.20 351.50 354.80 358.10
94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143
361.40 364.70 368.00 371.30 374.60 377.90 381.20 384.50 387.80 391.10 394.40 397.70 401.00 404.30 407.60 410.90 414.20 417.50 420.80 424.10 427.40 430.70 434.00 437.30 440.60 443.90 447.20 450.50 453.80 457.10 460.40 463.70 467.00 470.30 473.60 476.90 480.20 483.50 486.80 490.10 493.40 496.70 500.00 503.30 506.60 509.90 513.20 516.50 519.80 523.10
144 145 146 147 148 149 150
526.40 529.70 533.00 536.30 539.60 542.90 546.20