Bridge 1551 BoQ Submission 20160926
Short Description
boq for a bridge...
Description
Project:
Rural Bridge Project - Sri Lanka (Phase 2)
Bill of Qunatities for Construction of Bridge No CBUK 1551 At Kirindi Mawatha Across Kirindi oya. Contract No : Summary of Bill of Quantites Bill No.
Item
Amount ( Rs.)
Bill No.1
Preliminaries & General
240,000.00
Bill No.2
Site clearing
340,000.00
Bill No.3
Earth Works
154,000.00
Bill No.4
Road Works
39,000.00
Bill No.5
Construction of Bridge
Bill No.6
Construction of Superstructure
596,933.14
Bill No.7
Construction of Approach road
190,000.00
Day works ( Provisional)
449,750.00
BoQ Amount
3,894,980.00
5,904,663.14
Bill of Qunatities for Construction of Bridge No CBUK 1551 At Kirindi Mawatha Across Kirindi oya.
Bill No. 1
Preliminaries & General
Pay Item Item No. No. 1.1
P-001
1.2
103 (5)
Rate Code
Description Allow for Mobilisation & Demoblisation Implementation of all safety measures as directed
Qty
Unit
Item
L.S.
3.00
month
Rate ( Rs) Amount ( Rs.) Allow 30,000.00
Bill No 1 carried to summary
Bill No. 2
150,000.00 90,000.00 240,000.00
Site clearing
Item No.
Pay Item No.
2.1
Rate Code
Description
Qty
Unit
Rate ( Rs) Amount ( Rs.)
201 (2)
Clearing & grubbing inclusive of removal of trees
Item
L.S.
Allow
15,000.00
2.2
202(2)
Demolision of Existing structures
N/A
L.S.
Allow
60,000.00
2.3
202(2)
Construction of a by road/ by access and maintenece during construction
N/A
L.S.
Allow
265,000.00
2.4
Cutting tress girth more than 600mm .
N/A
Nos
quantity only
2.3
Relocation of electricty posts/ services
Not available
3.3
Relocation of telecom posts/ services
Not available
4.3
Relocation of watr services
Not available
Bill No 2 carried to summary
Bill No. 3 Item No.
340,000.00
Earth Works Pay Item No.
Rate Code
Description
Qty
Unit
Rate ( Rs) Amount ( Rs.)
3.1
Road way excavation in unclassified soil
10.00
Cu.m.
1,000.00
10,000.00
3.2
Trimming leveling and compaction of original ground to 100% standard density.
60.00
Sq.m
200.00
12,000.00
3.3
Embankment construction using Type I materials
60.00
Cu.m.
1,300.00
78,000.00
3.4
Embankment construction using Type II materials
30.00
Sq.m
1,300.00
39,000.00
3.5
Solid sodding,watering and maintenance
60.00
Sq.m
250.00
15,000.00
Bill No 3 carried to summary
Bill No. 4
Road Works
Pay Item Item No. No.
Description
4.1
Soil sub base compacted in position using approved soil ( Type I) Bill No 4- carried to summary
154,000.00
Qty 30.00
Unit Cu.m.
Rate ( Rs) Amount ( Rs.) 1,300.00
39,000.00 39,000.00
Bill No. 5
Construction of Bridge
Pay Item Item No. No.
Description Foundation, Sub structure & Capping beam Excavation in unclassified soil and backfilling for abutment & wing walls
Qty
Unit
Rate ( Rs) Amount ( Rs.)
370.00
Cu.m.
1,000.00
370,000.00
3,950.00
177,750.00
5.1
302 (1)
5.2
302(4)
Rock requiring blasting
45.00
Cu.m.
5.3
302 (7)
Item
L.S.
Allow
150,000.00
5.4
302(6)
Item
L.S.
Allow
80,000.00
5.4 (a)
302(10)
Dewatering Construction of necessary cofferdams cribs sheeting and bracing and their subsequent removal Allow for shoring, bracing and subsequent removal
Item
L.S.
Allow
175,000.00
Preparation of Foundation base
Item
L.S.
Allow
5,500.00
N/A
Sq.m
315.00
N/A
Cu.m.
4,200.00
4.50
Cu.m.
9,014.00
N/A
Cu.m.
10,611.00
N/A
Cu.m.
9,014.00
147.00
Cu.m.
10,611.00
Item
LS
35.00
Sq.m
1,200.00
42,000.00
390.00
Sq.m
2,000.00
780,000.00
35.00
208,600.00
5.5 (a)
302 (9)
5.5 (b) 5.5 (c)
5.6
1001 (3)
5.7 5.8
1001 (3b)
5.9
1001 (b)
5.10
Supplying geotextile for foundation base as necessary Supplying sand/ quarry dust for foundation base as necessary Concrete for structure (Cement Supplied by Client) Concrete grade15(19 mm) as screed in foundation Concrete grade 30 (19 mm) pocket filling in foundation Concrete of grade 20 (19mm) in abutment , wing wall Concrete of grade 30(19mm) in Foundation base,abutment, wing wall, Capping beams,ballast wall and curtain walls Casting 06 Nos. Bearing Pads on capping beam in grade 50 concrete as shown in drawings.
Allow
40,563.00
1,559,817.00
6,000.00
Formwork 5.11
1008 (2)
5.12
1008 (1)
5.13
1002 (1a)
5.14
1011(1)
5.15
706 (1)
Rough finish formwork for abutments & Wing walls Smooth finish formwork for abutment, wing walls Reinforcement ( Steel Supplied by Client) Fabricating & laying tor steel r/f for abutments & wing walls Supplying & fixing MS dowels, spliced and droved tailed with wedge at one end 20mm dia, 1m long, boring holes to 0.3m depth in fixing Weep holes Forming weep holes using type 400 PVC pipe of internal dia. Not less than 110mm
5,960.00
kg
N/A
Nos.
1,650.00
20.00
L.m
500.00
10,000.00
Drainage & Backfilling 5.16
705 (1)
Backfill using aggregate 50~200mm for dry stone lining behind abutment & wing walls
75.00
Cu.m
3,000.00
225,000.00
5.17
705 (2)
Filter medium using aggregate 37.5mm behind abutment and wing walls
10.50
Cu.m
3,500.00
36,750.00
5.18
705 (3)
Clay puddle laid under the porous backfill , behind abutment and wing wall
14.00
Cu.m.
2,000.00
28,000.00
5.19
804 (1)
Grouted Rip Rap Protection(Grouted rubble paving with concrte class C , 1:2:4 (19 mm) as necessary
N/A
Cu.m.
4,000.00
5.20
Turfing with solid sods, watering and maintenance
N/A
Sq.m
250.00
5.21
Constructing PVC Coated Gabbion wall with rubble
N/A
Cu.m
9,250.00
5.22
Supply and Laying Geo Textile in Gabion, as a per the drawing.
N/A
Sq.m
315.00
Bill No 5 carried to summary
3,894,980.00
Bill No 6 - Construction of Super Structure (20.0 m Span) - quantities as per given schedule. Pay Item Item No. No. Description Qty Unit Rate ( Rs)
6.1
1001 (b)
6.2
1008(1)
6.3
1002 (1a)
Concrete for deck slab ( Cement supplied by Client ) Class A Concrete G30 (19mm) in deck slab Formwork Smooth finish formwork for sides of deck slab Reinforcement ( Steel supplied by Client) Fabricating, laying & tying of tor steel r/f.
Cu.m.
10,611.00
347,404.14
30.52
Sq.m
1,200.00
36,624.00
35.00
212,905.00
6083.00
Kg
596,933.14
Bill No 7 – Construction of Approah road – 10m length each side , width 5.5m Pay Item Item No. No. Description Qty Unit( Rs)
7.1
1001(3)
7.2
7.3
1008(2)
7.4
808 (2)
7.5
Rate ( Rs)
Amount
( Rs.)
(
Class A concrete of grade 30 (19mm) in approach slab ( 150mm thick) Damp proof membrane (Polythene ) lay underneath the slab Formwork Rough finish formwork for sides of the concrete Supplying and fixing standard type guard stone in any soil and white washing two coats to guard stone.(Stones supplied by client) Reflective poles 100mm dia PVC , 0.75m high fixing in position on headwalls with a concrete ( Gr.15) infill and a 12mm dia steel rod (Poles supplied by client) Bill No 7 carried to summary
( Rs.)
32.74
Bill No 6 carried to summary
Concrete for Approach road Cement Supplied by Client)
Amount
17.63
Cu.m
117.74
Sq.m
22.77
Sq.m
16.00
Nos.
4.00
Nos.
L.S
190,000.00
-
190,000.00
Day works shedule ( Provisional) LABOUR Machinery
Rate
Amount ( Rs.)
Qty
Unit
1 2
Unskilled labour Semi skilled labour
25 25
day day
900.00 1,000.00
22,500.00 25,000.00
3
Skilled labour
15
day
1,200.00
18,000.00
4
Operators
25
day
1,200.00
30,000.00 95,500.00
Total
EQUIPMENTS Note: The rates are exclusive of driver, operator. But inclusive of fuel & consumables Machinery
Rate
Amount ( Rs.)
Qty
Unit
1 2 3 4 5 6
Backhoe loader - 2WD, 0.15 scoop capacity Farm Tractor with 3T trailer Water Bowser - 6000 ltrs Concrete Mixer - 200ltrs (10/7) Water pump - 2 inch Porker vibrator (Petrol) - 1.8m.hour
20 100 50 20 100 10
Hrs Hrs Hrs Hrs Hrs Hrs
2,700.00 750.00 1,000.00 600.00 300.00 200.00
54,000.00 75,000.00 50,000.00 12,000.00 30,000.00 2,000.00
7
Lorry 3 Ton - 3Ton
200
km
90.00
18,000.00
8 9
Plate Compactor - 80kg tamper plates Excavator
25 5
Hrs Hrs
500.00 4,000.00
12,500.00 20,000.00
Total
273,500.00
MATERIALS 1 2 3
Materials
Qty
Unit
Cement - Ordinary Aggregate for concrete (19mm) Sand
35 10 7
50kg Cu.m. Cu.m.
Total
Rate 910.00 3,000.00 2,700.00
Amount ( Rs.) 31,850.00 30,000.00 18,900.00 80,750.00
Summary of Day works Description 1. Labour 2. Equipment 3. Material Total
Amount ( Rs.) 95,500.00 273,500.00 80,750.00 449,750.00