Bremer stadium

February 20, 2017 | Author: narendra | Category: N/A
Share Embed Donate


Short Description

Download Bremer stadium ...

Description

STADIUMS & ARENAS SOLID CONSTRUCTION TO PERFECTION

SOLID CONSTRUCTION TO PERFECTION

QUALITY



FLEXIBILITY SOLID



COST

PRECISION

ON-TIME



MANAGEMENT

EFFECTIVE

INNOVATION

EFFICIENCY







DELIVERY DIVERSITY

INDIVIDUALITY



DEPENDABLE

RIENCE



SUSTAINABLE

DESIGN



RELIABILITY







EXPE-

PATENTED

PRODUCTION

EVERYTHING FROM A SINGLE SOURCE

2

SOLID CONSTRUCTION TO PERFECTION

We have been a sound and solvent partner for precast reinforced concrete construction for more than 60 years. We erect buildings up to any performance limit required. The precast concrete elements for our construction projects are designed and produced at our own works, which is one of the largest and most modern precast reinforced concrete plants in the world. Many of the precast elements are based on our own designs and patents. With a portfolio of more than 2,500 facilities – every single one completed successfully on deadline – we are a powerful partner for clients in industry, logistics and trade.

BREMER creates turnkey facilities, if required, and also acts as general contractor. The result, for example, is a modern stadium with a capacity of approx. 25,000, constructed in 15 months for a price of around € 23 million. A medium-scale company with an international orientation and annual revenues of € 300 million, we operate throughout Europe under the central management of our head office in Paderborn. Our top priority is full satisfaction for every client.

All the expertise needed for contract execution is available in-house. Our team of around 350 employees, including 100 graduate engineers and architects for design, structural analysis and project implementation, are distinguished by their high qualifications.

3

CONTENTS

4

Page 03

SOLID CONSTRUCTION TO PERFECTION

Page 05

BREMER STADIUMS & ARENAS Customised, efficient and completed on deadline

Page 06

BREMER STADIUM TYPES The future already built in

Page 12

PADERBORN ARENA First of its kind built to the latest standards

Page 14

OFFENBACH STADIUM Newbuild during the fixture season

Page 16

KASSEL STADIUM UPGRADE Grandstand with versatile function building

Page 18

MÜNSTER STADIUM UPGRADE New stand in record time

Page 20

GLIWICE ARENA DESIGN First-hand expertise

Page 22

The BREMER PRINCIPLE

STADIUMS AND ARENAS

Customised, efficient and completed on deadline

Solid, systemised precast construction is particularly well suited for the creation of stadiums and arenas. Our method of construction not only provides endless scope for customised design but also permits the economical realisation of sports and event facilities on any scale.

As general contractor, BREMER offers full turnkey solutions from a single source. Innovative design and end-to-end planning provide the sound foundation needed for efficient construction based on BREMER‘s own precast concrete construction patents.

BREMER constructed the first small arena-style stadium in Germany that meets all national and international soccer association stipulations. Its modern Bundesliga-standard specifications include a pitch with undersoil heating, sprinkler system and rolled turf.

Your benefits • Design, fabrication and assembly from a single source • Solid construction • League-standard and FIFA-compliant specifications • Very short construction period • Integration of exterior facilities and gardens • Upgradeable at any time

Apart from realising stands with seating and standing space tailored to individual requirements, stadium construction also involves creating function buildings for team rooms, VIP areas, catering facilities and office premises as well as fan shops and the whole range of facilities for media coverage of events.

5

BREMER STADIUM TYPES

Versatile, flexible and upgradeable

BREMER STADIUM TYPES

The future already built in

BREMER stadiums and arenas are available in three types, offering lots of design options for seating and standing plans. What is special about our stadium concepts is their flexibility. They are designed from the outset with possible upgrades in mind, so they are already primed to meet future needs. At the same time, we also take account of function buildings and the special requirements they need to meet to cater for players, VIPs and the media. The three stadium types, with different capacities, not only fulfil all international soccer association requirements; they can also be upgraded to accommodate more spectators in the future. BREMER arena construction is based on ground-breaking systemised precast construction patents that permit smaller stadiums and arenas to be realised within a short construction period on unbeatable terms. Depending on requirements, the facilities can also be used for other sporting or cultural events. BREMER constructs turnkey facilities and supplies all services, including finishing work, from a single source.

4-stand stadium, main view, function building

TYPE A 4-stand stadium: 15,000 seated or 10,000 seated and 8,000 standing

TYPE A 18,000 capacity

8

4-stand stadium, cross-section

TYPE B 4-stand stadium: 18,000 seated or 14,000 seated and 8,000 standing (approx. 1,000 capacity view obstructed)

TYPE B 22,000 capacity

9

Function building, player and coach areas

TYPE C Arena: 20,000 seated or 16,000 seated and 8,000 standing view obstruction (approx. 1,000 capacity view obstructed)

TYPE C 24,000 capacity

PADERBORN ARENA

First of its kind built to the latest standards

12

The Arena in Paderborn is built to meet all the specifications of the DFB, DFL and FIFA. The exterior walls are completely closed for better noise abatement. The pitch is furnished with undersoil heating, a sprinkler system and rolled turf. The function building offers space for club offices and catering.



The BREMER construction method is unique in Germany. The Paderborn Arena is the first small closed-design stadium that fulfils all soccer association guidelines and complies with the latest Bundesliga standards. It has thus been selected as a DFL reference facility for outstanding cost/benefit performance as well as efficient stadium construction and operation. Arena specifications Seated 4,891 Standing 9,260 Business and VIP 734 Disabled 30 Carers 30 Press 52 Total capacity 14,997 Year of construction Construction period Net contract sum

2009 11 months € 10.0 million

Scope of supply and services Turnkey realisation including architectural design and final planning as well as all engineering services. The arena can be upgraded to accommodate approx. 3,000 more spectators.

13

OFFENBACH STADIUM

Newbuild during the fixture season

14

With four stands and open corners, the new Offenbach Stadium is a British-style facility. It accommodates around 20,500 spectators and meets all the requirements of the national soccer associations as well as FIFA. Standing space, for around 9,500, is comparatively generous and, in line with tradition, partially located around the centre line.



One of the special features of this project is that the construction schedule runs through the fixture season. The speed and precision of the BREMER construction method makes it possible for stands to be erected in four construction phases without interfering with matches. Architectural accents such as the “drawer“ in the grandstand increase the 2nd floor business area to more than 1,500 square metres. Stadium specifications Seated 9,401 Standing 9,923 Business and VIP 920 Disabled 40 Carers 40 Press 56 Total capacity 20,380 Year of construction Construction period Net contract sum

2011 Feb 11 - July 12 € 22.0 million

Scope of supply and services Turnkey realisation including architectural design and final planning as well as all engineering services The Stadium can be upgraded to accommodate approx. 4,000 more spectators. 15

KASSEL STADIUM

Grandstand with versatile function building For the Auestadion in Kassel, BREMER constructed a new roofed grandstand as well as a three-storey function building that meets all the specifications of the DFB, DFL and German Athletics Association. The facility is thus suitable for use not only for soccer but also as a venue for athletic championship events, which require significantly more changing facilities, media rooms and sanitary facilities. The new stand offers seating for more than 2,600 spectators, with dedicated seating areas for VIPs and press. Realised by BREMER as a turnkey contract, it was completed – right down to the finishing work – in just eight months. Stadium specifications Seated 2,612 Standing Business and VIP 20 Disabled 15 Carers 15 Press 20 Previous capacity 15,341 Total capacity 17,993 Year of construction Construction period Net contract sum

2010 Feb 10 - Oct 10 € 7.0 million

Scope of supply and service Turnkey realisation including final construction planning and structural analysis.

16



17

MÜNSTER STADIUM

New stand in record time

The new grandstand for the Münster Stadium incorporates not only a stand roof but also a three-storey function building designed to meet DFB and DFL requirements. Among other things, it offers space for up to 700 VIP guests and was completed within a construction period of just six months. The 3,000 capacity stand, including roof, was finished in six months. BREMER was awarded the contract because its bid was within the € 5 million budget limit. The competing bid was € 1 million more. In the case of Münster Stadium, BREMER again performed all the architectural design and detail planning work as well as all engineering services and handed over the new grandstand as a turnkey facility. Stadium specifications Seated 1,930 Standing Business and VIP 943 Disabled 10 Carers 10 Press 42 Previous capacity 12,115 Total capacity 15,050 Year of construction Construction period Net contract sum

2008 Nov 08 - May 09 € 5.0 million

Scope of supply and services Turnkey realisation including architectural design and final planning as well as all engineering services. The Stadium can be upgraded to accommodate approx. 2,500 more spectators.

18



19

GLIWICE ARENA

First-hand expertise

20

The Gliwice Arena in Poland is being constructed by the same method as the Arena in Paderborn. With a capacity of more than 10,000 and modern specifications, it meets all UEFA and FIFA stipulations for international competitions. BREMER also supplied all the engineering and architectural services, including structural analysis. Arena specifications Seated 10,148 Standing Business and VIP Disabled 20 Carers 20 Press 80 Total capacity 10,268 Year of construction Construction period

2011 July 10 - Aug. 11

Scope of supply and services Architectural design and final planning as well as all engineering services.



21

THE

PRINCIPLE

The BREMER PRINCIPLE BREMER constructs buildings for trade and industry entirely of precast reinforced concrete elements, including walls and foundations. They can be realised optionally as

• • • • •

shell projects extended shell projects rainproof building projects semi-turnkey building packages or full turnkey building packages

The decision is yours! Shell, extended shell, rainproof building, semi-turnkey building package or full turnkey building package – all options are available and the performance limits and interfaces are clearly defined. The advantages for you • Precast reinforced concrete elements fabricated at our own works with the benefit of 60 years of experience, some units based on patents held by BREMER itself • Buildings made to exceptionally high quality standards, solid construction with a structure comprised of long-life building materials • Full management by BREMER – our team includes architects, structural engineers and building service engineers with years of experience in precast construction Cost-effectiveness Here are a few prices for turnkey delivery (excluding site and outdoor facilities) Logistics buildings Furniture stores/halls Stadiums/Arenas Multi-storey car parks

€ 250.00–450.00/sqm € 270.00–400.00/sqm € 1,100.00–1,300.00/seat € 500.00–700.00/standing place € 5,000.00–6,000.00/parking space

Short construction periods, e.g. for turnkey buildings

5–12 months 4–6 months 10–15 months 6–8 months

Logistics halls and buildings (construction volume € 6–50 million) Warehouses and production halls (construction volume € 0.5–5 million) Soccer stadiums and Arenas Multi-storey car park with approx. 500 parking spaces

Take advantage of the BREMER PRINCIPLE

• low prices • fixed price guarantees • short construction periods • exceptional quality • full technical management and years of experience

The BREMER PRINCIPLE services are rendered by BREMER.

22

and profit from

is guaranteed as long as all engineering



SOLID CONSTRUCTION TO PERFECTION

170 Klap

Paderborn

Stuttgart

Polen

BREMER AG

BREMER Systembau GmbH

BREMER POZNAN Sp. zo.o.

Grüner Weg 28-48 33098 Paderborn

Mittlerer Pfad 26 70499 Stuttgart

al. Wielkopolska 28 60-608 Poznan

Tel. +49 5251 770-0 Fax +49 5251 770-110 [email protected] www.bremerbau.de

Tel. +49 711 540813-0 Fax +49 711 540813-25 [email protected] www.bremerbau.de

Tel. +49 5251 770-0 Fax +49 5251 770-110 [email protected] www.bremerbau.de

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF