Area of tension reinforcement Minimum area of tension reinforcement
av
Length of that part of member traversed by shear failure plane
b
With (breath) or effective width of section
c
Cover to outer diameter
d Fc
Effective depth of section
Ft
Basic force used in defining tie forces
fcu
Characteristic strength of concrete
fs
Estimated design service stress in the tension reinforcement
fy
Characteristic strength of reinforcement
G
Shear modulus
H Hx
Maximum horizontal force
Hy
Horizontal force in y direction
h
Overall depth
KEL
Knife edge load
L lx
Critical perimeter
ly
Dimension of element on y direction
lz
Dimension of element on z direction
M Mx
Design ultimate resistance moment
My
Moment on y axis
Mz
Moment on z axis
q
Surcharge load
r
Internal radius of bend
SLS
Serviceability limit state
T
Traction force
t
Thickness of the element
ULS
Ultimate limit state
V
Shear force due to design ultimate loads or design ultimate value of a
Basic force used in defining compressive forces
Horizontal force in x direction
Dimension of element on x direction
Moment on x axis
concentrated load v
Design shear stress
vc
Design shear stress in concrete
x
Neutral axis depth
x'
Distance from Y axis to the centroid of an element
y'
Distance from X axis to the centroid of an element
z
Lever arm
z'
Distance from X - Y plane to point where the considered resultant force acting
β ¿s
Coefficient, variously defined, as appropriate
φ σa
Soil friction angle, or diameter
γ fL γ f3
Partial load factor
δ
γ
D E
DESIGN UNIT
Strain in tension reinforcement Nominal range of movement Active earth pressure Unit weight of soil Partial load factor
Doc. No. Designed
Date
D EPC DIVISION E CENTRAL ENGINEERING C Reference
CONSULTANCY BUREAU (CECB)
Calculation
Checked Job Code
Date Page Output
DESIGN UNIT
D EPC DIVISION E CENTRAL ENGINEERING C Reference
CONSULTANCY BUREAU (CECB)
Calculation
Doc. No. Designed Checked Job Code
Date Date Page Output
DESIGN UNIT
D EPC DIVISION E CENTRAL ENGINEERING C Reference
CONSULTANCY BUREAU (CECB)
Calculation
Doc. No. Designed Checked Job Code
Date Date Page Output
DESIGN UNIT
D EPC DIVISION E CENTRAL ENGINEERING C Reference
CONSULTANCY BUREAU (CECB)
Calculation
Doc. No. Designed Checked Job Code
Date Date Page Output
D E C
DESIGN UNIT EPC DIVISION CENTRAL ENGINEERING CONSULTANCY BUREAU (CECB)
Doc. No. Designed Checked Job Code
Date Date Page
Reference
Calculation
Output
Design of Box Culvert Ground Level X hs
A
hw
Y
B
H
hw
h l
D
C
hs
Figure 01 Dimentional Properties
Soil Cover ,
h
=
1.2 m
l
=
1.5 m
H
=
7.2 m
Safe Bearing Pressure
=
150 kN/m2
Section Thickness Main R/F Cover to R/F Grade of Concrete
=
0.2 m
= =
12 mm 45 mm 25 N/mm2
γc
=
24 kN/m3
γs
=
γw
=
Φ'
=
=
( hw , h
= span/(10 ~15))
Properties of Soil 20
kN/m3
9.81 kN/m3 25 o
1 - Permanent Loads 1.1 Dead Loads The nominal dead doad consist of the weight of the materials and the part of the structure Structural
Unit Weight of Concrete shall be taken as 24 kN/m3
Engineering
Becouse of the arching of soil, check whether the depth above culvert is
Design in
> 3 x width of culvert ( in which case limit depth to 3 x width )
preactice (Roger -
=
Depth of cover (H)
westbrook)
3 x width
(page-94)
= 3 =
7.2 m
1.6
x
4.8 m
3 x width < =
7.2 m
=
4.8 m
=
4.8 x
20
=
96
kN/m2
Depth limited to
So
Surcharge on Roof Surcharge Presure (qr) qr
Soil Engineering (Spangler & Handy)
Casses of conduit installation consider as Ditch Conduit Ditch Conduit A ditch conduit is defined as one which is instaled in a relatively narrow ditch dug in passive or undisturbed soil and wich is then covered with earth backfill.
Ceylon Electricity Board
C E B
Dam Safety Environmental &
Doc. No. Designed Checked
S.M.P
Date Date
31.05.2010
C E B
Job Code
Civil Structure Maintanance
Reference
Page
Calculation
1 Output
Maximum load on ditch condition Depth of cover
=
7.2
m
Surcharge on Roof Surcharge Presure (qr) 2 (qr) = Cd.γ.Bd Cd
=
µ'
,
1-e-2Kµ'(H/Bd) 2.K.µ'
= tan φ'
K
=
1-sin φ 1+sin φ
µ'
K Bd
-
coedicient of friction between fill material and side of ditch
-
Active Lateral earth pressure coeficient
-
Horizontal width of ditch at top of conduit
γ
-
Unit weight (wet density) of filling material
H
-
Height of fill above top of conduite
Cd
-
Load coeficient for ditch condition
So, K
=
1-sin φ
Bd =
3.60 m, Consider 1m length of Roof slab
1+sin φ = µ'
= 2.K.µ'.(H/Bd) = Cd
Structural
0.406
= tan φ'
=
0.466 0.76 1.403
(qr)
2 = Cd.γ.Bd
(qr)
=
101.0 kN/m2
1.2 Horizontal Earth Pressure
Engineering
Design in
If the backfill properties are known,
preactice
If wall friction is to be ignored
(δ = 0 )
(Roger westbrook)
K0
= 1-sin Φ'
=
0.58
(page-94)
Ka
= ( 1-sin Φ' ) / ( 1+sin Φ' )
=
0.41
q max
Ceylon Electricity Board
C E
Dam Safety
= γ.Ka.h = 20 x 0.41 x = 73.87 kN/m2
qep
= 20 x 0.41 x = 15.42 kN/m2
q q
= qmax - qep = 58.44 kN/m2
Doc. No. Designed
9.1
1.9
S.M.P
Date
31.05.2010
C E B
Checked Job Code
Environmental & Civil Structure Maintanance
Reference AASHTO
Date Page
Calculation 2 - Vertical Live Loads
3.7.1 For Fill Depths H ≥ 8 feet (2400 mm) and Culvert Clear Span Length, The effect of live load is neglected in design when the depth of fill is more than
8 feet 3 - Hydrostatic Pressure (Internal)
q ip
= C.h = 9.81 x 1.7 = 16.68 kN/m2
4 - Analysis Reinforced Concrete
Constant K
=
h
3
=
1.21
Manual
k1
=
K+1
=
2.21
(ref-5.1)
k3
=
K+3
=
4.21
k5
=
2K+3
=
5.43
k7
=
2K+7
=
9.43
k8
=
3K+8
=
11.64
Designers
l
{
hs hw
}
4.1 Load Case -01 Testing Condition 4.1.1 Hydrostatic Pressure-(Internal) Reinforced
A
B
MA =
MB = qip.h2.K.k7 60.k1.k3 = 0.99 kN.m/m
MC =
MD = Ma. K8 k7 = 1.22 kN.m/m
Concrete Designers
qip
Manual (ref-5.1)
D q = q ip Pressures
C B.M.D
4.1.2 Flexure due to weight of wall Wall weight ( G )
= hw.γ.h =
8.2 kN/m
q1 = 2.G l.hw
=
10.20 kN/m2
Reinforced Concrete
A
B
MA =
MB = q1.l2.K 12.k1.k3 = 0.22 kN.m/m
MC =
MD = Ma. K5 K = -0.97
Designers Manual
G
G
(ref-5.1) D q1 Pressures
C B.M.D
kN.m/m
4.1.3 Flexure due to weight of Roof q
= hs.γc
=
4.8 kN/m2
Doc. No.
1 Output
C E B
S.M.P
Designed Checked Job Code
Dam Safety Environmental & Civil Structure Maintanance
Reference
Date 31.05.2010 Date Page 2 Output
Calculation A
B
MA = C
D q = q1 Pressures
B.M.D
MB =
MC =
= q.l2 12.k1 = -0.35
kN.m/m
MD
Addition of moment for Load case 01 Position
Hydrostatic
γf
ulsMb
Walls
Roof
Walls + Roof
γf
ulsTotal Mb
A and B
0.99
1.4
1.38
0.22
-0.35
-0.14
1.4
-0.19
1.19
C and D
1.22
1.4
1.70
-0.97
-0.35
-1.32
1.4
-1.85
-0.15
Roof midSpan
0.99
1.4
1.38
0.22
1.04
1.4
1.45
2.83
Base midSpan
1.22
1.4
1.70
** 1.53
0.82
2.35
1.4
3.29
5.00
Walls middle
* -2.06
1.4
-2.88
-0.38
-0.35
-0.73
1.4
-1.02
-3.90
** 0.82
**
Table - 01 Fixed end mement of the wall for Hydrostatic load MA
=
W.L
MC
=
W.L
=
2.41 kN.m/m
15 =
10
1.61 kN.m/m
Maximum (-ve) moment
=
(Where x is 0.45L from C)
W.L 23.3
=
-1.0 kN.m/m
* Calculation of moment at mid span of walls done by aproximatly by adding moment transferred to mid span from FEM to the Maximum negative meoment occurred at 0.45L after moment distribution ** Moment at mid span of the wall is calculated by considering full bending Calculation of midspan moment due to wall load Niutral axis depth from A
=
0.26 m
4.2 Load Case -02 Culvert empty and trench filled
Lateral soil pressurees giving rise to flexture in the structure "q"is the rectanguler pressure and "qep" is the triangular pressure 4.2.1 Trianguler Pressure,qep Reinforced Concrete
A
B
MA =
MB = qep.h2.K.k7 60.k1.k3 = -0.91 kN.m/m
MC =
MD = MA. K8 k7 = -1.13 kN.m/m
Designers Manual (ref-5.1) qep
qep Pressures
D
C B.M.D
uls
C E B
Doc. No. Designed Checked Job Code
Dam Safety Environmental & Civil Structure Maintanance
Reference
S.M.P
Date 31.05.2010 Date Page 3 Output
Calculation 4.2.2 Surcharge on walls,q
A
MA =
Reinforced Concrete Designers Manual (ref-5.1)
MB = MC = MD = q.h2.K 12.k1 = -7.72 kN.m/m 4.2.3 Surcharge on Roof ,qr MA = MB = MC = MD = q.l2 12.k1 = -7.45 kN.m/m Addition of moment for Load Case 2
B
C B.M.D
A
B
D
C B.M.D
Pressures
Total (Survice)
γf
-7.45
-16.22
1.4
-22.70
-1.32
-7.45
-17.62
1.4
-24.66
-7.72
1.04
17.29
9.70
1.4
13.58
-1.13
-7.72
2.35
17.29
10.80
1.4
15.12
*
**
1.43
13.39
-0.73
-7.45
6.65
1.4
9.31
Walls & Surcharg Roof(LC-1) -e (Roof)
Posotion
qep
q
A and B
-0.91
-7.72
-0.14
C and D
-1.13
-7.72
Roof mid-Span
-0.91
Base midSpan Walls middle
D Pressures
Total
U.L.S.
Fixed end mement of the wall due to qep MA
=
W.L
=
1.49 kN.m/m
MC
=
W.L
=
2.23 kN.m/m
15
10
Maximum (-ve) moment
=
(Where x is 0.45L from C)
W.L 23.3
=
-1.0 kN.m/m
4.2 Load Case -03 4.2.1 This is load case 02 + Hydrostatic load from Load case 01
Posotion
L.C.02 (Service)
Hydrost. (Service)
Total (Service)
L.C.02 (U.L.S.)
Hydrost. (U.L.S.)
A and B
-16.22
0.99
-15.23
-22.70
1.38
-21.32
C and D
-17.62
1.22
-16.40
-24.66
1.70
-22.96
Roof mid-Span
9.70
0.99
10.69
13.58
1.38
14.96
Base midSpan
10.80
1.22
12.02
15.12
1.70
16.83
Walls middle
6.65
-2.06
4.59
9.31
-2.88
6.43
Total
(U.L.S.)
C E B
Doc. No. Designed Checked Job Code
Dam Safety Environmental & Civil Structure Maintanance
Reference
S.M.P
Calculation 5 - Check on ground safe bearing pressure 5.1 Load Case -01 Hydrostatic Pressure
=
16.68
kN/m2
Weight of walls
=
10.20
kN/m2
Weight of Roof + Floor
=
9.60
kN/m2
Total Pressure
=
36.48
Weight of walls
=
10.20
kN/m2
Weight of Roof + Floor
=
9.60
kN/m2
Surcharge on Roof
=
96.00
kN/m2
Total Pressure
=
115.80 kN/m2
Total Pressure
<
kN/m2 hence ok
150 kN/m2
5.2 Load Case -02
Total Pressure
<
150 kN/m2
hence ok
5.3 Load Case -03 Weight of walls
=
10.20
kN/m2
Weight of Roof + Floor
=
9.60
kN/m2
Surcharge on Roof
=
96.00
kN/m2
Hydrostatic Pressure
=
16.68
kN/m2
Total Pressure
=
122.28 kN/m2
Total Pressure
<
150 kN/m2
hence ok
6 - U.L.S. of Flexture Maximum Moments kN.m/m Member
Hogging
Sagging
Roof
-22.70
(L.C-01)
14.96
(L.C-03)
Walls
-24.66
(L.C-02)
9.31
(L.C-02)
Base
-24.66
(L.C-02)
16.83
(L.C-03)
i - Slabs Maximum Moment
=
24.15
kN.m/m
Date 31.05.2010 Date Page 4 Output
C E B
Doc. No. Designed Checked Job Code
Dam Safety Environmental & Civil Structure Maintanance
Reference
S.M.P
Calculation
Date 31.05.2010 Date Page 5 Output
Design Calculation for Box Culvert
6-
6.1 U.L.S. of Flexture Analysis was carried out for several load cases of various loading arrangements to find out the maximum effect on the Box culvert Diameter of main reinforcement
=
Diameter of secondary reinforcement
=
Section Thickness
=
Maximum Bending Moment
mm mm 200 mm 12 12
=
24.15
kN.m/m
Assume severe environment condition, for driving rain =
Cover =
Effective depth, d
200 -
45 -
45
mm
6
d
= 149
mm
= 149 k
mm 2 M / (bd fcu) =
2
= (24.15x106 /(1000x1492x25) = 0.044 < 0.16 Hence no compression r/f is required M z
= (0.87fy)Asz = (1 - 1.1fyAs/ fcubd) d
equation 1 equation 5
from these two equations
z
= d (0.5+(0.25-k/0.9)1/2
z
= d [0.5+(0.25-0.044/0.9)1/2 =
141.41
Take Z as 0.95d Z = 0.95
d
= 0.95
x
< 0.950 d
149
mm
= 142
6.1.1 Design of main reinforcement As = M / 0.87fyz As req
= 24.15 x106 / 0.87x460x142
mm /m T 12 @ 250 ( As =
Use
426
2
=
426 =
452
mm /m 2
As pro
mm2/m =
452 Minimum area of main rainforcement for slabs = 100x452/(1000x149) 100As / bad
= 0.30
### 0.13
Main r/f T
Hence o.k
6.2 Design for Shear Reinforcement
Check shear in U.L.S. on roof and floor slabs Take Load case 02 Shear across support = ( 115.80 - Wt of Base x γf ) = 109.08 kN/m2
mm2/m
12
@
250
Therefore shear in the support = =
C E B
109.08 x 1.2 /2 65.45 kN/m Doc. No. Designed Checked Job Code
Dam Safety Environmental & Civil Structure Maintanance
Reference
S.M.P
Calculation Design shear force, V design
=
65.45 kN/m
149 mm Tension steel across shear plane = Y12 -250 c/c =
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.