Bills of Quantities

DEVELOPMENT OF PLOT C20_C21 , REEM ISLAND - ABU DHABI

SECTION S - PROVISIONAL SUM ITEM

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

PROVISIONAL SUMS

Soft & Hard Landscaping with Irrigation System Allow a provisional sum for the design supply A

B

and installation of hard and soft landscaping and irrigation by a nominated sub-contractor and to Client/Consulltant approval Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

PS

4,000,000.00

%

Note: Surface paving's, bins, benches, parking spaces, internal roads, wheel stoppers, Kerbs, planting including shade trees, palm trees, green, hedges and flower bushes, sweet soil are covered under this provisional sum for areas on the top of podium, Ground Floor and outside the footprints of the building. All other elements including the structure, waterproofing, conduits for irrigation, lighting, fill to make up levels, etc. are to be covered in the fixed price element of the measured work. Kids Playing areas, Gym, Spa and spo rts field equipments

C

Allow for supply and installation of kids playing areas, Gym, Spa & Sports field equipments by a nominated subcontractor and to Client/Consultant approval

D

Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum Note: Rate shall include supply and installation of all the required equipments for kids outdoor & indoor playing area, Tennis court, badminton courts, Gym & Spa areas squash courts and class room and according to the proposed and approved shop drawings and specifications (All subject to client acceptance)

CARRIED TO COLLECTION BQ/SECTION S/1

PS %

2,200,000.00

Bills of Quantities

DEVELOPMENT OF PLOT C20_C21 , REEM ISLAND - ABU DHABI

SECTION S - PROVISIONAL SUM ITEM

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

PROVISIONAL SUMS (Contd.)

Water Fall Features 2 nos. at Top Of Podium

A

B

Design, coordination, supply & installation of water fall features by nominated sub contractor. Including civil works, finishing, equipment, machinerie, pipes, etc.. As per the proposed approved shop drawings and specifications of the same & to Client/Consultant approval Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

PS

375,000.00

%

Water Feature (main entrance)

C

D

Design, coordination supply and installation of the water feature near reception/information counter including water supply system, finishes, fittings, equipment and machinerie by a nominated sub contractor as per the proposed approved shop drawings and specifications & to Client/Consultant approval Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

PS

84,000.00

%

Shades and Sail Shade on Top OF Podium

E

Design, coordination supply and installation of the shades & Sail Shades by a nominated sub contractor including all required fixation material and accessoriesas amd finishing as per the proposed approved shop drawings/specifications and to Client/Consultant approval

PS

F

Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

%

CARRIED TO COLLECTION

BQ/SECTION S/2

325,000.00

Bills of Quantities

DEVELOPMENT OF PLOT C20_C21 , REEM ISLAND - ABU DHABI

SECTION S - PROVISIONAL SUM ITEM

DESCRIPTION

UNIT

QTY.

RATE

AMOUNT

PROVISIONAL SUMS (Contd.)

Kitchen Cupboard Unit

A

B

Supply and installation of kitchen cupboards unit (Floor & wall mounted ) by nominated sub contractor Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

PS

6,200,000.00

%

Supply and fixing of kitchen cupboards including but not limited to base units, tall units, wall units with drawer, adjustable shelf, millwork, base, backing, necessary finishes, fittings, fixtures, ironmongery, etc..; including site preperation for installation in accordance to drawings specifications and to Client/Consultant approval Galvanized steel cat ladder and cat walk at MEP shafts

A

B

Design, coordination, supply and installation of Galvanized steel cat ladder, cat walk and access from main corridors to MEP shafts by nominated sub contractor Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

PS

470,000.00

%

Supply and fixing of Galvanized steel cat ladder, cat walk and accesse from main corridors to MEP shafts including but not limited to fixing, framework, fittings, fixtures, necessary finishes, etc..; in accordance to specifications and Client/Consultant approval Lighting for Pool Deck, Gym, SPA, Sports fields & kids playground areas

C

Design, coordination an d installation of Lighting system as mentioned below by nominated sub contractor including testing and commissioning of the system.

PS

D

Allow for contractor's profit, overhead, attendance, general builders work, specific builders work, facilities and coordination cost incurred during execution of the works covered by the provisional sum

%

Note: lighting system for GYM, SPA, Management room, party hall, tennis court, swimming poosl, Jacuzzis, billiard room, Squash courts, Badminton Courts, steam, sauna as per proposed/approved shop drawings and specifications and to client/Consultant approval CARRIED TO COLLECTION BQ/SECTION S/3

360,000.00

Bills of Quantities

DEVELOPMENT OF PLOT C20_C21 , REEM ISLAND - ABU DHABI

SECTION S - PROVISIONAL SUM ITEM

DESCRIPTION

UNIT

PROVISIONAL SUMS (Contd.) COLLECTION

From Page BQ/N/01

From Page BQ/N/02

From Page BQ/N/03

TOTAL OF SECTION N - SPECIAL CONSTRUCTION SUMMARY CARRIED TO MAIN SUMMARY

BQ/SECTION S/4

QTY.

RATE

AMOUNT