BOQ- form
March 12, 2017 | Author: Arun Chandra Babu | Category: N/A
Short Description
Download BOQ- form...
Description
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 2 - SITE WORKS Section 02315 Earth Work Excavation and Backfilling 2.1
Excavation for foundation in any type of soil even rock, up to required height including backfilling, shoring (if required), dewatering and removing of surplus excavated material from site to a place approved by the Municipality. Mechanical excavation shall be stopped 300mm above the Foundation level and completed manually.
M3
13308
2.250
29943.000
L.S
L.S
6000.000
6000.000
L.S
L.S
1500.000
1500.000
Compacted fill 2.2
Filling inside building (under slab on grade etc.) as per proposed levels, with approved quality imported filling material. Filling shall be compacted in layers (each layer shall not be more than 250mm thick) and compaction shall not be less than 98% of dry density. Selected excavated material may be used for filling but as per approval of the Engineer.
Section 02360 Termite Control 2.3
Termilte Control/Soil treatment for the whole building area all as described
Bill No-1: Class Room + Administration Bldg (A)
1/2-1
SITE WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
37443.000
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 2 - SITEWORKS COLLECTION Page No. 2-1
Bill No-1: Class Room + Administration Bldg (A)
37,443.000
1/2-2
SITE WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
37,443.000
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/2-3
SITE WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
DIVISION 3 - CONCRETE Section 03300 Cast-in-place Concrete
3.1
3.1.1 3.1.2
3.2
Plain Concrete Plain concrete grade using sulphate resisting cement including all form work and laid as described (smooth face) 100 mm thick under Foundation 50 mm thick under Ground beam & External steps
M2
1,400
3.500
4900.000
M2
710
2.200
1562.000
Reinforced Concrete Vibrated reinforced concrete using sulphate resisting cement filled into formwork and tamped around reinforcement including all formwork, tie bolts and reinforcement etc. complete as described (Fair finish for all exposed faces)
3.2.1
Foundation: Col/Wall Footings etc.
M3
785
95.500
74967.500
3.2.2
Column/wall Neck
M3
190
100.000
19000.000
3.2.3
Ground Beam, External Steps/ramp etc.
M3
345
95.000
32775.000
3.2.4
150mm thick slab on grade with turn down slab/edge thicnessing and including Isolation joints (with celotex and mastic fill). Construction joints shall be provided in case bay area is more than 25 m2.
M2
3,930
7.250
28492.500
3.3
Vibrated reinforced concrete using ordinary portland cement, filled into form work and tamped around reinforcement including all formwork, reinforcement etc. complete as described. (Fair finish for all exposed faces)
3.3.1
Walls
M3
698
95.000
66310.000
3.3.4
Lintels, sills, bond beam etc.
M3
93
98.000
9114.000
Bill No-1: Class Room + Administration Bldg (A)
1/3-4
CONCRETE
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
237121.000
Total Carried to Collection ITEM
3.4
3.5
DESCRIPTION
UNIT QTY UNIT RATE KD
Section 03530 Concrete Topping Minimum 50mm thick concrete topping with mesh reinforcement (Y8/200mm both direction)and laid over hollow core slab in proper shape with required expansion, construction and contraction joints. (K-300)
AMOUNT KD
M2
11821
5.000
59,105.000
Section 03410 Plant Pre-cast Structural Concrete. Vibrated precast prestressed reinforced concrete with compressive strenght of 48Mpa (Cube strenght) using Ordinary portland cement finished fairface on all exposed surfaces including all formwork, reinforcemet, tension wires anchorage, lifting hooks, hoisting, placing in position, bedding neoprene bearing pads, perimeter gaskets, sealent, shims, dowels and connections all as specified Note : The dimensions mention below are as per the drawings, and the dimensions shown in the drawings are for guidance only, It is contractor's responsibility to design all the precast concrete element, and all connections and accessories as specified. The slab system shown in the drawing (Hollow core system) is for guide line only, The contractor to design complete slab system as hollow core system or Double T (TT) System, after consideration of all services passing fron the ceiling and take the approval from Engineer before commencing of the work.
3.5.1
Design, suplly and fixation of precast concrete columns.
L.S.
L.S.
98,650.000
98,650.000
3.5.2
Design, suplly and fixation of rectangular beams, edge beams, spine beams.
L.S.
L.S.
205,450.000
205,450.000
Bill No-1: Class Room + Administration Bldg (A)
1/3-5
CONCRETE
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
3.5.3
Design, suplly and fixation of hollow core or Double TT, slab system.
L.S.
L.S.
201,450.000
564655.000
Total Carried to Collection ITEM
201,450.000
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
3.5.4
Design, suplly and fixation of all staircases.
L.S.
L.S.
20,000.000
20,000.000
3.5.5
Design, suplly and fixation of parapet.
M3
160
85.000
13,600.000
M2
112
24.000
2,688.000
M2
215
7.500
1,612.500
Section 03455 Glass Reinforced Concrete (GRC) Precast GRC panel fixed over external wall including galvanized steel support, anchors, dowels etc. complete as described 3.6
Decorative GRC panels over Stair windows Section 03550 Concrete Screed
3.7
Approx. 100mm thick smooth surface sand cement and thin gravel screed with steel wiremesh (6mm dia @ 200mm c/c) all as described.
Bill No-1: Class Room + Administration Bldg (A)
1/3-6
CONCRETE
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
37900.500
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/3-7
CONCRETE
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
DIVISION 3 - CONCRETE COLLECTION Page No. 3-1
237121.000
Page No. 3-2
564655.000
Page No. 3-3
37900.500
839,676.500
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/3-8
CONCRETE
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 4 - MASONRY Section 04200 Unit Masonry 4.1
Solid concrete block wall bedded in sand cement motar with gavanized steel ties including scaffolding up to any height etc. complete as described.
4.1.1
400 mm thick wall
M2
72
12.250
882.000
4.1.2
300 mm thick wall
M2
10
8.750
87.500
4.1.3
250 mm thick wall
M2
75
7.300
547.500
4.1.4
200 mm thick wall
M2
3,152
7.000
22064.000
4.1.5
150 mm thick wall
M2
5,480
5.250
28770.000
4.1.6
100 mm thick wall
M2
487
4.250
2069.750
M2
1990
7.000
13930.000
M2
3,567
8.750
31,211.250
Sand Lime Bricks 4.2
Sand lime bricks size 290 x 90 x 45cm Standard 34. Malaki from National Industries Company or equally approved (Colour to be as per the approval of Engineer In-Charge) bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.
Section 04225 Light Weight Concrete Unit Masonry 4.3
4.3.1
Light weight concrete block wall bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.(External wall) 200 mm thick wall
Bill No-1: Class Room + Administration Bldg (A)
1/4-9
MASONRY
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
99562.000
Total Carried to Collection ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 4 - MASONRY COLLECTION Page No. 4-1
Bill No-1: Class Room + Administration Bldg (A)
99562.000
1/4-10
MASONRY
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
99,562.000
MASONRY
TOTAL CARRIED TO SUMMARY
1/4-11
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 5 - METALS Section 05500 Metal Fabrication 5.1
Steel Railing
5.1.1
900mm high steel pipe railing fixed over concrete with 25mm dia vertical steel post, 3 rows of 25mm dia horizontal steel pipe rail and 50mm dia steel pipe hand rail including anchors, dowels, fixing accssories and approved quality primer and alkyd paint etc. complete as described over Stairs
MR
205
18.700
3833.500
5.1.2
1000mm high steel pipe railing around openings fixed over concrete with 25mm dia vertical steel post and 50mm dia steel pipe hand rail including - ditto
MR
55
19.800
1089.000
5.1.3
200mm high steel pipe railing fixed over concrete over balconies with 25mm dia vertical steel post and 100mm dia steel pipe hand rail including - ditto.
MR
42
12.100
508.200
Access/Cat ladder: 5.2
Steel access ladder comprising 32 mm Dia.tubular section, stringer 25mm dia tubular sections rungs at 300mm centres including wall struts, welding, bolting, removable galvanized steel chain barrier and fixing to structure, the item include application of primer and akyd paint to the required thickness, overall height as shown in the drawings for different areas at roof level.
5.2.1
Cat ladder 3750 mm high (approx.)
Nos
6
121.000
726.000
5.2.2
Cat ladder 4650 mm high (approx.)
Nos
2
154.000
308.000
Bill No-1: Class Room + Administration Bldg (A)
1/5-12
METAL
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
6464.700
Total Carried to Collection ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
Steel shed over roof water tank 5.3
Design, fabricate and install steel shade over roof water tank. Contractor shall provide designed working/shop drawings for Engineer's approval
L.S.
L.S.
1760.000
1760.000
L.S.
L.S.
20000.000
20000.000
Section 05810 Expansion Joints and Cover Assemblies
5.4
20mm wide expansion joint for footings, columns, beams, slabs, walls etc. horizontally and vrtically using bitumen impregnated joint filler including 20x20mm approved quality mastic/sealant over exposed joint face and covered the exposed faces of joints with 30mm thick aluminium cover plate including all accessories complete as described
Bill No-1: Class Room + Administration Bldg (A)
1/5-13
METAL
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
21760.000
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 5 - METALS COLLECTION Page No. 5-1
6464.700
Page No. 5-2
21760.000
Bill No-1: Class Room + Administration Bldg (A)
1/5-14
METAL
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
28,224.700
METAL
TOTAL CARRIED TO SUMMARY
1/5-15
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 6 - WOOD AND PLASTICS Section 06200 Finish Carpentary 6.1
Preaperation and fixing of two wooden stripes parallel to each other of white wood having the size 25 x 100 mm each.( fixing on the walls other than which is having marker board)
Bill No-1: Class Room + Administration Bldg (A)
1/6-16
MR
405
13.000
5265.000
WOOD AND PLASTIC
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
5265.000
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 6 - WOOD AND PLASTICS COLLECTION Page No. 6-1
Bill No-1: Class Room + Administration Bldg (A)
5265.000
1/6-17
WOOD AND PLASTIC
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
5,265.000
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/6-18
WOOD AND PLASTIC
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 7 - TH. & MOIST. PROTECTION Section 07110 Sheet Membrane Waterproofing 7.1
Polythylene sheet 1000 gauge under slab on grade M2
3930
0.550
2161.500
7.2
4mm thick waterproofing membrane under, over and around foundation concrete elements contact in soil with 6mm thick protection board over vertical surfaces including 50mm thick horizontal protection screed below foundation bed all as per MPW specificaions
L.S
L.S
6750.000
6750.000
M2
220
0.800
176.000
Section 07140 Fluid Applied Waterproofing 7.3
Rubberized waterproofing paint over external wall along stone cladding Section 07110 & 07140 Waterproofing System (Toilets & Kitchen)
7.4
Under tiling in wet areas (Toilets and Kitchen) including dressing up walls, which shall be including.
7.4.1
Two coats of fluid applied waterproofing paint over concrete floor and wall
M2
345
0.800
276.000
7.4.2
130-150mm thick foam concrete fill
M2
345
1.950
672.750
7.4.3
20 mm thick sand cement screed
M2
345
0.950
327.750
7.4.4
4 mm thick waterproofing membrane
M2
345
2.000
690.000
7.4.5
2 cm sand cement screed
M2
345
0.950
327.750
Bill No-1: Class Room + Administration Bldg (A)
1/7-19
TH AND MOIST PROTECTION
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
11381.750 AMOUNT KD
Section 07500 (Composite Roofing System) (Section 03520, 07110, 07140, 07200, 07320) 7.5
Roof Waterproofing System including testing and guarantee of the roofing system for any water leakage all as per specifications and Engineer's approval.
7.5.1
2 coats of fluid applied w.p. paint over concrete roofM2
3140
0.950
2983.000
7.5.2
50-150mm thick lightweight concrete, 600 kg/m3 density with ordinary portland cement laid to falls and cross falls.
M2
3140
2.000
6280.000
7.5.3
20mm thick cement sand screed (1:3) mortar laid over light weight concrete bed.
M2
3140
1.250
3925.000
7.5.4
Two layer of 4mm thick membrane roofing including 350-450 mm girth laid over roof with primer
M2
3140
3.850
12089.000
7.5.5
20mm thick cement sand screed (1:3) mortar laid over WP membrane
M2
3140
0.950
2983.000
7.5.6
75 mm thick extruded polysterene insulation
M2
3140
3.100
9734.000
7.5.7
Filter fabric
M2
3140
0.200
628.000
7.5.8
400x400x40mm Cement tile and 400x150x40mm skirting bedded in cement and sand mortar and laid over roof in 2.80x2.80m bay with 10cm wide gravel/aggregate strip filled with selected gravel at both direction all as per Engineer's approval and as described
M2
3140
3.850
12089.000
Section 07840 Fire Stopping
Bill No-1: Class Room + Administration Bldg (A)
1/7-20
TH AND MOIST PROTECTION
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
7.6
Fire stopping over all openings around the perimeter of Fire Zone as described.
L.S
50711.000
Total Carried to Collection ITEM
L.S
DESCRIPTION
AMOUNT KD
DIVISION 7 - THERMAL & MOIST.PROTECTION COLLECTION Page No. 7-1
11381.750
Page No. 7-2
50711.000
Bill No-1: Class Room + Administration Bldg (A)
1/7-21
TH AND MOIST PROTECTION
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
62,092.750
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/7-22
TH AND MOIST PROTECTION
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVSION 8 - DOORS AND WINDOWS
8.1
Section 08110 Metal Door and frame Hollow metal door and frame with all required weather sealing, fixing accessories, sealant with backup rod and fixing to concrete or block wall including required fire rating, glazing and Hardware etc. complete as described
8.1.1
Door Type FD1, size 1100x2200mm
Nos
6
190.000
1140.000
8.1.2
Door Type FD2, size 2000x2200mm
Nos
7
420.000
2940.000
8.1.3
Door Type FD3, size 1800x2200mm
Nos
10
410.000
4100.000
8.1.4
Door Type D02, size 2000x2200mm
Nos
6
430.000
2580.000
8.1.5
Door Type D03, size 1000x2200mm
Nos
13
190.000
2470.000
8.2
Section 08210, 06100,06200 Wood door and Frame, Rough Carpentry Finish Carpentry Solid core flush timber teak veneered doors hanging to wood frames, fixed to concrete or block, including sub-frames/timber packings and fixings etc. complete as described. The item includes frames, finishes, Glazing, Fire Rating, Hardware etc., complete as described
8.2.1
Door Type D01, size 1100x2200mm
Nos
52
240.000
12480.000
8.2.2
Door Type D04, size 1000x2200mm
Nos
37
233.000
8621.000
8.2.3
Door Type D05, size 1000x2200mm
Nos
38
233.000
8854.000
8.2.4
Door Type D07, size 1100x2200mm
Nos
6
240.000
1440.000
8.2.5
Door Type D10, size 1800x2200mm
Nos
5
430.000
2150.000
8.2.6
Door Type D16, size 1100x2200mm
Nos
18
240.000
4320.000
8.2.7
Door Type D17, size 1000x2200mm
Nos
6
233.000
1398.000
8.2.8
Door Type D20, size 800x2200mm
Nos
13
226.000
2938.000
Bill No-1: Class Room + Administration Bldg (A)
1/8-23
DOORS AND WINDOWS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
55431.000
Total Carried to Collection ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
Section 08520 Aluminum Doors and Windows Powder coated extruded section aluminium Doors and Windows including glazing as required, frames, fly screens, mullions, loacation angles, shims and plates, heads, sills and jambs, glazing and glazing beads, weather stripping, caulking, pointing, sealing, sub frames, all hard ware, etc. complete and fixing to concrete or block work as described. 8.3
Aluminium Door:
8.3.1
Door Type D06, size 1800x2200mm
Nos
8
320.000
2560.000
8.3.2
Door Type D08, size 1100x2200mm
Nos
6
205.000
1230.000
8.3.3
Door Type D11, size 7100x2200mm
No
1
1313.000
1313.000
8.3.4
Door Type D12, size 11800x3000mm
Nos
2
2677.000
5354.000
8.3.5
Door Type D13, size 1100x2200mm
Nos
2
247.000
494.000
8.3.6
Door Type D14, size 3200x2200mm
Nos
4
588.000
2352.000
8.3.7
Door Type D15, size 3800x2200mm
Nos
6
704.000
4224.000
8.3.8
Door Type D18, size 1800x2200mm
Nos
2
325.000
650.000
8.3.9
Door Type D19, size 2000x2200mm
Nos
22
320.000
7040.000
8.3.10
Door Type D21, size 1600x2200mm
Nos
2
294.000
588.000
Nos
24
315.000
7560.000
Notes: Door D09 included in the toilet partition, Div-10 8.4 8.4.1
Aluminium Windows Window Type W01, size 1600x1600mm
Bill No-1: Class Room + Administration Bldg (A)
1/8-24
DOORS AND WINDOWS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
8.4.2
Window Type W02, size 25700x1600mm
Nos
3
3360.000
43445.000
Total Carried to Collection ITEM
10080.000
DESCRIPTION
UNIT QTY
8.4.3
Window Type W03, size 3200x1600mm
Nos
8
UNIT RATE KD 677.000
AMOUNT KD 5416.000
8.4.4
Window Type W04, size 3200x700mm
Nos
6
340.000
2040.000
8.4.5
Window Type W05, size 4800x1600mm
Nos
65
782.000
50830.000
8.4.6
Window Type W06, size 21500x1600mm
Nos
1
2835.000
2835.000
8.4.7
Window Type W07, size 1600x1600mm
Nos
12
195.000
2340.000
8.4.8
Window Type W08, size 800x1600mm
Nos
8
100.000
800.000
8.4.9
Window Type W09, size 2550x1600mm (internal) Nos
4
368.000
1472.000
8.4.10
Window Type W12, size 2000x1200mm (internal) No
1
184.000
184.000
8.4.11
Window Type W13, size 7100x2200mm (internal) No
1
1240.000
1240.000
Section 08600 Skylight 8.5
Aluminum framed double glazed skylight with complete waterproof installation
8.5.1
Skylight size 4000x1000mm, Type W10
Nos
2
1890.000
3780.000
8.5.2
Skylight size 7300x1500mm, Type W11
No
1
7500.000
7500.000
No
1
2000.000
2000.000
Shutter 8.6
SH01 4800 x 3750mm
Bill No-1: Class Room + Administration Bldg (A)
1/8-25
DOORS AND WINDOWS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
80437.000
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 8 - DOORS AND WINDOWS COLLECTION Page No. 8-1
55431.000
Page No. 8-2
43445.000
Page No. 8-3
80437.000
Bill No-1: Class Room + Administration Bldg (A)
1/8-26
DOORS AND WINDOWS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
179,313.000
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/8-27
DOORS AND WINDOWS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
DIVISION 9 - FINISHES
9.1
9.2
9.3
Section 09200 Lath and plaster 20mm thick cement and sand plaster (with mesh fabric) applied to internal wall and ceiling, stairs and shafts (concrete or block wall) including under coat, metal lath, corner beads, stop beads etc. complete as described. Section 09260 Gypsum Board 100 mm thick and 2200mm high metal stud partition comprising 12.5 mm thick waterproof quality gypsum wall board on both sides with sound attenuation blanket including metal furring channels, head and sill runners, caulking, leveling shims etc. all as described
M2
20,360
2.250
45810.000
M2
250
6.500
1625.000
Section 09310 Ceramic Tiles Non slip ceramic floor tiles on and including cement & sand setting bed, sand cushion and joints grouted in waterproof grout over concrete floor all as described. (Prime cost for all the ceramic are 2.5 KD/M2, similar to L& M artificial marble tiles ,Eagle ceramic tiles or equally approved, sizes mention here are only for reference , contrcator can use standard sizes of ceramic)
9.3.1
Non-slip decorative ceramic tile for wet areas, type CT1, size 600x600x10mm
M2
345
7.000
2415.000
9.3.2
Acid resistant ceramic tile, type CT2, size 600x600x10mm
M2
1,236
7.500
9270.000
9.3.3
Non-slip decorative ceramic tile with border, type CT4 & CT7, size 600x600x10mm
M2
6,876
7.000
48132.000
Bill No-1: Class Room + Administration Bldg (A)
1/9-28
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
107252.000
Total Carried to Collection ITEM
DESCRIPTION
9.3.4
Ditto-but with pattern and different color for Corridoors
M2
240
7.250
1740.000
9.3.5
Non-slip ceramic tile, type CT5 for store and service area, size 300x300x9mm
M2
553
6.500
3594.500
9.4
UNIT QTY UNIT RATE KD
AMOUNT KD
Ceramic Skirting - Ditto
9.4.1
Coved ceramic skirting, 600x100x10mm
MR
3,475
2.000
6950.000
9.4.2
Coved ceramic skirting, 300x100x9mm
MR
442
2.500
1105.000
9.5
Wall ceramic tiles fixed on concrete or block work on and including cement and sand backing and joints grouted in waterproof grout, all as described.
9.5.1
300x300x6mm ceramic tile over corridor wall 1200mm high
M2
1,270
5.150
6540.500
9.5.2
300x300x6mm ceramic tile with border for wet areas
M2
1,375
5.500
7562.500
9.5.3
Ditto but for laboratory areas (acid resistant)
M2
1,665
6.000
9990.000
9.5.4
300x300x 6mm ceramic tile for storage areas at F.F
M2
154
5.150
793.100
M2
500
6.000
3000.000
9.6
Section 09420 Terrazzo Precast Terrazzo floor tile, size 300x300x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described
Bill No-1: Class Room + Administration Bldg (A)
1/9-29
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
9.7
Precast Terrazzo Skirting, size 300x100x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described
MR
362
3.500
42542.600
Total Carried to Collection ITEM
DESCRIPTION
9.8
Section 09510 Acoustic tile Ceiling Acoustic tile ceiling, size 600x1200x15mm including all frame work, suspension system, access panels etc. complete as described
9.9
1267.000
UNIT QTY UNIT RATE KD
Section 09513 Metal Suspended Ceiling Metal tile / ribed crrugated sheet with anti bacterial paint ceiling including all frame work, suspension system, access panels etc. complete as described for wet areas
AMOUNT KD
M2
216
6.000
1296.000
M2
345
8.500
2932.500
M2
8,755
7.500
65662.500
M2
220
6.000
1320.000
Section 09260, 09535 Gypsum Board Ceiling / Acoustic tile Ceiling
9.10
Combination of 12.5mm thick Gypsum board ceiling with emulsion paint finish and 600x600x15mm acoustic tile ceiling including all frame work, suspension system, access panels etc. complete as described Section 09260 Glass Fiber Reinforced Gypsum (GRG) Ceiling
9.10 9.10.1
GRG Ceiling 20mm thick Decorative GRG ceiling with emulsion paint finish including all frame work, suspension system, access panels etc. complete as described Section 09260 Gypsum Board Ceiling
Bill No-1: Class Room + Administration Bldg (A)
1/9-30
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
9.10.2
12.5mm thick waterproof qualityGypsum board ceiling with waterproof paint for wet areas all as shown and described.
M2
695
6.500
123331.200
Total Carried to Collection ITEM
4517.500
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
Section 09600 Granite & Marble 9.11
Stone & Marble:
9.11.1
Natural Granite steps for external entrances, 30mm thick and 300mm wide Treadx 20mm thick and 160mm high Riser all as described.
MR
51
15.000
765.000
9.11.2
3cm thick granite flooring tiles for Main & Rear Entrances, type M-5,
M2
120
35.000
4200.000
9.11.3
400x400x30mm thick Italian carrara marble tile for stair hall and landings
M2
395
20.000
7900.000
9.11.4
Italian carrara marble Steps, 30mm thick and 300mm wide Tread x 20mm thick and 160mm high Riser Italian carrara marble Skirting for Stair, 160mm highx20mm thick
MR
960
13.000
12480.000
MR
547
5.000
2735.000
9.11.6
30mm thick Italian carrara marble threshold
MR
36
4.000
144.000
9.11.7
12mm thick synthetic marble (L.G. , Corrian or equally approved) wash basin counter fixed over galvanized steel supports including marble fascia, back spalsh, cut out for wash basin, all required accessories, sealant etc. complete as described. 30mm thickx600mm wide and 7220mm long with 7 Bowls
Nos
6
750.000
4500.000
9.11.8
Ditto- but 1200mm with 1 Bowl
No
1
160.000
160.000
9.11.9
Ditto- but1900mm with 2 Bowl
No
1
250.000
250.000
9.11.5
Bill No-1: Class Room + Administration Bldg (A)
1/9-31
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Section 09680 Carpet Tiles
9.12
Carpet tiles laid over screed floor with approved quality additives. (screed measured separately )
M2
225
7.000
Total Carried to Collection ITEM
1575.000
34709.000
DESCRIPTION
UNIT QTY UNIT RATE KD
AMOUNT KD
Section 09710 , 09842 Acoustical Wall Panel / Stretched fabric acoustic panels. 9.13
Combination of acoustic wood panel and Proprietary make "Streched Fabric" Acoustic wall panel inside Seminar hall, Library/Office, Vocal room and instrument music including all fittings and accessories as decribed
M2
520
46.000
23920.000
M2
215
3.000
645.000
(lower 1mt. Height from flooring wooden acoustic panel and fabric panels to be up to the ceiling from top of the wood panels) Section 09800 Epoxy 9.14
Epoxy finish over screed, Type CO-2 (Screed measured separately in Div-3) min 300 micron dry thick Section 09900 Painting
9.15
Prepare and apply 3 coats paint of approved colour over plastered surface (wall and ceiling) including preparation of surfaces, undercoat, sealcoat etc. complete as described
9.15.1
Emulsion paint
M2
13,140
1.200
15768.000
9.15.2
Oil paint
M2
4,065
1.300
5284.500
Bill No-1: Class Room + Administration Bldg (A)
1/9-32
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
9.15.3
Texture paint system as specified including two coats of Polyurethane protection layers (NIC texture paint system or equally approved)..
Total Carried to Collection ITEM
M2
2,184
2.600
5678.400
27375.900
DESCRIPTION
AMOUNT KD
DIVISION 9 - FINISHES COLLECTION Page No. 9-1
107252.000
Page No. 9-2
42542.600
Page No. 9-3
123331.200
Page No. 9-4
34709.000
Page No. 9-5
27375.900
Bill No-1: Class Room + Administration Bldg (A)
1/9-33
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
335,210.700
1/9-34
FINISHES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
DIVISION 10 - SPECIALTIES Section 10100 Visual Display Board 10.1
Wall mounted marker board and tack board with silver anodising frame with plastic rounded corners, elegant alluminium tray ,fixing etc. complete as described
10.1.1
Marker board having the size 2.5 mt x 1.25 mt for general class room
Nos
50
50.000
2500.000
10.1.2
Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop
Nos
22
50.000
1100.000
10.1.3
Marker board having the size 1.30 mt x 1.25 mt for general class room.
Nos
100
30.000
3000.000
10.1.4
Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop.
Nos
48
30.000
1440.000
Toilet partition/cubicle 13mm thick with five Nos (5) doors, size 12750x2200mm (Door TypeD09)
12
1700.000
20400.000
4
2400.000
9600.000
10.2
10.2.1
10.3
Section 10170 Toilet Partition/Cubicle Proprietary make Plastic toilet partition, cubicles including doors, front panels, divisions, end panels with all required hardware and accessories as described.
Section 10651 Operable Panel Partition Proprietary make "Manually Operated" Operable Partition over Class room, size 8500x3500m including all fittings, accessories and hardware all as described.
Bill No-1: Class Room + Administration Bldg (A)
1/10-35
Nos.
SPECIALITIES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
38040.000
Total Carried to Collection ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
Section 10800 Toilet Accessories 10.4
Supply and fix toilet accessories including all component parts, assembling, plugging, screwing or otherwise fixing and making good all as described.
10.4.1
Waste Receptacle (WR)
Nos
76
40.000
3040.000
10.4.2
Toilet Paper Dispenser (TPD) recessed
Nos
70
15.000
1050.000
10.4.3
Paper Towel Dispenser (PTD)
Nos
22
12.000
264.000
10.4.4
Robe Hook (RH)
Nos
70
10.000
700.000
10.4.5
Soap Dispenser Vertical (SDV) wall mounted
Nos
39
10.000
390.000
10.4.6
St.steel framed mirror (FM), size 7600x900mm
Nos
6
300.000
1800.000
10.4.7
Ditto but size 1870x900mm
No
1
120.000
120.000
10.4.8
St.steel framed mirror (FM), size 700x1000mm
Nos
10
75.000
750.000
10.4.9
St.Steel Grab Bar (GB)
Nos
52
2.500
130.000
10.4.10 Folding Shower Seat (FSS)
No
1
200.000
200.000
10.4.11 Utility Shelf, Mop and Broom Holder (MH)
Nos
6
10.000
60.000
10.4.12 Hot Air Dryer (HD)
Nos
6
135.000
810.000
Notes: Flexible hose with spray nozzle included with WC in Div-15, Mechanical
Bill No-1: Class Room + Administration Bldg (A)
1/10-36
SPECIALITIES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
9314.000
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 10 - SPECILITIES COLLECTION Page No. 10-1
38040.000
Page No. 10-2
9314.000
Bill No-1: Class Room + Administration Bldg (A)
1/10-37
SPECIALITIES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
47,354.000
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/10-38
SPECIALITIES
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 12 FURNISHINGS Section 12357 Kitchen Casework/Cabinet 12.1
Kitchen area base and wall units complete with double doors, adjustable shelves, sides, tops, bottoms, backs, skirting and all required accessories, hardware, fixings, components, support legs, sealing, plugging, screwing, making good, all as as per Engineer's approval.
12.1.1
Base unit size 600mm deep x 850mm high set in range including sink units with dustbin, shaped corner units and 3mm thick stainless steel top with cutout for sinks and recesses for appliances(Sink measured separately in Div-15, Mechanical.)
MR
12
12.1.2
Wall Unit size 400x600mm high - ditto
MR
12
Section 12358 Laboratory Casework
12.2
Supply and fix Laboratory Casework for Biology Lab 1 & 2, Geology Lab 1 & 2, Chemistry Lab 1 & 2 and Physics Lab 1 & 2, with all required fittings, weather sealing, fixing accessories, sealant with backup rod and fixing to concrete, block work or gypsum board including all required hardware and accessories as described. BASE CABINETS:
12.2.1
Base cabinet type CK055PHX
Nos
240
12.2.2
Base cabinet type CD0455PHX
Nos
64
12.2.3
Base cabinet type CB050PHX
Nos
8
12.2.4
Base cabinet type CD050PHX
Nos
4
Bill No-1: Class Room + Administration Bldg (A)
1/12-39
FURNISHINGS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection ITEM
DESCRIPTION
UNIT QTY
12.2.5
Base cabinet type CA060PHX
Nos
20
12.2.6
Base cabinet type CB060PHX
Nos
6
12.2.7
Base cabinet type CA045PHX
Nos
4
12.2.8
Base cabinet type CB045PHX
Nos
14
12.3
WALL CABINETS: Wall cabinet type S2PND090-30
Nos
32
12.4
STORAGE CABINETS: Storage cabinet type Q2PND120-40
Nos
14
12.5 12.5.1
WORKTOP COUNTERS: Worktop counter type 16TRE60
MR
382
12.5.2
Worktop counter type 24MEL75
MR
9
12.6 12.6.1
SINK CABINETS: Sink cabinet type CS060PHX
Nos
44
12.6.2
Sink cabinet type CS120PHX
Nos
4
12.7
UNIT RATE KD
AMOUNT KD
MISCELLANEOUS CABINETS/COUNTERS:
12.7.1
Type KB46
Nos
70
12.7.2
Type COD028
Nos
70
12.7.3
Type LE2WP
Nos
238
12.7.4
Type JCWSO
Nos
14
12.7.5
Type PPSINK
Nos
52
12.7.6
Type LMXSO
Nos
40
12.7.7
Type LGISO
Nos
32
12.8
FUME HOOD WITH BASIC CABINET: Type FC120
Nos
2
12.9
SAFETY SHOWER Type S&E Wash
Nos
2
Bill No-1: Class Room + Administration Bldg (A)
1/12-40
FURNISHINGS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection ITEM
DESCRIPTION
AMOUNT KD
DIVISION 12 FURNISHINGS
COLLECTION Page No. 12-1 Page No. 12-2
Bill No-1: Class Room + Administration Bldg (A)
1/12-41
FURNISHINGS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/12-42
FURNISHINGS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
DIVISION 14- CONVEYING SYSTEM 14.1
Electrical Passenger Elevator. Supply, Install & Commissioning Duplex Electrical Passenger Elevator for 3 stops, 1600Kg. ( 21 Passengers) Loading capacity, Complete with all necessary requirement as per contract and Fire Brigade specification as shown on the drawing. Including Fire Brigade approval.
Nos
2
14.2
Allows for electrical works (power, control, fire alarm, etc.) associated with Elevators Equipments, and System, Including cabling, wiring, switching, elevator control panels with all accessories and all other related works as per specification and Kuwait Fire Brigade..
LS
LS
14.3
Emergency Diesel Generator 45 KW for Fire Brigade operation and in case of power failure complete with all accessories
Nos.
4
14.4
Allow for interlocking the elevators control with the building managements system.
LS
LS
14.5
Any other item (s) not mentioned either above or in the specification but it’s necessary for the optimum operation of the system in according with the specification and Kuwait Fire Brigade requirements.
LS
LS
14.6
Allow for builder’s works required for the elevator.
LS
LS
14.7
Allow for submitting shop working drawing, coordination drawing, builder works drawing, asbuilt drawing, operation & maintenance manual, etc.
LS
LS
14.8
Allow for testing & commissioning of the elevators in accordance with specification and Kuwait Fire Brigade including handing over to Kuwait Fire Brigade.
LS
LS
14.9
Allow for Lloyd’s approval certification
LS
LS
Bill No-1: Class Room + Administration Bldg (A)
1/14-43
CONVEYNG SYSTEM
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection ITEM
AMOUNT KD
DESCRIPTION
DIVISION 14 CONVEYING SYSTEM
COLLECTION Page No. 14-1
Bill No-1: Class Room + Administration Bldg (A)
1/14-44
CONVEYNG SYSTEM
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/14-45
CONVEYNG SYSTEM
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
DIVISION - 15 MECHANICAL WORKS DRAINAGE The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price. Include in price all adjustment required by code or as per coordination with other disciplines. Contractor responsible to get approvals all authorities having jurisdictions for shop drawings. Contractor must attach a breakdown analysis for lump sum items. 15.1
High density polyethylene tempered (HDPE) to DIN 19535 / 19637 and DIN 8075 drainage piping for underground and above ground drainage system in all aspect as specified. Dia 50mm Dia 75mm Dia 100mm Dia 150mm
MR MR MR MR
409 170 778 433
3.150 4.200 5.250 8.400
1288.350 714.000 4084.500 3637.200
Polished bronze rain water shoe Dia 4"
Nos
28
36.750
1029.000
Adjustable floor cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug, with nickel bronze top Dia 4"
Nos
51
47.250
2409.750
Adjustable floordrain cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug,with nickel bronze top 15.4..1 Dia 4"
Nos
85
47.250
4016.250
15.4.2 Dia 3"
Nos
3
47.250
141.750
15.5 Vent Hood Caps 15.5.1 Dia 4"
Nos
2
15.750
31.500
15.1.1 15.1.2 15.1.3 15.1.4 15.2
15.3
15.4
Bill No-1: Class Room + Administration Bldg (A)
1/15-46
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
17352.300
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-47
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
15.6
15.7
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
Gco Dia 6"
Nos
1
47.250
47.250
Dia 3" Planter drain
Nos
2
31.500
63.000
Nos Nos
8 2
78.750 31.500
630.000 63.000
15.8 Roof Rain water outlets 15.8.1 Dia 6" 15.8.2 Dia 4" 15.9
Dia 3"Funnel floor drain
Nos
18
68.250
1228.500
15.10
Toilet & kitchen fixtures as shown on the on arch drawings with chrome fittings of drainage accessories, flexible hoses etc. Ewc Awc Ablution hose Wash basin (counter) Wash basin (pedstal) Pantry sinks-single bowl LabSink-Single bowl LabSink-double bowl Shower Trays Drinking Fountain (Type-A)
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
50 12 62 42 8 7 65 2 1 6
105.000 105.000 5.250 94.500 94.500 126.000 262.500 315.000 105.000 294.000
5250.000 1260.000 325.500 3969.000 756.000 882.000 17062.500 630.000 105.000 1764.000
15.10.1 15.10.2 15.10.3 15.10.4 15.10.5 15.10.6 15.10.7 15.10.8 15.10.9 15.10.10 15.11
Cleaning, flushing and painting of all the drainage piping as per colour codes.
L.S.
L.S.
15.12
Builders work like including connecting pipes and gullys through cement pipes to manhole and covers for particular application and installation of toilet
L.S.
L.S.
Bill No-1: Class Room + Administration Bldg (A)
1/15-48
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
34035.750
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-49
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
WATER SUPPLY Supply, installation, testing and commissioning of the following items & piping networks for buildings for hot and cold water supply system with fittings, valves, equipments, support and requiredpipe,fittings, valves, equipment, supports with pipe, accessories in all aspect as specified. NOTE : All exposed water supply piping on roof and inside roof shall be poly propylene, as per specification. 15.13
15.13.1 15.13.2 15.13.3 15.13.4 15.13.5 15.13.6 15.13.7 15.14
Water supply piping network from water tank to Including risers, with all accessories like gate valve, check valve. Dia 3" Dia 2" Dia 1 1/2" Dia 1 1/4" Dia 1" Dia 3/4" Dia 1/2" Polythelene water tanks (Shaded) including all accessories, fittings (float switches,inlet valve, drain valves, over flow and drain pipe up to required length etc) Cat and mouse water level indicator including all galvanized steel supports,frames and bases etc. complete 3000 gallon each.
15.14.1 Ditto - But Capacity 2000 gallon capacity for
MR MR MR MR MR MR MR
20 164 170 150 193 678 520
18.900 8.400 7.350 6.300 5.250 4.200 3.150
378.000 1377.600 1249.500 945.000 1013.250 2847.600 1638.000
Nos
5
840.000
4200.000
Nos
2
420.000
840.000
Nos Nos Nos
6 6 7
126.000 89.250 78.750
756.000 535.500 551.250
brackish water supply 15.15
Electric water heater pressure type with concealed valve, pressure and temperature relief valves, all fittings and accessories. 15.15.1 Unit Boiler 120 liter 15.15.2 Unit boiler of capacity 80 liters/each 15.15.3 Unit boiler of capacity 50 liters/each
Bill No-1: Class Room + Administration Bldg (A)
1/15-50
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
16331.700
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-51
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
15.16 Water filters 15.16.1 Central water filters of capacity 10 m3/hr 15.16.2 Unit filters for kitchen - Dia 1/2" 15.17
Booster pump set with pressure tank 200 ltr. Minimum capacity including all acccessories having capacity 40 Gpm @ 4 bar.
UNIT RATE KD
AMOUNT KD
Nos Nos
1 10
997.500 21.000
997.500 210.000
Nos
1
1312.500
1312.500
Notes : All the above rates to be including of the following : Submitting as-built drawings, providing all operation, instruction and maintenance materials etc.. Builders work related to all plumbing works including trenches, patching, chipping works etc. Electrical works related to all Plumbing services Testing and commissioning of all plumbing services
Bill No-1: Class Room + Administration Bldg (A)
1/15-52
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
2520.000
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-53
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
FIRE FIGHTING The tender drawing is for guidance only. Contractor should arranage the layout coordinated with all disciplines, submit calculation, catalogues for material and equipment for engineers approval and KFB. The BOQ is for guidance only. Contractor should quote for lump sum price including approval of KFB. 15.18
Black steel piping network suitable for welding type joints to schedule 40 seamless ( for sprinkler system from tank to pumps, pump rooms, by pass, risers etc. complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers. Dia 65mm
MR
30
15.750
472.500
MR MR MR
222 24 35
12.600 8.400 7.350
2797.200 201.600 257.250
L.S.
L.S.
525.000
525.000
Nos
18
288.750
5197.500
Nos
2
84.000
168.000
15.19
Galvanised steel piping suitable for threaded type joints to schedule 40 seamless complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers. 15.19.1 Dia 50mm 15.19.2 Dia 40mm 15.19.3 Dia 32mm 15.20
Painting of all fire fighting piping (2 coats of primer and 2 coats of final finish painting) as per colour codes, labelling, flow direction marking and tags for valves.
15.21
FHC 80cm x 160cmx40 cm including 25mm fire hose reel 30m long manual swing type fire extinguisher as specified 6 kg Dry powder and 2 gallons water/gas
15.22
FC Fire extinguisher cabinet with 6 kg Dry powder and 2 gallons water/gas
Bill No-1: Class Room + Administration Bldg (A)
1/15-54
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
9619.050
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-55
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM 15.23
UNIT QTY
DESCRIPTION Automatic air vents Dia 25mm
UNIT RATE KD
AMOUNT KD
Nos
2
26.250
52.500
Electrical fire pumps of type vertical multistage with all accessories and 2 years maintenance in all aspect including pressure tanks (approval to be done) 15.24.1 Capacity of 200 gpm@ 5.5 bar-20 K.W
Nos
2
2625.000
5250.000
15.24.2 Valves and fittings
L.S.
L.S.
15.24.3 Suction pipe from firewater tank to pumps
L.S.
L.S.
Fire Pumps and Accessories 15.24
including all fittings, connection to all valves, mater, strainers, header Notes : All the above rates to be including of the following : Submitting as-built drawings, providing all operation, instruction & maintenance materials etc. Electrcial works related to all firefighting services Testing & commissioning of all firefighting services Builders work related to all firefighting works
Bill No-1: Class Room + Administration Bldg (A)
1/15-56
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
5302.500
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-57
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
Kgs. 31000
1.694
52503.150
M2
4500
3.033
13650.525
L.S.
L.S.
1575.000
1575.000
L.S.
L.S.
12600.000
12600.000
HVAC - GENERAL NOTES The following BOQ is for guidance only. Contractor is responsible to get approval from all local authorites. The BOQ is for guidance only. Contractor should quote for lump sum price including approval of MEW . Include in quotation all catalogues for equipments.
15.25
Duct Work Glavanized sheet metal duct work complete with required volume control dampers, joints, test holes/back draft dampers, air turning devices, duct access doors. As specified , shown and required for functioning the system..
Duct Insulation Perform iinsulation material secured around duct work complete with finishing and aluminium cladding etc. as specified. 15.27 Perform internal acoustic lining material secured on internal surface of duct as specified. 15.26
Air Outlets and Inlets 15.28 Air Outlets and Inlets, include on diffusers, Linear bar grilles, registers, exhaust air valves, louvers, 4' thick filter grilles etc. complete as specified.
Bill No-1: Class Room + Administration Bldg (A)
1/15-58
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
80328.675
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-59
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
15.29
15.29.1 15.29.2 15.29.3 15.29.4 15.29.5 15.29.6 15.29.7 15.29.8 15.29.9 15.29.10 15.29.11 15.29.12 15.30
15.30.1 15.30.2 15.30.3 15.30.4 15.30.5 15.30.6 15.30.7 15.30.8 15.30.9 15.30.10 15.31
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
Exhaust Fans complete with bird screen, back draft damper and other accessories as specified. E.F -01 , 2700 cfm E.F -02 , 200 cfm E.F -03 , 2925cfm E.F -04 , 300 cfm E.F -05,06 , 400cfm E.F -07, 400cfm E.F -08 , 600 cfm E.F -09 , 200 cfm E.F -10 , 400 cfm E.F -11 , 400 cfm E.F -12,13,14,17,18,19 , 200 cfm E.F -15-16 , 200 cfm
Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos
1 1 1 1 2 1 1 1 1 1 6 2
5985.000
5985.000
Nos
2
3780.000
7560.000
Nos
4
3780.000
15120.000
Nos Nos Nos Nos Nos Nos Nos Nos
2 2 2 6 2 2 1 1
3780.000 3780.000 3780.000 3780.000 3780.000 3780.000 3780.000 3780.000
7560.000 7560.000 7560.000 22680.000 7560.000 7560.000 3780.000 3780.000
Nos
24
52.500
1260.000
Package Units
Package Unit complete with all accessories like filters ,mixing box etc as specified @ 115F PU-GF1&GF6 , 262800 BTU/Hr, 8750 cfm. PU-GF2&GF3&PU-GF5&GF8, 280000 BTU/Hr, 10000cfm PU-GF4&GF7, 200000 BTU/Hr, 7500cfm. PU-FF1&FF9, 280000 BTU/Hr., 10000 cfm PU-FF2&FF10, 262800 BTU/Hr. 8750cfm. PU-FF3 to FF8 , 262800 BTU/Hr. , 8750 cfm PU-SF1&SF6 , 315000 BTU/Hr.,12500 cfm PU-SF2&SF5, 280000 BTU/Hr. , 10000 cfm PU-SF3 ,271800 BTU/Hr., 9000 cfm PU-SF4 , 262800 BTU/Hr., 8750 cfm Automatic Control Sequence Electrical type wall mounted thermostats
97965.000
Total Carried to Collection Bill No-1: Class Room + Administration Bldg (A)
1/15-60
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
15.32 Refrigrant Piping / Condensate Drainnage piping Complete With Insulation , Hangers and cladding and insulation
L.S.
L.S.
1260.000
1260.000
15.33 Civil works related to A/C such as foundations, steel walkways over the piping on roof, openings and supporting structures, etc.
L.S.
L.S.
2625.000
2625.000
15.34 Allow for electrical works ( power, control and fire alarm) associated with HVAC works including cabling, wiring, switching, motor control panels with accessories and all other related works.
L.S.
L.S.
3675.000
3675.000
Bill No-1: Class Room + Administration Bldg (A)
1/15-61
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
7560.000
Total Carried to Collection ITEM
UNIT QTY
DESCRIPTION
UNIT RATE KD
AMOUNT KD
DIVISION - 15 MECHANICAL WORKS MEDICAL GAS SYSTEM, The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price. Include in price all adjustment required by code or as per coordination with other disciplines. Contractor responsible to get approvals all authorities having jurisdictions. Contractor must attach a breakdown analysis for lumpsum items. 15.35
Supply and Installation of Medical Grade, Degreased Copper Pipes as per specification complete with all fixtures,insulation. MR MR MR MR MR MR
78 72 108 70 120 80
31.500 26.250 21.000 15.750 12.600 10.500
2457.000 1890.000 2268.000 1102.500 1512.000 840.000
15.36.1 Dia 2" 15.36.2 Central Gas regular 3Ø 15.36.3 Regulating valve Ø 2"
Nos Nos Nos
20 1 2
84.000 126.000 52.500
1680.000 126.000 105.000
Gas Cylinders Supply and Installation of Medical Grade GS12 gas cylinders 15.37.1 Gas Cylinders (spare)
Nos
8
52.500
420.000
15.35.1 15.35.2 15.35.3 15.35.4 15.35.5 15.35.6
15.36
Dia 3" Dia 2" Dia 1 1/4" Dia 1" Dia 3/4" Dia 1/2" Control valves Supply and Installation of Medical Grade, Degreased Control valves as per specification complete with all fixtures,insulation.
15.37
Bill No-1: Class Room + Administration Bldg (A)
1/15-62
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
12400.500
Total Carried to Collection ITEM DESCRIPTION
UNIT QTY
UNIT RATE KD
AMOUNT KD
15.38
Builders work related to Medical Gas euipment and Piping
L.S.
L.S.
525.000
525.000
15.39
Testing and commissioning of all medical gas services
L.S.
L.S.
315.000
315.000
L.S.
L.S.
26250.000
26250.000
Building Automation System (BAS) for Complete Project 15.40 Full building automation system (BAS) complete with controller (Lontalk) type and (Bac) net, protocols and all control panels,wiring, sensors,devices, transformers etc. as as per BAS specifications and system points list schedules for each equipment as per BAS drawings.
(This includes the connection of all services (plumbing, fire fighting, HVAC) to BAS system as per specification and drawings)
Bill No-1: Class Room + Administration Bldg (A)
1/15-63
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
27090.000
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/15-64
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
ITEM DESCRIPTION
AMOUNT KD
DIVISION - 15 MECHANICAL WORKS COLLECTION Page No. 15-1 Page No. 15-2 Page No. 15-3 Page No. 15-4 Page No. 15-5 Page No. 15-6 Page No. 15-7 Page No. 15-8 Page No. 15-9 Page No. 15-10 Page No. 15-11
Bill No-1: Class Room + Administration Bldg (A)
17352.300 34035.750 16331.700 2520.000 9619.050 5302.500 80328.675 97965.000 7560.000 12400.500 27090.000
1/15-65
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
310,505.475
TOTAL CARRIED TO SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/15-66
Mechanical work
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
L.S.
L.S.
9900.000
DIVISION 16 - ELECTRICAL General Consideration for all items: 16.1
The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables, wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.
16.2
All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOE (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer. All works shall be carried out to comply with the BAS (Building Automation System) requirements. 16.3
The Contractor is reffered to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, wheather or not they are specifically mentioned within the items. 16.4
BUILDER WORK: All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholds, earth pits, ducts, trenches, cable tiles … etc. including supply and install 6" & 4" PVC ducts for MLTP, MSB's DB's cables as per shown in drawing and as per MOE (E&W) regulation. Including all ducts between ( LT, Panel and Transformer ) and H.T. duct for MOE (E&W) intake cable. And all civil work as per Drawings, Specification and the Approval of the Engineer.
Bill No-1: Class Room + Administration Bldg (A)
1/16-67
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-68
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
Section 16426 Distribution Equipment Supply, install and connect the following electrical board or S/Fs or DBs, including all cables, cable trays, access conduit, wiring, boxes, W/T Enclosure, earthing, labels name plates , wire and cables markers , foundation trenches , and All required for the connection with the Central Control Management and Monitoring System, etc., as MPW, MOE (E&W) requirements and as shown in the drawings. The Contractor Must Submit Detail For The Separate Phase Wire To Feed The Backup Battery For Approval, and He is Obligee to Achieve The Engineer Satisfaction. 16426 : Main Switch Board 16.5
Supply, install and connect the following main switch board (MSB), Sub-Main switch Boards (SMSB) complete with Conduits,wiring, earthing, cable glands, meters and all accessories as necessary, testing and commissioning to be ready for good working and all acording to drawings, specification and the Engineer approval.
16.5.01
MSB - A-G-1
No
1
3300.000
16.5.02
MSB - A-G-2
No
1
2640.000
16.5.03
MSB - PU-G
No
1
3168.000
16.5.04
MSB - A-F-1
No
1
2420.000
16.5.05
MSB - A-F-2
No
1
2420.000
16.5.06
MSB - PU-F
No
1
3300.000
16.5.07
MSB - A-S-1
No
1
2750.000
16.5.08
MSB - A-S-2
No
1
2970.000
16.5.09
MSB - A-PU-S
NO
1
2805.000
16.5.10
MSB - A-R
No
1
2475.000
16.5.11
MSB - FF
No
1
3300.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-69
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-70
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
16426 : Isolators and Switch Fuses& PANEL BOARDS 16.6
Supply, install and connect est and make necessary commissioning, complete with all necessary conduits feeding wirings and cables, earthing , HRC fuses, magnetic contactors ...etc. and all necessary accessories following electrical board and S/F , as per the drawing, specification, MOE (E&W) regulation, and approval of Engineer. All (S/F's, MCCB, ELCB, DB - AHU) protected by water tight enclosure. The following items fed from MSB - A-G-1-1 16.6.01
DB-A-G-02L
No
1
854.700
16.6.02
DB-A-G-02P
No
1
737.000
16.6.03
DB-A-G-03L
No
1
854.700
16.6.04
DB-A-G-03P
No
1
907.500
16.6.05
DB-A-G-05LP
No
1
693.000
16.6.06
DB-A-G-07L
No
1
836.000
16.6.07
DB-A-G-07P
No
1
902.000
16.6.08
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
No
1
192.500
16.6.09
15A TPN S/F in W.P.Enclosure for GU
No
1
88.000
The following items fed from MSB - A-G-1-2 16.6.10
DB-A-G-01L
No
1
825.000
16.6.11
DB-A-G-01P
No
1
495.000
16.6.12
DB-A-G-04L
No
1
495.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-71
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-72
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
16.6.16
DB-A-G-04P
No
1
Unit Price KD. Fils 385.000
16.6.17
DB-A-G-06L
No
1
660.000
16.6.18
DB-A-G-06P1
No
1
770.000
16.6.19
DB-A-G-06P2
No
1
412.500
16.6.20
DB-A-G-06P3
No
1
385.000
16.6.21
DB-A-G-08LP
No
1
825.000
16.6.22
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
No
1
313.500
No
1
89.100
No
2
385.000
Description
Item No.
Unit
Qty
The following items fed from DB-A-G-06P1 16.6.23
15A SPN S/F in W.P.Enclosure The following items fed from MSB - A-G-2-2
16.6.24
30A TPN S/F in W.P.Enclosure for GU The following items fed from MSB - A-F-1-1
16.6.25
DB-A - F -02L
No
1
660.000
16.6.26
DB-A - F -02P
No
1
660.000
16.6.27
DB-A - F -03L
No
1
632.500
16.6.28
DB-A - F -03P
No
1
660.000
16.6.29
DB-A - F -05LP
No
1
715.000
16.6.30
DB-A - F -07LP
No
1
715.000
16.6.31
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
No
1
220.000
No
1
385.000
The following items fed from MSB - A-F-1-2 16.6.32
30A TPN S/F in W.P.Enclosure for Klin room
Bill No-1: Class Room + Administration Bldg (A)
1/16-73
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-74
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
The following items fed from MSB - A-F-2-1 16.6.33
DB-A - F -01L
No
1
385.000
16.6.34
DB-A - F -01P
No
1
440.000
16.6.35
DB-A - F -04LP
No
1
275.000
16.6.36
DB-A - F -06LP
No
1
440.000
16.6.37
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
No
1
165.000
The following items fed from MSB - A-F-2-2 16.6.38
DB-A - S -02L
No
1
825.000
16.6.39
DB-A - S -02P
No
1
660.000
16.6.40
DB-A - S -03L
No
1
385.000
16.6.41
DB-A - S -03P1
No
1
660.000
16.6.42
DB-A - S -03P2
No
1
742.500
16.6.43
DB-A - S -03P3
No
1
605.000
16.6.44
DB-A - S -05LP
No
1
660.000
16.6.45
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
No
1
330.000
The following items fed from MSB - A-S-2 16.6.46
DB-A - S -01L
No
1
660.000
16.6.47
DB-A - S -01P1
No
1
605.000
16.6.48
DB-A - S -01P2
No
1
605.000
16.6.49
DB-A - S -01P3
No
1
825.000
16.6.50
DB-A - S -04LP
No
1
715.000
16.6.51
DB-A - S -06LP
No
1
770.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-75
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-76
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No. 16.6.52
30A TPN S/F in W.P.Enclosure for Water Cooler Type C
Unit
Qty
Unit Price KD. Fils
No
1
330.000
The following items fed from MSB - A-R 16.6.53
DB-A - Roof LP
No
1
440.000
16.6.54
DB-A - EX FAN
No
1
302.500
16.6.55
15A TPN S/F in W.P.Enclosure (for FAF-1&2, W.Pump 1&2)
No
4
66.000
The following items fed from MSB - F-F 16.6.56
Main Fire Pump -01
No
1
192.500
16.6.57
Main Fire Pump -02
No
1
192.500
The following items fed from DB-A - EX FAN 16.6.58
15A TPN S/F in W.P.Enclosure
No
4
82.500
16.6.59
15A SPN S/F in W.P.Enclosure 16140 : Electrical Points
No
14
66.000
16.7
Supply, install and connect to their respective DB's, the following points including conduit , wiring , draw boxes, outlet boxes , trenching, earthing, switches, accessories, cable, silicon wire, switches double pole switches and all requirements as specified and as shown in drawing and as per the approval of Engineer. 16.7.01
13 A switch / socket / outlet, 3 pin single socket
No
438
16.500
16.7.02
13 A switch / socket / outlet, 3 pin Twin socket
No
570
19.800
16.7.03
13 A W/T, 3 pin single socket, as specified and as per the drawing.
No
51
No
5
55.000
16.7.04
3 Compartment Under Floor Service Outlet Box complete with all accessories including the flexible connection to the Power , Telephone , and Data.
16.7.05
Junction box with 20A DP switch for F.C. Unit
No
7
27.500
16.7.06
Junction box with 20A DP switch for E. W. Heater
No
16
27.500
Bill No-1: Class Room + Administration Bldg (A)
1/16-77
39.600
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
16.7.07
Junction box with 20A DP switch for Fire A. C. Panel with AVA.
No
1
27.500
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-78
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
16.7.08
Junction box with 20A DP switch for W. Cooler
No
6
27.500
16.7.09
Junction box with 20A DP switch for Fume 16515 : Lighting
No
2
27.500
Lighting System 16.8
The price for the following items shall included the lighting points C/W wiring conduit, earthing, switches, push-button, ceiling rose, silicon wire and all accessories with supplying installation, connecting, testing and making ready for work of all, lighting fittings. The contractor should submit the fixation way of light fittings for approval.
16.8.01
Light Points
No
407
101.200
16.8.02
Exit sing + EM Light
No
49
13.200
No
1
550.000
16.8.03
Lighting control panel with all Push Buttons, labeling in grave and indication lambs (the indication Lampe shall indicate the on-off).
LIGHTING FITTINGS:
16.9
Supply light fitting complete with lamps, tubes , reflectors, diffusers , louvers , transformers , control gears , etc…and with all required fixing accessories , brackets , concrete bases , etc… all as shown on the drawings , specified and as required for proper operation, and as per the approval of the Engineer.
16.9.01
Type A
No
776
44.000
16.9.02
Type Ae
No
113
77.000
16.9.03
Type B
No
917
44.000
16.9.04
Type Be
No
99
77.000
16.9.05
Type E
No
205
60.500
16.9.06
Type E-EM
No
47
93.500
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-79
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
16.9.07
Type F
No
157
49.500
16.9.08
Type F-EM
No
18
77.000
16.9.09
Type G-70
No
86
93.500
16.9.10
Type H
No
109
55.000
16.9.11
Type H-EM
No
37
82.500
16.9.12
Type-EX
No
44
55.000
16.9.13
Type-EM
No
5
33.000
16.9.14
Type I
No
15
38.500
16.9.15
Type O
No
91
55.000
16.9.16
Type FL
No
12
82.500
16.9.17
Type M
No
229
60.500
16.9.18
Type M-EM
No
16
88.000
16.9.19
Type L
No
45
44.000
16.9.20
Type L-EM
No
45
71.500
16.9.21
Type Z
No
18
38.500
16.9.22
Type Z-EM
No
6
66.000
16.9.23
Type J
No
60
82.500
16.9.24
Type J-EM
No
5
110.000
16.9.25
Type N (1 x 3)
No
16
275.000
16.9.26
Type ST
No
6
27.500
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-80
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Description
Item No.
Unit
Qty
Unit Price KD. Fils
L.S.
L.S.
8250.000
16452 : Earthing 16.10
Supply, install and connect complete earthing system as per drawings, specification and MOE (E&W) regulation. Any additional earth electrodes needed shall be included without extra cost.
16.11
Prepare complete set of electrical and telephone as built drawings and get the approval from MOE (E&W) and MOC.
L.S.
L.S.
16.12
Testing and inspection of the electrical and telephone installation on completion and before being energized and get the approved by MOE (E&W) and MOC inspectors in accordance to the MOE (E&W) and MOC regulations and to the approved drawing.
L.S.
L.S.
16.13
Allow for submitting as built drawings, providing operation, instruction and maintenance manuals etc…
L.S.
L.S.
Bill No-1: Class Room + Administration Bldg (A)
1/16-81
all
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection Description
Unit
No.
Qty
Unit Price KD. Fils
DIVISION 16 - ELECTRICAL (LOW VOLTAGE) General Consideration for all items: 16.14
The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work. BUILDER WORK: All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholes, earth pits, ducts, trenches cable tiles … etc. 16.15
All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOP (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer. All works shall be carried out to comply with the BAS (Building Automation System) requirements. 16.16
The Contractor is referred to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items.
Bill No-1: Class Room + Administration Bldg (A)
1/16-82
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-83
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Unit
Qty
Unit Price KD. Fils
Description
Item No.
Section:16721 Fire Detection & Alarm System 16.17
Supply, install, connect, test and commission the fire detection and alarm system complete as per the drawings, specification and to the rules and regulation of Kuwait fire brigade and as per approval of Engineer. Work shall include all conduits , wiring, accessories and components.
16.17.01
Fire Alarm Control Panel complete with all accessories.
No
1
2585.000
16.17.02
Fire Alarm Active mimic display panel
No
1
1750.000
16.17.03
Main operating , display graphics and programming terminal with processor.
No
1
4400.000
16.17.04
Logging and event system printer.
No
1
275.000
16.17.05
Optical smoke detector ( addressable type).
Nos
235
38.500
16.17.06
Heat Detector (addressable type).
Nos
11
38.500
16.17.07
Duct Detector (addressable type).
Nos
20
137.500
16.17.08
Fire alarm manual call point (addressable type).
Nos
10
38.500
16.17.09
Local alarm horn.
Nos
35
55.000
16.17.10
Connection up to Motorized Dampers, Doors Opener, HVAC control panels, elevator control panels, sprinkler flow switches, Air pressure fans, Smoke and Fresh air Fans…etc.
L.S.
L.S.
825.000
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-84
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Item No.
Description
Unit
Qty
Unit Price KD. Fils
Section:16740 Telephone System - Cabling 16.18
Supply, install, connect, test and make ready for works the following Telephone System including conduits, wire, terminal boxes, draw boxes, socket outlet, all as per schematic, drawings
16.18.01
telephone socket outlets
Nos
151
38.500
16.18.02
MDF
Nos
1
715.000
16.18.03
TTB-A-F(80X90X15 CM)
Nos
1
550.000
16.18.04
TTB-A-S(70X80X15 CM)
Nos
1
440.000
16.18.05
TTB-A-F (80x90x15cm)
Nos
1
550.000
16.18.06
TTB-A-S (70x80x15cm)
Nos
1
440.000
16.18.7
Any other missing items required for full functioning of the job (if any)
L.S.
L.S.
Bill No-1: Class Room + Administration Bldg (A)
1/16-85
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection Item
Description
Unit
Qty
Unit Price KD. Fils
No No No No No No No No No No Nos No Nos No Nos
1
2200.000 385.000 1375.000 220.000 132.000 82.500 1430.000 330.000 1265.000 132.000 495.000 715.000
No.
Section 16750 Audio Visual System 16.23
16.23.4
Supply, install, connect test and make ready for works, Sound system including all, conduit, boxes, draw boxes, terminal boxes wires, connection of Gl conduit, The price for the sound system shall include the supply of all materials and equipment delivery to site,installations, connections, testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes, switches , push-buttons , cable trays, and all work required to make the work done. All should be as per the contract drawing and the approval of Engineer.
Seminar Hall
16.23.4.01 Data And Video Projector 4000 ANSI Lumens 16.23.4.02 Rear Projection Lens 16.23.4.03 Rear projection screen 16.23.4.04 Rear Projection screen frame 16.23.4.05 DVD 16.23.4.06 VCR 16.23.4.07 Visualizer 16.23.4.08 PC interface 16.23.4.09 Hide away unit 16.23.4.10 AV switcher 16.23.4.11 Power amplifier 16.23.4.12 Mixer and preamplifier 16.23.4.13 Sub waffer speaker 16.23.4.14 Monitoring panel 16.23.4.15 Stage speaker
Bill No-1: Class Room + Administration Bldg (A)
1/16-86
1 1 1 1 1 1 1 1 1 3 1 2 1 6
385.000 275.000
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Collection
Bill No-1: Class Room + Administration Bldg (A)
1/16-87
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
DESCRIPTION
PAGE NO
DIVISION 16 - ELECTRICAL
COLLECTION
Page No. 16-1 Page No. 16-2 Page No. 16-3 Page No. 16-4 Page No. 16-5 Page No. 16-6 Page No. 16-7 Page No. 16-8 Page No. 16-9 Page No. 16-10 Page No. 16-11 Page No. 16-12 Page No. 16-13 Page No. 16-14
Bill No-1: Class Room + Administration Bldg (A)
1/16-88
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Carried to Summary
Bill No-1: Class Room + Administration Bldg (A)
1/16-89
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
9900.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-90
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
9900.000
ELECTRICAL WORKS
1/16-91
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
3300.000 2640.000 3168.000 2420.000 2420.000 3300.000 2750.000 2970.000
2475.000 3300.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-92
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
28743.000
ELECTRICAL WORKS
1/16-93
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
854.700 737.000 854.700 907.500 693.000 836.000 902.000 192.500 88.000
825.000 495.000 495.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-94
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
7880.400
ELECTRICAL WORKS
1/16-95
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils 385.000 660.000 770.000 412.500 385.000 825.000 313.500
89.100
770.000
660.000 660.000 632.500 660.000 715.000 715.000 220.000
385.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-96
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
9257.600
ELECTRICAL WORKS
1/16-97
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
385.000 440.000 275.000 440.000 165.000
825.000 660.000 385.000 660.000 742.500 605.000 660.000 330.000
660.000 605.000 605.000 825.000 715.000 770.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-98
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
20395.100
ELECTRICAL WORKS
1/16-99
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils 330.000
440.000 302.500 264.000
192.500 192.500
330.000 924.000
7227.000 11286.000 2019.600
275.000
192.500 440.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-100
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
27.500 2975.500
ELECTRICAL WORKS
1/16-101
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils 165.000 55.000
41188.400 646.800 550.000
34144.000 8701.000 40348.000 7623.000 12402.500 4394.500 42605.200
Bill No-1: Class Room + Administration Bldg (A)
1/16-102
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils 7771.500 1386.000 8041.000 5995.000 3052.500 2420.000 165.000 577.500 5005.000 990.000 13854.500 1408.000 1980.000 3217.500 693.000 396.000 4950.000 550.000 4400.000 165.000 50666.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-103
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
8250.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-104
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
8250.000 Total Price KD. Fils
Bill No-1: Class Room + Administration Bldg (A)
1/16-105
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
ELECTRICAL WORKS
1/16-106
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
2585.000 1750.000 4400.000
275.000 9047.500 423.500 2750.000 385.000 1925.000 825.000
24366.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-107
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
5813.500 715.000 550.000 440.000 550.000 440.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-108
ELECTRICAL WORKS
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
8508.500 Total Price KD. Fils
2200.000 385.000 1375.000 220.000 132.000 82.500 1430.000 330.000 1265.000 132.000 1485.000 715.000 385.000 1650.000
Bill No-1: Class Room + Administration Bldg (A)
1/16-109
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
2035.000
ELECTRICAL WORKS
1/16-110
)Bill No-1: Class Room + Administration Bldg (A
2011- 2010/ 70/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
Total Price KD. Fils
9900.000 28743.000 7880.400 9257.600 20395.100 2975.500 42605.200
Bill No-1: Class Room + Administration Bldg (A)
1/16-111
ELECTRICAL WORKS
المناقصة رقم /م ع 2011- 2010/ 70/ إنشاء وإنجاز وصيانة مدرسة ثانوية بنين /بمنطقة الرميثيه قطعة 10
121756.800
ELECTRICAL WORKS
1/16-112
)Bill No-1: Class Room + Administration Bldg (A
PART SUMMARY - 1
PAGE NO.
DIVISION NO.
2-2
2
SITE WORKS
37443.000
3-4
3
CONCRETE
839676.500
4-2
4
MASONRY
99562.000
5-3
5
METAL WORKS
28224.700
6-2
6
WOOD AND PLASTIC
5265.000
7-3
7
THERMAL AND MOISTURE PROTECTION
62092.750
8-4
8
DOORS AND WINDOWS
179313.000
9-6
9
FINISHES
335210.700
10-3
10
SPECIALTIES
47354.000
12-3
12
FURNISHINGS
14-2
14
CONVEYING SYSTEM
15-12
15
MECHANICAL WORKS
16-14
16
ELECTRICAL WORKS
Bill No-1: Class Room + Administration Bldg (A)
TITLE
2011- 70/2010/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
1/SUM-1
AMOUNT KD
310505.475
PART SUMMARY-1
2011- 70/2010/ م ع/ المناقصة رقم إنشاء وإنجاز وصيانة مدرسة ثانوية 10 بمنطقة الرميثيه قطعة/بنين
PART SUMMARY - 1
TOTAL CARRIED TO MAIN SUMMARY
Bill No-1: Class Room + Administration Bldg (A)
1/SUM-1
KD
1944647.125
PART SUMMARY-1
View more...
Comments