2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 2 - SITE WORKS Section 02315 Earth Work Excavation and Backfilling 2.1

Excavation for foundation in any type of soil even rock, up to required height including backfilling, shoring (if required), dewatering and removing of surplus excavated material from site to a place approved by the Municipality. Mechanical excavation shall be stopped 300mm above the Foundation level and completed manually.

M3

13308

2.250

29943.000

L.S

L.S

6000.000

6000.000

L.S

L.S

1500.000

1500.000

Compacted fill 2.2

Filling inside building (under slab on grade etc.) as per proposed levels, with approved quality imported filling material. Filling shall be compacted in layers (each layer shall not be more than 250mm thick) and compaction shall not be less than 98% of dry density. Selected excavated material may be used for filling but as per approval of the Engineer.

Section 02360 Termite Control 2.3

Termilte Control/Soil treatment for the whole building area all as described

Bill No-1: Class Room + Administration Bldg (A)

1/2-1

SITE WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

37443.000

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 2 - SITEWORKS COLLECTION Page No. 2-1

Bill No-1: Class Room + Administration Bldg (A)

37,443.000

1/2-2

SITE WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

37,443.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/2-3

SITE WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

DIVISION 3 - CONCRETE Section 03300 Cast-in-place Concrete

3.1

3.1.1 3.1.2

3.2

Plain Concrete Plain concrete grade using sulphate resisting cement including all form work and laid as described (smooth face) 100 mm thick under Foundation 50 mm thick under Ground beam & External steps

M2

1,400

3.500

4900.000

M2

710

2.200

1562.000

Reinforced Concrete Vibrated reinforced concrete using sulphate resisting cement filled into formwork and tamped around reinforcement including all formwork, tie bolts and reinforcement etc. complete as described (Fair finish for all exposed faces)

3.2.1

Foundation: Col/Wall Footings etc.

M3

785

95.500

74967.500

3.2.2

Column/wall Neck

M3

190

100.000

19000.000

3.2.3

Ground Beam, External Steps/ramp etc.

M3

345

95.000

32775.000

3.2.4

150mm thick slab on grade with turn down slab/edge thicnessing and including Isolation joints (with celotex and mastic fill). Construction joints shall be provided in case bay area is more than 25 m2.

M2

3,930

7.250

28492.500

3.3

Vibrated reinforced concrete using ordinary portland cement, filled into form work and tamped around reinforcement including all formwork, reinforcement etc. complete as described. (Fair finish for all exposed faces)

3.3.1

Walls

M3

698

95.000

66310.000

3.3.4

Lintels, sills, bond beam etc.

M3

93

98.000

9114.000

Bill No-1: Class Room + Administration Bldg (A)

1/3-4

CONCRETE

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

237121.000

Total Carried to Collection ITEM

3.4

3.5

DESCRIPTION

UNIT QTY UNIT RATE KD

Section 03530 Concrete Topping Minimum 50mm thick concrete topping with mesh reinforcement (Y8/200mm both direction)and laid over hollow core slab in proper shape with required expansion, construction and contraction joints. (K-300)

AMOUNT KD

M2

11821

5.000

59,105.000

Section 03410 Plant Pre-cast Structural Concrete. Vibrated precast prestressed reinforced concrete with compressive strenght of 48Mpa (Cube strenght) using Ordinary portland cement finished fairface on all exposed surfaces including all formwork, reinforcemet, tension wires anchorage, lifting hooks, hoisting, placing in position, bedding neoprene bearing pads, perimeter gaskets, sealent, shims, dowels and connections all as specified Note : The dimensions mention below are as per the drawings, and the dimensions shown in the drawings are for guidance only, It is contractor's responsibility to design all the precast concrete element, and all connections and accessories as specified. The slab system shown in the drawing (Hollow core system) is for guide line only, The contractor to design complete slab system as hollow core system or Double T (TT) System, after consideration of all services passing fron the ceiling and take the approval from Engineer before commencing of the work.

3.5.1

Design, suplly and fixation of precast concrete columns.

L.S.

L.S.

98,650.000

98,650.000

3.5.2

Design, suplly and fixation of rectangular beams, edge beams, spine beams.

L.S.

L.S.

205,450.000

205,450.000

Bill No-1: Class Room + Administration Bldg (A)

1/3-5

CONCRETE

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

3.5.3

Design, suplly and fixation of hollow core or Double TT, slab system.

L.S.

L.S.

201,450.000

564655.000

Total Carried to Collection ITEM

201,450.000

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

3.5.4

Design, suplly and fixation of all staircases.

L.S.

L.S.

20,000.000

20,000.000

3.5.5

Design, suplly and fixation of parapet.

M3

160

85.000

13,600.000

M2

112

24.000

2,688.000

M2

215

7.500

1,612.500

Section 03455 Glass Reinforced Concrete (GRC) Precast GRC panel fixed over external wall including galvanized steel support, anchors, dowels etc. complete as described 3.6

Decorative GRC panels over Stair windows Section 03550 Concrete Screed

3.7

Approx. 100mm thick smooth surface sand cement and thin gravel screed with steel wiremesh (6mm dia @ 200mm c/c) all as described.

Bill No-1: Class Room + Administration Bldg (A)

1/3-6

CONCRETE

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

37900.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/3-7

CONCRETE

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

DIVISION 3 - CONCRETE COLLECTION Page No. 3-1

237121.000

Page No. 3-2

564655.000

Page No. 3-3

37900.500

839,676.500

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/3-8

CONCRETE

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 4 - MASONRY Section 04200 Unit Masonry 4.1

Solid concrete block wall bedded in sand cement motar with gavanized steel ties including scaffolding up to any height etc. complete as described.

4.1.1

400 mm thick wall

M2

72

12.250

882.000

4.1.2

300 mm thick wall

M2

10

8.750

87.500

4.1.3

250 mm thick wall

M2

75

7.300

547.500

4.1.4

200 mm thick wall

M2

3,152

7.000

22064.000

4.1.5

150 mm thick wall

M2

5,480

5.250

28770.000

4.1.6

100 mm thick wall

M2

487

4.250

2069.750

M2

1990

7.000

13930.000

M2

3,567

8.750

31,211.250

Sand Lime Bricks 4.2

Sand lime bricks size 290 x 90 x 45cm Standard 34. Malaki from National Industries Company or equally approved (Colour to be as per the approval of Engineer In-Charge) bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.

Section 04225 Light Weight Concrete Unit Masonry 4.3

4.3.1

Light weight concrete block wall bedded in sand cement mortar with galvanized steel ties including scaffolding up to any height etc. complete as described.(External wall) 200 mm thick wall

Bill No-1: Class Room + Administration Bldg (A)

1/4-9

MASONRY

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

99562.000

Total Carried to Collection ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 4 - MASONRY COLLECTION Page No. 4-1

Bill No-1: Class Room + Administration Bldg (A)

99562.000

1/4-10

MASONRY

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪99,562.000‬‬

‫‪MASONRY‬‬

‫‪TOTAL CARRIED TO SUMMARY‬‬

‫‪1/4-11‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 5 - METALS Section 05500 Metal Fabrication 5.1

Steel Railing

5.1.1

900mm high steel pipe railing fixed over concrete with 25mm dia vertical steel post, 3 rows of 25mm dia horizontal steel pipe rail and 50mm dia steel pipe hand rail including anchors, dowels, fixing accssories and approved quality primer and alkyd paint etc. complete as described over Stairs

MR

205

18.700

3833.500

5.1.2

1000mm high steel pipe railing around openings fixed over concrete with 25mm dia vertical steel post and 50mm dia steel pipe hand rail including - ditto

MR

55

19.800

1089.000

5.1.3

200mm high steel pipe railing fixed over concrete over balconies with 25mm dia vertical steel post and 100mm dia steel pipe hand rail including - ditto.

MR

42

12.100

508.200

Access/Cat ladder: 5.2

Steel access ladder comprising 32 mm Dia.tubular section, stringer 25mm dia tubular sections rungs at 300mm centres including wall struts, welding, bolting, removable galvanized steel chain barrier and fixing to structure, the item include application of primer and akyd paint to the required thickness, overall height as shown in the drawings for different areas at roof level.

5.2.1

Cat ladder 3750 mm high (approx.)

Nos

6

121.000

726.000

5.2.2

Cat ladder 4650 mm high (approx.)

Nos

2

154.000

308.000

Bill No-1: Class Room + Administration Bldg (A)

1/5-12

METAL

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

6464.700

Total Carried to Collection ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

Steel shed over roof water tank 5.3

Design, fabricate and install steel shade over roof water tank. Contractor shall provide designed working/shop drawings for Engineer's approval

L.S.

L.S.

1760.000

1760.000

L.S.

L.S.

20000.000

20000.000

Section 05810 Expansion Joints and Cover Assemblies

5.4

20mm wide expansion joint for footings, columns, beams, slabs, walls etc. horizontally and vrtically using bitumen impregnated joint filler including 20x20mm approved quality mastic/sealant over exposed joint face and covered the exposed faces of joints with 30mm thick aluminium cover plate including all accessories complete as described

Bill No-1: Class Room + Administration Bldg (A)

1/5-13

METAL

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

21760.000

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 5 - METALS COLLECTION Page No. 5-1

6464.700

Page No. 5-2

21760.000

Bill No-1: Class Room + Administration Bldg (A)

1/5-14

METAL

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪28,224.700‬‬

‫‪METAL‬‬

‫‪TOTAL CARRIED TO SUMMARY‬‬

‫‪1/5-15‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 6 - WOOD AND PLASTICS Section 06200 Finish Carpentary 6.1

Preaperation and fixing of two wooden stripes parallel to each other of white wood having the size 25 x 100 mm each.( fixing on the walls other than which is having marker board)

Bill No-1: Class Room + Administration Bldg (A)

1/6-16

MR

405

13.000

5265.000

WOOD AND PLASTIC

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

5265.000

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 6 - WOOD AND PLASTICS COLLECTION Page No. 6-1

Bill No-1: Class Room + Administration Bldg (A)

5265.000

1/6-17

WOOD AND PLASTIC

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

5,265.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/6-18

WOOD AND PLASTIC

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 7 - TH. & MOIST. PROTECTION Section 07110 Sheet Membrane Waterproofing 7.1

Polythylene sheet 1000 gauge under slab on grade M2

3930

0.550

2161.500

7.2

4mm thick waterproofing membrane under, over and around foundation concrete elements contact in soil with 6mm thick protection board over vertical surfaces including 50mm thick horizontal protection screed below foundation bed all as per MPW specificaions

L.S

L.S

6750.000

6750.000

M2

220

0.800

176.000

Section 07140 Fluid Applied Waterproofing 7.3

Rubberized waterproofing paint over external wall along stone cladding Section 07110 & 07140 Waterproofing System (Toilets & Kitchen)

7.4

Under tiling in wet areas (Toilets and Kitchen) including dressing up walls, which shall be including.

7.4.1

Two coats of fluid applied waterproofing paint over concrete floor and wall

M2

345

0.800

276.000

7.4.2

130-150mm thick foam concrete fill

M2

345

1.950

672.750

7.4.3

20 mm thick sand cement screed

M2

345

0.950

327.750

7.4.4

4 mm thick waterproofing membrane

M2

345

2.000

690.000

7.4.5

2 cm sand cement screed

M2

345

0.950

327.750

Bill No-1: Class Room + Administration Bldg (A)

1/7-19

TH AND MOIST PROTECTION

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

11381.750 AMOUNT KD

Section 07500 (Composite Roofing System) (Section 03520, 07110, 07140, 07200, 07320) 7.5

Roof Waterproofing System including testing and guarantee of the roofing system for any water leakage all as per specifications and Engineer's approval.

7.5.1

2 coats of fluid applied w.p. paint over concrete roofM2

3140

0.950

2983.000

7.5.2

50-150mm thick lightweight concrete, 600 kg/m3 density with ordinary portland cement laid to falls and cross falls.

M2

3140

2.000

6280.000

7.5.3

20mm thick cement sand screed (1:3) mortar laid over light weight concrete bed.

M2

3140

1.250

3925.000

7.5.4

Two layer of 4mm thick membrane roofing including 350-450 mm girth laid over roof with primer

M2

3140

3.850

12089.000

7.5.5

20mm thick cement sand screed (1:3) mortar laid over WP membrane

M2

3140

0.950

2983.000

7.5.6

75 mm thick extruded polysterene insulation

M2

3140

3.100

9734.000

7.5.7

Filter fabric

M2

3140

0.200

628.000

7.5.8

400x400x40mm Cement tile and 400x150x40mm skirting bedded in cement and sand mortar and laid over roof in 2.80x2.80m bay with 10cm wide gravel/aggregate strip filled with selected gravel at both direction all as per Engineer's approval and as described

M2

3140

3.850

12089.000

Section 07840 Fire Stopping

Bill No-1: Class Room + Administration Bldg (A)

1/7-20

TH AND MOIST PROTECTION

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

7.6

Fire stopping over all openings around the perimeter of Fire Zone as described.

L.S

50711.000

Total Carried to Collection ITEM

L.S

DESCRIPTION

AMOUNT KD

DIVISION 7 - THERMAL & MOIST.PROTECTION COLLECTION Page No. 7-1

11381.750

Page No. 7-2

50711.000

Bill No-1: Class Room + Administration Bldg (A)

1/7-21

TH AND MOIST PROTECTION

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

62,092.750

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/7-22

TH AND MOIST PROTECTION

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVSION 8 - DOORS AND WINDOWS

8.1

Section 08110 Metal Door and frame Hollow metal door and frame with all required weather sealing, fixing accessories, sealant with backup rod and fixing to concrete or block wall including required fire rating, glazing and Hardware etc. complete as described

8.1.1

Door Type FD1, size 1100x2200mm

Nos

6

190.000

1140.000

8.1.2

Door Type FD2, size 2000x2200mm

Nos

7

420.000

2940.000

8.1.3

Door Type FD3, size 1800x2200mm

Nos

10

410.000

4100.000

8.1.4

Door Type D02, size 2000x2200mm

Nos

6

430.000

2580.000

8.1.5

Door Type D03, size 1000x2200mm

Nos

13

190.000

2470.000

8.2

Section 08210, 06100,06200 Wood door and Frame, Rough Carpentry Finish Carpentry Solid core flush timber teak veneered doors hanging to wood frames, fixed to concrete or block, including sub-frames/timber packings and fixings etc. complete as described. The item includes frames, finishes, Glazing, Fire Rating, Hardware etc., complete as described

8.2.1

Door Type D01, size 1100x2200mm

Nos

52

240.000

12480.000

8.2.2

Door Type D04, size 1000x2200mm

Nos

37

233.000

8621.000

8.2.3

Door Type D05, size 1000x2200mm

Nos

38

233.000

8854.000

8.2.4

Door Type D07, size 1100x2200mm

Nos

6

240.000

1440.000

8.2.5

Door Type D10, size 1800x2200mm

Nos

5

430.000

2150.000

8.2.6

Door Type D16, size 1100x2200mm

Nos

18

240.000

4320.000

8.2.7

Door Type D17, size 1000x2200mm

Nos

6

233.000

1398.000

8.2.8

Door Type D20, size 800x2200mm

Nos

13

226.000

2938.000

Bill No-1: Class Room + Administration Bldg (A)

1/8-23

DOORS AND WINDOWS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

55431.000

Total Carried to Collection ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

Section 08520 Aluminum Doors and Windows Powder coated extruded section aluminium Doors and Windows including glazing as required, frames, fly screens, mullions, loacation angles, shims and plates, heads, sills and jambs, glazing and glazing beads, weather stripping, caulking, pointing, sealing, sub frames, all hard ware, etc. complete and fixing to concrete or block work as described. 8.3

Aluminium Door:

8.3.1

Door Type D06, size 1800x2200mm

Nos

8

320.000

2560.000

8.3.2

Door Type D08, size 1100x2200mm

Nos

6

205.000

1230.000

8.3.3

Door Type D11, size 7100x2200mm

No

1

1313.000

1313.000

8.3.4

Door Type D12, size 11800x3000mm

Nos

2

2677.000

5354.000

8.3.5

Door Type D13, size 1100x2200mm

Nos

2

247.000

494.000

8.3.6

Door Type D14, size 3200x2200mm

Nos

4

588.000

2352.000

8.3.7

Door Type D15, size 3800x2200mm

Nos

6

704.000

4224.000

8.3.8

Door Type D18, size 1800x2200mm

Nos

2

325.000

650.000

8.3.9

Door Type D19, size 2000x2200mm

Nos

22

320.000

7040.000

8.3.10

Door Type D21, size 1600x2200mm

Nos

2

294.000

588.000

Nos

24

315.000

7560.000

Notes: Door D09 included in the toilet partition, Div-10 8.4 8.4.1

Aluminium Windows Window Type W01, size 1600x1600mm

Bill No-1: Class Room + Administration Bldg (A)

1/8-24

DOORS AND WINDOWS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

8.4.2

Window Type W02, size 25700x1600mm

Nos

3

3360.000

43445.000

Total Carried to Collection ITEM

10080.000

DESCRIPTION

UNIT QTY

8.4.3

Window Type W03, size 3200x1600mm

Nos

8

UNIT RATE KD 677.000

AMOUNT KD 5416.000

8.4.4

Window Type W04, size 3200x700mm

Nos

6

340.000

2040.000

8.4.5

Window Type W05, size 4800x1600mm

Nos

65

782.000

50830.000

8.4.6

Window Type W06, size 21500x1600mm

Nos

1

2835.000

2835.000

8.4.7

Window Type W07, size 1600x1600mm

Nos

12

195.000

2340.000

8.4.8

Window Type W08, size 800x1600mm

Nos

8

100.000

800.000

8.4.9

Window Type W09, size 2550x1600mm (internal) Nos

4

368.000

1472.000

8.4.10

Window Type W12, size 2000x1200mm (internal) No

1

184.000

184.000

8.4.11

Window Type W13, size 7100x2200mm (internal) No

1

1240.000

1240.000

Section 08600 Skylight 8.5

Aluminum framed double glazed skylight with complete waterproof installation

8.5.1

Skylight size 4000x1000mm, Type W10

Nos

2

1890.000

3780.000

8.5.2

Skylight size 7300x1500mm, Type W11

No

1

7500.000

7500.000

No

1

2000.000

2000.000

Shutter 8.6

SH01 4800 x 3750mm

Bill No-1: Class Room + Administration Bldg (A)

1/8-25

DOORS AND WINDOWS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

80437.000

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 8 - DOORS AND WINDOWS COLLECTION Page No. 8-1

55431.000

Page No. 8-2

43445.000

Page No. 8-3

80437.000

Bill No-1: Class Room + Administration Bldg (A)

1/8-26

DOORS AND WINDOWS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

179,313.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/8-27

DOORS AND WINDOWS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

DIVISION 9 - FINISHES

9.1

9.2

9.3

Section 09200 Lath and plaster 20mm thick cement and sand plaster (with mesh fabric) applied to internal wall and ceiling, stairs and shafts (concrete or block wall) including under coat, metal lath, corner beads, stop beads etc. complete as described. Section 09260 Gypsum Board 100 mm thick and 2200mm high metal stud partition comprising 12.5 mm thick waterproof quality gypsum wall board on both sides with sound attenuation blanket including metal furring channels, head and sill runners, caulking, leveling shims etc. all as described

M2

20,360

2.250

45810.000

M2

250

6.500

1625.000

Section 09310 Ceramic Tiles Non slip ceramic floor tiles on and including cement & sand setting bed, sand cushion and joints grouted in waterproof grout over concrete floor all as described. (Prime cost for all the ceramic are 2.5 KD/M2, similar to L& M artificial marble tiles ,Eagle ceramic tiles or equally approved, sizes mention here are only for reference , contrcator can use standard sizes of ceramic)

9.3.1

Non-slip decorative ceramic tile for wet areas, type CT1, size 600x600x10mm

M2

345

7.000

2415.000

9.3.2

Acid resistant ceramic tile, type CT2, size 600x600x10mm

M2

1,236

7.500

9270.000

9.3.3

Non-slip decorative ceramic tile with border, type CT4 & CT7, size 600x600x10mm

M2

6,876

7.000

48132.000

Bill No-1: Class Room + Administration Bldg (A)

1/9-28

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

107252.000

Total Carried to Collection ITEM

DESCRIPTION

9.3.4

Ditto-but with pattern and different color for Corridoors

M2

240

7.250

1740.000

9.3.5

Non-slip ceramic tile, type CT5 for store and service area, size 300x300x9mm

M2

553

6.500

3594.500

9.4

UNIT QTY UNIT RATE KD

AMOUNT KD

Ceramic Skirting - Ditto

9.4.1

Coved ceramic skirting, 600x100x10mm

MR

3,475

2.000

6950.000

9.4.2

Coved ceramic skirting, 300x100x9mm

MR

442

2.500

1105.000

9.5

Wall ceramic tiles fixed on concrete or block work on and including cement and sand backing and joints grouted in waterproof grout, all as described.

9.5.1

300x300x6mm ceramic tile over corridor wall 1200mm high

M2

1,270

5.150

6540.500

9.5.2

300x300x6mm ceramic tile with border for wet areas

M2

1,375

5.500

7562.500

9.5.3

Ditto but for laboratory areas (acid resistant)

M2

1,665

6.000

9990.000

9.5.4

300x300x 6mm ceramic tile for storage areas at F.F

M2

154

5.150

793.100

M2

500

6.000

3000.000

9.6

Section 09420 Terrazzo Precast Terrazzo floor tile, size 300x300x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described

Bill No-1: Class Room + Administration Bldg (A)

1/9-29

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

9.7

Precast Terrazzo Skirting, size 300x100x30mm on and including cement and sand setting bed and backing with joints grouted in white/colured cement including grinding, polishing etc.complete as described

MR

362

3.500

42542.600

Total Carried to Collection ITEM

DESCRIPTION

9.8

Section 09510 Acoustic tile Ceiling Acoustic tile ceiling, size 600x1200x15mm including all frame work, suspension system, access panels etc. complete as described

9.9

1267.000

UNIT QTY UNIT RATE KD

Section 09513 Metal Suspended Ceiling Metal tile / ribed crrugated sheet with anti bacterial paint ceiling including all frame work, suspension system, access panels etc. complete as described for wet areas

AMOUNT KD

M2

216

6.000

1296.000

M2

345

8.500

2932.500

M2

8,755

7.500

65662.500

M2

220

6.000

1320.000

Section 09260, 09535 Gypsum Board Ceiling / Acoustic tile Ceiling

9.10

Combination of 12.5mm thick Gypsum board ceiling with emulsion paint finish and 600x600x15mm acoustic tile ceiling including all frame work, suspension system, access panels etc. complete as described Section 09260 Glass Fiber Reinforced Gypsum (GRG) Ceiling

9.10 9.10.1

GRG Ceiling 20mm thick Decorative GRG ceiling with emulsion paint finish including all frame work, suspension system, access panels etc. complete as described Section 09260 Gypsum Board Ceiling

Bill No-1: Class Room + Administration Bldg (A)

1/9-30

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

9.10.2

12.5mm thick waterproof qualityGypsum board ceiling with waterproof paint for wet areas all as shown and described.

M2

695

6.500

123331.200

Total Carried to Collection ITEM

4517.500

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

Section 09600 Granite & Marble 9.11

Stone & Marble:

9.11.1

Natural Granite steps for external entrances, 30mm thick and 300mm wide Treadx 20mm thick and 160mm high Riser all as described.

MR

51

15.000

765.000

9.11.2

3cm thick granite flooring tiles for Main & Rear Entrances, type M-5,

M2

120

35.000

4200.000

9.11.3

400x400x30mm thick Italian carrara marble tile for stair hall and landings

M2

395

20.000

7900.000

9.11.4

Italian carrara marble Steps, 30mm thick and 300mm wide Tread x 20mm thick and 160mm high Riser Italian carrara marble Skirting for Stair, 160mm highx20mm thick

MR

960

13.000

12480.000

MR

547

5.000

2735.000

9.11.6

30mm thick Italian carrara marble threshold

MR

36

4.000

144.000

9.11.7

12mm thick synthetic marble (L.G. , Corrian or equally approved) wash basin counter fixed over galvanized steel supports including marble fascia, back spalsh, cut out for wash basin, all required accessories, sealant etc. complete as described. 30mm thickx600mm wide and 7220mm long with 7 Bowls

Nos

6

750.000

4500.000

9.11.8

Ditto- but 1200mm with 1 Bowl

No

1

160.000

160.000

9.11.9

Ditto- but1900mm with 2 Bowl

No

1

250.000

250.000

9.11.5

Bill No-1: Class Room + Administration Bldg (A)

1/9-31

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Section 09680 Carpet Tiles

9.12

Carpet tiles laid over screed floor with approved quality additives. (screed measured separately )

M2

225

7.000

Total Carried to Collection ITEM

1575.000

34709.000

DESCRIPTION

UNIT QTY UNIT RATE KD

AMOUNT KD

Section 09710 , 09842 Acoustical Wall Panel / Stretched fabric acoustic panels. 9.13

Combination of acoustic wood panel and Proprietary make "Streched Fabric" Acoustic wall panel inside Seminar hall, Library/Office, Vocal room and instrument music including all fittings and accessories as decribed

M2

520

46.000

23920.000

M2

215

3.000

645.000

(lower 1mt. Height from flooring wooden acoustic panel and fabric panels to be up to the ceiling from top of the wood panels) Section 09800 Epoxy 9.14

Epoxy finish over screed, Type CO-2 (Screed measured separately in Div-3) min 300 micron dry thick Section 09900 Painting

9.15

Prepare and apply 3 coats paint of approved colour over plastered surface (wall and ceiling) including preparation of surfaces, undercoat, sealcoat etc. complete as described

9.15.1

Emulsion paint

M2

13,140

1.200

15768.000

9.15.2

Oil paint

M2

4,065

1.300

5284.500

Bill No-1: Class Room + Administration Bldg (A)

1/9-32

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

9.15.3

Texture paint system as specified including two coats of Polyurethane protection layers (NIC texture paint system or equally approved)..

Total Carried to Collection ITEM

M2

2,184

2.600

5678.400

27375.900

DESCRIPTION

AMOUNT KD

DIVISION 9 - FINISHES COLLECTION Page No. 9-1

107252.000

Page No. 9-2

42542.600

Page No. 9-3

123331.200

Page No. 9-4

34709.000

Page No. 9-5

27375.900

Bill No-1: Class Room + Administration Bldg (A)

1/9-33

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

335,210.700

1/9-34

FINISHES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

DIVISION 10 - SPECIALTIES Section 10100 Visual Display Board 10.1

Wall mounted marker board and tack board with silver anodising frame with plastic rounded corners, elegant alluminium tray ,fixing etc. complete as described

10.1.1

Marker board having the size 2.5 mt x 1.25 mt for general class room

Nos

50

50.000

2500.000

10.1.2

Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop

Nos

22

50.000

1100.000

10.1.3

Marker board having the size 1.30 mt x 1.25 mt for general class room.

Nos

100

30.000

3000.000

10.1.4

Ditto - but for computer lab,sientific club,physics lab chemistry lab, biology lab, geology lab, art club room, electronic workshop, car mechanic work shop.

Nos

48

30.000

1440.000

Toilet partition/cubicle 13mm thick with five Nos (5) doors, size 12750x2200mm (Door TypeD09)

12

1700.000

20400.000

4

2400.000

9600.000

10.2

10.2.1

10.3

Section 10170 Toilet Partition/Cubicle Proprietary make Plastic toilet partition, cubicles including doors, front panels, divisions, end panels with all required hardware and accessories as described.

Section 10651 Operable Panel Partition Proprietary make "Manually Operated" Operable Partition over Class room, size 8500x3500m including all fittings, accessories and hardware all as described.

Bill No-1: Class Room + Administration Bldg (A)

1/10-35

Nos.

SPECIALITIES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

38040.000

Total Carried to Collection ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

Section 10800 Toilet Accessories 10.4

Supply and fix toilet accessories including all component parts, assembling, plugging, screwing or otherwise fixing and making good all as described.

10.4.1

Waste Receptacle (WR)

Nos

76

40.000

3040.000

10.4.2

Toilet Paper Dispenser (TPD) recessed

Nos

70

15.000

1050.000

10.4.3

Paper Towel Dispenser (PTD)

Nos

22

12.000

264.000

10.4.4

Robe Hook (RH)

Nos

70

10.000

700.000

10.4.5

Soap Dispenser Vertical (SDV) wall mounted

Nos

39

10.000

390.000

10.4.6

St.steel framed mirror (FM), size 7600x900mm

Nos

6

300.000

1800.000

10.4.7

Ditto but size 1870x900mm

No

1

120.000

120.000

10.4.8

St.steel framed mirror (FM), size 700x1000mm

Nos

10

75.000

750.000

10.4.9

St.Steel Grab Bar (GB)

Nos

52

2.500

130.000

10.4.10 Folding Shower Seat (FSS)

No

1

200.000

200.000

10.4.11 Utility Shelf, Mop and Broom Holder (MH)

Nos

6

10.000

60.000

10.4.12 Hot Air Dryer (HD)

Nos

6

135.000

810.000

Notes: Flexible hose with spray nozzle included with WC in Div-15, Mechanical

Bill No-1: Class Room + Administration Bldg (A)

1/10-36

SPECIALITIES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

9314.000

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 10 - SPECILITIES COLLECTION Page No. 10-1

38040.000

Page No. 10-2

9314.000

Bill No-1: Class Room + Administration Bldg (A)

1/10-37

SPECIALITIES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

47,354.000

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/10-38

SPECIALITIES

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 12 FURNISHINGS Section 12357 Kitchen Casework/Cabinet 12.1

Kitchen area base and wall units complete with double doors, adjustable shelves, sides, tops, bottoms, backs, skirting and all required accessories, hardware, fixings, components, support legs, sealing, plugging, screwing, making good, all as as per Engineer's approval.

12.1.1

Base unit size 600mm deep x 850mm high set in range including sink units with dustbin, shaped corner units and 3mm thick stainless steel top with cutout for sinks and recesses for appliances(Sink measured separately in Div-15, Mechanical.)

MR

12

12.1.2

Wall Unit size 400x600mm high - ditto

MR

12

Section 12358 Laboratory Casework

12.2

Supply and fix Laboratory Casework for Biology Lab 1 & 2, Geology Lab 1 & 2, Chemistry Lab 1 & 2 and Physics Lab 1 & 2, with all required fittings, weather sealing, fixing accessories, sealant with backup rod and fixing to concrete, block work or gypsum board including all required hardware and accessories as described. BASE CABINETS:

12.2.1

Base cabinet type CK055PHX

Nos

240

12.2.2

Base cabinet type CD0455PHX

Nos

64

12.2.3

Base cabinet type CB050PHX

Nos

8

12.2.4

Base cabinet type CD050PHX

Nos

4

Bill No-1: Class Room + Administration Bldg (A)

1/12-39

FURNISHINGS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection ITEM

DESCRIPTION

UNIT QTY

12.2.5

Base cabinet type CA060PHX

Nos

20

12.2.6

Base cabinet type CB060PHX

Nos

6

12.2.7

Base cabinet type CA045PHX

Nos

4

12.2.8

Base cabinet type CB045PHX

Nos

14

12.3

WALL CABINETS: Wall cabinet type S2PND090-30

Nos

32

12.4

STORAGE CABINETS: Storage cabinet type Q2PND120-40

Nos

14

12.5 12.5.1

WORKTOP COUNTERS: Worktop counter type 16TRE60

MR

382

12.5.2

Worktop counter type 24MEL75

MR

9

12.6 12.6.1

SINK CABINETS: Sink cabinet type CS060PHX

Nos

44

12.6.2

Sink cabinet type CS120PHX

Nos

4

12.7

UNIT RATE KD

AMOUNT KD

MISCELLANEOUS CABINETS/COUNTERS:

12.7.1

Type KB46

Nos

70

12.7.2

Type COD028

Nos

70

12.7.3

Type LE2WP

Nos

238

12.7.4

Type JCWSO

Nos

14

12.7.5

Type PPSINK

Nos

52

12.7.6

Type LMXSO

Nos

40

12.7.7

Type LGISO

Nos

32

12.8

FUME HOOD WITH BASIC CABINET: Type FC120

Nos

2

12.9

SAFETY SHOWER Type S&E Wash

Nos

2

Bill No-1: Class Room + Administration Bldg (A)

1/12-40

FURNISHINGS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection ITEM

DESCRIPTION

AMOUNT KD

DIVISION 12 FURNISHINGS

COLLECTION Page No. 12-1 Page No. 12-2

Bill No-1: Class Room + Administration Bldg (A)

1/12-41

FURNISHINGS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/12-42

FURNISHINGS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

DIVISION 14- CONVEYING SYSTEM 14.1

Electrical Passenger Elevator. Supply, Install & Commissioning Duplex Electrical Passenger Elevator for 3 stops, 1600Kg. ( 21 Passengers) Loading capacity, Complete with all necessary requirement as per contract and Fire Brigade specification as shown on the drawing. Including Fire Brigade approval.

Nos

2

14.2

Allows for electrical works (power, control, fire alarm, etc.) associated with Elevators Equipments, and System, Including cabling, wiring, switching, elevator control panels with all accessories and all other related works as per specification and Kuwait Fire Brigade..

LS

LS

14.3

Emergency Diesel Generator 45 KW for Fire Brigade operation and in case of power failure complete with all accessories

Nos.

4

14.4

Allow for interlocking the elevators control with the building managements system.

LS

LS

14.5

Any other item (s) not mentioned either above or in the specification but it’s necessary for the optimum operation of the system in according with the specification and Kuwait Fire Brigade requirements.

LS

LS

14.6

Allow for builder’s works required for the elevator.

LS

LS

14.7

Allow for submitting shop working drawing, coordination drawing, builder works drawing, asbuilt drawing, operation & maintenance manual, etc.

LS

LS

14.8

Allow for testing & commissioning of the elevators in accordance with specification and Kuwait Fire Brigade including handing over to Kuwait Fire Brigade.

LS

LS

14.9

Allow for Lloyd’s approval certification

LS

LS

Bill No-1: Class Room + Administration Bldg (A)

1/14-43

CONVEYNG SYSTEM

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection ITEM

AMOUNT KD

DESCRIPTION

DIVISION 14 CONVEYING SYSTEM

COLLECTION Page No. 14-1

Bill No-1: Class Room + Administration Bldg (A)

1/14-44

CONVEYNG SYSTEM

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/14-45

CONVEYNG SYSTEM

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

DIVISION - 15 MECHANICAL WORKS DRAINAGE The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price. Include in price all adjustment required by code or as per coordination with other disciplines. Contractor responsible to get approvals all authorities having jurisdictions for shop drawings. Contractor must attach a breakdown analysis for lump sum items. 15.1

High density polyethylene tempered (HDPE) to DIN 19535 / 19637 and DIN 8075 drainage piping for underground and above ground drainage system in all aspect as specified. Dia 50mm Dia 75mm Dia 100mm Dia 150mm

MR MR MR MR

409 170 778 433

3.150 4.200 5.250 8.400

1288.350 714.000 4084.500 3637.200

Polished bronze rain water shoe Dia 4"

Nos

28

36.750

1029.000

Adjustable floor cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug, with nickel bronze top Dia 4"

Nos

51

47.250

2409.750

Adjustable floordrain cleanouts with galvanized cast iron body, gas and water tight ABS tapered thread plug,with nickel bronze top 15.4..1 Dia 4"

Nos

85

47.250

4016.250

15.4.2 Dia 3"

Nos

3

47.250

141.750

15.5 Vent Hood Caps 15.5.1 Dia 4"

Nos

2

15.750

31.500

15.1.1 15.1.2 15.1.3 15.1.4 15.2

15.3

15.4

Bill No-1: Class Room + Administration Bldg (A)

1/15-46

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

17352.300

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-47

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

15.6

15.7

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

Gco Dia 6"

Nos

1

47.250

47.250

Dia 3" Planter drain

Nos

2

31.500

63.000

Nos Nos

8 2

78.750 31.500

630.000 63.000

15.8 Roof Rain water outlets 15.8.1 Dia 6" 15.8.2 Dia 4" 15.9

Dia 3"Funnel floor drain

Nos

18

68.250

1228.500

15.10

Toilet & kitchen fixtures as shown on the on arch drawings with chrome fittings of drainage accessories, flexible hoses etc. Ewc Awc Ablution hose Wash basin (counter) Wash basin (pedstal) Pantry sinks-single bowl LabSink-Single bowl LabSink-double bowl Shower Trays Drinking Fountain (Type-A)

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

50 12 62 42 8 7 65 2 1 6

105.000 105.000 5.250 94.500 94.500 126.000 262.500 315.000 105.000 294.000

5250.000 1260.000 325.500 3969.000 756.000 882.000 17062.500 630.000 105.000 1764.000

15.10.1 15.10.2 15.10.3 15.10.4 15.10.5 15.10.6 15.10.7 15.10.8 15.10.9 15.10.10 15.11

Cleaning, flushing and painting of all the drainage piping as per colour codes.

L.S.

L.S.

15.12

Builders work like including connecting pipes and gullys through cement pipes to manhole and covers for particular application and installation of toilet

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/15-48

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

34035.750

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-49

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

WATER SUPPLY Supply, installation, testing and commissioning of the following items & piping networks for buildings for hot and cold water supply system with fittings, valves, equipments, support and requiredpipe,fittings, valves, equipment, supports with pipe, accessories in all aspect as specified. NOTE : All exposed water supply piping on roof and inside roof shall be poly propylene, as per specification. 15.13

15.13.1 15.13.2 15.13.3 15.13.4 15.13.5 15.13.6 15.13.7 15.14

Water supply piping network from water tank to Including risers, with all accessories like gate valve, check valve. Dia 3" Dia 2" Dia 1 1/2" Dia 1 1/4" Dia 1" Dia 3/4" Dia 1/2" Polythelene water tanks (Shaded) including all accessories, fittings (float switches,inlet valve, drain valves, over flow and drain pipe up to required length etc) Cat and mouse water level indicator including all galvanized steel supports,frames and bases etc. complete 3000 gallon each.

15.14.1 Ditto - But Capacity 2000 gallon capacity for

MR MR MR MR MR MR MR

20 164 170 150 193 678 520

18.900 8.400 7.350 6.300 5.250 4.200 3.150

378.000 1377.600 1249.500 945.000 1013.250 2847.600 1638.000

Nos

5

840.000

4200.000

Nos

2

420.000

840.000

Nos Nos Nos

6 6 7

126.000 89.250 78.750

756.000 535.500 551.250

brackish water supply 15.15

Electric water heater pressure type with concealed valve, pressure and temperature relief valves, all fittings and accessories. 15.15.1 Unit Boiler 120 liter 15.15.2 Unit boiler of capacity 80 liters/each 15.15.3 Unit boiler of capacity 50 liters/each

Bill No-1: Class Room + Administration Bldg (A)

1/15-50

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

16331.700

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-51

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

15.16 Water filters 15.16.1 Central water filters of capacity 10 m3/hr 15.16.2 Unit filters for kitchen - Dia 1/2" 15.17

Booster pump set with pressure tank 200 ltr. Minimum capacity including all acccessories having capacity 40 Gpm @ 4 bar.

UNIT RATE KD

AMOUNT KD

Nos Nos

1 10

997.500 21.000

997.500 210.000

Nos

1

1312.500

1312.500

Notes : All the above rates to be including of the following : Submitting as-built drawings, providing all operation, instruction and maintenance materials etc.. Builders work related to all plumbing works including trenches, patching, chipping works etc. Electrical works related to all Plumbing services Testing and commissioning of all plumbing services

Bill No-1: Class Room + Administration Bldg (A)

1/15-52

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

2520.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-53

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

FIRE FIGHTING The tender drawing is for guidance only. Contractor should arranage the layout coordinated with all disciplines, submit calculation, catalogues for material and equipment for engineers approval and KFB. The BOQ is for guidance only. Contractor should quote for lump sum price including approval of KFB. 15.18

Black steel piping network suitable for welding type joints to schedule 40 seamless ( for sprinkler system from tank to pumps, pump rooms, by pass, risers etc. complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers. Dia 65mm

MR

30

15.750

472.500

MR MR MR

222 24 35

12.600 8.400 7.350

2797.200 201.600 257.250

L.S.

L.S.

525.000

525.000

Nos

18

288.750

5197.500

Nos

2

84.000

168.000

15.19

Galvanised steel piping suitable for threaded type joints to schedule 40 seamless complete with all fittings, flanges blank flanges,unions, fixation materials, supports and hangers. 15.19.1 Dia 50mm 15.19.2 Dia 40mm 15.19.3 Dia 32mm 15.20

Painting of all fire fighting piping (2 coats of primer and 2 coats of final finish painting) as per colour codes, labelling, flow direction marking and tags for valves.

15.21

FHC 80cm x 160cmx40 cm including 25mm fire hose reel 30m long manual swing type fire extinguisher as specified 6 kg Dry powder and 2 gallons water/gas

15.22

FC Fire extinguisher cabinet with 6 kg Dry powder and 2 gallons water/gas

Bill No-1: Class Room + Administration Bldg (A)

1/15-54

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

9619.050

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-55

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM 15.23

UNIT QTY

DESCRIPTION Automatic air vents Dia 25mm

UNIT RATE KD

AMOUNT KD

Nos

2

26.250

52.500

Electrical fire pumps of type vertical multistage with all accessories and 2 years maintenance in all aspect including pressure tanks (approval to be done) 15.24.1 Capacity of 200 gpm@ 5.5 bar-20 K.W

Nos

2

2625.000

5250.000

15.24.2 Valves and fittings

L.S.

L.S.

15.24.3 Suction pipe from firewater tank to pumps

L.S.

L.S.

Fire Pumps and Accessories 15.24

including all fittings, connection to all valves, mater, strainers, header Notes : All the above rates to be including of the following : Submitting as-built drawings, providing all operation, instruction & maintenance materials etc. Electrcial works related to all firefighting services Testing & commissioning of all firefighting services Builders work related to all firefighting works

Bill No-1: Class Room + Administration Bldg (A)

1/15-56

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

5302.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-57

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

Kgs. 31000

1.694

52503.150

M2

4500

3.033

13650.525

L.S.

L.S.

1575.000

1575.000

L.S.

L.S.

12600.000

12600.000

HVAC - GENERAL NOTES The following BOQ is for guidance only. Contractor is responsible to get approval from all local authorites. The BOQ is for guidance only. Contractor should quote for lump sum price including approval of MEW . Include in quotation all catalogues for equipments.

15.25

Duct Work Glavanized sheet metal duct work complete with required volume control dampers, joints, test holes/back draft dampers, air turning devices, duct access doors. As specified , shown and required for functioning the system..

Duct Insulation Perform iinsulation material secured around duct work complete with finishing and aluminium cladding etc. as specified. 15.27 Perform internal acoustic lining material secured on internal surface of duct as specified. 15.26

Air Outlets and Inlets 15.28 Air Outlets and Inlets, include on diffusers, Linear bar grilles, registers, exhaust air valves, louvers, 4' thick filter grilles etc. complete as specified.

Bill No-1: Class Room + Administration Bldg (A)

1/15-58

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

80328.675

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-59

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

15.29

15.29.1 15.29.2 15.29.3 15.29.4 15.29.5 15.29.6 15.29.7 15.29.8 15.29.9 15.29.10 15.29.11 15.29.12 15.30

15.30.1 15.30.2 15.30.3 15.30.4 15.30.5 15.30.6 15.30.7 15.30.8 15.30.9 15.30.10 15.31

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

Exhaust Fans complete with bird screen, back draft damper and other accessories as specified. E.F -01 , 2700 cfm E.F -02 , 200 cfm E.F -03 , 2925cfm E.F -04 , 300 cfm E.F -05,06 , 400cfm E.F -07, 400cfm E.F -08 , 600 cfm E.F -09 , 200 cfm E.F -10 , 400 cfm E.F -11 , 400 cfm E.F -12,13,14,17,18,19 , 200 cfm E.F -15-16 , 200 cfm

Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos Nos

1 1 1 1 2 1 1 1 1 1 6 2

5985.000

5985.000

Nos

2

3780.000

7560.000

Nos

4

3780.000

15120.000

Nos Nos Nos Nos Nos Nos Nos Nos

2 2 2 6 2 2 1 1

3780.000 3780.000 3780.000 3780.000 3780.000 3780.000 3780.000 3780.000

7560.000 7560.000 7560.000 22680.000 7560.000 7560.000 3780.000 3780.000

Nos

24

52.500

1260.000

Package Units

Package Unit complete with all accessories like filters ,mixing box etc as specified @ 115F PU-GF1&GF6 , 262800 BTU/Hr, 8750 cfm. PU-GF2&GF3&PU-GF5&GF8, 280000 BTU/Hr, 10000cfm PU-GF4&GF7, 200000 BTU/Hr, 7500cfm. PU-FF1&FF9, 280000 BTU/Hr., 10000 cfm PU-FF2&FF10, 262800 BTU/Hr. 8750cfm. PU-FF3 to FF8 , 262800 BTU/Hr. , 8750 cfm PU-SF1&SF6 , 315000 BTU/Hr.,12500 cfm PU-SF2&SF5, 280000 BTU/Hr. , 10000 cfm PU-SF3 ,271800 BTU/Hr., 9000 cfm PU-SF4 , 262800 BTU/Hr., 8750 cfm Automatic Control Sequence Electrical type wall mounted thermostats

97965.000

Total Carried to Collection Bill No-1: Class Room + Administration Bldg (A)

1/15-60

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

15.32 Refrigrant Piping / Condensate Drainnage piping Complete With Insulation , Hangers and cladding and insulation

L.S.

L.S.

1260.000

1260.000

15.33 Civil works related to A/C such as foundations, steel walkways over the piping on roof, openings and supporting structures, etc.

L.S.

L.S.

2625.000

2625.000

15.34 Allow for electrical works ( power, control and fire alarm) associated with HVAC works including cabling, wiring, switching, motor control panels with accessories and all other related works.

L.S.

L.S.

3675.000

3675.000

Bill No-1: Class Room + Administration Bldg (A)

1/15-61

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

7560.000

Total Carried to Collection ITEM

UNIT QTY

DESCRIPTION

UNIT RATE KD

AMOUNT KD

DIVISION - 15 MECHANICAL WORKS MEDICAL GAS SYSTEM, The following BOQ is for guidance only. Contractor shall verify the quantities as per tender documents without increase in price. Include in price all adjustment required by code or as per coordination with other disciplines. Contractor responsible to get approvals all authorities having jurisdictions. Contractor must attach a breakdown analysis for lumpsum items. 15.35

Supply and Installation of Medical Grade, Degreased Copper Pipes as per specification complete with all fixtures,insulation. MR MR MR MR MR MR

78 72 108 70 120 80

31.500 26.250 21.000 15.750 12.600 10.500

2457.000 1890.000 2268.000 1102.500 1512.000 840.000

15.36.1 Dia 2" 15.36.2 Central Gas regular 3Ø 15.36.3 Regulating valve Ø 2"

Nos Nos Nos

20 1 2

84.000 126.000 52.500

1680.000 126.000 105.000

Gas Cylinders Supply and Installation of Medical Grade GS12 gas cylinders 15.37.1 Gas Cylinders (spare)

Nos

8

52.500

420.000

15.35.1 15.35.2 15.35.3 15.35.4 15.35.5 15.35.6

15.36

Dia 3" Dia 2" Dia 1 1/4" Dia 1" Dia 3/4" Dia 1/2" Control valves Supply and Installation of Medical Grade, Degreased Control valves as per specification complete with all fixtures,insulation.

15.37

Bill No-1: Class Room + Administration Bldg (A)

1/15-62

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

12400.500

Total Carried to Collection ITEM DESCRIPTION

UNIT QTY

UNIT RATE KD

AMOUNT KD

15.38

Builders work related to Medical Gas euipment and Piping

L.S.

L.S.

525.000

525.000

15.39

Testing and commissioning of all medical gas services

L.S.

L.S.

315.000

315.000

L.S.

L.S.

26250.000

26250.000

Building Automation System (BAS) for Complete Project 15.40 Full building automation system (BAS) complete with controller (Lontalk) type and (Bac) net, protocols and all control panels,wiring, sensors,devices, transformers etc. as as per BAS specifications and system points list schedules for each equipment as per BAS drawings.

(This includes the connection of all services (plumbing, fire fighting, HVAC) to BAS system as per specification and drawings)

Bill No-1: Class Room + Administration Bldg (A)

1/15-63

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

27090.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/15-64

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

ITEM DESCRIPTION

AMOUNT KD

DIVISION - 15 MECHANICAL WORKS COLLECTION Page No. 15-1 Page No. 15-2 Page No. 15-3 Page No. 15-4 Page No. 15-5 Page No. 15-6 Page No. 15-7 Page No. 15-8 Page No. 15-9 Page No. 15-10 Page No. 15-11

Bill No-1: Class Room + Administration Bldg (A)

17352.300 34035.750 16331.700 2520.000 9619.050 5302.500 80328.675 97965.000 7560.000 12400.500 27090.000

1/15-65

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

310,505.475

TOTAL CARRIED TO SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/15-66

Mechanical work

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

L.S.

L.S.

9900.000

DIVISION 16 - ELECTRICAL General Consideration for all items: 16.1

The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables, wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work.

16.2

All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOE (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer. All works shall be carried out to comply with the BAS (Building Automation System) requirements. 16.3

The Contractor is reffered to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, wheather or not they are specifically mentioned within the items. 16.4

BUILDER WORK: All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholds, earth pits, ducts, trenches, cable tiles … etc. including supply and install 6" & 4" PVC ducts for MLTP, MSB's DB's cables as per shown in drawing and as per MOE (E&W) regulation. Including all ducts between ( LT, Panel and Transformer ) and H.T. duct for MOE (E&W) intake cable. And all civil work as per Drawings, Specification and the Approval of the Engineer.

Bill No-1: Class Room + Administration Bldg (A)

1/16-67

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-68

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

Section 16426 Distribution Equipment Supply, install and connect the following electrical board or S/Fs or DBs, including all cables, cable trays, access conduit, wiring, boxes, W/T Enclosure, earthing, labels name plates , wire and cables markers , foundation trenches , and All required for the connection with the Central Control Management and Monitoring System, etc., as MPW, MOE (E&W) requirements and as shown in the drawings. The Contractor Must Submit Detail For The Separate Phase Wire To Feed The Backup Battery For Approval, and He is Obligee to Achieve The Engineer Satisfaction. 16426 : Main Switch Board 16.5

Supply, install and connect the following main switch board (MSB), Sub-Main switch Boards (SMSB) complete with Conduits,wiring, earthing, cable glands, meters and all accessories as necessary, testing and commissioning to be ready for good working and all acording to drawings, specification and the Engineer approval.

16.5.01

MSB - A-G-1

No

1

3300.000

16.5.02

MSB - A-G-2

No

1

2640.000

16.5.03

MSB - PU-G

No

1

3168.000

16.5.04

MSB - A-F-1

No

1

2420.000

16.5.05

MSB - A-F-2

No

1

2420.000

16.5.06

MSB - PU-F

No

1

3300.000

16.5.07

MSB - A-S-1

No

1

2750.000

16.5.08

MSB - A-S-2

No

1

2970.000

16.5.09

MSB - A-PU-S

NO

1

2805.000

16.5.10

MSB - A-R

No

1

2475.000

16.5.11

MSB - FF

No

1

3300.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-69

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-70

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

16426 : Isolators and Switch Fuses& PANEL BOARDS 16.6

Supply, install and connect est and make necessary commissioning, complete with all necessary conduits feeding wirings and cables, earthing , HRC fuses, magnetic contactors ...etc. and all necessary accessories following electrical board and S/F , as per the drawing, specification, MOE (E&W) regulation, and approval of Engineer. All (S/F's, MCCB, ELCB, DB - AHU) protected by water tight enclosure. The following items fed from MSB - A-G-1-1 16.6.01

DB-A-G-02L

No

1

854.700

16.6.02

DB-A-G-02P

No

1

737.000

16.6.03

DB-A-G-03L

No

1

854.700

16.6.04

DB-A-G-03P

No

1

907.500

16.6.05

DB-A-G-05LP

No

1

693.000

16.6.06

DB-A-G-07L

No

1

836.000

16.6.07

DB-A-G-07P

No

1

902.000

16.6.08

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

1

192.500

16.6.09

15A TPN S/F in W.P.Enclosure for GU

No

1

88.000

The following items fed from MSB - A-G-1-2 16.6.10

DB-A-G-01L

No

1

825.000

16.6.11

DB-A-G-01P

No

1

495.000

16.6.12

DB-A-G-04L

No

1

495.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-71

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-72

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

16.6.16

DB-A-G-04P

No

1

Unit Price KD. Fils 385.000

16.6.17

DB-A-G-06L

No

1

660.000

16.6.18

DB-A-G-06P1

No

1

770.000

16.6.19

DB-A-G-06P2

No

1

412.500

16.6.20

DB-A-G-06P3

No

1

385.000

16.6.21

DB-A-G-08LP

No

1

825.000

16.6.22

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

1

313.500

No

1

89.100

No

2

385.000

Description

Item No.

Unit

Qty

The following items fed from DB-A-G-06P1 16.6.23

15A SPN S/F in W.P.Enclosure The following items fed from MSB - A-G-2-2

16.6.24

30A TPN S/F in W.P.Enclosure for GU The following items fed from MSB - A-F-1-1

16.6.25

DB-A - F -02L

No

1

660.000

16.6.26

DB-A - F -02P

No

1

660.000

16.6.27

DB-A - F -03L

No

1

632.500

16.6.28

DB-A - F -03P

No

1

660.000

16.6.29

DB-A - F -05LP

No

1

715.000

16.6.30

DB-A - F -07LP

No

1

715.000

16.6.31

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

1

220.000

No

1

385.000

The following items fed from MSB - A-F-1-2 16.6.32

30A TPN S/F in W.P.Enclosure for Klin room

Bill No-1: Class Room + Administration Bldg (A)

1/16-73

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-74

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

The following items fed from MSB - A-F-2-1 16.6.33

DB-A - F -01L

No

1

385.000

16.6.34

DB-A - F -01P

No

1

440.000

16.6.35

DB-A - F -04LP

No

1

275.000

16.6.36

DB-A - F -06LP

No

1

440.000

16.6.37

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

1

165.000

The following items fed from MSB - A-F-2-2 16.6.38

DB-A - S -02L

No

1

825.000

16.6.39

DB-A - S -02P

No

1

660.000

16.6.40

DB-A - S -03L

No

1

385.000

16.6.41

DB-A - S -03P1

No

1

660.000

16.6.42

DB-A - S -03P2

No

1

742.500

16.6.43

DB-A - S -03P3

No

1

605.000

16.6.44

DB-A - S -05LP

No

1

660.000

16.6.45

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

No

1

330.000

The following items fed from MSB - A-S-2 16.6.46

DB-A - S -01L

No

1

660.000

16.6.47

DB-A - S -01P1

No

1

605.000

16.6.48

DB-A - S -01P2

No

1

605.000

16.6.49

DB-A - S -01P3

No

1

825.000

16.6.50

DB-A - S -04LP

No

1

715.000

16.6.51

DB-A - S -06LP

No

1

770.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-75

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-76

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No. 16.6.52

30A TPN S/F in W.P.Enclosure for Water Cooler Type C

Unit

Qty

Unit Price KD. Fils

No

1

330.000

The following items fed from MSB - A-R 16.6.53

DB-A - Roof LP

No

1

440.000

16.6.54

DB-A - EX FAN

No

1

302.500

16.6.55

15A TPN S/F in W.P.Enclosure (for FAF-1&2, W.Pump 1&2)

No

4

66.000

The following items fed from MSB - F-F 16.6.56

Main Fire Pump -01

No

1

192.500

16.6.57

Main Fire Pump -02

No

1

192.500

The following items fed from DB-A - EX FAN 16.6.58

15A TPN S/F in W.P.Enclosure

No

4

82.500

16.6.59

15A SPN S/F in W.P.Enclosure 16140 : Electrical Points

No

14

66.000

16.7

Supply, install and connect to their respective DB's, the following points including conduit , wiring , draw boxes, outlet boxes , trenching, earthing, switches, accessories, cable, silicon wire, switches double pole switches and all requirements as specified and as shown in drawing and as per the approval of Engineer. 16.7.01

13 A switch / socket / outlet, 3 pin single socket

No

438

16.500

16.7.02

13 A switch / socket / outlet, 3 pin Twin socket

No

570

19.800

16.7.03

13 A W/T, 3 pin single socket, as specified and as per the drawing.

No

51

No

5

55.000

16.7.04

3 Compartment Under Floor Service Outlet Box complete with all accessories including the flexible connection to the Power , Telephone , and Data.

16.7.05

Junction box with 20A DP switch for F.C. Unit

No

7

27.500

16.7.06

Junction box with 20A DP switch for E. W. Heater

No

16

27.500

Bill No-1: Class Room + Administration Bldg (A)

1/16-77

39.600

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

16.7.07

Junction box with 20A DP switch for Fire A. C. Panel with AVA.

No

1

27.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-78

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

16.7.08

Junction box with 20A DP switch for W. Cooler

No

6

27.500

16.7.09

Junction box with 20A DP switch for Fume 16515 : Lighting

No

2

27.500

Lighting System 16.8

The price for the following items shall included the lighting points C/W wiring conduit, earthing, switches, push-button, ceiling rose, silicon wire and all accessories with supplying installation, connecting, testing and making ready for work of all, lighting fittings. The contractor should submit the fixation way of light fittings for approval.

16.8.01

Light Points

No

407

101.200

16.8.02

Exit sing + EM Light

No

49

13.200

No

1

550.000

16.8.03

Lighting control panel with all Push Buttons, labeling in grave and indication lambs (the indication Lampe shall indicate the on-off).

LIGHTING FITTINGS:

16.9

Supply light fitting complete with lamps, tubes , reflectors, diffusers , louvers , transformers , control gears , etc…and with all required fixing accessories , brackets , concrete bases , etc… all as shown on the drawings , specified and as required for proper operation, and as per the approval of the Engineer.

16.9.01

Type A

No

776

44.000

16.9.02

Type Ae

No

113

77.000

16.9.03

Type B

No

917

44.000

16.9.04

Type Be

No

99

77.000

16.9.05

Type E

No

205

60.500

16.9.06

Type E-EM

No

47

93.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-79

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

16.9.07

Type F

No

157

49.500

16.9.08

Type F-EM

No

18

77.000

16.9.09

Type G-70

No

86

93.500

16.9.10

Type H

No

109

55.000

16.9.11

Type H-EM

No

37

82.500

16.9.12

Type-EX

No

44

55.000

16.9.13

Type-EM

No

5

33.000

16.9.14

Type I

No

15

38.500

16.9.15

Type O

No

91

55.000

16.9.16

Type FL

No

12

82.500

16.9.17

Type M

No

229

60.500

16.9.18

Type M-EM

No

16

88.000

16.9.19

Type L

No

45

44.000

16.9.20

Type L-EM

No

45

71.500

16.9.21

Type Z

No

18

38.500

16.9.22

Type Z-EM

No

6

66.000

16.9.23

Type J

No

60

82.500

16.9.24

Type J-EM

No

5

110.000

16.9.25

Type N (1 x 3)

No

16

275.000

16.9.26

Type ST

No

6

27.500

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-80

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Description

Item No.

Unit

Qty

Unit Price KD. Fils

L.S.

L.S.

8250.000

16452 : Earthing 16.10

Supply, install and connect complete earthing system as per drawings, specification and MOE (E&W) regulation. Any additional earth electrodes needed shall be included without extra cost.

16.11

Prepare complete set of electrical and telephone as built drawings and get the approval from MOE (E&W) and MOC.

L.S.

L.S.

16.12

Testing and inspection of the electrical and telephone installation on completion and before being energized and get the approved by MOE (E&W) and MOC inspectors in accordance to the MOE (E&W) and MOC regulations and to the approved drawing.

L.S.

L.S.

16.13

Allow for submitting as built drawings, providing operation, instruction and maintenance manuals etc…

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/16-81

all

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection Description

Unit

No.

Qty

Unit Price KD. Fils

DIVISION 16 - ELECTRICAL (LOW VOLTAGE) General Consideration for all items: 16.14

The price for all the following items shall include the supply of all materials and equipment unless other wise specified, delivery to site installations , connections , testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes , switches, push-buttons, cable trays, trenches, supply steel frames, angles, beams, rods fixation, etc…. and all necessary accessories and components for complete and perfect installation ready for work. BUILDER WORK: All necessary Builder works required by the Engineer for Electrical installation i.e. Manholes, handholes, earth pits, ducts, trenches cable tiles … etc. 16.15

All works shall be carried out according to drawings, particular and general specifications, contract conditions and to the latest rules and regulations of MOP (E&W), MPW, MOC, Kuwait Fire Brigade and any other concerned authorities, and as approved by these authorities and approved by the Engineer. All works shall be carried out to comply with the BAS (Building Automation System) requirements. 16.16

The Contractor is referred to the specifications and Drawings for all details related to this section of the works and here is to include for complying with all the requirements contained therein, whether or not they are specifically mentioned within the items.

Bill No-1: Class Room + Administration Bldg (A)

1/16-82

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-83

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Unit

Qty

Unit Price KD. Fils

Description

Item No.

Section:16721 Fire Detection & Alarm System 16.17

Supply, install, connect, test and commission the fire detection and alarm system complete as per the drawings, specification and to the rules and regulation of Kuwait fire brigade and as per approval of Engineer. Work shall include all conduits , wiring, accessories and components.

16.17.01

Fire Alarm Control Panel complete with all accessories.

No

1

2585.000

16.17.02

Fire Alarm Active mimic display panel

No

1

1750.000

16.17.03

Main operating , display graphics and programming terminal with processor.

No

1

4400.000

16.17.04

Logging and event system printer.

No

1

275.000

16.17.05

Optical smoke detector ( addressable type).

Nos

235

38.500

16.17.06

Heat Detector (addressable type).

Nos

11

38.500

16.17.07

Duct Detector (addressable type).

Nos

20

137.500

16.17.08

Fire alarm manual call point (addressable type).

Nos

10

38.500

16.17.09

Local alarm horn.

Nos

35

55.000

16.17.10

Connection up to Motorized Dampers, Doors Opener, HVAC control panels, elevator control panels, sprinkler flow switches, Air pressure fans, Smoke and Fresh air Fans…etc.

L.S.

L.S.

825.000

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-84

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Item No.

Description

Unit

Qty

Unit Price KD. Fils

Section:16740 Telephone System - Cabling 16.18

Supply, install, connect, test and make ready for works the following Telephone System including conduits, wire, terminal boxes, draw boxes, socket outlet, all as per schematic, drawings

16.18.01

telephone socket outlets

Nos

151

38.500

16.18.02

MDF

Nos

1

715.000

16.18.03

TTB-A-F(80X90X15 CM)

Nos

1

550.000

16.18.04

TTB-A-S(70X80X15 CM)

Nos

1

440.000

16.18.05

TTB-A-F (80x90x15cm)

Nos

1

550.000

16.18.06

TTB-A-S (70x80x15cm)

Nos

1

440.000

16.18.7

Any other missing items required for full functioning of the job (if any)

L.S.

L.S.

Bill No-1: Class Room + Administration Bldg (A)

1/16-85

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection Item

Description

Unit

Qty

Unit Price KD. Fils

No No No No No No No No No No Nos No Nos No Nos

1

2200.000 385.000 1375.000 220.000 132.000 82.500 1430.000 330.000 1265.000 132.000 495.000 715.000

No.

Section 16750 Audio Visual System 16.23

16.23.4

Supply, install, connect test and make ready for works, Sound system including all, conduit, boxes, draw boxes, terminal boxes wires, connection of Gl conduit, The price for the sound system shall include the supply of all materials and equipment delivery to site,installations, connections, testing, commissioning and making ready for work complete with all necessary cables wiring, earthing, conduits, draw and outlet boxes, switches , push-buttons , cable trays, and all work required to make the work done. All should be as per the contract drawing and the approval of Engineer.

Seminar Hall

16.23.4.01 Data And Video Projector 4000 ANSI Lumens 16.23.4.02 Rear Projection Lens 16.23.4.03 Rear projection screen 16.23.4.04 Rear Projection screen frame 16.23.4.05 DVD 16.23.4.06 VCR 16.23.4.07 Visualizer 16.23.4.08 PC interface 16.23.4.09 Hide away unit 16.23.4.10 AV switcher 16.23.4.11 Power amplifier 16.23.4.12 Mixer and preamplifier 16.23.4.13 Sub waffer speaker 16.23.4.14 Monitoring panel 16.23.4.15 Stage speaker

Bill No-1: Class Room + Administration Bldg (A)

1/16-86

1 1 1 1 1 1 1 1 1 3 1 2 1 6

385.000 275.000

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Collection

Bill No-1: Class Room + Administration Bldg (A)

1/16-87

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

DESCRIPTION

PAGE NO

DIVISION 16 - ELECTRICAL

COLLECTION

Page No. 16-1 Page No. 16-2 Page No. 16-3 Page No. 16-4 Page No. 16-5 Page No. 16-6 Page No. 16-7 Page No. 16-8 Page No. 16-9 Page No. 16-10 Page No. 16-11 Page No. 16-12 Page No. 16-13 Page No. 16-14

Bill No-1: Class Room + Administration Bldg (A)

1/16-88

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Carried to Summary

Bill No-1: Class Room + Administration Bldg (A)

1/16-89

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

9900.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-90

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪9900.000‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-91‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

3300.000 2640.000 3168.000 2420.000 2420.000 3300.000 2750.000 2970.000

2475.000 3300.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-92

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪28743.000‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-93‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

854.700 737.000 854.700 907.500 693.000 836.000 902.000 192.500 88.000

825.000 495.000 495.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-94

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪7880.400‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-95‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils 385.000 660.000 770.000 412.500 385.000 825.000 313.500

89.100

770.000

660.000 660.000 632.500 660.000 715.000 715.000 220.000

385.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-96

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪9257.600‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-97‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

385.000 440.000 275.000 440.000 165.000

825.000 660.000 385.000 660.000 742.500 605.000 660.000 330.000

660.000 605.000 605.000 825.000 715.000 770.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-98

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪20395.100‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-99‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils 330.000

440.000 302.500 264.000

192.500 192.500

330.000 924.000

7227.000 11286.000 2019.600

275.000

192.500 440.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-100

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪27.500‬‬ ‫‪2975.500‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-101‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils 165.000 55.000

41188.400 646.800 550.000

34144.000 8701.000 40348.000 7623.000 12402.500 4394.500 42605.200

Bill No-1: Class Room + Administration Bldg (A)

1/16-102

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils 7771.500 1386.000 8041.000 5995.000 3052.500 2420.000 165.000 577.500 5005.000 990.000 13854.500 1408.000 1980.000 3217.500 693.000 396.000 4950.000 550.000 4400.000 165.000 50666.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-103

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

8250.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-104

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

8250.000 Total Price KD. Fils

Bill No-1: Class Room + Administration Bldg (A)

1/16-105

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-106‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

2585.000 1750.000 4400.000

275.000 9047.500 423.500 2750.000 385.000 1925.000 825.000

24366.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-107

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

5813.500 715.000 550.000 440.000 550.000 440.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-108

ELECTRICAL WORKS

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

8508.500 Total Price KD. Fils

2200.000 385.000 1375.000 220.000 132.000 82.500 1430.000 330.000 1265.000 132.000 1485.000 715.000 385.000 1650.000

Bill No-1: Class Room + Administration Bldg (A)

1/16-109

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪2035.000‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-110‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

2011- 2010/ 70/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

Total Price KD. Fils

9900.000 28743.000 7880.400 9257.600 20395.100 2975.500 42605.200

Bill No-1: Class Room + Administration Bldg (A)

1/16-111

ELECTRICAL WORKS

‫المناقصة رقم ‪/‬م ع ‪2011- 2010/ 70/‬‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ ‫بنين‪ /‬بمنطقة الرميثيه قطعة ‪10‬‬

‫‪121756.800‬‬

‫‪ELECTRICAL WORKS‬‬

‫‪1/16-112‬‬

‫)‪Bill No-1: Class Room + Administration Bldg (A‬‬

PART SUMMARY - 1

PAGE NO.

DIVISION NO.

2-2

2

SITE WORKS

37443.000

3-4

3

CONCRETE

839676.500

4-2

4

MASONRY

99562.000

5-3

5

METAL WORKS

28224.700

6-2

6

WOOD AND PLASTIC

5265.000

7-3

7

THERMAL AND MOISTURE PROTECTION

62092.750

8-4

8

DOORS AND WINDOWS

179313.000

9-6

9

FINISHES

335210.700

10-3

10

SPECIALTIES

47354.000

12-3

12

FURNISHINGS

14-2

14

CONVEYING SYSTEM

15-12

15

MECHANICAL WORKS

16-14

16

ELECTRICAL WORKS

Bill No-1: Class Room + Administration Bldg (A)

TITLE

2011- 70/2010/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

1/SUM-1

AMOUNT KD

310505.475

PART SUMMARY-1

2011- 70/2010/ ‫م ع‬/ ‫المناقصة رقم‬ ‫إنشاء وإنجاز وصيانة مدرسة ثانوية‬ 10 ‫ بمنطقة الرميثيه قطعة‬/‫بنين‬

PART SUMMARY - 1

TOTAL CARRIED TO MAIN SUMMARY

Bill No-1: Class Room + Administration Bldg (A)

1/SUM-1

KD

1944647.125