INSPECTION AND TEST PLAN Contract No. Job No. Client Project Location
:
PLG-SA-200-MR-MC-0005
: : : :
G- 2001 PT. PLN PERSERO PLTU LAMPUNG 2x100 MW Tanjung Selaki - Tarahan
INSTALLATION OF INSTALLATION BOILER FEED PUMP
ITEM ACTIVITIES
NO
1.0
REFERENCE DOCUMENT
VERIFYING DOCUMENT
Project Specification / Applicable Codes and Standards
Approved Tech. Spec
Project Specifica Applicable Code Standards
Project Specification, Inspection and Test Plan
Approved ITP
Project Specifica Applicable Code Standards
Approval Drawing
Approved Drawing with Last revision
Approval Draw
Material Receiving, Handling And Storage Procedure.
Inspection Report ( MRR or Release Notes )
As Per Packing
Material Receiving, Handling And Storage Proc
Mill Certificate
Material Receiving, Handling And Storage Procedure
Material Receiving Non Conformance report
Project Specific
Approved drawing
Release note for Hand Over, Inspection Report
Approval Drawing Feed Water Pu
ACCEPTANCE CR
SPECIFICATION, PROCEDURE, CONTRACT DOCUMENT REVIEW : a. Technicall Specification a.1. Review Client’s approved technical Specification a.2. Finalized deviation, amendments or Queries b. QA/QC Document b.1. Review Client’s approved Inspection Test Plan (ITP) c. Drawing Control c.1. Review Client’s approved drawings
2.0
RECEIVING MATERIAL a. Check material received are in line with delivery note, PO Packing List (Material spec/size/quantity), Visually inspection for iregularities of surface b. Check mill certificate against material received c. Material without mill certificate or without any correlation between mill certificate and material shall be considered irrelevant material than report to Client
3.0
Related Material Standard
HAND OVER CIVIL WORK TO MECHANICAL WORK a. Establish main Civil setting points/datum are correct b. Check location, center line and elevation of Foundation
Lampung Coal fire st
INSPECTION AND TEST PLAN Contract No. Job No. Client Project Location
:
PLG-SA-200-MR-MC-0005
: : : :
G- 2001 PT. PLN PERSERO PLTU LAMPUNG 2x100 MW Tanjung Selaki - Tarahan
INSTALLATION OF INSTALLATION BOILER FEED PUMP
ITEM ACTIVITIES
NO
REFERENCE DOCUMENT
VERIFYING DOCUMENT
ACCEPTANCE CR
Approved drawing
Release note for Hand Over, Inspection Report
Approval Drawing Feed Water Pu
Project Specification, Approved Drawing
Inspection Report
Technical specifi Approved Draw
Project Specification, Approved Drawing
Inspection Report
Technicall Specifi Approved Draw
c. Check center line and elevation of anchor bolt 4.0
MOTOR, FLUID COUPLING, FLUID COUPLING TANK, INLET & OUTLET OF FEED PUMP a. Location, centerline and elevation check b. Alignment check c. Tightening To Correct Tension
5.0
CHECKING MECHANICAL COMPLETION OF INSTALLATION BOILER FEED PUMP
ng Coal fire steam Power Plant 2X100 MW Project
Doc No Sheet No Revision No Date Prepared by:
EPTANCE CRITERIA
: : 4 of 4
:0 : 01-FEB-11 : QA/QC
LEVEL OF INSPECTION GKE
ADHI
PLN
oject Specification / plicable Codes and Standards
R
R
R/A
oject Specification / plicable Codes and Standards