BMS Single Line Diagram & Schedule of Points
December 22, 2016 | Author: Chim Con | Category: N/A
Short Description
Download BMS Single Line Diagram & Schedule of Points...
Description
OWNER KINGDOM OF SAUDI ARABIA
A
MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046
GENERAL NOTES: BUILDING MANAGEMENT SYSTEM 1. BUILDING MANAGEMENT SYSTEM (BMS) SHALL UTILIZE LONWORKS PROTOCOL. 2. DIRECT DIGITAL CONTROLLERS (DDCs) TO BE USED SHALL BE FULLY STAND-ALONE DEFINED BY HAVING ITS OWN INTERNAL CLOCK, DATA GATHERING MEMORY BANK AND CENTRAL PROCCESSING UNIT. 3. EACH DDC PANEL SHALL BE CAPABLE OF ACTING INDEPENDENTLY FROM THE BMS NETWORK. CONTROL AND MONITORING PROGRAMS OF EACH DDC POINT SHALL STILL BE IN EFFECT EVEN IN CASES OF DISCONNECTION FROM THE NETWORK DUE TO TECHNICAL / INCIDENTAL MATTERS. 4. HIGH LEVEL INTERFACE VIA RS 232/485 COMMUNICATION LINK SHALL BE REQUIRED FOR A SELECTED ELECTRO-MECHANICAL EQUIPMENT FOR ACCURATE DATA GATHERING. THE HIGH LEVEL INTERFACE INCLUDES A THIRD PARTY INTERFACE WHICH IS DIFFERENT FROM THE LON WORKS PROTOCOL USED BY THE BMS WHICH INCLUDES MODBUS, BACNET,PROFIBUS, ETC. THE CONTRACTOR SHALL PROVIDE THE NECESSARY DEVICES TO THE ADAPT THE THIRD PARTY INTERFACE TO THE PRIMARY NETWORK PROTOCOL 5. THE BMS CONTRACTOR SHALL CONSIDER IN THE BMS OPERATIONS PROGRAMMING THE REDUNDANCY OF DATA GATHERING AND OPERATIONS. 6. THE BMS CONTRACTOR SHALL CONSIDER PROVISION OF THE THIRD PARTY INTERFACE TO OTHER SYSTEMS IN THE BUILDING SUCH AS; A. FIRE ALARM SYSTEM B. SECURITY SYSTEM (CCTV (SURVEILLANCE SYSTEM) AND ACCESS CONTROL) C. LIGHTING CONTROL SYSTEM D. OTHER ELECTRO-MECHANICAL SYSTEMS 7. THE PURPOSE OF THE SCHEMATIC DIAGRAM IS TO PROVIDE THE GENERAL CONCEPT AND PRINCIPLE OF THE PROPOSED KFMC BUILDING MANAGEMENT SYSTEM (BMS). 8. THE EQUIPMENT AND DEVICES REFLECTED ON THE PLANS ARE INDICATIVE ONLY. THE BMS CONTRACTOR SHALL FURNISH THE WHOLE SYSTEM TO INCLUDE ALL CABLES, DEVICES, FIELD DEVICES, ACCESSORIES, SOFTWARE PROGRAMMING, AND ENGINEERING WORKS AS MAY DEEM NECESSARY FOR A COMPLETE AND SUCCESSFUL OPERATION OF THE SYSTEM. 9. ALL BMS POINTS INDICATED ON THE PLAN ARE INDICATIVE ONLY. THE CONTRACTOR SHALL ENSURE THAT ALL BMS CONTROL POINTS REQUIRED FOR THE ELECTRO-MECHANICAL OPERATIONS ARE COMPLETELY CONSIDRED. 10. THE BMS CONTRACTOR SHALL PROVIDE AND SUBMIT THE ACTUAL CONTROL AND MONITORING DIAGRAM (SHOP DRAWINGS) FOR EACH SYSTEM OR EQUIPMENT FOR THE APPROVAL OF THE CONSULTANT PRIOR TO INSTALLATION. 11. BMS CONTRACTOR SHALL DETERMINE THE SIZES OF DDC ENCLOSURES WITH CONSULTANTS APPROVAL PRIOR TO INSTALLATION. 12. BMS TERMINAL BOXES SHALL INCLUDE REPEATER CIRCUITS. THE BMS CONTRACTOR SHALL DETERMINE EXACT QUANTITY OF REPEATERS , WHENEVER NECESSARY. 13. THE UNIT RATE FOR EACH BMS POINT SHALL INCLUDE THE FOLLOWING WORKS:
A
RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
A. DIRECT DIGITAL CONTROLLERS (DDC'S) AND ALL ASSOCIATED ACCESSORIES. B. ALL COMMUNICATION / CONTROL SIGNAL CABLES, CONDUITS / TRUNKING, TERMINATION, ETC. C. ALL FIELD SENSORS, DEVICES INCLUDING FLOW METER. DIFFERENTIAL PRESSURE SWITCH, TEMPERATURE SENSORS, ETC. D. SOFTWARE AND PROGRAMMING. E. GRAPHIC GENERATION AND TREND LOGGING. F. ELECTRICAL TERMINAL, CONTRACTORS, MARSHALING BOX, ETC. G. TESTING AND COMMISSIONING.
A
RIYADH, SAUDI ARABIA
14. THE BMS CONTRACTOR SHALL CONSIDER THE SPARE POINTS IN THE BMS POINTS LIST. 15. THE BMS CONTRACTOR SHALL CONSIDER THE REQUIRED BMS POINTS IN THE OPERATION OF OTHER ELECTRO-MECHANICAL EQUIPMENT REQUIRED IN THE ELECTRO-MECHANICAL DESIGN BUT NOT EXACLTY MENTIONED IN THE ATTACHED BMS POINTS LIST. ANY BMS POINTS NOT CONSIDERED BY THE BMS CONTRACTOR ON THE BMS PACKAGE BUT REQUIRED IN THE SYSTEM OPERATION SHALL BE UNDER THE RESPONSIBILITY OF THE BMS CONTRACTOR . NO ADDITIONAL COST AND TIME SHALL BE PROVIDED TO THE CONTRACTOR. 16. THE SUPPLY OF ALL NECESSARY INTERFACE / TRANSDUCERS / MODULE /ACCESSORIES FOR EFFECTIVE BMS/ FA INTERLOCKS / CONTROLS / MONITORING, ETC. AS DEFINED IN THE RELEVANT SPECIFICATION CLAUSE SHALL BE INCLUDE IN THE BMS CONTRACTOR'S SCOPE OF WORKS. 17. ALL WIRING INSTALLATION WORKS SHALL BE IN ACCORDANCE WITH THE NEC AND SASO STANDARDS.
NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
LEGEND: PB
DDC
- 400mm (W) x 400mm (H) x 200mm (D) (OR SIZE AS REQUIRED) - DIRECT DIGITAL CONTROLLER - HIGH LEVEL INTERFACE
HLI BMS
- BUILDING MANAGEMENT SYSTEM
Generator Priority Loading - KFMC Priority 1 - Life Safety Loads/Critical Loads Life Safety Branch: a. Illumination of means of egress. b. Exit lighting fixtures. c. Alarm and alerting systems such as fire alarm and medical gas systems. d. Communication systems : if used during emergency conditions, they shall include: (1) Disaster Control or emergency communication centers, i.e. communication equipment, selected receptacles, and task illumination (2) Public address system (PA). (3) Nurse Call System e. Generator set location : typical for all task illumination, battery charger for emergency battery powered lighting, and selected receptacles, and f. Elevators: cab lighting, control intercom, signal systems, and elevator machine room lighting. g. Fire Pumps h. Smoke Control and Stair Pressurization System
REFERENCE DRAWINGS
The Critical Branch
DESCRIPTION
DWG. NOS
a. Data Centre / Building Management System Priority 2 - Equipment System necessary for Hospital Operations 1. Arrange the following equipment for delayed-automatic connection to the alternate power source thru BMS:
A
a. Central Suction Systems b. Sump pumps and associated controls and alarm systems c. Compressed air system/Medical gas systems d. Kitchen hood Supply e. Heating, ventilating, and air-conditioning (HVAC) systems for all types of Clean Rooms i.e. ICU, Surgical Suites, Isolation Rooms, CT Scanners, Proton Theraphy, Linear accelerator, UPS & Battery rooms, BMS rooms, Server rooms, etc. f. Closed loop water chilling equipment for linear accelerator, Proton Therapy, CT Scanners and other medical equipment. Priority 3 - Equipment System necessary for Patient Care 1. Arrange the following equipment for delayed-automatic or manual connection to the alternate power source thru the BMS; a. Heating equipment; b. Equipment and control systems for elevators; c. General supply, return, and exhaust ventilating systems serving common basement, toilets and stores; d. Proton Therapy cooling system; e. Automatically operated doors. f. Minimal electrically heated autoclaving equipment shall be permitted to be arranged for either automatic or manual connection to the alternate source.
KEY PLAN
Priority 5 - Other Loads not included above In case of one unit of genset as well as the standby genset break down the reverse sequence of operation will be observed i.e. Priority 5 will be the first to be shed.
1
2
3
4
5
6
7
8
A
REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SYSTEMPOINT LIST, GEN. NOTES, & LEGEND
A
BMS SYSTEM POINT LIST, GEN. NOTES, & LEGEND N.T.S
SHEET NO.
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
RIYADH, SAUDI ARABIA
NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
KEY PLAN
1
2
3
4
5
6
7
8
REVISION NO.
DESCRIPTION
DATE
BMS SYSTEM POINT LIST FOR CSB (ADDITIONAL) N.T.S
DAR PROJECT NUMBER
DB-12 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SYSTEM POINT LIST FOR CSB (ADDITIONAL)
SHEET NO.
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
RIYADH, SAUDI ARABIA
NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
KEY PLAN
1
2
3
4
5
6
7
8
REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS CONTROL DIAGRAM
BMS CONTROL DIAGRAM N.T.S
SHEET NO.
M5.00.02
JF
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
RIYADH, SAUDI ARABIA
TYPICAL PARKING SUPPLY FAN
TYPICAL PARKING EXHAUST/ SMOKE FAN
NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
KEY PLAN
1
2
3
4
5
6
7
8
REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS CONTROL DIAGRAM
SHEET NO.
M5.00.03
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
RIYADH, SAUDI ARABIA
NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
KEY PLAN
1
2
3
4
5
6
7
8
REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS CONTROL DIAGRAM
SHEET NO.
M5.00.04
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY PB
PB
P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
PB
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER
PB
DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
PB PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB PB
PB
PB
PB
RIYADH, SAUDI ARABIA PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
PB
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB PB VAV DDC
PB
VAV DDC
NOTES:
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
VAV DDC
VAV DDC
PB HLI
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
PB
HLI
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
PB
PB HLI
2.
PB PB
VAV DDC
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
PB PB
VAV DDC
1.
PB
PB
PB VAV DDC
PB
VAV DDC
PB
REFERENCE DRAWINGS DESCRIPTION
VAV DDC
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
VAV DDC
HLI
HLI
PB HLI
DWG. NOS
HLI
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
HLI
HLI
PB VAV DDC
HLI
VAV DDC
PB
PB VAV DDC
VAV DDC
KEY PLAN PB
PB
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
PB
PB VAV DDC
PB
PB
VAV DDC
PB VAV DDC
VAV DDC
PB
REVISION NO.
PB
DESCRIPTION
DATE
PB
PB
PB
PB
PB HLI
PB HLI
HLI
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM SHEET NO.
BMS SINGLE LINE DIAGRAM N.T.S
M5.00.05
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
PB HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
RIYADH, SAUDI ARABIA
PB HLI
NOTES:
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
HLI
HLI
HLI
PB HLI
HLI
HLI
HLI
HLI
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
KEY PLAN
PB REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
HLI
14381.000
PB
DATE HLI
HLI
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM PART-1 SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-1 N.T.S
M5.00.06
PB
PB PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
OWNER PB
KINGDOM OF SAUDI ARABIA
PB PB VAV DDC
VAV DDC
VAV DDC
MINISTRY OF HEALTH KING FAHAD MEDICAL CITY
VAV DDC
P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC.
PB
235 E. MAIN STREET, SUITE 102C
PB
NORTHVILLE, MI 48167, U.S.A.
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
PB
PB PB
CAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
CAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
CAV DDC
VAV DDC
CAV DDC
CAV DDC
CAV DDC
CAV DDC
VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
PB VAV DDC
VAV DDC
RIYADH, SAUDI ARABIA
NOTES:
VAV DDC
PB VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
VAV DDC
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
REFERENCE DRAWINGS VAV DDC
VAV DDC
DESCRIPTION
DWG. NOS
PB VAV DDC
VAV DDC
PB
PB VAV DDC
KEY PLAN
PB VAV DDC
PB VAV DDC
PB
PB
REVISION NO.
DESCRIPTION
DATE
PB
PB
PB
DAR PROJECT NUMBER
DB-09/10/11
PB
HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM PART-2 SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-2 N.T.S
M5.00.07
OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA
PB
HLI
HLI
HLI
HLI
HLI
HLI
HLI RIYADH, SAUDI ARABIA
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB NOTES: 1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
PB VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
PB VAV DDC
VAV DDC
PB VAV DDC
PB
VAV DDC KEY PLAN
PB VAV DDC
PB
VAV DDC
PB
REVISION NO.
PB
DESCRIPTION
DATE
PB VAV DDC
PB
VAV DDC
VAV DDC
VAV DDC
DAR PROJECT NUMBER
PB
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM PART-3 SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-3 N.T.S
M5.00.08
DDC
DDC
DDC
PB
OWNER
PB
VAV DDC
VAV DDC
KINGDOM OF SAUDI ARABIA
VAV DDC
MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER PB
PB
VAV DDC
VAV DDC
PB
DAR ENGINEERING P.O. BOX 301
VAV DDC
RIYADH 11411, SAUDI ARABIA
RIYADH, SAUDI ARABIA
VAV DDC
VAV DDC
NOTES: HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
HLI
PB
PB VAV DDC
HLI
1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
VAV DDC
PB
REFERENCE DRAWINGS DESCRIPTION VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB VAV DDC
VAV DDC
DWG. NOS
PB VAV DDC
VAV DDC
KEY PLAN
PB
PB
REVISION NO.
DESCRIPTION
DATE
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM PART-4 SHEET NO.
BMS SINGLE LINE DIAGRAM AREA-4 N.T.S
M5.00.09
PB OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA
CONSULTING ARCHITECT HKS ARCHITECTS, PC.
HLI
HLI
HLI
HLI
HLI
HLI
235 E. MAIN STREET, SUITE 102C
HLI
NORTHVILLE, MI 48167, U.S.A.
HLI
HLI
HLI
HLI
HLI
HLI
CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER
HLI
DAR ENGINEERING P.O. BOX 301
PB
RIYADH 11411, SAUDI ARABIA
PB VAV DDC
VAV DDC
RIYADH, SAUDI ARABIA
PB VAV DDC
VAV DDC
NOTES: PB VAV DDC
VAV DDC
1.
FOR GENERAL NOTES REFER TO DWG. # M5.00.01
2.
DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.
3.
FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
PB
REFERENCE DRAWINGS DESCRIPTION
DWG. NOS
PB
KEY PLAN
PB VAV DDC
VAV DDC
VAV DDC
VAV DDC
PB
REVISION NO.
PB VAV DDC
DESCRIPTION
DATE
PB
VAV DDC
DAR PROJECT NUMBER
DB-09/10/11 HKS PROJECT NUMBER
14381.000 DATE
15 APRIL, 2012 ISSUE
TENDER ISSUE SHEET TITLE
BMS SINGLE LINE DIAGRAM SHEET NO.
BMS SINGLE LINE DIAGRAM N.T.S
M5.00.10