BMS Single Line Diagram & Schedule of Points

December 22, 2016 | Author: Chim Con | Category: N/A
Share Embed Donate


Short Description

Download BMS Single Line Diagram & Schedule of Points...

Description

OWNER KINGDOM OF SAUDI ARABIA

A

MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046

GENERAL NOTES: BUILDING MANAGEMENT SYSTEM 1. BUILDING MANAGEMENT SYSTEM (BMS) SHALL UTILIZE LONWORKS PROTOCOL. 2. DIRECT DIGITAL CONTROLLERS (DDCs) TO BE USED SHALL BE FULLY STAND-ALONE DEFINED BY HAVING ITS OWN INTERNAL CLOCK, DATA GATHERING MEMORY BANK AND CENTRAL PROCCESSING UNIT. 3. EACH DDC PANEL SHALL BE CAPABLE OF ACTING INDEPENDENTLY FROM THE BMS NETWORK. CONTROL AND MONITORING PROGRAMS OF EACH DDC POINT SHALL STILL BE IN EFFECT EVEN IN CASES OF DISCONNECTION FROM THE NETWORK DUE TO TECHNICAL / INCIDENTAL MATTERS. 4. HIGH LEVEL INTERFACE VIA RS 232/485 COMMUNICATION LINK SHALL BE REQUIRED FOR A SELECTED ELECTRO-MECHANICAL EQUIPMENT FOR ACCURATE DATA GATHERING. THE HIGH LEVEL INTERFACE INCLUDES A THIRD PARTY INTERFACE WHICH IS DIFFERENT FROM THE LON WORKS PROTOCOL USED BY THE BMS WHICH INCLUDES MODBUS, BACNET,PROFIBUS, ETC. THE CONTRACTOR SHALL PROVIDE THE NECESSARY DEVICES TO THE ADAPT THE THIRD PARTY INTERFACE TO THE PRIMARY NETWORK PROTOCOL 5. THE BMS CONTRACTOR SHALL CONSIDER IN THE BMS OPERATIONS PROGRAMMING THE REDUNDANCY OF DATA GATHERING AND OPERATIONS. 6. THE BMS CONTRACTOR SHALL CONSIDER PROVISION OF THE THIRD PARTY INTERFACE TO OTHER SYSTEMS IN THE BUILDING SUCH AS; A. FIRE ALARM SYSTEM B. SECURITY SYSTEM (CCTV (SURVEILLANCE SYSTEM) AND ACCESS CONTROL) C. LIGHTING CONTROL SYSTEM D. OTHER ELECTRO-MECHANICAL SYSTEMS 7. THE PURPOSE OF THE SCHEMATIC DIAGRAM IS TO PROVIDE THE GENERAL CONCEPT AND PRINCIPLE OF THE PROPOSED KFMC BUILDING MANAGEMENT SYSTEM (BMS). 8. THE EQUIPMENT AND DEVICES REFLECTED ON THE PLANS ARE INDICATIVE ONLY. THE BMS CONTRACTOR SHALL FURNISH THE WHOLE SYSTEM TO INCLUDE ALL CABLES, DEVICES, FIELD DEVICES, ACCESSORIES, SOFTWARE PROGRAMMING, AND ENGINEERING WORKS AS MAY DEEM NECESSARY FOR A COMPLETE AND SUCCESSFUL OPERATION OF THE SYSTEM. 9. ALL BMS POINTS INDICATED ON THE PLAN ARE INDICATIVE ONLY. THE CONTRACTOR SHALL ENSURE THAT ALL BMS CONTROL POINTS REQUIRED FOR THE ELECTRO-MECHANICAL OPERATIONS ARE COMPLETELY CONSIDRED. 10. THE BMS CONTRACTOR SHALL PROVIDE AND SUBMIT THE ACTUAL CONTROL AND MONITORING DIAGRAM (SHOP DRAWINGS) FOR EACH SYSTEM OR EQUIPMENT FOR THE APPROVAL OF THE CONSULTANT PRIOR TO INSTALLATION. 11. BMS CONTRACTOR SHALL DETERMINE THE SIZES OF DDC ENCLOSURES WITH CONSULTANTS APPROVAL PRIOR TO INSTALLATION. 12. BMS TERMINAL BOXES SHALL INCLUDE REPEATER CIRCUITS. THE BMS CONTRACTOR SHALL DETERMINE EXACT QUANTITY OF REPEATERS , WHENEVER NECESSARY. 13. THE UNIT RATE FOR EACH BMS POINT SHALL INCLUDE THE FOLLOWING WORKS:

A

RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

A. DIRECT DIGITAL CONTROLLERS (DDC'S) AND ALL ASSOCIATED ACCESSORIES. B. ALL COMMUNICATION / CONTROL SIGNAL CABLES, CONDUITS / TRUNKING, TERMINATION, ETC. C. ALL FIELD SENSORS, DEVICES INCLUDING FLOW METER. DIFFERENTIAL PRESSURE SWITCH, TEMPERATURE SENSORS, ETC. D. SOFTWARE AND PROGRAMMING. E. GRAPHIC GENERATION AND TREND LOGGING. F. ELECTRICAL TERMINAL, CONTRACTORS, MARSHALING BOX, ETC. G. TESTING AND COMMISSIONING.

A

RIYADH, SAUDI ARABIA

14. THE BMS CONTRACTOR SHALL CONSIDER THE SPARE POINTS IN THE BMS POINTS LIST. 15. THE BMS CONTRACTOR SHALL CONSIDER THE REQUIRED BMS POINTS IN THE OPERATION OF OTHER ELECTRO-MECHANICAL EQUIPMENT REQUIRED IN THE ELECTRO-MECHANICAL DESIGN BUT NOT EXACLTY MENTIONED IN THE ATTACHED BMS POINTS LIST. ANY BMS POINTS NOT CONSIDERED BY THE BMS CONTRACTOR ON THE BMS PACKAGE BUT REQUIRED IN THE SYSTEM OPERATION SHALL BE UNDER THE RESPONSIBILITY OF THE BMS CONTRACTOR . NO ADDITIONAL COST AND TIME SHALL BE PROVIDED TO THE CONTRACTOR. 16. THE SUPPLY OF ALL NECESSARY INTERFACE / TRANSDUCERS / MODULE /ACCESSORIES FOR EFFECTIVE BMS/ FA INTERLOCKS / CONTROLS / MONITORING, ETC. AS DEFINED IN THE RELEVANT SPECIFICATION CLAUSE SHALL BE INCLUDE IN THE BMS CONTRACTOR'S SCOPE OF WORKS. 17. ALL WIRING INSTALLATION WORKS SHALL BE IN ACCORDANCE WITH THE NEC AND SASO STANDARDS.

NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

LEGEND: PB

DDC

- 400mm (W) x 400mm (H) x 200mm (D) (OR SIZE AS REQUIRED) - DIRECT DIGITAL CONTROLLER - HIGH LEVEL INTERFACE

HLI BMS

- BUILDING MANAGEMENT SYSTEM

Generator Priority Loading - KFMC Priority 1 - Life Safety Loads/Critical Loads Life Safety Branch: a. Illumination of means of egress. b. Exit lighting fixtures. c. Alarm and alerting systems such as fire alarm and medical gas systems. d. Communication systems : if used during emergency conditions, they shall include: (1) Disaster Control or emergency communication centers, i.e. communication equipment, selected receptacles, and task illumination (2) Public address system (PA). (3) Nurse Call System e. Generator set location : typical for all task illumination, battery charger for emergency battery powered lighting, and selected receptacles, and f. Elevators: cab lighting, control intercom, signal systems, and elevator machine room lighting. g. Fire Pumps h. Smoke Control and Stair Pressurization System

REFERENCE DRAWINGS

The Critical Branch

DESCRIPTION

DWG. NOS

a. Data Centre / Building Management System Priority 2 - Equipment System necessary for Hospital Operations 1. Arrange the following equipment for delayed-automatic connection to the alternate power source thru BMS:

A

a. Central Suction Systems b. Sump pumps and associated controls and alarm systems c. Compressed air system/Medical gas systems d. Kitchen hood Supply e. Heating, ventilating, and air-conditioning (HVAC) systems for all types of Clean Rooms i.e. ICU, Surgical Suites, Isolation Rooms, CT Scanners, Proton Theraphy, Linear accelerator, UPS & Battery rooms, BMS rooms, Server rooms, etc. f. Closed loop water chilling equipment for linear accelerator, Proton Therapy, CT Scanners and other medical equipment. Priority 3 - Equipment System necessary for Patient Care 1. Arrange the following equipment for delayed-automatic or manual connection to the alternate power source thru the BMS; a. Heating equipment; b. Equipment and control systems for elevators; c. General supply, return, and exhaust ventilating systems serving common basement, toilets and stores; d. Proton Therapy cooling system; e. Automatically operated doors. f. Minimal electrically heated autoclaving equipment shall be permitted to be arranged for either automatic or manual connection to the alternate source.

KEY PLAN

Priority 5 - Other Loads not included above In case of one unit of genset as well as the standby genset break down the reverse sequence of operation will be observed i.e. Priority 5 will be the first to be shed.

1

2

3

4

5

6

7

8

A

REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SYSTEMPOINT LIST, GEN. NOTES, & LEGEND

A

BMS SYSTEM POINT LIST, GEN. NOTES, & LEGEND N.T.S

SHEET NO.

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

KEY PLAN

1

2

3

4

5

6

7

8

REVISION NO.

DESCRIPTION

DATE

BMS SYSTEM POINT LIST FOR CSB (ADDITIONAL) N.T.S

DAR PROJECT NUMBER

DB-12 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SYSTEM POINT LIST FOR CSB (ADDITIONAL)

SHEET NO.

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

KEY PLAN

1

2

3

4

5

6

7

8

REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS CONTROL DIAGRAM

BMS CONTROL DIAGRAM N.T.S

SHEET NO.

M5.00.02

JF

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

TYPICAL PARKING SUPPLY FAN

TYPICAL PARKING EXHAUST/ SMOKE FAN

NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

KEY PLAN

1

2

3

4

5

6

7

8

REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS CONTROL DIAGRAM

SHEET NO.

M5.00.03

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

KEY PLAN

1

2

3

4

5

6

7

8

REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS CONTROL DIAGRAM

SHEET NO.

M5.00.04

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY PB

PB

P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

PB

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER

PB

DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

PB PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB PB

PB

PB

PB

RIYADH, SAUDI ARABIA PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

PB

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB PB VAV DDC

PB

VAV DDC

NOTES:

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

VAV DDC

VAV DDC

PB HLI

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

PB

HLI

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

PB

PB HLI

2.

PB PB

VAV DDC

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

PB PB

VAV DDC

1.

PB

PB

PB VAV DDC

PB

VAV DDC

PB

REFERENCE DRAWINGS DESCRIPTION

VAV DDC

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

VAV DDC

HLI

HLI

PB HLI

DWG. NOS

HLI

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

HLI

HLI

PB VAV DDC

HLI

VAV DDC

PB

PB VAV DDC

VAV DDC

KEY PLAN PB

PB

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

PB

PB VAV DDC

PB

PB

VAV DDC

PB VAV DDC

VAV DDC

PB

REVISION NO.

PB

DESCRIPTION

DATE

PB

PB

PB

PB

PB HLI

PB HLI

HLI

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM SHEET NO.

BMS SINGLE LINE DIAGRAM N.T.S

M5.00.05

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

PB HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

RIYADH, SAUDI ARABIA

PB HLI

NOTES:

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

HLI

HLI

HLI

PB HLI

HLI

HLI

HLI

HLI

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

KEY PLAN

PB REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

HLI

14381.000

PB

DATE HLI

HLI

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM PART-1 SHEET NO.

BMS SINGLE LINE DIAGRAM AREA-1 N.T.S

M5.00.06

PB

PB PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

OWNER PB

KINGDOM OF SAUDI ARABIA

PB PB VAV DDC

VAV DDC

VAV DDC

MINISTRY OF HEALTH KING FAHAD MEDICAL CITY

VAV DDC

P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC.

PB

235 E. MAIN STREET, SUITE 102C

PB

NORTHVILLE, MI 48167, U.S.A.

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

PB

PB PB

CAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

CAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

CAV DDC

VAV DDC

CAV DDC

CAV DDC

CAV DDC

CAV DDC

VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

PB VAV DDC

VAV DDC

RIYADH, SAUDI ARABIA

NOTES:

VAV DDC

PB VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

VAV DDC

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

REFERENCE DRAWINGS VAV DDC

VAV DDC

DESCRIPTION

DWG. NOS

PB VAV DDC

VAV DDC

PB

PB VAV DDC

KEY PLAN

PB VAV DDC

PB VAV DDC

PB

PB

REVISION NO.

DESCRIPTION

DATE

PB

PB

PB

DAR PROJECT NUMBER

DB-09/10/11

PB

HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM PART-2 SHEET NO.

BMS SINGLE LINE DIAGRAM AREA-2 N.T.S

M5.00.07

OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER DAR ENGINEERING P.O. BOX 301 RIYADH 11411, SAUDI ARABIA

PB

HLI

HLI

HLI

HLI

HLI

HLI

HLI RIYADH, SAUDI ARABIA

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB NOTES: 1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

PB VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

PB VAV DDC

VAV DDC

PB VAV DDC

PB

VAV DDC KEY PLAN

PB VAV DDC

PB

VAV DDC

PB

REVISION NO.

PB

DESCRIPTION

DATE

PB VAV DDC

PB

VAV DDC

VAV DDC

VAV DDC

DAR PROJECT NUMBER

PB

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM PART-3 SHEET NO.

BMS SINGLE LINE DIAGRAM AREA-3 N.T.S

M5.00.08

DDC

DDC

DDC

PB

OWNER

PB

VAV DDC

VAV DDC

KINGDOM OF SAUDI ARABIA

VAV DDC

MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC. 235 E. MAIN STREET, SUITE 102C NORTHVILLE, MI 48167, U.S.A.

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER PB

PB

VAV DDC

VAV DDC

PB

DAR ENGINEERING P.O. BOX 301

VAV DDC

RIYADH 11411, SAUDI ARABIA

RIYADH, SAUDI ARABIA

VAV DDC

VAV DDC

NOTES: HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

HLI

PB

PB VAV DDC

HLI

1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

VAV DDC

PB

REFERENCE DRAWINGS DESCRIPTION VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB VAV DDC

VAV DDC

DWG. NOS

PB VAV DDC

VAV DDC

KEY PLAN

PB

PB

REVISION NO.

DESCRIPTION

DATE

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM PART-4 SHEET NO.

BMS SINGLE LINE DIAGRAM AREA-4 N.T.S

M5.00.09

PB OWNER KINGDOM OF SAUDI ARABIA MINISTRY OF HEALTH KING FAHAD MEDICAL CITY P.O. BOX 59046 RIYADH 11525, SAUDI ARABIA

CONSULTING ARCHITECT HKS ARCHITECTS, PC.

HLI

HLI

HLI

HLI

HLI

HLI

235 E. MAIN STREET, SUITE 102C

HLI

NORTHVILLE, MI 48167, U.S.A.

HLI

HLI

HLI

HLI

HLI

HLI

CIVIL / LANDSCAPE STRUCTURAL / MEP ENGINEER

HLI

DAR ENGINEERING P.O. BOX 301

PB

RIYADH 11411, SAUDI ARABIA

PB VAV DDC

VAV DDC

RIYADH, SAUDI ARABIA

PB VAV DDC

VAV DDC

NOTES: PB VAV DDC

VAV DDC

1.

FOR GENERAL NOTES REFER TO DWG. # M5.00.01

2.

DDC & HLI QUANTITY INCLUDING LOCATION ARE BASED ON ALL ELECTROMECHANICAL EQUIPMENT.

3.

FINAL LOCATION OF DDC & HLI SHOP DRAWING SHALL BE SUBMITTED BY CONTRACTOR FOR APPROVAL.

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

PB

REFERENCE DRAWINGS DESCRIPTION

DWG. NOS

PB

KEY PLAN

PB VAV DDC

VAV DDC

VAV DDC

VAV DDC

PB

REVISION NO.

PB VAV DDC

DESCRIPTION

DATE

PB

VAV DDC

DAR PROJECT NUMBER

DB-09/10/11 HKS PROJECT NUMBER

14381.000 DATE

15 APRIL, 2012 ISSUE

TENDER ISSUE SHEET TITLE

BMS SINGLE LINE DIAGRAM SHEET NO.

BMS SINGLE LINE DIAGRAM N.T.S

M5.00.10

View more...

Comments

Copyright ©2017 KUPDF Inc.
SUPPORT KUPDF