AMAZON ENERGY
APLUS MEGA BIZ LIMITED LIMITED
Document Code : Code :AMBL-0001234 AMBL-0001234
Project Tittle
Reference: Standard Construction / Maintenance Specifications NACE, SSPC & ASME Standards.
PAINT QUALIFICATION
Title of ITP : Structural, Pipes , Tank lining Surface cleaning, cleaning, Preparation/ Coating Coating Location where ITP is Applicable: OKIOZIENGBE/OREDO FLOW STATIONS No Description of QC . Activity
Controlling Procedure.
INSPECTION AND TEST PLAN Revision & Date : 0-11-March 2020.
Specification Acceptance Criteria
Submit BPS for review and Aplus Mega Biz NACE & SSPC 1 approval Standards. BP Procedure. Verify all painting & blasting Aplus Mega Biz NACE & SSPC 2 equipment has been Standards. BP Procedure. Premob/ calibrated Conduct material receiving Visual/ review to inspection confirm the Material Technical data sheet. 3 and approval of material certificate. principal Check environmental condition & 4 mixing ratio Visual Examination on the structures
With Digital Hygrometer Aplus Mega Biz
Humidity maximum must be 85% and steel temperature must not be less than 3oc above the Dew Point. NACE, SSP SSPC C & ASME
QA/QC Record to be used to verify Compliance.
Inspection Level APLUS MEGA BIZ QA/QC
CLIENT REPRESENTATIVE REPRESENTATIVE
Aplus General General BP Procedure/ Client Specification. Specification. Aplus Mega Biz Biz General BP Procedure/ Client Specification. Specification.
R
R
M
R
Before Use
H
W
M
R/M
W
W
Before commencement of each day day bl blas asti ting ng an and d pa pain inti ting ng activity on site and every one ho hour ur as long long as th the e jo job b is progress. Aplus Mega Biz Biz General BP
Comments /Remarks
Page 1 of 3
5
after sludge removal/ solvent BP Procedure. Standards. cleaning, if needed. Checking of environmental condition Aplus Mega Biz NACE & SSPC 6 on daily bases. Standards. BP Procedure. Check the quality of surface profile Per-ASTM D-4417 7 after blasting prior to painting or ISO 8503. SA-2.5 SSPC SP-10 every day Per the Standard (No visible contaminant. 8 Compressed Air Quality. ASTM D 4285.
9
10
For Dust. Conduct chloride Test on the Blasted surface Prior to Painting Application to ascertain ascertain the salt level.
11
Examination of Coating.
12
D.F.T Quality check.
Holiday Detection three days after 13 the final Coat Application on the overall project. Inspection Report & Daily work 14 progress report.
Prepared by :
Procedure/ Client Specification. Specification. Aplus General General BP Procedure/ Client Specification. Specification. Each component or once per each day/ as specified in the Project Painting procedure. Before the start of each day
shift or change in compress Air source (compressor) after four hours interval. Spot Check, but not less than Maximum quantity and size ISO 8502-3 1 per 10m2. . rating 2. Extraction: ISO Average Conductivity Conductivity Specific location to be 85026 ( Bresle test corresponding to ≤ 20mg/m2 determined by WAS kit ) ( 2µg/cm2 ) Representative. Assessment: ISO 8502-9 ( Conduct metric ) Visual to confirm absence of contamination, According to Specification. Specification. 100% of all surfaces surfaces.. pinholes, popping, sagging Runs or other defects, After each coat dry stage, prior prior With Elcometer to next Coat application and at digital D.F.T According to Specification Specification every gauge. final coat dry stage Aplus BP NACE RP0188-Sect.3 or Aplus General General BP Procedure/ Procedure. ASTM D 5162. 5162. Client Specification. Specification.
Typed, only signatures will be hand written.
As specified
Reviewed by :
Work progress report will be every day, and Inspection report will be at the end of every inspection between liquid energy company NACE Certified QA/QC work.
Rev
Date
0
11-03-2020
M
R
H
W
M
M
M
W
M
W
M
I
M
W
M
W
M
R/S
Revision Description Prepared Approved by by Issue for comment
Page 2 of 3
Signature Approved by :
Date
Signature
Date
Approved by : Signature
Date Signature
Date
Legend & definition of inspection levels: 1.W-Witness point. A Stage of Operation that is designated to be witnessed by the Client. If the specified party has been formally notified in accordance with the 1.W-Witness Contract Administration Instruction and no formal response have been returned and the party is not present, the work may continue. 2.H-Hold Point. A designated stopping place during a specific activity at which inspection or examination, and dated signature or initial of the Client -Representative is 2.H-Hold required before further work can be performed.
3.R 3.R-- Review Point. This point is used for review of documents, drawings or records of the work being performed and/or carried out. No formal notification is required. 4.I 4.I-- Random inspection Point. Point. An inspection where the Aplus Mega Bi Biz z Limited Company and Client plans to audit, monitor or witness witness the activity in process at random or periodic basis. No formal notification is required. 5.BP-Blasting 5.BPBlasting & Painting. 6.AMBL-- Aplus Mega Biz Limited. 6.AMBL