  ITEM NO.

DESCRIPTION

UNIT

PRELIMINARIES PERFORMANCE BOND, INSURANCE OF WORKS, INSURANCE AGAINST PERSONAL, INJURIES AND DAMAGE TO PROPERTY, WORKMEN'S COMPENSATION INSURANCE AND/OR SOCSO. 1

Provide insurance against personal injuries and damage to properties, Clause 33, Conditions of Contract.

Lump Sum

2

Provide Workmen's Compensation Insurance and/or SOCSO, Clause 34 or 35, Conditions of Contract.

Lump Sum

3

Provide Insurance of Condition of Contract.

Works,

Clause

36,

Lump Sum

4

Provide Performance Conditions of Contract.

Bond,

Clause

37,

Lump Sum

5

Setting out of Works.

Lump Sum

6

Contractor's Superintendance.

Lump Sum

7

Maintenance of existing roads, surface drains, culverts etc.

Lump Sum

8

Provide fortnightly progress reports and photograph to be taken as directed by the S.O

Lump Sum

9

Clear site on completion

Lump Sum

10

Allow for compliance with each and every Term and Conditions of Contract and Preliminaries excluding items already mentioned

Lump Sum

11

Allow for special safety devices, eg. Signboards, warning lights, watchmen diversion, guides, etc. to the requirement of all authorities for the safety of the road user is directed by the S.O.

Lump Sum

12

Supply (2) pairs aprroved leather safety boot and 2 unit of safety helmet for the use of DBKL staff during the duration of the works

Lump Sum

To Collection on Page BQ 1/3

BQ1/1   

RATE

AMOUNT (RM)

 

ITEM NO.

DESCRIPTION

UNIT

13

Preparation of as-built drawings / paint colour scheme as directed by the S.O.

Lump Sum

14

Arranging for the supply of water for the works and labour lines and pay Local Authority's charges for the supply, temporary meters and connections

Lump Sum

15

Permitting free accesses and generally afford facilities and usual convenience to any special contractor's or the City Hall's workmen carrying out work of any description under separate arrangement.

Lump Sum

RATE

To Collection on Page BQ 1/3

BQ1/2   

CONTRACT AMOUNT (RM)

 

COLLECTION OF BILL NO. 1 CONTRACT AMOUNT (RM) Total of Page No BQ 1/1

……

Total of Page No BQ 1/2

……

TOTAL OF BILL NO. 1 - Preliminary Works

……

(CARRIED TO GENERAL SUMMARY ON PAGES RT/2)

 

BQ1/3   