BILL OF QUANTITY PROPOSED LANDSCAPE DESIGN AT…. 1/4/2013 LA’S STUDIO PART2
BQ 1: GENERAL AND PRELIMINARY BIL
DESCRIPTION
UNIT
QUANTITY
RATE
AMOUNT
General and preliminaries Insurance Provide 3 insurance policies as follows: A Contract Works Policy in joint names of Employer and Contractor. B SOCSO and Workmen’s Compensation Policy. C
Public liability and Fire Policy in joint names of the Employer and Contractor. Performance Bond
D Allow here for expenses in connection with providing unconditional Performance Bond by way of Banker’s or Insurance Guarantee approved by the Employer and severally bound to the Employer in a sum to live (5) percent of the due observance of this contract. TOTAL
L/S
3000
00
3000
00
3000
00
12000
00
L/S
L/S
BQ 2: SITE CLEARING BIL
DESCRIPTION
UNIT
QUANTITY
RATE
AMOUNT
Site clearing A To provide labour, transport, all tools and equipments and to clear all plant materials from existing planter bed and to cart away and to clean up the work area to the satisfaction and approval of the Employer or Employer’s Representative. To provide labour, transport, all tools and equipments and to B excavate existing soil from the planter bed and cart away and to clean up the work area to the satisfaction and approval of the Employer or Employer’s Representative. Work shall also include rectification works to the existing planter bed.
TOTAL
L/S
3000
00
L/S
4000
00
7000
00
BQ 3: PLANT MATERIALS (INGREDIANTS)
BIL
A
DESCRIPTION
UNIT
QUANTITY
Plant Materials
RATE
AMOUNT
RM
RM
To supply nursery grown plant materials listed below, transport to site and provide labour for planting as indicated in the drawing. Rates by the contractor shall include the following: B
Soil Mixture Supply, deliver, unload and spread soil mixture, compose of one part of good approved organic matter/ compost and three parts of approved topsoil into planter bed as indicated in the drawing. The soil mixture should be well- mixed. Trees (1.0 x 1.0 x 1.0 m)
m3
57
35.00
1995
00
Palm (1.0 x 1.0 x1.0m)
m3
9
35.00
315
00
Shrub (0.3 x 0.3 x 0.3m)
m3
2245
15.00
33675
00
Groundcover (0.15 x 0.15 x 0.15m)
m3
60
8.00
480
00
36465
00
TOTAL
BQ 3: PLANT MATERIALS (INGREDIENTS)
BIL
DESCRIPTION
C Crusher Run for Drainage
UNIT
m³
Supply, deliver, unload and spread crusher run into planter boxes as drainage layer between
QUANTITY
RATE
RM
AMOUNT
RM
17500
00
40000
00
57500
00
75-100mm thick (20mm dia. average size.)
D Filter Membrane
m³
To provide geotextile filter membrane ‘terram’ or equivalent (to Landscape Architect’s approval) on top of crusher run layer in all planter boxes.
TOTAL
BQ 3: PLANT MATERIALS (SPECIES)
BIL
DESCRIPTION
UNIT
QUANTITY
This Bills of Quantities shall be read in conjunction with Specification and Preambles A
AMOUNT
RM
RM
9
160.00
140
00
1. Bucida molineti
8
150.00
1200
00
2. Citrus aurantifolia
3
5.00
15
00
3. Citrus hystrix
11
5.00
55
00
4. Eugenia oleina
5
70.00
5350
00
5. Michelia champaca
6
120.00
720
00
6. Mussaenda phillipica ‘Aurorae’
2
30.00
60
00
7. Magnifera indica
3
20.00
60
00
8. Plumeria rubra
6
120.00
720
00
9. Tabebuai penthaphylla
13
120.00
1560
00
9880
00
Palm 1.
B
RATE
Veitchia merrilli
Trees
TOTAL
BQ 3: PLANT MATERIALS (SPECIES) BIL
DESCRIPTION
UNIT QUANTITY RATE
This Bills of Quantities shall be read in conjunction with Specification and Preambles D
E
AMOUNT
RM
RM
Shrubs 1. Alpinia galangga
Nos
90
10.00
900
00
2. Allamanda schottii
Nos
310
10.00
3100
00
3. Curcuma Longga
Nos
30
5.00
150
00
4. Coleus blumei
Nos
140
3.00
420
00
5. Cymbopogen citrate
Nos
60
5.00
300
00
6. Etlingera elatior
Nos
90
5.00
450
00
7. Hymenocaulis carribea
Nos
180
8.00
1440
00
8. Ixora japonica
Nos
520
8.00
4160
00
9. Kaemfera galangal linn
Nos
170
5.00
850
00
10. Murraya koenigii
Nos
7
5.00
35
00
11. Murraya paniculata
Nos
60
5.00
300
00
12. Ochna kirkii
Nos
18
8.00
144
00
13. Ophipogun jaburan
Nos
220
5.00
1100
00
14. Panadanus amarytifolius
Nos
110
5.00
550
00
15. Phyllanthus mrytifolius
Nos
240
6.00
1440
00
m³
60
4.00
240
00
15579
00
‘variegate’
Groundcovers 1.
Axonoupus compressus TOTAL
BQ 4: COMPUSORY MAINTENANCE ITEM
DESCRIPTION
UNIT QUANTITY RATE
AMOUNT
Compulsory Maintenance. A
B
To provide all labor, tools, equipment, transport, etc and carry out maintenance in all planted areas for 12 months.
Maintenance shall include but not necessarily be limited to watering, weeding, pruning, fertilizing, spraying and clearing
L/S
2500
00
L/S
2500
00
L/S
4000
00
9000
00
of unnecessary growth….etc and any other horticultural management as directed but the S.O or S.O’s representative as necessary for the proper growth of plants. C From the time planting until the end of maintenance period, the landscape constructor is required to replace dead, dying or missing plants, or those severely damaged by pests or diseases to the original sizes of the plants due to the replaced and true to types at the contractor’s own coasts as and when directed by the S.O or TOTAL
BQ 5: HARD LANDSCAPE ITEMS BIL
DESCRIPTION
UNIT
QUANTITY
This Bills of Quantities shall be read in conjunction with Specification and Preambles
RATE
AMOUNT
RM
RM
3000.00
3000
00
Hard landscape items To provide all labour, tools, equipment, transport, etc. and carry out maintenance in all process in finish the work and built the gazebo, pergola, stage and pavement around the side.
I. Pergola (14.0 m x 6.0m)
L/S
II. Gazebo ( 5.0m x 5.0m)
Nos
3
1500.00
4500
00
III. Pedestrian walkway (1.5m width)
L/S
165m²
50.00
8250
00
IV. Fish Pond (2.0 m x 4.0m)
L/S
1000.00
1000
00
V. Planter Box
L/S
3500.00
3500
00
VI. Wooden Table and Seating
Nos
2
800.00
1600
00
VII. Rabbit’s Hut (4.0m x 2.0m)
Nos
1
900.00
900
00
VIII. Bird’s Cage (3.0m x 2.0m)
Nos
1
500.00
500
00
23250
00
TOTAL
BQ 6: SUMMARY -TOTAL PROJECT COST The following are the prices in Ringgit Malaysia of the items making up the Total Contract Prince. The price of each item includes the use of all tools and equipment, supervision, overheads and profits, taxes, transportation and all other incidental costs. The Total Contract Price is for completely supply, erection, handing over ITEM
DESCRIPTION
AMOUNT
BQ 1
General and preliminaries
12000
00
BQ 2
Site clearing
7000
00
BQ 3
Plant materials (Ingredients)
36465
00
BQ 3
Plant materials (Species)
25459
00
BQ 4
Compulsory maintenance
9000
00
BQ 5
Hard landscape items
23250
00
113174
00
TOTAL SUM
--------------------------
-------------------------