PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
BLOCK A ( FOUR BEDROOM DUPLEX ) ELEMENT Nr. 1 SUBSTRUCTURE (ALL PROVISIONAL) D20: Excavation and Filling. 640
m2
40.00
25,600.00
631
m
3
575.00
362,825.00
85
m
3
575.00
48,875.00
107
m
3
220.00
23,540.00
materials arising from excavations
138
m3
180.00
24,840.00
F
150mm laterite filling in layers
86
m3
1,350.00
116,100.00
G
Filling to make up levels, thickness not exceeding 150mm, 86
m3
2,100.00
180,600.00
1,212
m2
40.00
48,480.00
1,212
m
2
55.00
66,660.00
57
m2
1,050.00
59,850.00
141
m
3
21,000.00
2,961,000.00
A
Excavate topsoil average depth not exceeding 150mm
B
Excavating trenches, width exceeding 0.3m maximum depth not exceeding 1.50m
C
Excavating pits (38nr), maximum depth not exceeding 2.00m
D
Dispose excavated materials off site, in spoil heap away from site
E
Filling to excavations, thickness exceeding 250mm,
hardcore materials obtained off site H
Level and compact bottom of excavation
J
Dieldrex or other equal and approved antitermite treatment solution spread to faces of excavations E10: In situ concrete Plain in situ concrete (1:10)-40mm aggregate
K
Blinding beds, thickness not exceeding 50mm Plain in situ concrete (1:3:6)-20mm aggregate
L
Foundations Reinforced in situ concrete (1:2:4)-19mm aggregate
M
Beds/ attached steps (150mm thick)
92
m3
38,000.00
3,496,000.00
N
Column bases
26
m3
38,000.00
988,000.00
P
Column (62nos)
4
m3
38,000.00
152,000.00
Q
Circular Column 450mm Diameter (2nos) Carried to collection
1
m3
38,000.00
38,000.00 8,592,370.00
4 BEDROOM DUPLEX 1
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
E20: Formwork for in situ concrete Plain vertical sawn formwork A
Edges of beds, height not exceeding 250mm
22
m2
1,450.00
31,900.00
B
Sides of column
71
m
2
1,450.00
102,950.00
C
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight 20mm Diameter
1.260
t
240,000.00
302,400.00
D
16mm Diameter
0.390
t
240,000.00
93,600.00
E
12mm Diameter
0.550
t
240,000.00
132,000.00
0.460
t
240,000.00
110,400.00
669
m2
850.00
568,650.00
845
m2
3,800.00
3,211,000.00
Mild steel bars to BS 4449, bent. F
10mm Diameter Fabric mesh A192 weighting 42kg/m2 laid as detailed in manufacturer's manual
G
Ground floor bed/Attached ramp F10: Brick/Block walling Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed, filled solid with lean concrete
H
Walls, 230mm thick vertical
EXTERNAL RENDERING J
15mm thick cement and sand (1:4) smooth rendering to face of the wall
53
m2
650.00
34,450.00
53
m2
1,200.00
63,600.00
PAINTING AND DECORATION K
Prepare prime and apply one undercoat and two finishing coats of high quality "DULUX" emulsion paint on rendered wall (rate including floating)
Carried to collection
4,650,950.00
4 BEDROOM DUPLEX 2
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Collection
Page 01
8,592,370.00
Page 02
4,650,950.00
SUBSTRUCTURE CARRIED TO SUMMARY
13,243,320.00
4 BEDROOM DUPLEX 3
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 2 FRAMES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Columns
31
m3
38,000.00
1,178,000.00
B
Circular Columns
6
m3
38,000.00
228,000.00
C
Beams
8
m3
38,000.00
304,000.00
D
Roof beams/ concrete fascia
4
m3
38,000.00
152,000.00
E20: Formwork for in situ concrete Plain vertical sawn formwork E
Columns
539
m2
1,450.00
781,550.00
F
Circular Columns
146
m2
1,450.00
211,700.00
G
Beams
421
m2
1,450.00
610,450.00
H
Roof beams/ concrete fascia
88
m2
1,450.00
127,600.00
J
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. 20mm Diameter
3.630
t
240,000.00
871,200.00
K
16mm Diameter
4.210
t
240,000.00
1,010,400.00
L
12mm Diameter
8.960
t
240,000.00
2,150,400.00
7.120
t
240,000.00
1,708,800.00
Mild steel bars to BS 4449, bent. M
10mm Diameter
FRAMES CARRIED TO SUMMARY
9,334,100.00
4 BEDROOM DUPLEX 4
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 3 STAIRCASES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Staircases (flight)
4
m3
38,000.00
152,000.00
B
Landings
3
m3
38,000.00
114,000.00
C
Steps
2
m3
38,000.00
76,000.00
D
Beams
2
m3
38,000.00
76,000.00
Plain vertical sawn formwork: E
Soffits of landings
83
m2
1,450.00
120,350.00
F
Soffits of flight
44
m2
1,450.00
63,800.00
G
Sides of beams
6
m2
1,450.00
8,700.00
H
Edges of suspended slabs
14
m
400.00
5,600.00
J
Stairflights
24
m
400.00
9,600.00
K
Steps
24
m
400.00
9,600.00
Reinforcement for in situ concrete High tensile bars to BS 4449, straight and vertical. L
16mm Diameter
1.330
t
240,000.00
319,200.00
M
12mm Diameter
1.240
t
240,000.00
297,600.00
N
10mm Diameter
1.000
t
240,000.00
240,000.00
Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) rendering P
Landings soffit, width exceeding 300mm
83
m
2
650.00
53,950.00
Q
Stairflight soffit, width exceeding 300mm
498
m2
650.00
323,700.00
R
Strings
144
m
225.00
32,400.00
Carried to collection
1,902,500.00
4 BEDROOM DUPLEX 5
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Sand cement/Concrete/Granolithic screeds/flooring 25mm thick cement and sand (1:4) screeded floor A
Landing floors
36
m2
830.00
29,880.00
B
Treads, 300mm wide
258
m
250.00
64,500.00
310
m
180.00
55,800.00
12mm thick cement and sand (1:3) rendering C
Risers; plain, 150mm high Stone/ConcreteQuarry/Ceramic tilling/Mosaic Granite floor tilling on cement and sand bed
D
Landing Floors
36
m2
8,000.00
288,000.00
E
Skirtings
276
m
650.00
179,400.00
F
Treads to steps
129
m
1,950.00
251,550.00
G
Risers to steps
300
m
975.00
292,500.00
23
m2
1,200.00
27,600.00
Stair Balustrades; 1000mm high purpose made designed balustrade in 75mm diameter stainless steel pipes complying to Architect's details embedded into concrete
468
m
4,800.00
2,246,400.00
Stainless steel handrails consisting of 75mm x 75mm top and bottom rail complete with bolts and nuts screwed to steel wall bracket
552
m
3,700.00
2,042,400.00
Painting/Clear finishing prepare and apply 3 coats of emulsion paints to floated surfaces, rate including floating to Architect's details. H
Rendered surfaces, width exceeding 300mm Stairs/Walkways/Balustrades
J
K
Carried to collection
5,478,030.00
Collection Page 05
1,902,500.00
Page 06
5,478,030.00
STAIRCASES CARRIED TO SUMMARY
7,380,530.00
4 BEDROOM DUPLEX 6
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 4 UPPER FLOORS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Slabs thickness, 150-450mm, sloping not exceeding 150
114
m3
38,000.00
4,332,000.00
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. B
12mm Diameter
13.60
t
240,000.00
3,264,000.00
C
10mm Diameter
9.57
t
240,000.00
2,296,800.00
121
m
250.00
30,250.00
1,112
m
2
1,450.00
1,612,400.00
E20: Formwork for in situ concrete Plain vertical sawn formwork to the following D
Edges of suspended slabs, height 150- 250mm Plain sawn formwork comprises of verical struts and runners
E
Soffit of slabs, slab thickness not exceeding 450mm, horizontal, height to soffit not exceeding 4.50m
UPPER FLOORS CARRIED TO SUMMARY
11,535,450.00
4 BEDROOM DUPLEX 7
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 5 ROOF G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in pitched roof members A
Tie beams 150 x 50mm
1,162
m
380.00
441,560.00
B
Struts 150 x 50mm
5,128
m
380.00
1,948,640.00
C
Rafters 150 x 50mm
1,648
m
380.00
626,240.00
D
Purlins 75 x 50mm
3,821
m
260.00
993,460.00
2,322
m2
3,500.00
8,127,000.00
H72: Aluminium sheet coverings/flashings 0.55mm coloured approved stone coated aluminium coverings laid to slope not exceeding 50 degrees from the horizontal with one and half corrugation side lap and 200m end lap and fixed in accordance to manufacturers instruction (measured nett) to timber purlins at approved general spacing E
Pitched covering
F
Ridge cappings, girth 600mm
528
m
2,100.00
1,108,800.00
G
Hip capping, girth 600mm
487
m
2,100.00
1,022,700.00
ROOF CARRIED TO SUMMARY
4 BEDROOM DUPLEX 8
14,268,400.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 6 INTERNAL AND EXTERNAL WALLS F10: Brick/Block walling Hollow Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed. A
Walls, 230mm thick vertical
B
Dwarf walls
4,891
m2
3,200.00
15,651,200.00
187
m
2
3,200.00
598,400.00
INTERNAL AND EXTERNAL WALLS CARRIED TO SUMMARY
4 BEDROOM DUPLEX 9
16,249,600.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 7 DOORS AND WINDOWS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Lintels
12
m3
38,000.00
456,000.00
372
m2
1,450.00
539,400.00
1.238
t
240,000.00
297,120.00
0.965
t
240,000.00
231,600.00
E20: Formwork for in situ concrete Plain vertical sawn formwork B
Lintels E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight.
C
12mm Diameter Mild steel bars to BS 4449, bent.
D
10mm Diameter DOORS L21: Metal doors/shutters/hatches purpose made decorative steel HPI security doors with steel frame in autobase paint built into blockwork and concrete surround, bedded and pointed in cement and sand mortar with mastic sealant complete with all necessary ironmongery
E
Door, size 1200 x 2100mm high
10
nr
96,500.00
965,000.00
F
Door, size 900 x 2100mm high
10
nr
78,500.00
785,000.00
L20: Timber doors/shutters/hatches 50mm thick polished hardwood timber panel door including 225mm wide treated wrought finished hardwood door frame complete with architraves and ironmongery, all complying to Architect's details G
Door, size 900 x 2100mm high
48
nr
30,000.00
1,440,000.00
H
Door, size 750 x 2100mm high
48
nr
30,000.00
1,440,000.00
Carried to collection
6,154,120.00
4 BEDROOM DUPLEX 10
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
WINDOWS L11: Metal windows/rooflights/sceens/louvres White powder coated aluminium casement windows in 5mm thick tinted glass complete with fly screen and burglar bars fit to detail A
Windows size, 1200 x 1500mm high
50
nr
58,050.00
2,902,500.00
B
Windows size, 900 x 900mm high
24
nr
48,375.00
1,161,000.00
B
Windows size, 600 x 600mm high
25
nr
32,375.00
809,375.00
Carried to collection
4,872,875.00
Collection
Page 10
6,154,120.00
Page 11
4,872,875.00
DOORS AND WINDOWS CARRIED TO SUMMARY
11,026,995.00
4 BEDROOM DUPLEX 11
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr.8 FIXTURES AND FITTINGS N10: General fixtures/furnishings/equipment Wardrobes Composite wardrobe units, in veneer-finished laminated particle board or other approved materials, comprising compartments fitted with shelves and door leaves with and including all necessary iron mongery; all to Architect's details A
B
Wardrobe size 2100mm length x 3000mm high x 600mm deep; self closing
5
nr
220,000.00
1,100,000.00
Wardrobe size 1800mm length x 3000mm high x 600mm deep; self closing
15
nr
175,000.00
2,625,000.00
1
nr
450,000.00
450,000.00
1
nr
120,000.00
120,000.00
Kitchen carbinet unit C
7600mm long x 600mm deep x 750mm high; L-shaped kitchen carbinet in accordance to Architect's details Store shelve unit
D
2270mm long x 450mm deep x 1750mm high; U-shaped and 3-tiers shelve unit in accordance to Architect's details Railings to Balcony and walls
E
Allow provisional sum of N500,000.00 for railings to balconys and walls in accordance to Architect's details
FIXTURES AND FITTINGS CARRIED TO SUMMARY
4 BEDROOM DUPLEX 12
sum
500,000.00
4,795,000.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 9 WALL FINISHES M20: Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) floated smooth synthetic rendering to general surfaces complying to Architect's details. A
Walls; externally
1,538
m2
650.00
999,700.00
B
Walls; internally
5,210
m2
650.00
3,386,500.00
C
Reveals, width not exceeding 300mm
1,458
m
210.00
306,180.00
12mm thick cement and sand (1:4) floated backing to general surfaces to receive further finishes D
Walls; externally
112
m2
650.00
72,800.00
E
Walls; internally
86
m2
650.00
55,900.00
F
Reveals, width not exceeding 300mm
48
m
200.00
9,600.00
G
Plaster impression
111
m
450.00
49,950.00
1,368
m2
2,300.00
3,146,400.00
296
m
690.00
204,240.00
28
m
2
2,850.00
79,800.00
M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic High quality glazed ceramic wall tilling on cement and sand backing H
Walls; internally
J
Reveals, width not exceeding 300mm Patterned crack tiles on cement and sand backing
K
Walls; externally
Carried to collection
8,311,070.00
4 BEDROOM DUPLEX 13
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
M60: Painting/Clear finishing Vinyl mat emulsion paint as manufactured by Portland or CAPL in 3 coats to floated surfaces, rate including POP floating to Architect's details. A
Rendered surfaces, externally
1538
m
2
1,200.00
1,845,600.00
B
Rendered surfaces, internally
5210
m2
1,200.00
6,252,000.00
C
Plaster impression
111
m
350.00
38,850.00
D
Reveals, width not exceeding 300mm
316
m
400.00
126,400.00
Carried to collection
8,262,850.00
Collection
Page 13
8,311,070.00
Page 14
8,262,850.00
WALL FINISHES CARRIED TO SUMMARY
16,573,920.00
4 BEDROOM DUPLEX 14
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 10 CEILING FINISHES G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in ceiling members A
Noggins 50 x 50mm
1,256
m
240.00
301,440.00
3,600.00
11,016,000.00
K40: Suspended ceilings Plaster of Paris ceiling finishes with centre rosette hunged to 50x50mm timber noggins (measured separately) including cornics fixed in accordance to the manufacturer's instructions. B
Ceiling lining
3,060
CEILING FINISHES CARRIED TO SUMMARY
4 BEDROOM DUPLEX 15
2
m
11,317,440.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr.11 FLOOR FINISHES M10: Sand cement/Concrete/Granolithic screeds/flooring 42mm thick cement and sand (1:4) floated bed to general surfaces to receive further finishes A
0
Floors, level and to falls only not exceeding 15 from 2,040
m2
830.00
1,693,200.00
horinzontal
690
m2
6,500.00
4,485,000.00
Skirtings; height 100mm including backing
768
m
650.00
499,200.00
984
m2
3,800.00
3,739,200.00
1,518
m
380.00
576,840.00
horinzontal
61
m2
3,200.00
195,200.00
Skirtings; height 100mm including backing
111
m
320.00
35,520.00
horinzontal M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic Patterned Granite floor finish on cement and sand bed B
C
0
Floors; level and to falls only not exceeding 15 from
Glazed vitrified ceramic floor tilling on cement and sand bed D
Floors; level and to falls only not exceeding 150 from horinzontal
E
Skirtings; height 100mm including backing Unglazed ceramic tilling on cement and sand bed in toilet areas
F
G
Floors; level and to falls only not exceeding 150 from
FLOOR FINISHES CARRIED TO SUMMARY
4 BEDROOM DUPLEX 16
11,224,160.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 12 ELECTRICAL SERVICES V20: LV Distribution Equipment; Metal clad Main Distrbution Board surface/ flush type as manufacured by FEDERAL ELECTRIC or MEM or BILLS including all MCB, back outlet connections to flush adaptable boxes, earth bonding, labels and fixing in accordance with manufacturer's instructions MV PANEL A
100A TPN MCCB main distribution panel (MV panel) comprising 2no 60A MCCB, 1no spare and circuit breaker
5
nr
250,000.00
1,250,000.00
B
100A change over switch
5
nr
35,000.00
175,000.00
C
100A main fuse switch
5
nr
27,000.00
135,000.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories D
4 x 150mm2 PVC/SWA/PVC copper cable
121
m
9,500.00
1,149,500.00
E
4 x 100mm2 PVC/SWA/PVC copper cable
132
m
6,000.00
792,000.00
5
nr
35,000.00
175,000.00
5
nr
20,000.00
100,000.00
DISTRIBUTION BOARDS TP&N MCB Distribution Board complete with 100A integral incoming isolator and comprising 6nr 10A stablock; 8nr 20A stablock; 12nr 30A stablock, 1nr 45A stablock and 3nr spares ways F
100A 12-Way Equipment; Metal clad isolating pattern switches or ELCB as manufactured by FEDERAL ELECTRICAL, MEM or BILLS including all necessary fuse links with quick make and quick breaks contacts and fixing in accordance with manufacturer's instructions
G
100A TP&N ELCB
Carried to collection
3,776,500.00
4 BEDROOM DUPLEX 17
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A
25mm Diameter
2,873
m
75.00
215,475.00
1,840
m
180.00
331,200.00
986
m
180.00
177,480.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B
4 x 6mm2 single core PVC copper cable
C
1 x 10mm2 single core PVC copper cable LUMINAIRES AND LAMPS V21: General lighting Lamp and luminaires; lighting fittings as manufactured by ABB or ASTRA or THORN or approved equal fixed to soffit including all necessary for complete installation
D
250w prismatic wall mounted halogen flood light fitting
72
nr
5,200.00
374,400.00
E
1 x 40w; 1200mm flourescent fittings
24
nr
3,800.00
91,200.00
F
60w wall bracket luminaires
360
nr
2,100.00
756,000.00
G
1 x 60w screw neck lighting fittings
72
nr
2,500.00
180,000.00
H
1 x 60w downlight luminaire fittings
72
nr
2,500.00
180,000.00
J
60w ceiling mounted bowl head lighting fitting
168
nr
2,800.00
470,400.00
K
40w, 40 bulbs ceiling hunged chandelier fittings
12
nr
120,000.00
1,440,000.00
L
"NEWCLIME" ceiling fan complete with regulator
36
nr
6,000.00
216,000.00
Carried to collection
4,432,155.00
4 BEDROOM DUPLEX 18
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Y74: Accessories for Electrical services Accessories as manufactured by MK or ABB or MEM including steel knock-out boxes fixed to form complete A
5A 1 gang 1 way switch
216
nr
600.00
129,600.00
B
5A 1 gang 2 way switch
84
nr
600.00
50,400.00
C
5A 2 gang 2 way switch
132
nr
900.00
118,800.00
D
5A 3 gang 2 way switch
24
nr
900.00
21,600.00
E
Bedside switch
20
nr
500.00
10,000.00
F
Dimmer switch
12
nr
800.00
9,600.00
G
240v fire alarm bell
5
nr
7,500.00
37,500.00
H
Break glass
5
nr
5,000.00
25,000.00
V22: General LV Power Ancillaries; low voltage power socket outlets switches and contactors as manufactured by MK or ABB or MEM or approved equal complete with accessories J
13A single switched socket outlets
192
nr
600.00
115,200.00
K
13A Twin switched socket outlets
192
nr
850.00
163,200.00
L
15A Single switched socket outlets Air conditioning
48
nr
1,500.00
72,000.00
M
20A water heater switch
25
nr
1,500.00
37,500.00
N
45A cooker control unit with light/ 13A socket outlets
5
nr
9,500.00
47,500.00
P
Telephone outlet
30
nr
750.00
22,500.00
Q
Television outlet
30
nr
750.00
22,500.00
R
Satellite outlet
30
nr
750.00
22,500.00
Carried to collection
905,400.00
4 BEDROOM DUPLEX 19
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A
20mm Diameter
20,190
m
70.00
1,413,300.00
2
2,088
m
200.00
417,600.00
2
12,528
m
240.00
3,006,720.00
2,022
m
270.00
545,940.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B
3 x 1.5mm single core PVC copper cable - Lighting
C
3 x 2.5mm single core PVC copper cable - Sockets
D
3 x 4mm2 PVC cable copper - Air conditioning
E
3 x 6mm2 single core PVC copper cable - Cooker sockets
522
m
375.00
195,750.00
F
1.0mm2 single core PVC copper cable TV outlets
468
m
120.00
56,160.00
G
1.0mm2 single core PVC copper cable Telephone outlets
468
m
90.00
42,120.00
H
1.0mm2 single core PVC copper cable Satellite outlets
468
m
85.00
39,780.00
5
nr
65,000.00
325,000.00
5
nr
45,000.00
225,000.00
Installation generally; supply, install, connect up and commission the complete earthing of the whole installation as at the main disribution panel, switch boards, distribution boards, generator room, transformer substation, etc. J
Earthing and bonding; 25 x 3 copper tape and 600 x 600mm mat forming a basket and bonded to foundation reinforcement complete with salt and charcoal applied as specified W52: Lightning protection
K
lightning protector/arrestor complete applied as specified
Carried to collection
6,267,370.00
4 BEDROOM DUPLEX 20
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Collection
Page 17
3,776,500.00
Page 18
4,432,155.00
Page 19
905,400.00
Page 20
6,267,370.00
ELECTRICAL SERVICES CARRIED TO SUMMARY
4 BEDROOM DUPLEX 21
15,381,425.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
ELEMENT Nr. 13 PLUMBING AND MECHANICAL SERVICES All materials supplied and installed shall be done in accordance with technical specification for mechanical installation as contained in the contract document. P30: Trenches/Pipeways/Pits for buried Engineering services A
Excavating trenches for services 500mm nominal size; 500mm average depth from 150mm below existing ground level; backfilling with selected excavated materials; disposal of surplus excavated materials
1,284
m
150.00
192,600.00
Y10: Pipelines Straight galvanised iron pipe to BS 425 in chases/trenches/floor screeds B
25mm Diameter - Cold water supply
534
m
400.00
213,600.00
C
19mm Diameter - cold water supply
1,332
m
320.00
426,240.00
D
13mm Diameter - Hot and Cold water supply
1,254
m
320.00
401,280.00
E
Non return valve
24
nr
3,000.00
72,000.00
F
Gate Valve
30
nr
3,000.00
90,000.00
G
Water meter
6
nr
12,500.00
75,000.00
Extra over galvanized iron pipes; fittings, not exceeding 65mm diameter 25mm Diameter fittings H
Elbows
300
nr
230.00
69,000.00
J
Equal tees
168
nr
280.00
47,040.00
K
Reducing tees
66
nr
280.00
18,480.00
L
Union connector
114
nr
250.00
28,500.00
M
Nipple
120
nr
120.00
14,400.00
Carried to collection
1,648,140.00
4 BEDROOM DUPLEX 22
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
19mm Diameter fittings A
Elbows
86
nr
200.00
17,200.00
B
Equal tees
48
nr
250.00
12,000.00
C
Reducing tees
14
nr
250.00
3,500.00
D
Union connector
78
nr
230.00
17,940.00
E
Nipple
51
nr
120.00
6,120.00
13mm Diameter fittings F
Elbows
89
nr
200.00
17,800.00
G
Equal tees
82
nr
250.00
20,500.00
H
Reducing tees
41
nr
250.00
10,250.00
J
Union connector
27
nr
230.00
6,210.00
K
Nipple
55
nr
120.00
6,600.00
Double trap coloured syphonic water closet with horizontal outlet with close couple 9 litres cistern and plastic cover complete with fittings
25
nr
25,500.00
637,500.00
wash hand basin 620 x 500mm with 3 taphole oval pedestal, starlite 12mm mixer with pop up waste accessories complete with wash-top to Architect's details
25
nr
14,500.00
362,500.00
Purposed made quality Jacuzzi set complete with all necessary accessories
5
nr
350,000.00
1,750,000.00
Pressed steel bath tub size; 1700 x 700mm with telephone shower
5
nr
27,000.00
135,000.00
R
Double drainer double bowl kitchen sink
5
nr
19,000.00
95,000.00
S
750mm x 750mm shower tray complete with all neccesary Accessories
20
nr
8,500.00
170,000.00
Y25: General pipeline equipment Equipment; supply, install and connect up pipeline equipment as manufactured by Eago or other approved equal with all necessary accessories for complete installation L
M
N
P
Carried to collection
3,268,120.00
4 BEDROOM DUPLEX 23
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Y25: General pipeline equipment A
Vitreous china toilet roll holder fixed to wall
30
nr
3,000.00
90,000.00
B
Stainless steel towel holder fixed to wall
30
nr
3,000.00
90,000.00
C
Mirror; 4mm silvered float glass size 600 x 450mm high
30
nr
7,000.00
210,000.00
D
50 litres ARISTON electric water heater
30
nr
27,000.00
810,000.00
E
Soap dish
30
nr
2,000.00
60,000.00
F
Soap Dispenser
30
nr
6,500.00
195,000.00
G
Hand dryer
30
nr
13,000.00
390,000.00
Straight UPVC pipes in chases/trenches/floor screeds H
100mm Diameter
465
m
520.00
241,800.00
J
75mm Diameter
360
m
450.00
162,000.00
K
50mm Diameter
210
m
450.00
94,500.00
Extra over PVC pipes; fittings, exceeding 65mm diameter 100mm Diameter L
UPVC elbow
44
nr
350.00
15,400.00
M
PVC tee
36
nr
400.00
14,400.00
N
WC connection sleeve
12
nr
1,450.00
17,400.00
P
Y radius bend
15
nr
625.00
9,375.00
Q
Pam connector
35
nr
560.00
19,600.00
R
Cleaning eye
44
nr
450.00
19,800.00
75mm Diameter S
UPVC elbow
80
nr
320.00
25,600.00
T
PVC tee
65
nr
370.00
24,050.00
U
Pam connector
55
nr
500.00
27,500.00
V
Cleaning eye
41
nr
400.00
16,400.00
Carried to collection
2,532,825.00
4 BEDROOM DUPLEX 24
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
50mm Diameter A
UPVC elbow
53
nr
280.00
14,840.00
B
PVC tee
34
nr
320.00
10,880.00
C
Cleaning eye
35
nr
400.00
14,000.00
14
nr
1,250.00
17,500.00
36
nr
25,000.00
900,000.00
Y11: Pipework ancillaries D
Traps; 50mm diameter UPVC floor drains grouted to floor bed Manholes/ Inspection Chamber
E
Manhole size 500 x 500 x 600mm deep internally constructed of 150mm thick concrete(1:3:6) base, 150mm thick sandcrete blockwork filled solid with lean concrete, 75mm thick concrete(1:3:6) benching and forming 150mm diameter half round channel, covered with cast iron, internal faces rendered in water proof cement sand mortar(1:3) including excavation, backfilling and disposal of surplus excavated materials U60: Air conditioning Units
F
Allow a provisional sum of N800,000.00 for pipe work and ancillaries in connection to Air Conditioning to be expended in accordance to Engineer's instructions
sum
800,000.00
Fire Fighting System Equipment; supply, install, connect up and commission fire fighting system as manufactured by ANGUS or other approved equal complete with piping/trunking as specified including all necessary accessories G
Fire extinguisher; ABC 9Kg capacity general purpose dry powder type
6
nr
16,500.00
99,000.00
H
240v fire alarm bell
6
nr
7,500.00
45,000.00
J
Break glass
6
nr
5,500.00
33,000.00
K
fire alarm outdoor siren
6
nr
10,550.00
63,300.00
Carried to collection
1,997,520.00
4 BEDROOM DUPLEX 25
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
Collection
Page 22
1,648,140.00
Page 23
3,268,120.00
Page 24
2,532,825.00
Page 25
1,997,520.00
PLUMBING AND MECHANICAL SERVICES CARRIED TO SUMMARY
4 BEDROOM DUPLEX 26
9,446,605.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SPORT CENTER
SUMMARY 1
SUBSTRUCTURE
13,243,320.00
2
FRAMES
9,334,100.00
3
STAIRCASES
7,380,530.00
4
UPPER FLOORS
11,535,450.00
5
ROOF
14,268,400.00
6
INTERNAL AND EXTERNAL WALLS
16,249,600.00
7
DOORS AND WINDOWS
11,026,995.00
8
FITTINGS AND FIXTURES
9
WALL FINISHES
16,573,920.00
10
CEILING FINISHES
11,317,440.00
11
FLOOR FINISHES
11,224,160.00
12
ELECTRICAL SERVICES
15,381,425.00
13
PLUMBING AND MECHANICAL SERVICES
4,795,000.00
9,446,605.00
FOUR BEDROOM SEMI-DETACHED DUPLEX (5Nos) Total carried to General Summary
4 BEDROOM DUPLEX 27
151,776,945.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
GENERAL SUMMARY
PRELIMINARIES
114,877,755.25
POLICE/FIRE SERVICE POST
1
NR
7,490,575.00
7,490,575.00
SHOPPING CENTER
1
NR
1,190,064,530.00
1,190,064,530.00
SPORT CENTER (All- Provisional) Subject to Measurement
EXTERNAL WORKS Parking and Fencing and external Drainage system (All- Provisional) Subject to Measurement
SUM
450,000,000.00
SUM
650,000,000.00
2,412,432,860.25
CONTINGENCIES
50,000,000.00 2,462,432,860.25
ADD VAT 5%
123,121,643.01
TOTAL COST OF CONSTRUCTION
2,585,554,503.26
28
GENERAL SUMMARY
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO BILL NO. 1
GENERAL CONDITIONS AND PRELIMINARIES CONDITIONS OF CONTRACT The Contractor is deemed to have carefully examined the Conditions of Contract of the Tender Documents and included against all the obligations and liabilities. The Conditions of Contract are the Standard Form of Building Contract in Nigeria for use with Quantities/ Federal Ministry of Works & Housing "LUMP SUM CONTRACT"; severally amended to suit local conditions and the peculiarities of the Works. Allow for complying with the requirements of the following clauses:CLAUSE Nr. 1. Contractor's Obligations 2. Consultants' Instructions. 3. Contract Documents.
4. Statutory Obligations, Notices, Fees and Charges. The Contractor should allow here or in his rates for any fees and charges legally demandable under this clause. 5. Levels and Setting out of the Works. 6. Materials, goods and workmanship to conform to description, testing and inspection. 7. Royalties and patent rights. 8. Foreman-in-charge. 9. Access for Architect/Supervising Officer to the works. 10. Clerk of works 11. Variations, Provisional and Prime Costs Sums. 12. Contract Bills. 13. Contract Sum. 14. Unfixed goods and materials 15. Practical completion and defects liability.
To Collection
PRELIMINARIES 29
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Conditions of Contract (contd.) Clause No. 16. Sectional completion. 17. Assignment or Sub-letting.
18. Injury to persons send property and Employer's indemnity. 19. Insurance against injury to persons and property Provide a provisional sum of N………………… for Insurances under 19(2) (a) whereby the Employer and the Contractor are Jointly indemnified up to the sum of N………………………………………… 20. Insurance of the Works against Fire etc. 21. Possession, completion and postpoment. 22. Damages for non-completion 23. Extension of time. 24. Loss and expenses caused by disturbances of regular progress of the Works 25. Determination by the Employer. 26. Determination by the Contractor. 27. Nominated Sub-contractor. 28. Nominated Suppliers 29. Artists and Tradesmen. 30. Certificates and Payments. 31. Fluctuations. 32. Outbreaks of Hostilities. 33. War Damage. 34. Antiquities. 35. Arbitration. To Collection
PRELIMINARIES 30
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Names of Parties The Employer is
INVESTRITE AND ABUJA MUNICIPAL AREA COUNCIL
The Architectr is: SHUAFEM CONSTRUCTION ASSOCIATES LIMITED
The Structural Engineer is: PRODEM LIMITED
The Quantity Surveyor is: JESIM LIMITED
The Electrical & Mechanical Engineers are: PRODEM LIMITED
To Collection
PRELIMINARIES 31
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries.
A
B
C
Site Location This work is to be carried out at a site located at …………………………… The Contractor is deemed to have inspected the site and taken notice of the site conditions as no claim arising from lack of knowledge of same will be entertainedd by the employer. Site Visit and Scope of Works. The contractor is advised to visit and inspect the site and make himself thoroughly and completely informed as to the condition of the site in its present state, the nature of the ground and full extent and character of the Works to be executed, means of access and storage space, the conditions affecting the supply of labour and the availability and supply of water. No claim for extra payment above the Contract Sum will be paid to the Contractor for want of knowledge of any conditions affecting the execution of the Works. A brief outline of the scope of the works appears immediately inside the front cover of this document and the Contractor is to allow here any sum in respect of the scope of nature of the Works. Bills of Quantities.
D
The pricing, Moneying out and totalling in these Bills of Quantities is to be in INK throughout and is to be in Nigerian Currency. The bills of quantities shall not be used for ordering materials. Any discripances found between the quantities or descriptions in the Bills and those to be ordered are reported to the Quantity Surveyor immediately.
E
The Contractor will be deemed to have included in his tender for the obligations and requirements of all items in these Contract Documents whether or not he has placed a rate or price against the items. Drawings.
F
All drawings, tracings, photo prints, etc., are the sole property of the Architect/S.O and must be returned to him upon completion of the works.
G
The Contractor shall check the whole of the dimensions on site and if any discripancy is found between the drawings and conditions on site, he shall notify the Architect/S.O immediately and request instructions.
To Collection
PRELIMINARIES 32
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries.
A
Drawings (Contd.) The Contractor shall provide and do everything necessary for the proper execution of the works according to the true intent and meaning of the drawings, whether the same may or may not be particularly shown on the drawings, provided that same is reasonably to be inferred therefrom. Figured dimensions are to be followed in preference to scaled dimensions.
B
Allow for mounting one complete set of drawings on plywood or other suitable rigid panels and keeping them on site throughout the Contract period.
C
The Contractor shall give adequate advance notice to the Architect/S.O of requirements with regards to instructions, etc. and in the absence of advance written notification to the contrary it will be assumed that the progress of the Works is not affected by the want of such notification.
D
E
Insurance Declaration On signing the contract, the Contractor shall obtain from his insurers and lodge with the Architect/S.O. a declaration that the insurance provided is strictly in accordance with clauses of the conditions of contract. Setting Out The Contractor shall accurately set out the works and include for providing all pegs, templates, instruments and labour necessary for so doing and as required by the Architect/S.O for checking this Works.
F
Excavation shall not be commenced until the permission of the Architect/S.O. is obtained.
G
Allow for providing when required on the site a "Dumpy" or Precise type level, complete with tripod and staff and allow for the free use of the leveling equipment by the Architect/S.O, Engineer or Quantity Surveyor.
H
J
J
Site Accommodation Allow for providing a suitable weather proof office on the site for the use of the Foreman-in-charge and other site staff and include for providing necessary furniture and lighting and clear away on completion. Allow for providing a suitable weather proof office on the site for the use of the Clerk of Works and consultants and large enough for the holding of site meetings and include for providing necessary furniture and lighting and clear away on completion. Allow for providing a temporary hut for the Watchman complete with lighting and necessary furniture and clear away on completion. To Collection
PRELIMINARIES 33
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Site Accommodation (contd.) A
Allow for providing and maintaining all necessary temporary Buildings for storage and protection of goods and materials on site and other work that may be brought or executed on the site including the tools and materials of sub-contractors and remove on completion. Sheds for the storage of cement are to have floors raised from ground. Electricity
B
Allow for providing all temporary lighting and power for the works including that for use by special tradesmen and sub-contractors; paying all fees and charges and providing all necessary temporary mains and clearing away and making good on completion. Water
C
Allow for providing all water required for the works including that for sub-contractors. The water is to be clean, fresh water.
D
Allow for executing all temporary plumbing and paying all fees and charges incurred in the connection and supply of the water for building purposes and the removal of all temporary plumbing on completion. Temporary Works
E
The Contractor shall ensure that all temporary electrical, water and other installations are executed in accordance with the requirements of the Authorities concerned. Temporary Fencing and Access Roads.
F
Allow for all necessary temporary access roads, crossroads, crossovers, gangways, gates, entrances and the like required, maintain and clear away and make good on completion.
G
Allow for adequate temporary security fencing to the perimeter of site, maintain and clear away and make good on completion. Welfare and Safety.
H
Allow for providing adequate latrine accommodation and keeping same in a clean and sanitary condition to the satisfaction of the Health Authorities and clearing away latrines and soil whenever necessary and making good all works disturbed.
To Collection
PRELIMINARIES 34
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Welfare and Safety (Contd.) A
Allow for providing sheds and workshops for the use of the workmen on the site and maintaining and subsequently dismantling and carting away on completion and allow for providing and maintaining welfare and safety measures and amenities of a suitable standard approved by the Architect/S.O. or required by the authorities.
B
The Contractor is to provide on site a First Aid Box or Cupboard prominently marked with the words "First Aid" for the purpose of treating any of his employees injured on site. The contents of this box or cupboard are to comply in all respects with the Factories Ordinance. The Contractor is to ensure that there is always adequate stocks in the First Aid Box or Cupboard which is to be produced and opened for the inspection of the Architect/ S.O. on request. Watching and Lighting
C
Allow for providing all necessary guards, day and night watchmen and lighting for the protection of the works and the safety of the public. Hoardings and Barreirs
D
Allow for providing all fans, gantries, hoardings guard rails, barriers, or any other form of special protection to all sides of the buildings and site as necessary to protect adjoining property, persons, vehicles and the like from injury. Ordering of Materials
E
Upon receipt of the order to commence the works, the contracttor shall immediately place orders for all the required materials and will be held responsible for any delays occurring due to the late placing of such orders.
F
The contractor shall, if so requested by the Architect/S.O. make available to him all documents in connection with the ordering of materials for the works, showing agreed delivery dates, sources of supply and the like.
G
If upon receiving quotations for any materials required for the works it appears that delivery by the dates quoted will delay the works, the contractor shall inform the Architect/S.O. of this fact before placing the orders.
To Collection
PRELIMINARIES 35
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Time and Progress A
The works shall be proceeded with in such sections and sequences as will affect completion of all works within the time for completion or as directed by the Architect/S.O.
B
Immediately upon signing the Contract, or before signing the Contract, if requested, the Contractor shall in collaboration with Sub-Contractors submit to the Architect/S.O. for acceptance programmed and progress charts to cover all activities on the site and shall record progress thereon throughout the execution of the works.
C
The Contractor shall arrange for representatives to attend site meetings as and when reasonably required by the Architect/ S.O. and shall provide seating and other necessary facilities for such meetings.
D
The Contractor's attention is drawn to his responsibility for the co - ordination and programming of sub-contractor's work. The Contractor is expected to arrange suitable programmes with his sub-contractors and to check regularly that such programmes are adhered to. Where delays arise in connection with sub - con tract works, the Contractor will be expected to have been aware of such at an early stage and to have taken appropriate action defined in the sub - contract document by the giving of such notices as may be required in preparation for determination of same. Determination shall not be affected without the prior consent of the Architect/S.O. but requests for extensions of the Contract period on the grounds of delay by sub - contractor will not be considered unless the contractor can establish requirements. Materials found on the site
E
Any sand, laterite, gravel, or other building materials discovered on the site shall be property of the Employer and shall not be used in the construction of the Works without the prior written consent of the Architect/S.O. The market price of the materials so used shall be allowed to the Employer by the Contractor and the Contract Sum adjusted accordingly. Precious articles or antiquities found on the site shall be the property of the Employer and shall be handed over to the Architect/S.O
To Collection
PRELIMINARIES 36
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Scaffolding and Plant A
Allow for providing all scaffolding, hoists, tackle and other plant, profiles, templates, centerings and equipment generally required for the proper, safe and efficient execution of the works and providing all labour and things required by the Architect/S.O. for testing and measuring the Works and for weighting, measuring or testing the efficiency of any portion of the works.
B
The Contractor is particularly to note that scaffolding, staging and the like is to be provided both for the execution of his own work and that of sub - contractors employed under this Contract, including that required solely for the execution of work by sub - contractors.
C
Allow for providing all gangways, walkways, planking, deckings, temporary platforms, etc. necessary to construct and afford access to or between all parts of the works. Records
D
Allow for keeping such books, accounts and other documents and records as are necessary to show the increases in costs incurred or the reductions obtained under Clause 31 of the Conditions of Contract and furnishing such books, accounts documents and records to the Quantity Surveyor or other person authorised to receive them at monthly intervals or as requested throughout the duration of the Contract.
E
In the event of adjustments arising under Clause 31 of the Conditions of Contract, the Contractor shall submit monthly fully priced out and totalled, statements showing the total adjustments claimed, together with separate sheets relating individually to the various sub-contractors. Protection of the works
F
Allow for covering up and protecting from injury from weather or from any cause, all new work, also for supplying all temporary doors, protection to windows and any other requisite protection for the whole of the works executed whether by the Contractor or special tradesmen or sub-contractors and any damage caused must be made good by the Contractor at his own expense.
G
During inclement weather the Contractor shall suspend such parts of the Works for such time as the Architect/S.O. may decide and shall protect from injury all works then in the course of erection.
To Collection
PRELIMINARIES 37
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Tests and Samples A
Allow for carrying out tests of any materials, either before or after use in the works and for providing samples of all materials and specimens of colours for approval as required by the Architect/S.O. or Engineer before or application in the Works. Covering Up
B
No work shall be covered up until it has been examined and approved by the Architect/S.O.
C
In the case of work executed against provisional quantities in the Bills of Quantities (and therefore subject to measurement) the Contractor shall notify the Quantity Surveyor before proceeding to cover up the Works. Opening Up.
D
The Contractor shall, at the request of the Architect/S.O. open up for inspection any work covered; and should the Contractor refuse or fail to comply with such request, the Architect/S.O. may employ other workmen to open up same. If the said work has been covered in contravention of the Architect/S.O.'s Instructions and if on being opened up it be found not in accordance with the drawings or instructions of the Architect/ S.O. , the expenses of opening up and covering up again, whether done by the Contractor or other workmen, shall be borne by, or recoverable from the Contractor or may be deducted as aforesaid. If the work has not been covered up in contravention of such instructions and be found in accordance with the said drawings, etc. , then the expenses aforesaid shall be borne by the Employer and be added to the Contract Sum. Existing Installations
E
Allow for protecting and maintaining all pipes, ducts and cables met in excavations, for keeping all ditches, gullies and channels clear and unobstructed and for making good any damaged caused to public or private roads, paths, kerbs and drains and paying all costs and charges incurred. Temporary Storm Water Drainage.
F
Allow for ensuring that the whole of the site is kept free from the risk of stormwater flooding and providing such temporary ditches, gullies and the like as may be necessary and for subsequently backfilling such excavations and making good. Any damage arising from non-compliance with this clause is to be made good at the Contractor's own expense.
To Collection
PRELIMINARIES 38
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Prevention of Nuisance A
Allow for taking all necessary precautions with regard to the order and method of execution of the work to avoid causing disturbance or nuisance to the users and occupiers of existing buildings and premises adjacent to the Works and for complying with any directions of the Architect/S.O. in this respect. Access for Workmen
B
The Contractor shall at all times give access to workmen employed by the Employer or by local or other authorities or any other parties and use of proper, sufficient, and if required, special scaffolding, hoists and ladders and provide them with water and lighting, etc. Delays
C
The Contractor will be deemed to have made allowance for all delays caused by difficulty in obtaining labour and materials or suspension of part or the whole of the Works due to adverse weather conditions. Overtime and Completion
D
The whole of the Works are to be completed by the time stated in the Contract and no extra will be allowed in respect of overtime paid to achieve this.
E
In the event of the Works falling behind programme for reasons other than those which would entitle the Contractor to an extension of time under the Conditions of Contract, then the Contractor shall, if so instructed by the Architect/S.O. arrange, at no extra cost, double-shift working on the site until such time as progress on the site is in accordance with the programme.
F
If overtime is specifically ordered in writing by the Architect/S.O. in respect of extra works, the net extra costs, over and above normal daily rates, will be paid to the Contractor. Dismissal by Request
G
The Contractor shall, on written request of the Architect/S.O. or his representative on the site, immediately dismiss from the Works any person employed by him thereon who may, in the opinion of the Architect/S.O be incompetent or misconduct himself and such person shall not again be employed on the Works without the written permission of the Architect/S.O.
To Collection
PRELIMINARIES 39
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Imported Materials A
Where materials are to be supplied from outside Nigeria, the cost of such materials C.I.F., Apapa Docks together with landing charges, duty and other Government taxes will be set against the P.C or Provisional Sum included in the Bills of Quantities. The Contractor will be required to collect and clear the materials from Apapa Docks, handle, load and transport them to the site and will be responsible for any loss or damage to the materials after they are landed; an item for this is included in the Bills of Quantities after the relevant P.C Sums. Prime Cost Sums
B
The following items in connection with prime cost sums are in addition to the Contractor's obligations described elsewhere (for example, provision of scaffolding, etc.)
C
Receipted vouchers for all articles for which prime cost amounts are included in the Bills of Quantities must be produced at the final settlement of accounts and the final certificate will not be issued until such receipts have been produced.
D
The Contractor shall allow for checking Nominated Suppliers' invoices and quotations, etc., before placing orders in respect of P.C Items and shall be solely responsible for ensuring that all materials so ordered are sufficient and correct in quantity and contain due allowance for waste, etc.
E
The Contractor shall allow for checking all materials supplied by the Nominated Suppliers at the time of receipt on site, unpacking, re-packing and taking all necessary action in respect of insurance claims and the re-ordering of broken or damaged articles.
F
Where the Contractor is required to 'Fix Only' materials supplied by Nominated Suppliers or others, the rates inserted in the Bills of Quantities are to allow for taking delivery, stacking, storing and protecting until required, assembling as necessary and getting into position before fixing.
To Collection
PRELIMINARIES 40
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Prime Cost Sums (cont'd) A
Where the term 'attendance' or 'attend upon' is used in the Bills of Quantities in connection with Nominated Sub-Contractor's work, or work executed by others, the Contractor shall allow for the use of standing scaffolding, canteens, sanitary accommodation, office accommodation, space for storage of plant and materials and for providing light and water and clearing away rubbish and for taking delivery of all materials when received on the site, unloading, handling, stacking or storing until required and hoisting into position. The Contractor shall allow for affording maximum co-operation in arranging that builder's work is carried out, as far as possible to suit the convenience of the Sub-contractors. The Contractor shall obtain from the sub-contractors their requireements for recesses, chases, holes and the like so that these may be formed correctly as the work proceeds. No extra charge will be allowed for cutting chases, holes, etc., out of proper sequence. Provisional Sums
B
Work executed against provisional sums shall be measured and valued in accordance with clause 11 of the Conditions of Contract with the exception that the cost of materials falling within the scope of P.C items elsewhere in the Bills of Quantities will be offset against those P.C items. Omission of P.C or Provisional Sums
C
The Employer reserves the right to omit any P.C or Provisional Sum from the Contract and no claim for loss of profit arising from such omissions will be entertained. Direct Payment by Employer for Items covered by P.C or Provisional Sums.
D
The Employer reserves the right to supply and pay direct for any items covered in this Contract by P.C or Provisional Sums.
E
No adjustment will be made to the Contractor's profit and attendance on P.C Sums (whether expressed as a lump sum or as a percentage) should this right be exercised.
To Collection
PRELIMINARIES 41
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries. Advertisements A
The Contractor shall not display, or permit the display of any advertisement within the boundaries of the site or upon any temporary fencing, hoardings, plant, etc., save upon the written instructions of the Architect/S.O. Site Board
B
Provide and erect a site board showing the title of the Contract, names and addresses of the Consultants, Nominated Suppliers and Sub-Contractors and such other information as may be required by the Architect/S.O who shall approve the design layout and colours of the board. Lettering shall be 'cut-out' plywood or plastic of an approved thickness, and shall be 100mm high for the main title, and 50mm or 38mm high elsewhere. The whole board shall be maintained in good condition, repainted as necessary, and removed when no longer required. Clearing of Rubbish
C
Allow for clearing away all shavings, cuttings and other rubbish as it accumulates from time to time during the progress of the Works and on completion, including that of sub-contractors and special tradesmen and the disposal of all materials condemned by the Architect/S.O. Clearing on Completion
D
Allow for cleaning down the whole of the premises including cleaning glass both sides and cleaning off all floors, pavings, metalwork, finishings and fittings throughout, touching up generally and removing all stains, dirt and surplus materials and rubbish and leaving the Works and site in a clean and tidy condition and ready for immediate use, with all damage to property, roads, paths and drains, etc., made good to the satisfaction of the Architect/S.O. Defects after Completion
E
Allow for inspecting the Works at the end of the Defects Liability Period and making good all defects in accordance with clause 15 of the Conditions of Contract. Allow also for inspecting and making good such defects as may be of an urgent nature during the Defects Liability Period.
To Collection
PRELIMINARIES 42
N
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DESCRIPTION
NO Preliminaries.
A
B
C
Exterminate and Prevent Pests Allow for effectively destroying all vermin, insects and pests to the whole area of the site and taking all preventive measures to maintain the site in a clean and sanitary condition to the satisfaction of the Architect/S.O. (See also item in "work below ground floor slab" of each building for special treatment of ground under buildings) Advance Payment/Performance Bond Allow for providing an Advance Payment/Performance Bond obtainable from an approved Bank or Insurance Company. Project Vehicle Allow for provion of an approved 2Nrs Hilux car as consultants' project Vehicle including fueling and maitaining, driver salaries etc. throughout the duration of the project, and shall be handed over to client on completion of the project.
21,000,000.00
To Collection Below COLLECTION Page Prel/1 Page Prel/2 Page Prel/3 Page Prel/4 Page Prel/5 Page Prel/6 Page Prel/7 Page Prel/8 Page Prel/9 Page Prel/10 Page Prel/11 Page Prel/12 Page Prel/13 Page Prel/14 Page Prel/15 Preliminaries Carried to Grand Summary
PRELIMINARIES 43
114,877,755.25
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
POLICE POST/FIRE OFFICE SUBSTRUCTURE (ALL PROVISIONAL) Excavations and Earthwork A
B
C
Excavate topsoil to remove vegetable top soil maximum depth not exceeding 150mm and cart away to a distance of 2.00m from site
119
m
2
50.00
5,950.00
from stripped level not exceeding 1.50m deep.
50
m
3
575.00
28,750.00
Ditto pit to receive column bases
22
m
3
575.00
12,650.00
11
m
3
220.00
2,420.00
28
m
3
180.00
5,040.00
101
m2
1,350.00
136,350.00
56
m2
40.00
2,240.00
151
m2
55.00
8,305.00
Excavate trench for foundation starting
Filling D
Remove surplus excavated material and cart away from site
E
Return fill and ram excavated material around pits and Foundation.
F
Approved imported laterite hardcore filling well rammed and consilidated in layers in 150mm layers.
Surface Treatment G
Level and compact bottom of excavation to receive concrete.
H
Prepare and apply "Dieldrex" 20 anti-terminate treatment to sides and bottom of excavation.
201,705.00
To Collections
POLICE/FIRE SERVICE POST44
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
substructure cont'd concrete Work Insitu Concrete mix 1:10 aggregate in A
50mm thick blinding
73
m2
2,100.00
35,700.00
17
m
3
42,000.00
42,000.00
42,000.00
210,000.00
plain insitu concrete Grade 20 developing crushing strenght of 21N/mm2 in 28 days in: B
Foundation trenches Reinforced in-situ concrete (grade 25) developing strenght of 21N/mm2 at 28 days in:
C
Column Base
1
m
3
D
Column
1
m
3
E
Ground Beam
1
m3
F
150mm bed
2
m3
5 Reinforcement Round hot rolled tensile deformed bar reinforcement to BS4449 and 4461 including all necessary cuttings, bends, hooks, tying, wires etc. Column Bases G
12mm diameter bar
86
Kg
300.00
25,800.00
Column H
16mm diameter bar
110
Kg
300.00
33,000.00
J
10mm diameter bar
76
Kg
300.00
22,800.00
Ground Beam K
16mm diameter bar
120
Kg
300.00
36,000.00
L
10mm diameter bar
98
Kg
300.00
29,400.00
119
m2
1,150.00
136,850.00
Slab Single layer BRC mesh reinforcement to BS 4483 reference A193 weighing 3,02Kg/m2 laid in bed with 150mm side and end laps (measured nett) in: M
Floor Slab
To Collections 571,550.00
POLICE/FIRE SERVICE POST45
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
Substructure cont'd Formwork Sawn formwork to A.
Sides of Columns base
2
m2
B
Sides of column
3
m2
1,650.00
8,250.00
5 C
Sides floor bed 150mm high
15
m
400.00
6,000.00
10
m
2
4,800.00
48,000.00
Blockwork sandcrete hollow blocks with cavities filled solid with plain in situ concrete (1:4:8) - 100mm aggregate D
230mm walls
To Collections
62,250.00
COLLECTIONS PAGE 1
201,705.00
PAGE 2
571,550.00
PAGE 3
62,250.00
SUBSTRUCTURE CARRIED TO SUMMARY
835,505.00
POLICE/FIRE SERVICE POST46
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
CONCRETE WORK Reinforced in-situ concrete (grade 25) developing strenght of 2/mm2 at 28 days in: A
Column
1
m
3
42,000.00
42,000.00
B
Roof Beam
1
m
3
42,000.00
42,000.00
Reinforcement Round hot rolled tensile deformed bar reinforcement to BS 4449 and 4461 including all necessary cuttings, bends hooks, tying wires etc. in Column C
16mm Diameter
180
Kg
300.00
54,000.00
D
10mm Diameter
90
Kg
300.00
27,000.00
Roof Beam E
16mm Diameter
165
Kg
300.00
49,500.00
F
10mm Diameter
87
Kg
300.00
26,100.00
Sawn Formwork G
Sides of Column
3
m2
1,650.00
4,950.00
H
Sides and Soffit of roof beam
19
m
360.00
6,840.00
252,390.00 CONCRETE WORK CARRIED TO SUMMARY
POLICE/FIRE SERVICE POST47
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
BLOCKWORK
Sandcrete hollow block in blocks sizes 450 x 230mm high built in cement mortar (1:4) A
230mm thick wall
380
BLOCKWORK CARRIED TO SUMMARY
m2
3,800.00
1,444,000.00
1,444,000.00
POLICE/FIRE SERVICE POST48
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ROOFING Aluminium roofing sheets 0.55mm gauge longspan aluminium roofing sheets fixed to timber purlin with hooks and bolts in accordance with the manufactures instruction A
Roofing
212
m
2
4,850.00
1,028,200.00
B
Ridge capping 700mm girth
12
m
2,450.00
29,400.00
C
Gutter valley 700mm girth
34
m
2,450.00
83,300.00
D
450mm flashing twice bent one end dressed over and other end turned in groove in blockwork
22
m
1,650.00
36,300.00
ROOFING CARRIED TO SUMMARY
1,177,200.00
POLICE/FIRE SERVICE POST49
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
CARPENTARY AND JOINERY
Treated Sawn Hardwood A
150 x 50mm Rafters at 1200mm centres
211
m
380.00
80,180.00
B
150 x 50mm Tie beams at 1200mm centres
186
m
380.00
70,680.00
C
150 x 50mm King post at 1200mm centres
24
m
380.00
9,120.00
D
100 x 50mm struts
18
m
320.00
5,760.00
E
50 x 75mm purlins at 900mm centres
21
m
260.00
5,460.00
F
50 x 50mm Noggins at 600mm centres
176
m
240.00
42,240.00
CARPENTARY & JOINERY CARRIED TO SUMMARY
213,440.00
POLICE/FIRE SERVICE POST50
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
DOORS AND WINDOWS
A
HARDWOOD TIMBER 44mm Thick solid core veneer plywood polished flush doors complete with metal frame and high quality lock set (measured separately), Doors 900 x 2100mm high
4
No
30,000.00
120,000.00
B
Door 750 x 2100mm high
2
No
30,000.00
60,000.00
6
No
4,500.00
27,000.00
6
No
6,500.00
39,000.00
6
No
600.00
3,600.00
Supply and fix approved ironmongery to doors C
75 toilet privacy bolts
D
Cylinder lockset or other equal and approved type with lever handle furniture
E
Plastic door stopper screwed to floor
WINDOWS ALUMINIUM SLIDING WINDOWS F
Composite window overall size 900x 1200mm high comprising sliding window size 900 x 1200 Fixed to block work and concrete
6
No
20,000.00
120,000.00
G
Ditto 600 x 600mm ditto
2
No
12,500.00
25,000.00
BURGLAR PROOFING TO WINDOWS Fabricate and install complete Mild Steel bars consisting of 16mm high tensile vertical and horizontal bars welded together including priming in red oxide paint and one finishing coat gloss paint. H
1200 x 900mm high.
6
No
9,500.00
57,000.00
J
600 x 600mm high
2
No
7,500.00
15,000.00
DOORS AND WINDOWS CARRIED TO SUMMARY
466,600.00
POLICE/FIRE SERVICE POST51
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
PLUMBING AND ENGINEERING INSTALLATIONS SANITARY APPLIANCES Supply anf fix the following sanitary fittings in accordance with the manufacturer's instructions TWYFORD Vitreous china low level water Closet white suite with "P" trap or equal approved type by "CCA" complete with all necessary accessories
2
Nr
28,000.00
56,000.00
TWYFORD 560 x 405mm Wash Hand basin complete with pedestal and all accessories
2
Nr
18,000.00
36,000.00
750 x 750mm shower tray complete with all necessary accessories approved by 'CCA'
2
Nr
20,000.00
40,000.00
Towel rail Chrome plated steel rail and holder; Screwed to wall with and including drive screws
2
Nr
3,500.00
7,000.00
Toilet roll holder; stainless stell with a wooden thief proof holder fixed to wall
2
Nr
1,400.00
2,800.00
Mirrow; 4mm silvered floated glass; 600 x 450mm with arised edges
2
Nr
5,500.00
11,000.00
2
Nr
1,500.00
3,000.00
148
m
350.00
51,800.00
J
Straight galvanised iron pipe in chases/trenches/ Floor screed 38mm Diameter
18
m
1,200.00
21,600.00
K
25mm Diameter
21
m
900.00
18,900.00
L
19mm Diameter
14
m
410.00
5,740.00
M
13mm Diameter
8
m
240.00
1,920.00
N
Extra over 38mm UPVC Pipe; for Fittings Elbows;38
5
Nr
180.00
900.00
P
Equal tee;38x38x38
16
Nr
180.00
2,880.00
Q
Reducing Tee;38x38x25
12
Nr
180.00
2,160.00
R
Union Connector;38
8
Nr
180.00
1,440.00
S
12
Nr
180.00
2,160.00
T
Sockets;25 Extra over 25mm UPVC Pipe; for Fittings Elbows;25
8
Nr
180.00
1,440.00
U
Reducing Tee;25x25x19
8
Nr
180.00
1,440.00
A
B
C
D
E
F
G
Floor drain; stainless steel; mounted flush with floor finish and 50mm low level S-trap COLD WATER SUPPLY Trenches/Pipesways/Pits for buried Engineering Services
H
Excavating trenches for services 500mm norminal size: 500mm average depth from 150mm below excavated materials; disposal of surplus excavated materials
Pipelines
To Collections
268,180.00
POLICE/FIRE SERVICE POST52
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
A
Union Connector;25
8
Nr
180.00
1,440.00
B
Sockets;25
6
Nr
180.00
1,080.00
Extra over 19mm UPVC Pipe; for Fittings C
Elbows;19
6
Nr
80.00
480.00
D
Equal tee;19x19x19
8
Nr
80.00
640.00
E
Reducing Tee;19x19x13
1
Nr
80.00
80.00
F
Union Connector;19
4
Nr
80.00
320.00
G
Sockets;19
6
Nr
80.00
480.00
Extra over 13mm UPVC Pipe; for Fittings H
Elbows;13
8
Nr
80.00
640.00
J
Equal tee;13x13x13
4
Nr
80.00
320.00
K
Nipples; 13
2
Nr
80.00
160.00
L
Union Connector;13
8
Nr
80.00
640.00
M
Sockets;13
5
Nr
80.00
400.00
Gate valve; 19mm; bronze body; with 2 nr connections to galvanised mild steel pipe
3
Nr
2,000.00
6,000.00
Stop cork; 13mm; bronze body; with 2 nr connections to galvanised mild steel pipe
8
Nr
800.00
6,400.00
Pipework Ancillaries N
P
WASTE WATER INSTALLATION Pipe work The following in approved PVC waste water discharge pipe with and including all accessories to match Q
100mm Diameter
97
m
700.00
67,900.00
R
32mm Diameter
13
m
550.00
7,150.00
Extra over PVC Discharge pipe S
100 x 100mm WC connector
1
Nr
800.00
800.00
T
32 x 32mm elbow
4
Nr
800.00
3,200.00
U
Tee 50 x 50mm
3
Nr
800.00
2,400.00
Inspection Chamber 450 x 450 x 450mm high inspection chamber with blockwall on reinforced 100mm thick concrete base and including precast 75mm thidk reinforced concrete cover.
2
Nr
30,000.00
60,000.00
V
To Collections
160,530.00
POLICE/FIRE SERVICE POST53
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
TESTING AND COMMISSIONING A
B
Test the entire installation in accordance with the Enginner's specification
100,000.00
Preparing Drawings;information required in the Engineer's specification;3Nr copies;1Nr negative and 2Nr prints; binding into two sets;for the Employer.
50,000.00
To collections
150,000.00
COLLECTIONS PAGE 9
268,180.00
PAGE 10
160,530.00
PAGE 11
150,000.00
PLUMBING AND ENGINEERING INSTALLATIONS CARRIED TO SUMMARY
POLICE/FIRE SERVICE POST54
578,710.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELECTRICAL ENGINEERING INSTALLATIONS Accessories fo Electrical Services ACCESSORIES; LIGHTING SWITCHES; AS SPECIFIED RATE TO INCLUDE GALVANISED STEEL KNOCKOUT BOX SET IN MORTICES IN WALL; (FLUSH MOUNTED)
A
1 gang 1 way "MEM' or equal approved
4
Nr
2,500.00
10,000.00
B
1 gang 2 way Ditto
4
Nr
2,500.00
10,000.00
C
2 gang 2 way Ditto
2
Nr
2,500.00
5,000.00
D
3 gang 2 way Ditto
2
Nr
2,500.00
5,000.00
CONDUIT AND CABLE TRUNKING CABLE AND CONDUIT IN FINAL CIRCUIT;RADIAL MAIN CIRCUIT; PVC INSULATED AND COLOUR CODED CABLE TO BS 6004 TABLE 1A; DRAWN INTO AND INCLUDING 20MM DIAMETER HEAVY GUAGE PVC CONDUIT; RATE TO INCLUDE FOR ALL CABLE ANCILLARIES DEEMED NECCESARY FOR A COMPLETE INSTALLATION E
3Nr single Core 2.5mm2 Cables
110
m
1,250.00
137,500.00
F
3Nr single Core 4mm2 Cables
46
m
1,800.00
82,800.00
ACCESSORIES; SOCKETS; AS SPECIFIED RATE TO INCLUDE GALVANISED STEEL KNOCKOUT BOX SET IN MORTICES IN WALL; (FLUSH MOUNTED)
G
13A 1 gang Double Pole "MEM' or equal approved
3
Nr
2,500.00
7,500.00
H
13A 2 gang Double Pole "MEM' or equal approved
1
Nr
2,500.00
2,500.00
J
20A 3 pin 1 gang Double Pole "MEM' or equal approved
1
Nr
3,200.00
3,200.00
K
15A 3 pin 1 gang Double Pole "MEM' or equal approved
1
Nr
2,800.00
2,800.00
1 x 18W Flourscent, Ceiling Mounted with Diffuser
1
Nr
1,800.00
1,800.00
Surface mounted Twin Flourscent with Opal Diffuser with 1 x 36 TLD Flourescent
1
Nr
3,500.00
3,500.00
Surface mounted Single Flourscent with Opal Diffuser with 1 x 18 TLD Flourescent
1
Nr
3,500.00
3,500.00
Recessed Vertical Downlighter witrh High Frequency Electronic ballast
1
Nr
2,400.00
2,400.00
Ceiling Mounted Fitting in Die cast Aluminium Satin Glass With Aluminium reflector
1
Nr
2,900.00
2,900.00
R
Compact Flourescent wall Mirrow Light
1
Nr
1,200.00
1,200.00
S
Newclime celing fan complete with regulators
1
Nr
9,500.00
9,500.00
Fittings and Accessories L M
N
P Q
ELECTRICAL ENGINEERING INSTALLATIONS: Carried to Summary
291,100.00
POLICE/FIRE SERVICE POST55
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT NO. 8 FLOOR, WALL AND CEILING FINISHINGS FLOOR FINISHES INTERNAL WORKS 300 x 300 x 8mm Vitrified ceramic floor tiles laid on cement and sand screeded bed (measured separately)
134
m
2
3,800.00
509,200.00
B
Ditto 19x150mm skirting
19
m
1,500.00
28,500.00
C
Ditto treads 300mm wide
6
m
1,850.00
11,100.00
134
m
2
630.00
84,420.00
A.
Cement and sand (1:3) beds and backings D
42mm Screeded bed to receive vitrified ceramic floor tiles
E
Ditto screeded bed to receive treads
6
m
465.00
2,790.00
F
12mm floated backing
19
m
465.00
8,835.00
G
EXTERNAL WORKS 300 x 300 x 8mm Vitrified ceramic floor tiles laid on cement and sand screeded bed (measured separately)
4
m2
3,800.00
15,200.00
H
Ditto 19x150mm skirting
6
m
1,500.00
9,000.00
J
Ditto treads 300mm wide
4
m
1,850.00
7,400.00
K
Cement and sand (1:3) bed 42mm Screeded bed to receive vitrified ceramic floor tiles
4
m2
630.00
2,520.00
L
Ditto screeded bed to receive treads
4
m
465.00
1,860.00
M
12mm floated backing
6
m
465.00
2,790.00
WALL FINISHES Internal works 12mm cement and sand (1:4) smooth rendering to N
Walls
134
m
2
450.00
60,300.00
P
Surfaces not exceeding 100 -200mm wide
10
m
90.00
900.00
Q
Ditto not exceeding 300mm wide
3
m
135.00
405.00
R
GLAZED WALL TILES 200 x 200x6mm Colour glazed wall tiles fixed with approved adhesive on cement and sand floated backing (measured separately)
12
m2
3,500.00
42,000.00
S
Ditto reveals100-200mm wide
5
m
1,500.00
7,500.00
T
Ditto 19x150mm Apron
4
m
1,500.00
6,000.00
U
Ditto risers 150mm high Cement and sand (1:3) beds and backings
2
m
1,500.00
3,000.00
12mm floated backing to receive glazed ceramic wall tiles (measured separately)
12
m2
450.00
5,400.00
W
Ditto reveals100-200mm wide
5
m
90.00
450.00
X
Ditto 19x150mm Apron
4
m
90.00
360.00
Y
Ditto risers 150mm high
2
m
90.00
180.00
V
To collection
810,110.00
POLICE/FIRE SERVICE POST56
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT NO. 8 continued External works 12mm cement and sand (1:4) smooth rendering to: A
Walls
C
224
m2
450.00
100,800.00
Sides not exceeding 200mm width
6
m
90.00
540.00
D
Ditto not exceeding 300mm wide
3
m
135.00
405.00
E
Isolated circular columns 150 radius GLAZED WALL TILES
5
m
135.00
675.00
200 x 200x6mm Colour glazed wall tiles fixed with approved adhesive on cement and sand floated backing (measured separately) on risers 150mm high Cement and sand (1:3) beds and backings
10
m
1,500.00
15,000.00
12mm floated backing to receive glazed ceramic tiles riser 150mm high (m/s)
10
m
90.00
900.00
134
m2
4,800.00
643,200.00
27
m2
4,800.00
129,600.00
F
G
Ceiling Finishes Internal works ALUMINIUM SUSPENDED CEILING SYSTEM H
600 x 600mm Aluminium suspended ceiling in concealed grids; suspended ceiling tiles or other equal and approved External works
J
600 x 600mm Aluminium suspended ceiling in concealed grids; suspended ceiling tiles or other equal and approved 12mm cement and sand (1:4) smooth rendering on:
K
Protect all works in this section
Item To Collection
891,120.00
COLLECTIONS PAGE 13
810,110.00
PAGE 14
891,120.00
FLOOR, WALL AND CEILING FINISHINGS: Carried to Summary
1,701,230.00
POLICE/FIRE SERVICE POST57
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT NO 10 PAINTING AND DECORATING INTERNAL WORK Prepare and aply two undercoats and one finishings coat of emulsion paint on: A
Walls
134
m
2
1,200.00
160,800.00
224
m
2
1,650.00
369,600.00
External works Prepare and aply chemical décor glossy textured paint from approved manufacturer on: B
Rendered walls
PAINTING AND DECORATING Carried to Summary
530,400.00
POLICE/FIRE SERVICE POST58
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
SUMMARY A
SUBSTRUCTURE
835,505.00
B
FRAME
252,390.00
C
INTERNAL AND EXTERNAL WALLS
1,444,000.00
D
ROOF AND ROOF COVERINGS
1,177,200.00
E
CARPENTARY AND JOINERY
213,440.00
F
DOORS, WINDOWS AND IRONMONGERY
466,600.00
G
PLUMBING AND ENGINEERING INSTALLATIONS
578,710.00
H
ELECTRICAL INSTALLATIONS
291,100.00
J
FLOOR, WALLS AND CEILING FINISHINGS
K
PAINTING AND DECORATING
1,701,230.00
530,400.00
7,490,575.00
POLICE/FIRE POST
POLICE/FIRE SERVICE POST59
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SHOPPING MALL ELEMENT Nr. 1 BLOCK A SUBSTRUCTURE (ALL PROVISIONAL) D20: Excavation and Filling. 22,500
m
2
40.00
900,000.00
4,575
m3
575.00
2,630,625.00
4,050
m3
575.00
2,328,750.00
5,111
m3
220.00
1,124,420.00
3,514
m3
180.00
632,520.00
86
m3
1,350.00
116,100.00
hardcore materials obtained off site
1,410
m
3
2,100.00
2,961,000.00
H
Level and compact bottom of excavation
1,321
m2
40.00
52,840.00
J
Dieldrex or other equal and approved antitermite treatment 1,321
m
2
55.00
72,655.00
57
m2
2,100.00
119,700.00
701
m
3
42,000.00
29,442,000.00
A
Excavate topsoil average depth not exceeding 150mm
B
Excavating trenches, width exceeding 0.3m maximum depth not exceeding 1.50m
C
Excavating pits (900nr), maximum depth not exceeding 2.00m
D
Dispose excavated materials off site, in spoil heap away from site
E
Filling to excavations, thickness exceeding 250mm, materials arising from excavations
F
150mm laterite filling in layers
G
Filling to make up levels, thickness not exceeding 150mm,
solution spread to faces of excavations E10: In situ concrete Plain in situ concrete (1:10)-40mm aggregate K
Blinding beds, thickness not exceeding 50mm Plain in situ concrete (1:3:6)-20mm aggregate
L
Foundations Reinforced in situ concrete (1:2:4)-19mm aggregate
M
Beds/ attached steps (150mm thick)
1,360
m
3
42,000.00
57,120,000.00
N
Column bases
1311
m3
42,000.00
55,062,000.00
P
Column (900nos)
211
m
3
42,000.00
8,862,000.00
Carried to collection
161,424,610.00
SHOPPING MALL 60
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
E20: Formwork for in situ concrete Plain vertical sawn formwork 544
m
2
1,650.00
897,600.00
1,242
m
2
1,650.00
2,049,300.00
C
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight 20mm Diameter
121.110
t
300,000.00
36,333,000.00
D
16mm Diameter
14.812
t
300,000.00
4,443,600.00
E
12mm Diameter
6.411
t
300,000.00
1,923,300.00
8.123
t
300,000.00
2,436,900.00
9,831
m2
1,150.00
11,305,650.00
7,112
m2
4,800.00
34,137,600.00
A
Edges of beds, height not exceeding 250mm
B
Sides of column
Mild steel bars to BS 4449, bent. F
10mm Diameter Fabric mesh A192 weighting 42kg/m2 laid as detailed in manufacturer's manual
G
Ground floor bed/Attached ramp F10: Brick/Block walling Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed, filled solid with lean concrete
H
Walls, 230mm thick vertical
EXTERNAL RENDERING J
15mm thick cement and sand (1:4) smooth rendering to face of the wall
912
m
2
650.00
592,800.00
912
m2
1,650.00
1,504,800.00
PAINTING AND DECORATION K
Prepare prime and apply one undercoat and two finishing coats of high quality "DULUX" emulsion paint on rendered wall (rate including floating)
Carried to collection
95,624,550.00
SHOPPING MALL 61
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
Collection
Page 01
161,424,610.00
Page 02
95,624,550.00
SUBSTRUCTURE CARRIED TO SUMMARY
257,049,160.00
SHOPPING MALL 62
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 2 FRAMES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Columns
312
m
3
42,000.00
13,104,000.00
C
Beams
61
m
3
42,000.00
2,562,000.00
D
Roof beams/ concrete fascia
26
m3
42,000.00
1,092,000.00
5,921
m2
1,650.00
9,769,650.00
E20: Formwork for in situ concrete Plain vertical sawn formwork E
Columns
G
Beams
562
m2
1,650.00
927,300.00
H
Roof beams/ concrete fascia
343
m2
1,650.00
565,950.00
J
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. 20mm Diameter
18.110
t
300,000.00
5,433,000.00
K
16mm Diameter
29.710
t
300,000.00
8,913,000.00
L
12mm Diameter
19.910
t
300,000.00
5,973,000.00
29.180
t
300,000.00
8,754,000.00
Mild steel bars to BS 4449, bent. M
10mm Diameter
FRAMES CARRIED TO SUMMARY
57,093,900.00
SHOPPING MALL 63
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 3 STAIRCASES E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Staircases (flight)
18
m
3
42,000.00
756,000.00
B
Landings
12
m
3
42,000.00
504,000.00
C
Steps
8
m3
42,000.00
336,000.00
D
Beams
11
m
3
42,000.00
462,000.00
Plain vertical sawn formwork: E
Soffits of landings
104
m2
1,650.00
171,600.00
F
Soffits of flight
132
m2
1,650.00
217,800.00
G
Sides of beams
24
m2
1,650.00
39,600.00
H
Edges of suspended slabs
64
m
400.00
25,600.00
J
Stairflights
128
m
400.00
51,200.00
K
Steps
321
m
400.00
128,400.00
Reinforcement for in situ concrete High tensile bars to BS 4449, straight and vertical. L
16mm Diameter
1.480
t
300,000.00
444,000.00
M
12mm Diameter
5.012
t
300,000.00
1,503,600.00
N
10mm Diameter
0.913
t
300,000.00
273,900.00
Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) rendering P
Landings soffit, width exceeding 300mm
344
m
2
650.00
223,600.00
Q
Stairflight soffit, width exceeding 300mm
498
m
2
650.00
323,700.00
R
Strings
211
m
225.00
47,475.00
Carried to collection
5,508,475.00
SHOPPING MALL 64
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
Sand cement/Concrete/Granolithic screeds/flooring 25mm thick cement and sand (1:4) screeded floor A
Landing floors
112
m2
830.00
92,960.00
B
Treads, 300mm wide
347
m
250.00
86,750.00
481
m
180.00
86,580.00
12mm thick cement and sand (1:3) rendering C
Risers; plain, 150mm high Stone/ConcreteQuarry/Ceramic tilling/Mosaic Granite floor tilling on cement and sand bed
D
Landing Floors
112
m2
8,500.00
952,000.00
E
Skirtings
411
m
650.00
267,150.00
F
Treads to steps
308
m
1,950.00
600,600.00
G
Risers to steps
321
m
975.00
312,975.00
141
m2
1,650.00
232,650.00
Stair Balustrades; 1000mm high purpose made designed balustrade in 75mm diameter stainless steel pipes complying to Architect's details embedded into concrete
1,811
m
5,700.00
10,322,700.00
Stainless steel handrails consisting of 75mm x 75mm top and bottom rail complete with bolts and nuts screwed to steel wall bracket
2,911
m
4,800.00
13,972,800.00
Painting/Clear finishing prepare and apply 3 coats of emulsion paints to floated surfaces, rate including floating to Architect's details. H
Rendered surfaces, width exceeding 300mm Stairs/Walkways/Balustrades
J
K
Carried to collection
26,927,165.00
Collection Page 05
5,508,475.00
Page 06
26,927,165.00
STAIRCASES CARRIED TO SUMMARY
32,435,640.00
SHOPPING MALL 65
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 4 UPPER FLOORS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Slabs thickness, 150-450mm, sloping not exceeding 15
0
1,360
m
3
42,000.00
57,120,000.00
E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight. B
12mm Diameter
191.86
t
300,000.00
57,558,000.00
C
10mm Diameter
51.40
t
300,000.00
15,420,000.00
2,176
m
350.00
761,600.00
9,067
m2
1,650.00
14,960,550.00
E20: Formwork for in situ concrete Plain vertical sawn formwork to the following D
Edges of suspended slabs, height 150- 250mm Plain sawn formwork comprises of verical struts and runners
E
Soffit of slabs, slab thickness not exceeding 450mm, horizontal, height to soffit not exceeding 4.50m
UPPER FLOORS CARRIED TO SUMMARY
145,820,150.00
SHOPPING MALL 66
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 5 ROOF G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in pitched roof members A
Tie beams 150 x 50mm
4,118
m
380.00
1,564,840.00
B
Struts 150 x 50mm
9,711
m
380.00
3,690,180.00
C
Rafters 150 x 50mm
8,717
m
380.00
3,312,460.00
D
Purlins 75 x 50mm
7,231
m
260.00
1,880,060.00
4,821
m2
4,850.00
23,381,850.00
H72: Aluminium sheet coverings/flashings 0.55mm coloured approved stone coated aluminium coverings laid to slope not exceeding 50 degrees from the horizontal with one and half corrugation side lap and 200m end lap and fixed in accordance to manufacturers instruction (measured nett) to timber purlins at approved general spacing E
Pitched covering
F
Ridge cappings, girth 600mm
811
m
2,450.00
1,986,950.00
G
Hip capping, girth 600mm
521
m
2,450.00
1,276,450.00
ROOF CARRIED TO SUMMARY
37,092,790.00
SHOPPING MALL 67
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 6 INTERNAL AND EXTERNAL WALLS F10: Brick/Block walling Hollow Sandcrete blockwork in stretcher bond bedded in cement and sand mortar mix (1:6) flush pointed. A
Walls, 230mm thick vertical
18,648
m
2
3,800.00
70,862,400.00
B
Dwarf walls
5,128
m2
3,800.00
19,486,400.00
INTERNAL AND EXTERNAL WALLS CARRIED TO SUMMARY
SHOPPING MALL 68
90,348,800.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 7 DOORS AND WINDOWS E10: In situ concrete Reinforced in situ concrete (1:2:4)-19mm aggregate A
Lintels
33
m
3
42,000.00
1,386,000.00
614
m2
1,650.00
1,013,100.00
3.310
t
300,000.00
993,000.00
4.612
t
300,000.00
1,383,600.00
E20: Formwork for in situ concrete Plain vertical sawn formwork B
Lintels E30: Reinforcement for in situ concrete High tensile bars to BS 4449, straight.
C
12mm Diameter Mild steel bars to BS 4449, bent.
D
10mm Diameter DOORS L21: Metal doors/shutters/hatches purpose made decorative steel HPI security doors with steel frame in autobase paint built into blockwork and concrete surround, bedded and pointed in cement and sand mortar with mastic sealant complete with all necessary ironmongery
E
Door, size 1800 x 2100mm high
522
nr
165,000.00
86,130,000.00
F
Door, size 900 x 2100mm high
12
nr
78,500.00
942,000.00
L20: Timber doors/shutters/hatches 50mm thick polished hardwood timber panel door including 225mm wide treated wrought finished hardwood door frame complete with architraves and ironmongery, all complying to Architect's details H
Door, size 900 x 2100mm high
20
nr
45,000.00
900,000.00
J
Door, size 750 x 2100mm high
590
nr
38,500.00
22,715,000.00
Carried to collection
115,462,700.00
SHOPPING MALL 69
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
WINDOWS L11: Metal windows/rooflights/sceens/louvres White powder coated aluminium casement windows in 5mm thick tinted glass complete with fly screen and burglar bars fit to detail A
Windows size, 1500 x 1200mm high
150
nr
88,500.00
13,275,000.00
B
Windows size, 1200 x 1200mm high
32
nr
54,000.00
1,728,000.00
C
Windows size, 600 x 900mm high
704
nr
20,250.00
14,256,000.00
Carried to collection
29,259,000.00
Collection
Page 10
115,462,700.00
Page 11
29,259,000.00
DOORS AND WINDOWS CARRIED TO SUMMARY
144,721,700.00
SHOPPING MALL 70
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
ELEMENT Nr. 8 WALL FINISHES M20: Plastered/Rendered/Roughcast coatings 12mm thick cement and sand (1:3) floated smooth synthetic rendering to general surfaces complying to Architect's details. A
Walls; externally
16,512
m2
650.00
10,732,800.00
B
Walls; internally
28,112
m2
650.00
18,272,800.00
C
Reveals, width not exceeding 300mm
5,116
m
210.00
1,074,360.00
12mm thick cement and sand (1:4) floated backing to general surfaces to receive further finishes D
Walls; externally
44
m2
650.00
28,600.00
E
Walls; internally
1,121
m2
650.00
728,650.00
F
Reveals, width not exceeding 300mm
68
m
200.00
13,600.00
G
Plaster impression
19
m
450.00
8,550.00
Carried to collection
30,859,360.00
SHOPPING MALL 71
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY M60: Painting/Clear finishing Vinyl mat emulsion paint as manufactured by Portland or CAPL in 3 coats to floated surfaces, rate including POP floating to Architect's details. A
Rendered surfaces, externally
16,512
m2
1,650.00
27,244,800.00
B
Rendered surfaces, internally
28,112
m
2
1,650.00
46,384,800.00
C
Plaster impression
19
m
350.00
6,650.00
D
Reveals, width not exceeding 300mm
316
m
400.00
126,400.00
Carried to collection
73,762,650.00
Collection
Page 13
30,859,360.00
Page 14
73,762,650.00
WALL FINISHES CARRIED TO SUMMARY
104,622,010.00
SHOPPING MALL 72
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 10 CEILING FINISHES G20: Carpentary/Timber framing/First fixing Sawn treated hardwood in ceiling members A
Noggins 50 x 50mm
12,694
m
280.00
3,554,320.00
1,650.00
14,960,550.00
K40: Asbestos ceilings Asbestos ceiling finishes with centre rosette hunged to 50x50mm timber noggins (measured separately) including cornics fixed in accordance to the manufacturer's instructions. B
Ceiling lining
9,067
m2
CEILING FINISHES CARRIED TO SUMMARY
18,514,870.00
SHOPPING MALL 73
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr.11 FLOOR FINISHES M10: Sand cement/Concrete/Granolithic screeds/flooring 42mm thick cement and sand (1:4) floated bed to general surfaces to receive further finishes A
Floors, level and to falls only not exceeding 150 from 18,134
m2
830.00
15,051,220.00
horinzontal
231
m2
8,500.00
1,963,500.00
Skirtings; height 100mm including backing
421
m
650.00
273,650.00
horinzontal
17,222
m2
3,800.00
65,443,600.00
Skirtings; height 100mm including backing
6,722
m
380.00
2,554,360.00
681
m
2
3,200.00
2,179,200.00
horinzontal M40: Stone/ConcreteQuarry/Ceramic tilling/Mosaic Patterned Granite floor finish on cement and sand bed B
C
0
Floors; level and to falls only not exceeding 15 from
Glazed vitrified ceramic floor tilling on cement and sand bed D
Floors; level and to falls only not exceeding 150 from
Unglazed ceramic tilling on cement and sand bed in toilet areas F
0
Floors; level and to falls only not exceeding 15 from horinzontal
FLOOR FINISHES CARRIED TO SUMMARY
SHOPPING MALL 74
87,465,530.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 12 ELECTRICAL SERVICES V20: LV Distribution Equipment; Metal clad Main Distrbution Board surface/ flush type as manufacured by FEDERAL ELECTRIC or MEM or BILLS including all MCB, back outlet connections to flush adaptable boxes, earth bonding, labels and fixing in accordance with manufacturer's instructions MV PANEL A
100A TPN MCCB main distribution panel (MV panel) comprising 2no 60A MCCB, 1no spare and circuit breaker
B
100A change over switch
C
100A main fuse switch
8
nr
300,000.00
2,400,000.00
121
nr
35,000.00
4,235,000.00
80
nr
27,000.00
2,160,000.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories D
4 x 150mm2 PVC/SWA/PVC copper cable
6,512
m
12,500.00
81,400,000.00
E
4 x 100mm2 PVC/SWA/PVC copper cable
1,411
m
8,500.00
11,993,500.00
482
nr
40,000.00
19,280,000.00
162
nr
20,000.00
3,240,000.00
DISTRIBUTION BOARDS TP&N MCB Distribution Board complete with 100A integral incoming isolator and comprising 6nr 10A stablock; 8nr 20A stablock; 12nr 30A stablock, 1nr 45A stablock and 3nr spares ways F
100A 12-Way Equipment; Metal clad isolating pattern switches or ELCB as manufactured by FEDERAL ELECTRICAL, MEM or BILLS including all necessary fuse links with quick make and quick breaks contacts and fixing in accordance with manufacturer's instructions
G
100A TP&N ELCB
Carried to collection
124,708,500.00
SHOPPING MALL 75
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A
25mm Diameter
18,916
m
120.00
2,269,920.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories B
4 x 6mm2 single core PVC copper cable
14,993
m
220.00
3,298,460.00
C
1 x 10mm2 single core PVC copper cable
8,761
m
220.00
1,927,420.00
LUMINAIRES AND LAMPS V21: General lighting Lamp and luminaires; lighting fittings as manufactured by ABB or ASTRA or THORN or approved equal fixed to soffit including all necessary for complete installation D
250w prismatic wall mounted halogen flood light fitting
432
nr
8,000.00
3,456,000.00
E
1 x 40w; 1200mm flourescent fittings
211
nr
3,800.00
801,800.00
F
60w ceiling mounted bowl head lighting fitting
162
nr
2,800.00
453,600.00
G
"NEWCLIME" ceiling fan complete with regulator
512
nr
8,500.00
4,352,000.00
Carried to collection
16,559,200.00
SHOPPING MALL 76
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y74: Accessories for Electrical services Accessories as manufactured by MK or ABB or MEM including steel knock-out boxes fixed to form complete A
5A 1 gang 1 way switch
216
nr
1,200.00
259,200.00
B
5A 1 gang 2 way switch
84
nr
1,200.00
100,800.00
C
5A 2 gang 2 way switch
132
nr
1,200.00
158,400.00
D
5A 3 gang 2 way switch
24
nr
1,200.00
28,800.00
E
240v fire alarm bell
16
nr
7,500.00
120,000.00
F
Break glass
16
nr
5,000.00
80,000.00
V22: General LV Power Ancillaries; low voltage power socket outlets switches and contactors as manufactured by MK or ABB or MEM or approved equal complete with accessories G
13A single switched socket outlets
543
nr
1,200.00
651,600.00
H
13A Twin switched socket outlets
543
nr
1,200.00
651,600.00
Carried to collection
2,050,400.00
SHOPPING MALL 77
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
Y60: Conduit and cable trunking Conduit; straight PVC pipe with flange joints in chases/floor screeds with and inlcuding conduit boxes, locknuts, brushes, couplers, bends, reducers, cutting and other necessary accessories, rates including making good surfaces disturbed. A
20mm Diameter
26,531
m
70.00
1,857,170.00
Y61: HV/LV cable and wiring Cables; PVC insulated cable as manufactured by NOCACO or approved equal drawn into conduits or ducts or laid down into trunking or laid in trenches including cable loops, terminations, glands and all other accessories 2
B
3 x 1.5mm single core PVC copper cable - Lighting
12,479
m
650.00
8,111,350.00
C
3 x 2.5mm2 single core PVC copper cable - Sockets
14,052
m
480.00
6,744,960.00
12
nr
120,000.00
1,440,000.00
12
nr
80,000.00
960,000.00
Installation generally; supply, install, connect up and commission the complete earthing of the whole installation as at the main disribution panel, switch boards, distribution boards, generator room, transformer substation, etc. J
Earthing and bonding; 25 x 3 copper tape and 600 x 600mm mat forming a basket and bonded to foundation reinforcement complete with salt and charcoal applied as specified W52: Lightning protection
K
lightning protector/arrestor complete applied as specified
Carried to collection
19,113,480.00
SHOPPING MALL 78
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Collection
Page 17
124,708,500.00
Page 18
16,559,200.00
Page 19
2,050,400.00
Page 20
19,113,480.00
ELECTRICAL SERVICES CARRIED TO SUMMARY
162,431,580.00
SHOPPING MALL 79
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY ELEMENT Nr. 13 PLUMBING AND MECHANICAL SERVICES All materials supplied and installed shall be done in accordance with technical specification for mechanical installation as contained in the contract document. P30: Trenches/Pipeways/Pits for buried Engineering services A
Excavating trenches for services 500mm nominal size; 500mm average depth from 150mm below existing ground level; backfilling with selected excavated materials; disposal of surplus excavated materials
6,211
m
250.00
1,552,750.00
2,461
m
320.00
787,520.00
821
m
320.00
262,720.00
Y10: Pipelines Straight galvanised iron pipe to BS 425 in chases/trenches/floor screeds B
19mm Diameter - cold water supply
C
13mm Diameter - Hot and Cold water supply
D
Non return valve
45
nr
3,000.00
135,000.00
E
Gate Valve
33
nr
3,000.00
99,000.00
F
Water meter
18
nr
12,500.00
225,000.00
Extra over galvanized iron pipes; fittings, not exceeding 65mm diameter 25mm Diameter fittings H
Elbows
310
nr
230.00
71,300.00
J
Equal tees
211
nr
280.00
59,080.00
K
Reducing tees
61
nr
280.00
17,080.00
L
Union connector
81
nr
250.00
20,250.00
M
Nipple
112
nr
120.00
13,440.00
Carried to collection
3,243,140.00
SHOPPING MALL 80
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY 19mm Diameter fittings A
Elbows
24
nr
200.00
4,800.00
B
Equal tees
13
nr
250.00
3,250.00
C
Reducing tees
21
nr
250.00
5,250.00
D
Union connector
32
nr
230.00
7,360.00
E
Nipple
21
nr
120.00
2,520.00
13mm Diameter fittings F
Elbows
44
nr
200.00
8,800.00
G
Equal tees
61
nr
250.00
15,250.00
H
Reducing tees
38
nr
250.00
9,500.00
J
Union connector
65
nr
230.00
14,950.00
K
Nipple
82
nr
120.00
9,840.00
Double trap coloured syphonic water closet with horizontal outlet with close couple 9 litres cistern and plastic cover complete with fittings
536
nr
32,000.00
17,152,000.00
wash hand basin 620 x 500mm with 3 taphole oval pedestal, starlite 12mm mixer with pop up waste accessories complete with wash-top to Architect's details
536
nr
25,500.00
13,668,000.00
Y25: General pipeline equipment Equipment; supply, install and connect up pipeline equipment as manufactured by Eago or other approved equal with all necessary accessories for complete installation L
M
Carried to collection
30,901,520.00
SHOPPING MALL 81
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY Y25: General pipeline equipment A
Vitreous china toilet roll holder fixed to wall
536
nr
3,000.00
1,608,000.00
B
Mirror; 4mm silvered float glass size 600 x 450mm high
481
nr
7,000.00
3,367,000.00
C
Hand dryer
12
nr
13,000.00
156,000.00
Straight UPVC pipes in chases/trenches/floor screeds H
100mm Diameter
4,932
m
520.00
2,564,640.00
J
75mm Diameter
2,612
m
450.00
1,175,400.00
K
50mm Diameter
4,118
m
450.00
1,853,100.00
Extra over PVC pipes; fittings, exceeding 65mm diameter 100mm Diameter L
UPVC elbow
98
nr
350.00
34,300.00
M
PVC tee
48
nr
400.00
19,200.00
N
WC connection sleeve
32
nr
1,450.00
46,400.00
P
Y radius bend
36
nr
625.00
22,500.00
Q
Pam connector
61
nr
560.00
34,160.00
R
Cleaning eye
44
nr
450.00
19,800.00
112
nr
320.00
35,840.00
75mm Diameter S
UPVC elbow
T
PVC tee
86
nr
370.00
31,820.00
U
Pam connector
55
nr
500.00
27,500.00
V
Cleaning eye
42
nr
400.00
16,800.00
Carried to collection
11,012,460.00
SHOPPING MALL 82
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY 50mm Diameter A
UPVC elbow
27
nr
280.00
7,560.00
B
PVC tee
21
nr
320.00
6,720.00
C
Cleaning eye
21
nr
400.00
8,400.00
432
nr
1,250.00
540,000.00
191
nr
30,000.00
5,730,000.00
44
nr
16,500.00
726,000.00
6
nr
7,500.00
45,000.00
Y11: Pipework ancillaries D
Traps; 50mm diameter UPVC floor drains grouted to floor bed Manholes/ Inspection Chamber
E
Manhole size 500 x 500 x 600mm deep internally constructed of 150mm thick concrete(1:3:6) base, 150mm thick sandcrete blockwork filled solid with lean concrete, 75mm thick concrete(1:3:6) benching and forming 150mm diameter half round channel, covered with cast iron, internal faces rendered in water proof cement sand mortar(1:3) including excavation, backfilling and disposal of surplus excavated materials
Fire Fighting System Equipment; supply, install, connect up and commission fire fighting system as manufactured by ANGUS or other approved equal complete with piping/trunking as specified including all necessary accessories G
Fire extinguisher; ABC 9Kg capacity general purpose dry powder type
H
240v fire alarm bell
J
Break glass
22
nr
5,500.00
121,000.00
K
fire alarm outdoor siren
12
nr
10,550.00
126,600.00
Carried to collection
7,311,280.00
SHOPPING MALL 83
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY
Collection
Page 22
3,243,140.00
Page 23
30,901,520.00
Page 24
11,012,460.00
Page 25
7,311,280.00
PLUMBING AND MECHANICAL SERVICES CARRIED TO SUMMARY
SHOPPING MALL 84
52,468,400.00
PROPOSED DEVELOPMENT OF NYANYA COMMUNITY SUMMARY 1
SUBSTRUCTURE
257,049,160.00
2
FRAMES
57,093,900.00
3
STAIRCASES
32,435,640.00
4
UPPER FLOORS
5
ROOF
37,092,790.00
6
INTERNAL AND EXTERNAL WALLS
90,348,800.00
7
DOORS AND WINDOWS
144,721,700.00
8
WALL FINISHES
104,622,010.00
9
CEILING FINISHES
145,820,150.00
18,514,870.00
10 FLOOR FINISHES
87,465,530.00
11 ELECTRICAL SERVICES
162,431,580.00
12 PLUMBING AND MECHANICAL SERVICES
52,468,400.00
SHOPPING CENTER Total carried to General Summary
1,190,064,530.00