CÔNG TY CỔ PHẦN CƠ KHÍ – ĐIỆN LỮ GIA   LU GIA MECHANNICAL – ELECTRIC JOINT STOCK COMPANY COMPANY ---------o0o--------

ASSEMBLY ERECTION Operation and maintenance maintenan ce manual

for lighting Masts (3-point SUSPENSION system)

LIG LI G HTING & URB URBA N EQUI EQ UIPM PME ENT C O M PA PANY.,LT NY.,LTD A DDRES DDRESS S : 70-LU 70-LUG G IA STR.,HO C HI MINH, MIN H, VIET NA M

 

ASSEMBLY ERECTION OPERATION AND MAINTENANCE MANUAL

  2

 

TABLE OF CONTENTS No .

CONTENT

Page

1

Part I

- Introduction

6

2

Part II

- Assembly

9

3

Part III

- Hoisting wire ropes

11

4

Pa Part rt IV

- Ass sseemb mbly ly of fix fixed brack rackeet & hois hoisttin ing g sys syste tem m

17

5

Part V

- Erection

22

6

Part VI

- Luminaire carriage assembly

25

7

Part VII - Luminaire carriage latching system

28

8

Part VIII - Luminaire and accessories

30

9

Part IX

- Maintenance

34

10

Pa Part rt X

- Ma Manu nufa fact ctur urer er’s ’s info informa rmati tion on

35

3

 

 

LUGIACO APRON flood lighting MAS 3-point suspention system  Ki Kim m thu s? t

N?n chôp C OV ER PR PROTE OTEC C TION

Dµn è® ®inh inh FIXEDc SYST SYSTEM EM C ¸ p n©ng h h¹¹ D8 C ABLE FFO O R LIFT LIFT UP AND DO WN D8 C ¸ p DÑp 6X 6X4m 4mm2 m2 & c¸ p th«ng ti tin n PO WER S SUPPLY UPPLY 6x 6x4mm2 4mm2 (EL (ELEC ECT TRICA L, INFORM A TION ION)) Hép ®Êu ®Êu nè i J UNT UNTION ION BOX

Dµn Dµ n ® ®?? n d i ®éng luminaires carriage ring

Th©n c é t mast bod y mast

TÊm chuyÓn tr tra a nsiti nsition on plate pla te Hép gi¶m tèc tèc , tr trôc ôc b¸ nh v?t red uction uction gear ge ar § éng c¬ 1.1KW motor 1,1kw B¶ B¶ng ng ®iÖn electrical board

§ i?u i? u khiÓ khiÓn cÇm c Çm tay REMO TE pend a nt co ntr ntrol Cöa c ét se rvic rvice e d o or

5m

 

4

 

  Part I 1.1 - Introduction This manual has compiled to assist site management with the following:

Assembly, erection, operation and periodic maintenance of lighting masts with winch operated raising and lowering equipment.





Before starting operation, users are recommended to carefully read the instruction.



Lighting masts floodlighting manufactured by HAPULICO is made based on the structure of steel section with length suitable for transport and installation.



Sections of the Mast body and Utilities are manufactured by modern production line with advanced technology.



Our engineers had made necessary calculation to gain the comprehensive capacity on mast structure. A special computer program was used to achieve figures which match the height, load and wind velocity of polygon section mast.



Strictly following content of working security is essential during the period of installation, operation and maintenance.



Save time, make it easy to deal with the mast if instruction is closely followed.



The constant development and progress in design and manufacture of the company may make some actual parts of the mast different from the one in supplied material. The company holds the rights to modify our production without prior notice.

1.2 - Safety warning Safe working practices in assembly, erection and operation of the equipment should be observed at all times. It is essential that the following procedures are followed when operating the equipment. 1. Mechanical and electricity works must be controlled by qualified qualified and authorized person only. 2. Unauthorized and observation people must keep a safe distance from the mast. 3. Durin During g the work, do not stand right under: -

Flood light: light: includin including g the fixed bracket bracket and mobile mobile luminair luminairee carriage. carriage.

-

Ground for conducting conducting maintenance. maintenance. When work is in progress

The mast controller is at least 5m far from the mast. 4. Mast controllers and observation observation people must wear safety helmet. 5. Do n not ot use use the the corrupted corrupted metal cable. 6. Pull Pulling ing cable cable and installi installing ng equipment equipment with with glove. glove. 7. Using lifeline lifeline is a must when when being being on the flood flood light. light. 8. Do not use over-l over-limit imitation ation safety safety equipments equipments. 9. Do not operate operate in strong strong wind condition. condition. 10. Do not use the similar replacing equipments. Use the right-designed equipments

5

 

Part II – COLUMN ASSEMBLY 2.1

PACKING, PACKING, SITE REQUIREMENT REQUIREMENT AND UNLOADING UNLOADING

2.2

ASSEMBLY ASSEMBLY OF COLUMN COLUMN SECTIONS SECTIONS

2.1

PACKING, PACKING, SIT REQUIREMEN REQUIREMENT T AND UNLODING UNLODING 1. 2. 3. 4.

Column sections are co-axially packed inside each other for ease of handing in transport transport The fixed bracket assembly and accessories are packet in separate containers. The winch is supplied mounted on its mounting bracket bracket ready for bolting into the mast. The eq equipmen uipmentt required required at site will be : a. A mobile crane of sufficient capacity and lift height. b. Suit Suitable able slings. slings. c. A quantity of wedges and timber for packing, to suit the number of column section d. Two pull lift devices with a minimum capacity of 4 tonnes tonnes e. A crowbar, crowbar, a sledge hammer... hammer... f. A quantity of rubber based grey paint or linseed oil to suit the number of joints. g. A crew of 4 men are normally required to to carry out the assembly and erection, in addition to the crane crew. 5. Unload the column sections sections onto the packing on the ground in order of assembly and in in line so that the center of gravity will be adjaccent to the column foundation when assembled, making due allowance for the joint overlap. This will minimise crane handling when erecting the column (Figure 2.1).

K hung hung mãng cét

§ Õ cé t

C öa tthao hao t¸ t¸ c

CG

C ¸ c ®o¹ ®o¹ n cét cé t

(Figure 2.1)   (Figure 2.1).   2.2

ASSEMBLY ASSEMBLY OF COLUMN COLUMN SECTIONS SECTIONS 1. Arrange the base section onto the packing with the access opening on the top top and levelled so that the axis of the column section will be horizontal. The height of the packing must be 6

 

compatible with the base plate and the fixed bracket dimentions so that both will be clear of  the ground when assembled. 2. Make sure that the base plate is is wedge to to prevent rotation. rotation. 3. Check that the packing packing under the arranged sections is a minimum of 300mm clear of the end of the slip joint length ( L ) (Figure 2.2) to allow for column during assembly.

§Ơ cét

300

L

L

(figure 2.2)   4. Lubrication for the the slip joints joints is provided provided by rubber based paint or linseed oil applied to the column sections to be joined as follows (Figure 2.3) a. The external suface suface of the the lower column column section is coated for approximatetely 75% of  the slip joint length from the end of the section.The minimum length of the slip joint is marked on the male section of the column joint, with red coloured paint. b. The internal surface of the upper column section is coated for approximately 75% of the slip joint length leaving the first 25 % of o f slip joint length clear.

7

 

0.25L

0.25L

0.75L

0.75L

C hiÒu dµi mèi ghÐp khi l¾p = L

  (Figure 2.3) 5. To facilitate, the the internal surface can be coated while the section is resting on the packing, prior to slinging to the required assembly height. 6. Do not use oil or grease grease for assembly assembly lubrication as this may lead lead to a detrimental detrimental appearance if runs or drips are formed. 7. Sling the section section for assembly assembly at its its centre of gravity and engage the the sections, making sure that the centre line of the column is correctly aligned in the horizontal and vertical planes. 8. While installing installing the pull winchs winchs into 2 sides of the the column under the close close supervision pull pull winch will move unanimously to ensure column sections to be fitted synchronously according to the column axis.(figure 2.4)  

(Figure 2.4) 8

 

9. During operation perform perform step. 8 the external external surface of the slip slip joint joint can be hammered hammered using a wooden block and a sledge hammer, to assist in achieving a good joint. Do not hammer directly on the galvanised surface. The length of the slip joint “L” according to design. 10. Misalignment of the sections for any reason may lead to jamming, which will prevent good telescoping of the joint any may be difficult to rectify. 11. Compare of theoretical slip joint length with the actual slip joint length, and if necessary continue to apply pressure as describel in 9 above until at least the minimum nominated dimension is obtained. 12. Continue assembly process of column step. 3. Always check straight level of the column sections. 13. When the final section of the column is in plate, the pack packing ing must be arrange so that there is at least 1300mm to enable fitting of the fixed bracket at a later stage.

Part III – HOISTING WIRE ROPES 3. 3.1 1 3.2 3.2 3.1

WIR IRE E ROP ROPES CORR CORREC ECT T PROC PROCED EDUR URES ES WIRE ROPES 1. Hoisting wire ropes are stainless stainless steel supplied by LUGIACO 2. Do not substitute any other construction of wire ropes. ropes. 3. Mini Minimum mum breaking breaking strain: strain: a. 4259 kg for 8mm diameter. diameter. b. 6680 kg for for 12mm diameter. diameter.

3.2

CORRECT PROCEDURES FOR MAKING UP SUSPENSION WIRE ROPES

1. Disconnect the cable as illustrated in pictures pictures 3.1 and 3.2. 2. If cable cable is wrongly wrongly disconne disconnecte cted, d, it will be ti tied ed or twiste twisted. d. Though the cable surface surface is strained but in fact, its inner structure was mixed. 3. If that tied/ tied/twist twisted ed positions positions are strained, strained, then at the position, position, length and quality quality of cable will be reduced, life expectance and safety of cable will seriously lessen. 4.

Do not straighten the tied or twisted twisted section. Replacement of new one is essential in the case.

5.

Types of twisted section.

9

 

 

 

a) Picture 3.3 & 3.4: Twisted on the left or right right due to wrong disconnection. b) Pi Pict ctur uree 3.5 3.5 & 3.6: 3.6: Illu Illust stra rati tion on of the the ri right ght an and d le left ft tw twis iste ted d (the usage

of this is

absolutely forbidden, it is obligatory to replace with the new one). c) Picture 3.7 & 3.8: Illustration Illustration of straightening straightening the right/left twisted (the usage of this is absolutely forbidden, it is obligatory to replace with the new one). 6. The fast fastening ening clams must must be put in position. U-fasten U-fastening ing clams must must closely touch touch the wire and be located from the first position (picture 3.9).

Picture 3.9 7. Wrong Wrongly ly cliping cliping (3.10) will affect affect the strength strength of the wire, to repair repair this, it is essential essential to make the fastening clams in series (3.11) .

  Picture 3.10

10

 

Picture 3.11 8. The number of fastening clams are required as in the following table: table: Cable radius (mm) Number of fastening clams (nos) Distance to the center (mm)

Φ

8

03 45

12 03

Φ

60

Part IV – ASSEMBLY OF FIXED BRACKET AND HOISTING SYSTEM 4.1

ASSEMBLY OF HOISTING WIRE ROPES TO THE TRANSMISSION TRANSMISSION SET

4.2

ASSEMBLY OF TRANSMISSION SET

4.3

ELECTRICAL POWER CABLE ASSEMBLY

4.4

POSITIONING THE TRANSMISSION SET

4.5

ASSEMBLY OF FIXED BRACKET

4.1 4.1

WIRE WIRE ROPE ROPES S -

Prepare Prepare the 3 hoisting hoisting wire wire ropes ropes to to the same length length and and mark mark (refer (refer figure figure 4.1)

Lc

§ iÓm iÓm ®¸ nh dÊu (Figure 4.1) Lc : Length of wire rope Length of wire rope in the following table

4.2

Mast size

Mast 25 m

Mast 30 m

Mast 35 m

Mast 40 m

Lc (mm)

24500

29500

34400

38900

ASSEMBLY ASSEMBLY OF TRANSMISS TRANSMISSION ION SET

11

 

1. Feed the pul pulll through through rope into the mast mast through the the door opening and attach attach the other other end to the base plate (Figure 4.2).

(Figure 4.2) 2. Tie the other end of the rope to the transmission transmission set (Possitioning (1) (1) Figure 4.3) 3. Tie 3 hanging rope to the transmission set set (Possitioning (Possitioning (2) Figure 4.3) place a wooden block  in the column (3) (Figure 4.4) to protect the hanging rope and po power wer cable

(Figure 4.3)

(Figure 4.4) 4. Lay the cables out perf perfectly ectly str straight aight to avoid any kinks and attach. attach. Pull the transmissi transmission on set into column. 12

 

5. If it is not possible to lay the the cables out straight thay may be coiled as shown iin n (Figure 4.5)  

(Figure 4.5) Note : In order to avoid faulty in the assembly process it requires to distinguish electric cable and hanging cable with a colour plaster, each kind with one colour  Ensure Ens ure to assemb assemble le accord according ing to right right direct direction ion of electr electric ic cable cable and hanging hanging cable cable from from transmission set to puly (Figure 4.6)

A

B 3 5 (Figure 4.6) Include : A : Puly hanging rope B : Puly electric cable 3 : Hanging rope 13

 

5 : Electric cable 4.3

ELECTRICAL ELECTRICAL POWER CABLE ASSEMBLY ASSEMBLY 1. One, One, tw two o or thre threee po powe werr ca cabl bles es may may be su supp ppli lied ed su subj bjec ectt to th thee power power re requi quire red d fo forr th thee luminaires. 2. Identify each power cable using using coloured adhesive tape. 3. Each power cable (5) is placed facing a hoisting wire wire rope (3) (Figure 6) 4. Fasten the electric electric cable in to the tranmission set with clamp plates (4). Note electric cable (5) 5.

must be let unstraight until the hanging cable is straight. Leave a distance of 2m metre between the transmission set and cable end (Figure 4.7)

3

2000mm 5

4

(Figure 4.7) 4.4

POSITIONI POSITIONING NG THE TRANSMISS TRANSMISSION ION SET 1. When the wire ropes and power cables are correctly correctly aligned, pull the transmission set through the mast until the 2m above the top of the door opening. 2. Wire ropes and electrical cables must project outside outside the top of the mast, for it to pass through the fixed bracket when fitted.

Note : 1. Bolt to fit winch bracket and machine is M16 (Page 27) 2. Mechenical transmission transmission system includes machine, cable drum and chain transmission transmission set were assembled and adjusted at the bottom of column (Figure 4.8).

14

 

TÊmchuyÓn transittiio on npla latte e Hép gi gi¶ ¶m mtèc c,, trôc b¸ ¸n nhv? t reduction gear § éngc¬ c¬1.1KW motor 1,,1 1kw Cöa

cé t

serv ice doo r

B¶ng ® iÖn electricall board electrica

 

  (Figure 4.8)

15

 

4.5

ASSEMBLY ASSEMBLY OF FIXED FIXED BRACKET BRACKET 1. Assemble the fixed bracket to the stub using M16 bolts (Refer page 27) 2. Remove tthe he fixed fixed bracket bracket cover (Figure (Figure 4.9). 4.9). 3. Pass the hanging rope (to raise raise fixed bracket with crane) with with position one among three age of  fixed bracket according to vertical (Figure 4.9)

  (Figure 4.9 4. Feed (about 2m) hanging cable and electrical cable through fixed bracket. bracket. 5. Slide fixed bracket to the top of mast (Figure (Figure 4.10)

(Figure 4.10) 16

 

6. Pass the wir wiree ropes and electrical electrical cable above pulies pulies (Figure (Figure 4.11) (Note (Note : Separate hanging hanging ropes and electrical electrical cable with cable dividing set in the fixed bracket and don’t let the cable attach).

 

(Figure 4.11)

17

 

7. Pull hang hanging ing rope and electrical electrical cable cable to the bottom of base plate plate and bind together (Note (Note : Don’t let the cable be twisted)

Part V – ERECTION

5.1

5. 5.1 1

COLU COLUMN MN FOUN FOUNDA DATI TION ONS S

5.2 5.2

PROC PROCED EDUR URE E FOR FOR EREC ERECTI TION ON

5. 5.3 3

BOLT BOLT TORQ TORQUE UE TABL TABLE E

COLUMN COLUMN FOUNDA FOUNDATIO TIONS NS 1. The column foundation, foundation, supplied by others, must be designed by competent civil engineers to suit the soil conditions at the location of the column. 2. Before Before pouring pouring concret concretee for the founda foundatio tion n it is recomm recommend ended ed that that templa templates tes be used used to ensure that’s the bolts will be correctly centred and vertical. The protruding portion of the bolts should be coated with grease and protected by a cap.

5.2

PROCED PROCEDURE URE FOR ERECTI ERECTION ON 1. Threa Thread d nuts over all the anchor anchor bolts so th that at they will will be under the column column base plate and clear of the top of the concrete con crete by approximately 15-20mm. 2. Adjust two pairs pairs of nuts diametrically diametrically opposite at 90 degrees so that thay are 15-20mm higher  than the remainder and level with each other. These four nuts will provide a means of  obtaining vertical alignment by adjustment (Figure 5.1)

0 6 1

0 2 5 1

0 2 5 1

  (Figure 5.1)

18

 

  3. The fift fifting ing point will be several several metres fur further ther up the column than the centre centre of gravity. At the lifting point a suiteble sling is applied from which two “Pull-lift” or similar divices, one each side of the column, are arranged with the lower end anchored at the base plate. These “Pull-Lift” devices are tensioned to avoid a possible seperation of slip joint, and to prevent the sling from slipping up the column (Figure 5.2) 4. Before lifting lifting the column, mark the the base plate and foundation foundation to ensure that the fixed bracket assembly and lighting array are correctly aligned. 5. If necessary, rotate the column on the packing prior to to lifting to facilitate the alignment.

19

 

 

(Figure 5.2) 6. When the column is located over the bolts, fit fit washers and nuts to the anchor bolts. Adjust Adjust the 4 nuts on the underside of the base plate which are apaced at 90 degrees and are 15-20mm above the others, using the weight we ight of the column to facilitate its vertical adjustment 7. When When the column column is vertica verticall lly y aligne aligned d tighte tighten n all the nuts under the base plate plate and the corresponding nuts above. Apply lock nuts to all bolts. Keep the mast suppended on the crane until this operation is completed. Tension the nuts as specified on the bolt torque table Page 27. 20

 

8. Fill tthe he space under the base base plate with gro grout ut and protect protect exposed parts parts of the anchor bolts bolts with bitumen or by other suitable means (Figure 5.3)

Lùc xiƠt ®ai èc tham kh¶o trang 27

  5.3

BOLT BOLT TORQUE TORQUE TABLE TABLE

(Figure 5.3)

RECOMMENDED BOLT TORQUE FOR LUGIACO MASTS 21

 

FOUNDATION ANCHOR  BOLTS SIZE (mm)

CLASS

BOLTS FOR COLUMN AND ACCESSORIES

NUT TORQUE

SIZE

(Nm)

(mm)

CLASS

TORQUE

CLAS

TORQUE

(Nm)

S

(Nm)

M30

4.6

495

M10

5.8

30

8.8

45

M36

4.6

865

M12

5.8

50

8.8

80

M42 M48

4.6 4.6

1380 2065

M16 M20

5.8 5.8

125 245

8.8 8.8

190 375

M56

4.6

3335

M24

5.8

420

8.8

640

M64

4.6

5035

NOTE: 

Foundation anchor bolts are class 4.6



If high tensile tensile steel foundation foundation bolts are used special anchoring and tensioning tensioning techniques techniques must be follower and specialised. Foundation engineering design is required



Hexagon head bolt class identification is marked on the head of the bolt.

4.6



Never use bolts of a class lower than specified.



When tensioning bolts and nuts, apply the torque wrench to the nut and hold the bolt head with a spanner to prevent the bolt turning.

Part VI – LUMINAIRE CARRIAGE ASSEMBLE 6.1

PREPARE

6.2

LUMINAIRE CARRIAGE ASSEMBLE

6. 6.1 1

PREP PREPAR ARE E 1. Fit the the 3 luminaire luminaire carriage support arms into mast body.

6.2

2. Installation operation floor above of bracket 0,6m LUMINAIRE LUMINAIRE CARRIAGE CARRIAGE ASSEMBLE ASSEMBLE 1. Part Partss of luminaire luminaire carriage carriage 22

 

-

Lumina Luminaire ire carria carriage ge

-

Fixe Fi xed d fram framee

-

Support Support for obstructio obstruction n lighting lighting

-

Suppor Supportt for flood flood light light

-

Junc Juncti tion on bo box x

-

Loca Locate ted d fram framee

-

La Latc tch h grov grovee

2. Parts of luminaire luminaire carriage installation together (refer (refer figure 6.1)  

1 7

2 6 8 5 4

3 (Figure 6.1)

23

 

  (Figure 6.1)

24

 

3. Hanging cable installation refer (Figure 6.2)

(Figure 6.2)

25

 

4. Remove luminaire luminaire carriage with hand and check refer (Figure (Figure 6.3)

(Figure 6.3)

26

 

Part VII – LATCHING OF THE LUMINAIRE CARRIAGE 7.1

POSSITION OF THE LATCH

7. 7.2 2 7.1

CLOS CLOSED ED AND OPEN STAT STATUS US OF THE THE LATC LATCH H POSSI POSSITIO TION N OF THE LATCH LATCH 1. Latching of the luminaire carriage include 3 latchs arrange refer (Figure 7.1).

1

2

(Figure 7.1)

2. Latch ((1) 1) may be be spun round round pin (2) (2) (Figure (Figure 7.2) 7.2)

27

 

1

2

(Figure 7.2)

7.2

STATUS STATUS OF THE LATCH LATCH Status of the latch: 1. “Closed” status: the flood flood light reaches the mast top, the the latch (1) is fixed fixed to the

supporter (3)

on the fixed bracket (Figure 7.3) 28

 

3  

1

(Figure 7.3)

29

 

2. “Open” status: starting the lowering; the latch (1) leaves the supporter (3) and moves

down

(Figure 7.4)

  (Figure 7.4)

30

 

Part VIII – LUMINAIRE CARRIAGE AND ELECTRIC EQUIPMENT SYSTEM  

8.1

8.1

ADJUSTMENT ADJUSTMENT OF LUMINA LUMINAIRE IRE CARRIAG CARRIAGE E POSSIT POSSITION ION OF THE THE LATCH LATCH

8.2

INSTALLATI INSTALLATION ON OF ELECTRIC ELECTRIC SYSTEM SYSTEM

ADJUSTMENT ADJUSTMENT OF LUMINAIRE LUMINAIRE CARRIAGE CARRIAGE 1. Fit the 3 luminaire carriage support arms into mast body. Switch cable drums to raise luminaire carriage to the lock position, ensuring the stability of 3 latches locked. Fix the hanging cable. 2. Cheking 3 hanging cables linked to the transmission set, ensuring the strain level same. - If the strain level of each cable is the same, lock the cable keeping bolts (3) (4) of  hanging cables. - If the strain level of cables is different, unfasten bolts (3) (4) on the transmission set to adjust cables accurately and then fasten (Figure 8.1)

(Figure 8.1) 31

 

32

 

(Figure 8.2) The Figure 8.2 describle the operation of the switch. The process ends when the pin (1) contact to the process switch (2).

Part IX- MAINTENANCE 9.1

12 - MONTH MAINTENANCE

9.2

24 - MONTH MAINTENANCE

9.3

REPLACEMENT OF HANGING CABLE

9.4

REPLACEMENT OF ELECTRIC CABLE

9.5

REPLACEMENT OF THE PULLING SLING

9.1 12-month maintenance. 1.Shut down the electric source.

2.Check all the bolts, nuts; tighten the transmission set to see if they are already loosen or  corroded. 3.Check lubricant level in service outlet box. Fill in or replace if necessary. Hanging and pulling cable. 4.Thoroughly check the outstanding conditions of the pulling sling all the way long from the

winch pulley to the distribution unit. 33

 

5. Check all the links between the distribution unit and the sling sling to see if they are already loosen or  malfunctioned. 6.Check the fastening clams of the electric cables to see if the electric cables already wear  some abrasion and fasten the bolts if necessary. Equipments inside the Mast 

7.Check the plugs and the electric wires to see if they are crooked and broken. 8.Check the connection points of the main panel. 9. Check the earthing earthing wire 10. Connect the motor to the main and lower the lighting lighting frame. 11. All the lights lights and the switch switch boxes must be check to detect detect any possible leakage leakage of the rain water (this is a crucial requirement). 12. Clean all the pane of the lights and the reflecting reflecting surfaces if necessary. necessary. It is forbiddance to use the materials or substances possibly causing scratches to the glass panes of the lights. 13. Disconnect the light bulb and check the holder. 14. Check the electric cable for the damages relating to the ultraviolet rays or other physical reasons. 15. Check the connection in the connection boxes and at the intermediate connection point. 16. Check the liner around the electric cable. 17. Check the bolts bo lts and nuts of the flanges to detect the loosening and fasten if necessary. 18. Check the working condition of the hanging lock. 19. Test the lams. 20. Hoist the lighting frame. 21. Socket the plugs. Anchor bolts at the foot of the mast.

22. Check the fastening of the nuts. Note:

23. Take note and report all problems. 9.2

 24-month maintenance. 

1.check and carry out the maintenance regime for 12-moth period and do some more subworks as follow: 2.Lower the lighting frame on to the supporters and disassemble it. 3.Unscrew the nuts and bolts connecting the flanges to detect any crook if having. 4.Check the washers for any abrasion, replace with the new one if necessary. 5. Check the outer surface of the electric cable for for any abrasion. If so, replace the cables with

the

new one. 6.Check the shape of the lighting frame. 9.3

 Replace Replacemen mentt of the hanging hanging cable cable .

1.Prepare 1 section of the same sort of sling of which the length is 1m longer than the mast’s height. 2. Make the loop at each each end. 3.Lower the lighting frame onto the supporters. 34

 

4.Disconnect the hanging cable from the lighting frame. 5.Cut the old sling at the at the position right above the hanging position. 6.Plait or joint one end of new sling to the just-cut end of the old section. 7. Lower the distribution unit until the end of new section could go inside the mast from the

top

hole. Pay attention to keep the other end of new section from not sliding through the top hole of the mast. 8. Disconnect the new sling and the old one, make the new loop and fasten the new sling to

the

distribution unit. 9. Connect the other end the new sling to the lighting frame. Check the working processes of

the

lighting frame (it is a must to keep the electric cable from not being tensile). 10. Reset the limit for the traveling of the light lighting ing frame.

Picture 9.1

9.4

Replacement of electric cable

1.Prepare 1 section of the same kind of the old electric cable with 2m longer than the old one. 2.Lower the lighting frame onto the supporters. 3. Disconnect the electric cable from the connection boxes on the lighting frame. Tap one end the new cable to the connection box on the lighting frame. The other end will be jointed

of  to 35

 

the end of the the old cable in order to get it it slide into into the mast through the top hole. The link  should be firm enough to be able to pull the new cable up into the mast through the top hole. 4. Hoist the lighting frame to the working position, disassemble the old cable from the

fastening

clams. 5. Manually pull the new cable all the way inside the mast mast and fasten it it to the distribution unit using usi ng the fasten fastening ing clams clams (remember

by

that the electric cable is not supposed to bear

any weight of the lighting frame)  6.Remove the old cable and tap the new one of the main panel

Picture 9.2

36

 

9.5

Replacement of the pulling sling on the pulley winch

1.Disconnect the old sling from the distribution unit. 2.Unroll the old sling from the pulley (keep on pushing the “Down” button on control unit). 3.Get 1 section of the new sling with the same length as the old one. 4. Connect the one end of the new sling to the pulley. Keep on pushing the “Up” button to roll

the

sling around the pulley. 5.Make the loop at the other end of new sling then connect it to the distribution unit. 6.Make the necessary adjustment and reset the traveling process of the lighting frame.

37

 

Part X: Manufactur Manufacturer’s er’s information 

Refer attached supplier’s catalogue for information



Company Compan y name :

LUGIACO LUGIACO

Addr Ad dres esss

:

7070- Lu Gia Gia St Str. r.,, Ho Ch Chii Minh Minh,, Viet Vietna nam m

Tel

:

+083-9626954/0822433022

Fax

:

+(84-8)39650012

Email

:

lugiaco@ @lugiaco lugiaco.com.vn   .com.vn lugiaco

Website

:

www www.lugia giaco.c o.com. m.v vn

38