7/15/2015

Technical Services

CONTENTS   DESCRIPTION

SL. N O. 01.

COLD   S T A RT   ­   U P

02.

IN T EGRA T ED   S T A RT   U P   P ROCED U RE  –  COLD   S T A RT   U P

03.

H OT   A N D   W A RM   S T A RT   U P S .

04.

IN T EGRA T ED   S T A RT   U P   P ROCED U RE  –  W A RM   S T A RT   U P

05.

IN T EGRA T ED   S T A RT   U P   P ROCED U RE  –  H OT   S T A RT   U P .

06.

10.

S T A RT   U P   B Y   CU RV ES   FOR  A B S OLU T E  COLD   S T A RT   W IT H   H P / LP   B Y P A S S S Y S T EM . S T A RT   U P   CU RV ES   A FT ER  48  H OU RS   S H A T   D OW N   W IT H   H P / LP   B Y P A S S S Y S T EM . S T A RT   U P   P ROCED U RE  A FT ER  8  H OU RS   S H U T   D OW N   W IT H   H P / LP   B Y P A S S S Y S T EM . T ECH N ICA L  D A T A   –  LIM IT   CU RV ES   FOR  T U RB IN E  V A LV ES   –  W A LL  OF  T H E CA S IN G  –  S H A FT S . W A RM IN G  –  U P   A N D   S T A RT IN G  T H E  T U RB IN E  –  T EM P ERA T U RE  CRIT ERIA .

11.

T ECH N ICA L  D A T A   –  REA CT IV E  CA P A CIT Y   CU RV E  FOR  T U RB O  GEN ERA T ORS .

07. 08. 09.

 

COLD START UP (With Aux Steam available)

A cold start up is by definition, one of which the maximum of HP casing and HP shaft is less than 1500C. This normally means that the unit is shut down from the maximum load for more than five days. If machine is started from ambient temperature (HPC/HP shaft temp approx. 400C), heating up of casting is required. This is accomplished by soaking the machine at 360 rpm at warming up steam parameters (40kg/cm2, 3600 C), till the TSE margin are satisfactory.            The rifle construction of the water wall combined with the boiler circulating water pumps permits very high rate of pressure rising of boiler. An upper limit of 2000C/hr saturation temperature gradient can be allowed, i.e. approximately the boiler pressure can be brought to 20 kg/cm2 within an hour of cold start up. But actual temperature gradient is limited by the thick walled Y piece provided in the main steam and HRH lines. A main steam line heating is to be started as early as possible (at approx. 4 kg/cm2) as maximum differential temperature allowed between inner (98%) and mid wall temperature (50%) is  400C.  So boiler loading is accordingly regulated. It may be preferably to start only two CC pumps in order to minimise flashing in down comers (and subsequent vibration) when the boiler water is in range of 850C to 1250C. The third pump should be started before drum pressure reaches 7 kg/cm2 to minimise the temperature transients experienced by the pump casing (this is to avoid fast load out back on the boiler in the event of any CC pump tripping).            To get the rolling parameters, normally two elevation oil guns are taken with approx. 70 to 80t/hr flow through HP­LP bypass. At that time M.S. parameters would be 40 kg/cm2 and 3600C, HRH parameters would be 12 kg/cm2 and 3600C. As soon as the turbine loading has started, HP/LP bypass closes and gets completely closed as the turbine reaches the boiler load. First mill is put into operation around 10% of generator load. Second mill is put into operation around 25% while third mill is at 40% of generator load. Fourth and fifth mills are put into operation at 60% and 80% of generator load respectively. Sixth mill is taken to reach full generator load.               During loading the RH outlet steam temperature has to be kept as close as possible to SH outlet steam temperature Burner tilt, SH spray, RH spray controls has to be adjusted accordingly. The turbine­loading rate is decided by a selection circuit which compares the external load gradient, TSE margin and time dependant gradient (set internally) and frequency influence. http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

1/26

7/15/2015

Technical Services

 INTEGRATED START­UP PROCEDURE COLD START­UP (AUXILIARY STEAM AVAILABLE) REF. DRG NO. 20 – BPE – 691 STEP

TIME

0

..

UNIT CONDITION

OPERATION

Charge Aux. Steam header Boiler pr. 0 kg/cm2 (g) 16 ata, 2600C, from existing and Ambient temperature units.

NOTES ­

­

­

­

Charge steam to fuel oil pump house, atomising steam and tracing steam deaerator warming up.

­

­

­

Start tank heating of LSHS oil.

­

­

Start one LSHS pump on recirculation as soon as the sufficient oil temperature at inlet is achieved.

­

­

Charge LSHS to boiler front and keep it on long recirculation, with heaters control set on ‘Auto’ to maintain 110­1290C.

­

­

­

­

­

­

­

­

­

All the steam tracing lines and electrical tracings in pump house & boiler to be charged.

Fill water in drum upto +200mm.

Ensure that the suction and discharge valves of all the CC pumps are open and the pump suction and discharge lines are vented.

­

Start Bearing cooling water system pumps for Boiler, Turbine and TG auxiliaries .

Check all circuits have sufficient flow. Before starting the pumps, the emergency cooling water tank level to be checked and made normal.

­

­

­

­

Start instrument air compressor and check that Check that all circuits have all the lines to Boiler and TG sufficient air pressure. are charged.

­

­

­

Start service air compressor and fill the air receiver tanks of SRAPH & PRAPH are filled.

­

­

­

­

Ensure that purge air to HEA is open in all corners.

­

­

­

­

Line up Air and flue gas circuits for startup.

­

­

­

ESP ready in all respects.

­

­

­

­

Furnace bottom ash system and seal through lined up.

­

­

­

­

FSSS panel ready in all respects.

­

­

­

­

EAST panel ready in all respects.

­

­

­

­

Excitation panel ready in all respects.

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Check dampers and gates register position.

2/26

7/15/2015

Technical Services

­

­

­

­

­

­

Generator H2 gas pressure is Check purity of H2 gas is normal. 4 kg/cm2

­

­

­

Generator stator water Check purity of generator system ready in all respects. stator water is normal.

­

­

­

H2 cooling water system ready in all respects with SLC on.

­

­

­

­

LP & HP chemical dozing system is ready.

Check for level in Hydrazine, Ammonia and phosphate preparation tanks.

­

­

­

SADC panel readiness.

Check for air pressure in all the corners and elevations.

­

­

­

Power supply for all the Ensure Aux. air dampers and valves and dampers are ON. modulating.

­

­

­

Supply for all auxiliaries of SG, Turbine and Generator is ensured.

­

­

­

Readiness of HP bypass panel in all respects.

Ensure the oil unit is running and all the bypass and spray valves are closed.

­

­

­

Start one of the CC pumps.

Ensure drum level is +200 mm, and the drum air vents are closed.

­

­

­

Start the second CC pump.

Ensure drum level is normal.

­

­

­

Start scanner air fan.

­

­

­

Start both the secondary air preheaters.

Ensure that all the inlet and outlet air gas dampers are open.

­

­

­

Start both the primary air preheaters.

Ensure that the gas dampers are closed.

­

­

­

Start one set of ID and FD fans.

Adjust 30% air flow, and furnace draft minus 5 to 10 mm WCL.

­

­

­

Charge steam coil preheater concerned with the running FD fans.

­

­

­

Initiate Boiler ‘Purge’ (duration 5 minutes).

­

­

­

­

­

­

­

­

­

­

­

­

­­

­

Put lub oil temperature controller on.

­

­

­

Start one JOP.

­

­­

­

Lub oil system stopped.

Generator protection panel ready in all respects.

­

­

­

­

­ After purge completion Boiler trip valves will get reset. Also, after purge, adjust the wind box dampers to get 30­ 40 mm WCL. Wind box ‘dp’.

Start one vapour extraction Check oil level in MOT. fan, keep other fan standby. Line up lub oil cooler and thrust bearing filter Start one AOP. ­

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Put on SLCs for other AOP and EOP. Check out auto start of AOP and EOP. ­ Put on SLCs for other JOP and DC­JOP. Check out auto start of JOP 3/26

7/15/2015

Technical Services

and DC­JOP. ­

­

­

Put off SLCs JOP 1, 2 & 3. Stop running JOP.

­

­

­

Open gate valve gearing.

­

­

­

Start one JOP and switch on SLCs for JOPs.

­

­

­ Switch on SLC gate valve gearing. ­

­

M/c. comes on barring.

MOT level – 50 mm oil temp. 450C JOP header pr. 140 kg/cm2 speed 80 – 100 rpm.

­

The sequential operation narrated above on ‘Lub oil system stopped’ – is achieved by SGC – mode.

If the programme gets interrupted, the step and criteria to be checked and to be fulfilled for the programme to proceed further. ­

­

­

­

­

M/c on barring.

Start centrifuge with both heaters

­

­

FRF system in stopped condition.

Check FRF tank level.

+200 mm.

­

­

­

Line up FRF cooler and duplex filters in 32­bar system start one CEP. Check auto start of standby CEP.

­

­

­

Establish control fluid supply FRF tank level ‘O’ (normal). to various services.

­

­

­

Start one VEF.

­

­

­

­

Start one recirculation pump and include one Filter’s earth and ultra fine.

­

­

­

­

Switch on FRF heater and keep SLC ON for temperature control, and control fluid pumps.

­

­

­

Switch ON control fluid SGC.

­

FRF temperature 550C. ­

­

­

FRF system, SGC is on.

The sequential operation narrated above in FRF system stopped condition is achieved by SGC­FRF system on starting programme mode.

01

oo

Boiler ready for light up and Turbine on Turning gear.

Start 4 burners in ‘AB’ elevation with LSHS.

­

­

­

­

SH & RH drains are open.

­

­

­

­

MSV’s closed and drains before MSV open.

­

­

­

Regulate oil pressure to 8­10 Ensure atomising steam kg/cm2. pressure about 6 kg/cm2. After 30 minutes, take additional burners, so as to ensure a drum metal temperature raise of about 20C/min.

­

­

­

­

­

­

­

If the programme gets interrupted the step and criteria to be checked and fulfilled for the programme to proceed further. Check that SH & RH vents are open.

Insert furnace probe and ensure that the temperature is below 5350C. Check drum level and give blow down. Keep open the Eco.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

4/26

7/15/2015

Technical Services

­

­

­

­

­

­

Start motor driven feed pump on recirculation.

­

­

­

Charge the feed line upto feed control station.

­

­

­

­

Charge heating steam to deaerator from Aux. PRDS.

­

­

­

­

Start condensate pumps and feed to deaerator as and Check hotwell level. when required.

­­

­

­

Start hotwell make up pumps and feed hotwell as and when required.

­

­

­

­

Aux. PRDS steam 15kg/cm2 (g) 2600C

­

­

­

­

CW system is charged.

­

­

­

­

CW boxes – to ensure ventilating of water boxes.

­

­

­

­

Start one gland steam exhauster fan.

­

­

Line up vacuum pumps and start one by one – Gradually Ensure gland steam admit gland steam when admission temperature is condenser vacuum reaches – always above 2000C. 0.2kg/cm2 (g).

­

Vacuum building can be done through SGC – vacuum on starting programme mode, gland steam exhauster has to be started manually.

­

Open all drains connected to flash tanks and flash boxes connected to condenser.

­

­

­

­

recirculation valve when there is no feeding to drum. Check deaerator level.

­

­

­

­

­­

­

­

Open HPBP warm up valves.

­

­

­

­

Switch on – SLC drains.

­

02

60'

­

­

­

Close SH & RH header drains.

­

­

­

Open MSV by pass lines.

MS, HRH, & CRH lines will get warmed up.

100’

Boiler pressure 5kg /cm2.

Switch on automatic control interface of LP bypass.

As soon as the fixed set point reaches 12 kg/cm2, it seizes. Automatic control interface gets switched off when the hot reheat steam pressure reaches 13kg/cm2 i.e. after synchronisation.

03

Vacuum 0­9kg/cm2 (g).

Boiler pressure 2kg /cm2 Close SH & RH header vents.

­ ­

­

­

­

Open Main steam valves.

­

­

­

Open HP by pass.

­

­

­

­

Start third C.C. pump when boiler pressure reaches 9 kg/cm2.

­

­

­

­

Take additional guns in CD & Air heater soot blowing to be EF elevation. carried out.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

5/26

7/15/2015

­

Technical Services

­

­

Close HPBP warm up valves.

­

A – ROLLING THROUGH HYDRAULIC GOVERNOR Boiler pressure:15 kg/cm2 04

150’

Temperature:180­2000C HRH Pressure:8­ 12Kg/cm2

­

­

­

Open HPESVs & IPESVs for warming up by operating starting device to approximately 42%.

­

Check and ensure that speed set point is zero and speeder gear is 0% position.

Ensure TSE influence is switched on and available margins are greater than = 30  0 K.

M. S. Pr. 50 kg/cm2 Raise the speed set point of EHC to 3200 rpm

If the oil system of EHC is isolated at speed Gov. rack, speed set point need not be raised.

Gradually raise the starting device to bring the speed to 360 rpm

Starting device position approximately 56%.

Turbine ready for Rolling.

Hold the speed at 360 rpm for about 35 to 40 mts.

Ensure closure of gate valve gearing at 240 rpm. Monitor bearing vibrations, shaft vibrations, TSE margins, bearing temperature & Turbosupervisory readings at 360 rpm.

M. S. Pr. 50 kg/cm2/3500C. Turbine running at 360 rpm.

Raise the speed upto 2400 rpm through starting device at the rate of 600 rpm.

Ensure tripping of JOP at 540 rpm.

Raise further speed upto 3000 rpm through speeder gear.

Starting device will be at 90%.

M.S. temp. 3500C 05

­300’ H. R. H. Pr. 12 kg/cm2 HRH temp. : 3500C

­

­

­

­

06

­360’

­

­

­

­

­

­

­

Monitoring bearing temperature and vibrations, shaft vibrations, TSE margins and Turbovisory readings, Seal oil, Primary water and gas temperatures & Generator winding temperature.

­

­

­

­

Ensure trippinf of AOP at 2950 rpm.

­

­

­

­

Speeder gear position will be approximately at 50 to 60%.

07

370’

­

­

­

­

MS Pr. 50 kg/cm2. Temperature: 3500C Turbine running at 3000 rpm.

Put AVR on Auto.

­

­

Close field breaker.

­

­

Set manually the generator voltage to grid voltage.

­

Synchronise the generator with grid. ­

­

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

­ 6/26

7/15/2015

Technical Services

Pick up 50 MW load by operating speeder gear. ­

­

­

­

Ensure closure of HPBP steam valves & spray valves.

­

Increase HPBP set point.

­

Drain pot drains of MS, CRH Close other drains, M.S. & HRH and extraction steam HRH, keeping SLC drains on. lines will operate as per the actuation of level switches.

B ­ ROLLING THROUGH EHC. 04

150'

­

­

MS Pr.: 15 kg/cm2. Temperature:180­2000C HRH Pressure:8to12kg/cm2. ­

Open HPESVs & IPESVs for warming up by operating starting device to approximately 42%. ­

Check and ensure that TSE influences is switched on and available margins are greater than  300K. Check and ensure that speed set point is zero and speeder gear is 0% position.

MS Pressure: 50 kg/cm2 MS Temperature:3500C 05

300'

HRH Pressure: 12kg/cm2

Raise the starting device to about 70%.

Check and ensure opening of valves in HP/IP secondary fluid lines to EHC at speed control rack.

If tracking device is switched ON, starting device position will automatically track the EHC position

HRH Temperature: 3500C. Turbine Ready for rolling

­

­

­

Raise the speed set point to 360 rpm and watch the actual speed.

­

­

­

Raise the speeder gear to 100%

­

­

­

Hold the speed at 360 rpm for about 35 to 40 mts.

­

­

­

MS Pressure:50 kg/cm2 06

360' MS Temperature:3500C

­

­

­

­

Turbine speed: 360 rpm.

­

­

Raise the speed set point to 3000 rpm.

Ensure closure of gate valve gearing at 240 rpm. Monitoring bearing vibrations, bearing temperatures, shaft vibrations, TSE margins and Turbovisory readings.

Ensure tripping of jacking oil pump at 540 rpm.

­

The rate of acceleration will be 600 to 850 rpm.

­

Monitor bearing vibration and temperatures, shaft vibrations, Turbovisory readings and TSE margins

­

­

­

­

Monitor and control, SEAL oil temperatures, Primary water temp. Hydrogen gas temperature and winding temperature.

­

­

­

­

Ensure tripping of AOP at 2950 rpm.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

7/26

7/15/2015

Technical Services

MS Pressure: 50 kg/cm2 07

370'

Put AVR on auto, Close Field Breaker.

­

­

Set manually generator voltage to grid voltage.

­

MS Temperature: 3500C Turbine speed: 3000 rpm.

­

­

Speed set point will raise automatically by 8 rpm and load will be picked upto 20MW.

­

­

­

Synchronise the generator with grid.

­

­

­

Raise the speed set point and pick up the load to 50 MW.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves & spray valves.

­

Close other drains of MS, CRH, HRH, keeping SLC drains 'ON'.

Drain pot drains of MS, CRH, HRH and extraction steam lines will operate as per the actuation of level switches.

­

­

­

C ­ ROLLING THROUGH SGC ­ TURBINE. MS Pressure: 15 kg/cm2 04

150'

MS Temp.:180­2000C HRH Pressure: 12 kg/cm2

Switch on the start up programme of SGC – Turbine.

­

­

­

­

­

   

 

­

Ensure TSE influence is switched on.

­

If the programme interrupts the particular step and criteria to be checked and corrected for the programme to proceed further.

­

All operations as explained under EHC rolling will be carried out by SHC – Turbine programme sequentially.

MS Pressure: 50 kg/cm2 MS Temperature: 3500C 05

300'

HRH Pressure: 12 kg/cm2

Turbine speed will be raised to 360 rpm through SGC – Programme.

Ensure closure of gate valve gearing at 240 rpm.

HRH Temp.: 3500C. Turbine Ready for rolling ­

­

­

­

­

­

­

Monitor bearing vibration, bearing temperature, shaft vibration, TSE margins and Turbovisory readings.

­

To achieve the programme as per the starting curve, the main steam temperature should be maintained steadily till loading upto 50 MW.

MS Pressure: 50 kg/cm2 06

360'

MS Temperature: 3500C

Turbine speed will be raised upto 3000rpm through SGC­ programme.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure tripping of JOP at 540 rpm. 8/26

7/15/2015

Technical Services

Turbine running at 360 rpm.  ­

­

­

­

­

­

MS Pressure: 50 kg/cm2 07

370'

MS Temperature: 3500C Turbine speed:3000rpm. 

­

Ensure tripping of AOP at 2950 rpm.

­

Monitor bearing temp and vibrations, shaft vibrations, TSE margins and turbovisory readings seal oil, primary water, Hydrogen gas and Generator winding temperatures.

SGC programme will switch ON field breaker, put AVR on Ensure SGC – start up auto, synchronise and pick programme is completed. up load upto 20 MW.

­

­

­

Raise the speed set point and pick up the load upto 50 MW.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves and spray valves.

­

Close other drains of M.S. CRH and HRH, keeping SLC drains ‘ON’.

Drain pot drains of MS, CRH, HRH extraction steam lines will operate as per the actuation of level switches.

­

­

Load : 55 MW 08

390'

M.S. : 54kg/cm2/3500C HRH : 12 kg/cm2/3400C

Before starting P.A. fan, Start seal air fan and PA fan ensure that air and gas and take first mill in service. dampers of Primary Air Preheaters are open.

­

­

­

Charge ESP fields

Ensure Ash handling system is ready.

­

­

­

Start the second set of ID & FD fans.

Make ready SH & RH spray systems.

­

­

­

Cut in L.P. heaters 2 & 3.

Ensure switching on of load controller above 60MW.

­

­

­

Cut out heating steam from Aux. P.R.D.S. to Deaerator.

­

­

­

­

Peg Deaerator from CRH steam gradually upto 2 kg/cm2.

­

­

­

­

Cut in auto controllers.

­

Load : 55 MW ­

­

M.S. : 54kg/cm2/3500C HRH : 12 kg/cm2/3400C

Charge Aux. PRDS station from CRH. Cut in spray and maintain a temperature of 2500C.

Ensure energizing of solenoid in trimming device at and above 100 MW load.

­

­

­

Peg Deaerator gradually to 4 Raise the pressure set point of Deaerator pressure kg/cm2. controller gradually.

­

­

­

Cut in IInd mill and cut in auto controllers.

­

­

­

Start withdrawing oil support Ensure fire ball scanner gradually. healthiness

­

­

­

Control main steam and reheat steam temperatures by using spray if required.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

­

­

9/26

7/15/2015

Technical Services

Load : 160 MW 10

440'

M.S. : 90kg/cm2/3800C HRH : 20 kg/cm2/3800C

Increase the wind box to furnace differential pressure to 100mm W.C. by adjusting SADC.

­

Steam flow : 580t/hr. ­

­

­

Charge H.P. heaters 5A, 5B, 6A and 6B.

­

­

­

­

Put controllers on auto.

­

­

­

­

Start first TDBFP & second CEP.

­

­

­

­

Charge Deareator pegging Ensure Deareator Pressure steam flow CRH to Extraction controller remains as auto. around 200 MW load.

Load : 250 MW M.S. : 120kg/cm2/4200C 11

480' HRH : 26 kg/cm2/3400C

Cut in IIIrd mill and cut in auto controllers.

­

Steam flow : 820t/hr. ­

­

­

Start second P.A. Fan.

Before starting P.A. fan ensure that air and gas dampers of PAPHs are open.

Load : 320 MW M.S. : 125kg/cm2/3500C 12

510'

HRH : 28­30 kg/cm2/3400C

Cut in IVth mill and cut in auto controllers.

­

Steam flow : 1040t/hr. ­

­

­

Cut of oil support completely.

Ensure healthiness of fire ball scanners.

Load : 405 MW M.S. : 145kg/cm2/4600C 13

Cut in Vth mill and cut in auto controllers.

­

Cut in second TD BFP and switch off motor driven BFP.

­

If full load is not reached cut in VIth mill along with its controllers. Increase the set M.S. : 170 kg/cm2/4750C point of SH & RH spray controllers such that rated 2 0 HRH : 40.5 kg/cm /475 C parametes are achieved gradually.

­

550' HRH : 33 kg/cm2/4600C Steam flow : 1310 t/hr.

­

­

­ Load : 500 MW

14

590'

Load : 405 MW M.S. : 145kg/cm2/4600C 15

670'

­

­

HRH : 33 kg/cm2/4600C Steam flow : 1310 t/hr.

   http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

10/26

7/15/2015

Technical Services

 WARM AND HOT START UPS   (With Aux. Steam Available).                  A  warm  start  up  is,  by  definition,  one  which  the  maximum  of  HP  casing/HP  shaft  temperature  is between 1500C and 3500C. This normally means that the unit is shut down from the maximum load for one to  four  days.  Depending  upon  the  absolute  temperature  of  HP  casing  and  HP  shaft,  steam  parameters  are derived. A hot start up is by definition one which the maximum of HP casing/shaft temperature is more than 3500C. In this case to get the rolling parameters two mills are taken into service keeping HP, LP by pass in operation.    (Again  the  flow  rate  is  restricted  by  the  ‘Y’  pieces  constraints  i.e.,  ±  400C).  In  both  the  cases, curves  are  given  to  derive  the  rolling  parameters.  In  case  when  machine  is  rolled  through  EAST,  curve generators, calculate and give permissive for rolling.

  INTEGRATED START­UP PROCEDURE WARM START UP (AFTER 48 HOURS SHUT DOWN). STEP

TIME IN MINUTES

UNIT CONDITION

­

­

One CC pump in operation and scanner fan in operation.

­

­

Both SAPHs and PAPHs in operation.

­

­

­

­

Turbine on bearing gear with AOP, JOP and seal oil pumps in operation.

­

­

­

Control fluid system ready in all respects. One circulating pump in operation with one earth filter and ultra fine filter in circuit.

­

­

­

­

Generator gas system, seal oil system and primary water system in operation.

­

­

­

­

Bearing cooling water system in operation.

­

­

­

­

HT and LT auxiliaries power supply available.

­

­

­

­

HP bypass system ready in all respects.

­

­

­

­

ESP ready in all respects.

­

­

­

­

EAST panels ready in all respects.

­

­

­

­

Furnace bottom ash system and seal trough lined up.

­

­

­

­

Vacuum pumps lined up and ready for operation.

­

­

­

Gland steam and leak steam controllers are lined up and ready for operation.

­

­

­

­

OPERATION Motor operated BFP is run as and when required to maintain the drum level.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

NOTES. ­

11/26

7/15/2015

Technical Services

­

Generator protection panel and exciter panels ready in all respects.

­

­

Boiler drum pressure = 0 kg/cm2.        SH temperature between 1300C and 1500C.

­

­

­

­

­

­

­

­

­

­

­

­

­

1. Charge auxiliary steam header from existing units. Pr. 16ata temp. 2600C.

­

­

2. Charge steam to fuel oil pump house, atomising steam and tracing steam.

­

­

3. Start tank heating of LSHS oil.

­

­

4. Start one LSHS pump on recirculation as soon as sufficient oil temp. at inlet is achieved.

­

­

Start instrument oil compressor and service air compressors and check that all lines to boiler and TG are charged.

­

­

Charge LSHS pump to boiler front and keep it on long recirculation with heaters control set on auto to maintain 1200C.

­

­

­

­

­

Start circulating water pump for condenser and deaerate the condenser water boxes.

­

­

­

Start second CC Pump.

­

­

­

Start one set of ID and FD fans.

­

­

­

­

Initiate boiler purge.

­

­

­

­

Start one CEP and keep the hot well make up in service.

­

­

­

­

Start one of the control fluid pumps and keep the second as auto standby.

­

­

­

­

Keep the control fluid temperature control on auto.

­

­

Ensure running of motor driven BFP continuously for maintaining drum level.

­

­

­

Line up main steam, CRH and HRH steam lines for charging by opening respective line drains.

­

­

­

Line up FSSS panels in all respects

­

­

­

­

Charge heating steam line to Deaerator from Aux. PRDS.

­

01

oo

­

­

­

­

SH & RH drains are open.

­

­

­

­

MSV’s closed and drains before MSV open.

Boiler ready for light up and turbine on turning gear.

Start 4 burners in ‘AB’ elevation with LSHS.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Check that SH & RH vents are open.

12/26

7/15/2015

Technical Services

­

­

­

­

Ensure atomising steam pressure of about 6 kg/cm2

­

­

­

­

Ensure motor operated BFP is in service.

­

­

­

Start Gland steam Exhauster.

­

­

­

­

Start one by one vacuum pumps.

­

­

Admit gland steam when vacuum reaches – 0.2 kg/cm2.

­

­

Ensure gland steam admission temperature is always above 2000C.

­

­

­

Vacuum building can be done through SGC vacuum on starting programme mode. Gland steam exhauster has to be started manually.

­

­

­

Open all drains connected to Ensure condenser vacuum flash tanks and flash boxes of – 0.8 kg/cm2. connected to condenser.

­

­

­

Switch on ‘SLC’ drains.

­

­

­

Close SH & RH header vents Ensure boiler pressure is and drains. 2kg/cm2.

­

­

­

Open HPBP warming up valves.

­

­

­

­

Open MSV bypass lines.

­

­

­

­

Switch Automatic control interface of LP bypass.

As soon as the fixed set point reaches 12kg/cm2, it seizes.

­

­

­

Automatic control interface gets switched off when the hot reheat steam pressure reaches 13kg/cm2 (i.e.) after synchronisation.

­

­

­

­

­

­

Open Main steam stop valves.

Ensure MS, CRH & HRH lines get warmed up.

­

­

­

Open HP bypass and close the HPBP warm up valves.

Ensure Boiler pressure is 5kg/cm2.

­

­

­

Start third CC pump.

Ensure Boiler pressure is 9kg/cm2.

­

­

­

Put HP bypass controller on auto and vary the set point Ensure Boiler pressure is according to the gradient of 10kg/cm2 pipeline temperatures.

­

­

­

Put HP bypass spray control on auto.

­

­

­

Take additional guns according to the requirement.

­ Air heater soot blowing to be carried out.

A – ROLLING THROUGH HYDRAULIC GOVERNOR. MS: 50 kg/cm2/3650C 02

180'

HRH: 12 kg/cm2/3250C  By pass steam flow: 170t/hr.

Open HPESV and IPESV for warming up by operating starting device to approx. 42%

Check and ensure that speed set point is zero and speeder gear is 0%.

Ensure TSE influence is http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

13/26

7/15/2015

Technical Services

­

­

­

­

switched on and available margins are greater than   300K.

MS: 60 kg/cm2/4000C 03

210'

HRH: 12 kg/cm2/3500C  By pass steam flow: 200t/hr.

If the oil system of EHC is Raise the speed set point of isolated at speed Gov. EHC to 3200 rpm. rack, speed set point need not be raised.

­

­

­

Gradually rise the starting Starting device position device to bring the speed to approximately 56%. 360 rpm.

­

­

­

Hold the speed at 360 rpm for about 5 minutes.

­

­

04

215'

­

­

­

Turbine running at 360 rpm. ­

­

Ensure closure of gate valve gearing at 240 rpm. Monitor bearing vibrations, shaft vibrations, TDE margins, bearing temp. & Turbovisory readings at 360rpm.

Raise the speed upto 2400 Ensure tripping of JOP at rpm through starting device 540 rpm. at the rate of 600 rpm. Raise further speed upto 3000 rpm through speeder gear.

Starting device will be at 90%.

­

­

­

­

Monitor bearing temp & vibrations, shaft vibrations, TSE margins and Turbovisory readings. Seal oil, Primary water and gas temperatures & Generator winding temperature.

­

­

­

­

Ensure tripping of AOP at 2950 rpm.

­

­

­

­

Speeder gear position will be approx. at 50 to 60 %.

05

220'

­

­

­

­

Turbine running at 3000 rpm

Put AVR on auto.

­

­

Close field breaker.

­

­

Set manually the generator voltage to grid voltage.

­

­

­

­

­

Synchronise the generator with grid. Pick up 50 MW load by operating speeder gear.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves & spray valves.

­

Close other drains, M.S. HRH, keeping SLC drains on.

Drain pot drains of MS, CRH, and HRH and extraction steam lines will operate as per the actuation of level switches.

­

­

­

­

­

­

Further load raising will be done by operating the speeder gear according to the start up curve.

B – ROLLING THROUGH EHC MS: 50 kg/cm2/3650C http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

14/26

7/15/2015

Technical Services

HRH: 12 kg/cm2/3250C 02

180'

­

­

By pass steam flow: 170t/hr.

­

Open HPESVs and IPESVs for warming up by operating starting device to approx. 42%.

Check and ensure that TSE influence is switched on and available margins are greater than  300K.

­

Check and ensure that speed set point is zero and speeder gear is 0%.

Raise the starting device to about 70%.

Check and ensure opening of valves in HP/IP secondary fluid lines to EHC at speed control rack.

MS: 60 kg/cm2/4000C HRH: 12 kg/cm2/3500C 03

210'

By pass steam flow: 200t/hr. Turbine ready for rolling.

­

­

­

If tracking device is Raise the speed set point to switched on starting device 360 rpm and watch the position will automatically actual speed. track the EHC position

­

­

­

Raise the speeder gear to 100%.

Ensure closure of gate valve gearing at 240 rpm.

Hold the speed at 360 rpm for about 5 minutes.

Monitor bearing vibrations bearing temperatures, shaft vibrations, TSE margins & turbovisory readings.

­

­

­

04

215'

Turbine running at 360rpm.

Raise the speed set point to Ensure tripping of Jacking 3000 rpm. oil pump at 340 rpm.

­

­

­

­

Monitor bearing vibrations and temps, shaft vibration, turbovisory readings and TSE margins.

­

­

­

­

Ensure tripping of AOP at 2950 rpm.

05

225'

­

­

Put AVR on auto close Field breaker.

­

­

Set manually generator voltage to grid voltage.

­ Speed set point will be raise automatically by about 8 rpm & load will be picked upto 20 MW. ­

Turbine speed: 3000 rpm.

­

­

­

Synchronise the generator with grid.

­

­

­

Raise the speed set point and pick up the load to 50 MW.

­

­

­

Increase HPBP set points.

Ensure closure of HPBP steam valves and spray valves.

­

Close other drains of MS, CRH, and HRH keeping SLC drains ‘ON’.

Drain pot drains of MS, CRH, HRH and extraction steam lines will operate as per the actuation of level switches.

­

­

C – ROLLING THROUGH SGC – TURBINE. MS: 50 kg/cm2/3650C 02

180'

HRH: 12 kg/cm2/3250C By pass steam flow:

Switch on the start up programme of SGC – Turbine.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure TSE influence is switched on.

15/26

7/15/2015

Technical Services

170t/hr.

­

­

­

­

­

­

­

If the programme interrupts the particular step and criteria to be checked and corrected for the programme to proceed further.

­

All operations as explained under EHC rolling will be carried out by SGC – Turbine programme sequentially.

MS: 50 kg/cm2/3650C HRH: 12 kg/cm2/3250C 03

210'

By pass steam flow: 170t/hr.

Turbine speed will be raised Ensure closure of gate to 360 rpm through SGC­ valve gearing at 240 rpm. Programme.

Turbine ready for rolling.

  ­

­

­

­

­

­

­

Monitor bearing vibration, bearing temp, shaft vibration, TSE margins and Turbovisory readings.

­

To achieve the programme as per the starting curve, the main steam temperature should be maintained steadily till loading upto 50 MW.

MS: 60 kg/cm2/4000C 04

215'

Turbine running at 360 rpm.

Turbine speed will be raised Ensure tripping of JOP at upto 3000 rpm through SGC 540 rpm. – Ensure tripping Programme. of A.O.P. at 2950 rpm.

 

­

­

­

MS: 60 kg/cm2/4000C 05

225'

Turbine speed: 3000 rpm.

 

­

Monitor bearing temp & vibrations, shaft vibrations, TSE margin and turbovisory readings, seal oil, primary water, Hydrogen gas and Generator winding temperatures.

SGC programme will switch ON field breaker, put AVR Ensure SGC – Start up on auto, synchronise and programme is completed. pick up load upto 20 MW.

­

­

­

Raise the speed set point and pick up load upto 50 MW.

­

­

­

Increase HPBP set point

Ensure closure of HPBP steam valves and spray valves.

­

Close other drains of M.S., CRH and HRH, keeping SLC drains ‘ON’.

Drain pot drains of M.S., CRH, HRH and Extraction steam lines will operate as per the actuator of level switches.

­

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

­

16/26

7/15/2015

Technical Services

Load: 60 MW 06

230'

MS: 60 kg/cm2/4100C

Cut in L.P. heaters 2 and 3.

Ensure switching on of load controller at 60 MW.

HRH: 14 kg/cm2/3600C ­

­

­

Cut out heating steam from Aux. PRDS to Deaerator.

­

­

­

­

Peg Deaerator from CRH steam gradually upto 2 kg/cm2.

­

­

­

­

Cut in all auto controllers.

­

­

­

­

Start seal air fan and P.A. fan

­

­

­

Cut in further oil guns for raising parameters.

Before starting P.A. fan, ensure that air and gas dampers of Primary Air Preheaters are open. ­

Load: 110 MW MS: 80 kg/cm2/4200C 07

245'

HRH: 19 kg/cm2/3800C

Cut in 1st coal mill and cut in Auto controllers.

Make ready SH & RH spray system.

­

Charge ESP Fields.

Ensure Ash handling system is ready.

­

Charge Aux. PRDS station from CRH. Cut in spray and maintain a temperature of 2500C.

Main steam flow: 470t/hr. Trimming device is in ‘OFF’. ­

­

­

­

­ Raise the pressure set point of Deaerator pressure controller gradually

­

­

­

Peg Deaerator gradually upto 4 kg/cm2.

­

­

­

Cut in H.P. heaters and put the level controls on auto.

­

­

­

­

Start first TD BFP and second CEP around a load of 170 MW.

­

­

Increase the windbox to furnace diff. pressure to 100mm. W.C. by adjusting SADC.

­

Cut in IInd mill and cut in auto controllers.

­

­

­

Load: 200 MW MS: 100 kg/cm2/4350C 08

270' HRH: 19 kg/cm2/4000C Main steam flow: 750t/hr.

­

­

­

Start withdrawing oil support gradually.

­

­

­

Control main steam and reheat steam temperature by using spray if required.

­

­

­

­

Change Deaerator pegging steam from CRH to

Ensure Deaerator pressure

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure healthiness of fire ball scanners.

17/26

7/15/2015

Technical Services

Extraction steam. ­

­

­

­

­

­

Cut in IIIrd mill and cut in auto controllers. Start second P.A. fan.

controller remains on auto. ­ Before starting P.A. fan ensure that air and gas dampers of PAPH are open.

Load: 320 MW MS: 125 kg/cm2/4500C 09

300' HRH: 30 kg/cm2/4300C

Cut in IVth mill and cut in auto controllers.

­

Main steam flow: 1080t/hr. ­

­

­

Cut off oil support completely.

Ensure healthiness of fire ball scanners.

­

­

­

Cut in Vth coal mill and cut in auto controllers.

­

­

­

­

Start second TDBFP and switch off motor driven BFP.

­

­

­

­

Cut in VIth coal mill and cut in auto controllers.

­

Check all parameters at full load and ensure them within limits.

­

Increase the set point of SH & RH spray controllers such that rated parameters are achieved.

­

­

­

Load: 500 MW MS: 170 kg/cm2/4800C 10

340' HRH: 40.5 kg/cm2/4800C Main steam flow: 1620t/hr.

­

­

­ Load: 500 MW MS: 170 kg/cm2/5350C

11

420' HRH: 40.5 kg/cm2/5350C Main steam flow: 1570t/hr.

  INTEGRATED START UP PROCEDURE HOT START UP (AFTER 8 HOURS SHUT DOWN)  

STEP

TIME IN MINUTES.

UNIT CONDITION 

OPERATION

­

­

Motor operated BFP is run Two CC pumps in operation as and when required to and scanner fan in maintain the drum level. If operation. necessary BFP should be kept running continuously.

­

­

Both SAPHs and PAPHs in operation.

­

NOTES.

­

­

Turbine on barring gear http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

18/26

7/15/2015

Technical Services

­

­

­

­

Control fluid pump in operation. One circulating pump in operation with one earth filter and ultra fine filter in circuit.

­

­

­

­

Generator gas system, seal oil system and primary water system in operation.

­

­

­

­

Bearing cooling water system in operation.

­

­

­

­

Condenser circulating water system in operation.

­

­

­

­

Service air and instrument air compressors in operation.

­

­

­

­

One condensate pump in operation and hot well make up in service.

­

­

­

­

Aux. steam header charged from existing units (16ata 2600C).

­

­

­

­

LSHS pump in operation on long recirculation upto boiler front with heaters control set on

­

­

­

­

HP bypass system ready in all respects.

­

­

­

­

LP & HP and chemical dosing system ready.

­

­

­

­

ESP panels ready in all respects.

­

­

­

­

EAST panels ready in all respects.

­

­

­

­

Furnace bottom ash system and seal trough lined up.

­

­

­

­

Vacuum pumps lined up and ready for operation.

­

­

­

­

Gland steam and leak steam controllers are lined up and ready for operation.

­

­

­

­

Generator protection panel and exciter panels ready in all respects.

­

­

­

­

FSSS panel ready in all respects.

­

­

­

­

Boiler drum Pr. 75 kg/cm2 SH. Temp. between 4150C and 4300C.

­

­

­

Start one gland steam exhauster.

­

­

­

­

Start one by one vacuum pumps.

­

­

­

­

­

­

with AOP, JOP and seal oil pumps in operation.

Line up main steam, CRH and HRH steam lines for charging by opening respective line drains.

Admit gland steam when vacuum reaches – 0.2

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure MSV is closed.

Ensure gland steam admission temperature is 19/26

7/15/2015

Technical Services

kg/cm2.

always above 2000C.

­

­

­

Vacuum building can be done through SGC vacuum on starting programme mode. Gland steam exhauster has to be started manually.

­

­

­

Open all drains connected to Ensure condenser vacuum flash tanks and flash boxes of 0.8 kg/cm2. connected to condenser.

­

­

­

Ensure condenser vacuum of 0.8 kg/cm2.

­

­

­

­

Open HPBP warming up valves.

­

­

­

­

Switch Automatic control interface of LP bypass.

As soon as the fixed set point reaches 12 kg/cm2, it seizes. Automatic control interface gets switched off when the hot reheat steam pressure reaches 13 kg/cm2 (i.e.) after synchronisation.

­

­

­

­

­

­

­

­

­

­

­

­

Start both ID & FD fans

­

­

­

­

Initiate boiler purge.

­

­

­

­

Charge heating steam line to Deaerator from Aux. PRDS.

­

01

oo

Boiler ready for light up and turbine on turning gear.

­

­

Start third CC pump. ­

Start 4 burners in ‘AB’ elevation with LSHS.

Ensure differential temp. is within permissible limits. Ensure running of motor driven BFP continuously for maintaining drum level.

Ensure atomising steam pressure of about 6kg/cm2.

 Drum Pr. 75 kg/cm2   SH. Temp. 4150C and 4300C.

­

Ensure motor operated BFP is in service.

­

­

­

Open drains before MSV.

­

­

­

­

Open MSV by pass lines.

­

­

­

­

Open Main steam stop valves.

­

­

­

Open HP bypass and close the HPBP warm up valves.

­

­

­

­

­

­

Put HP bypass controllers on auto and vary the set point according to the gradient of pipeline temperatures.

­

­

­

Put HP bypass spray control on auto.

­

­

­

Take additional guns according to the requirement.

­

Start both P.A. fans and seal air fans.

­

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure MS, CRH, HRH lines got warmed up.

Air heater soot blowing to be carried out. Before starting P.A. Fans ensure that air and gas dampers of Primary air 20/26

7/15/2015

Technical Services

preheaters are open. ­

­

­

Line up milling system for starting.

­

A – ROLLING THROUGH HYDRAULIC GOVERNOR MS: 85 kg/cm2/4850C 02

40'

HRH: 12 kg/cm2/4400C

Cut in first coal mill & cut in Make ready SH and RH auto controllers. spray system.

Bypass steam flow: 280t/hr. ­

­

Ensure Ash handling system is ready.

­

Charge ESP fields.

­

­

­

­

Increase the windbox to furnace diff. Pressure to 100mm W.C. by adjusting S.A.D.C.

­

­

­

Cut in second mill and cut in auto controllers.

­

­

­

­

Peg the deaerator from CRH gradually upto 2 kg/cm2.

­

­

Open HPESVs and IPESVs Check and ensure that for warming up by speed set point is zero and operating starting device to speeder gear is at 0%. approximately 42%.

­

Ensure TSE influence is switched on and available margins are greater than   300K.

­

­

­

­

­

MS Pressure: 85 kg/cm2 MS Temperature: 5000C HRH Pressure: 12 kg/cm2 03

50'

HRH Temperature: 4500C.

If the oil of EHC is isolated Raise the speed set point of at speed Gov. rack, speed EHC to 3200 rpm. set point need not be raised.

Bypass steam flow: 360t/hr. Turbine Ready for rolling ­

­

­

­

­

­

­

04

­

­

Ensure closure of gate valve gearing at 240 rpm.

­

Monitoring bearing vibrations, shaft vibrations, TSE margins, bearing temp & Turbovisory readings at 360 rpm.

Raise speed upto 2400 rpm Turbine running at 360rpm. through starting device at the rate of 600 rpm.

52'

­

­

Gradually raise the starting Starting device position device to bring the speed to approximately 56%. 360 rpm

­

­

Raise further speed upto 300 rpm through speeder gear.

Ensure tripping of JOP at 540 rpm. Starting device will be at 90%. Monitor bearing temp and vibrations, shaft

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

21/26

7/15/2015

Technical Services

vibrations, TSE margins and turbovisory readings. Seal oil Primary water and gas temperatures and Generator winding temperature.

­

­

­

­

­

­

­

­

Ensure tripping of AOP at 2950 rpm.

­

­

­

­

Speeder gear position will be approximately at 50 to 60%.

05

56'

­

­

­

­

Turbine running at 3000rpm

Put AVR on auto.

­

­

Close field breaker.

­

­

Set manually the generator voltage to grid voltage.

­

­

­

­

­

Synchronise the Generator with grid. Pick up 50 MW load by operating speeder gear.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves & spray valves.

­

Close other drains, M.S. CRH, HRH, keeping SLC drains on.

Drain pot drains of MS, CRH, and HRH and extraction steam lines will operate as per the actuation of level switches.

­

­

­

­

­

­

Further load raising will be done by operating the speeder gear according to the start up curve.

B – ROLLING THROUGH EHC MS Pressure: 85 kg/cm2 MS Temperature: 4850C 02

40'

HRH Pressure: 12 kg/cm2

Cut in first coal mill & cut in Make ready SH & RH spray auto controllers. systems.

HRH Temperature: 4400C. Bypass steam flow: 280t/hr. ­

­

Ensure Ash handling system is ready.

­

Charge ESP fields.

­

­

­

­

Increase the windbox to furnace diff. Pressure to 100mm W.C. by adjusting S.A.D.C.

­

­

­

Cut in second mill and cut in auto controllers.

­

­

­

­

Peg the deareator from CRH gradually upto 2 kg/cm2.

­

­

Open HPESVs and IPESVs Check and ensure that for warming up by speed set point is zero and operating starting device to speeder gear is at 0%. approximately 42%.

­

­

­

­

­

­

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

Ensure TSE influence is switched on and available margins are greater than   22/26

7/15/2015

Technical Services

300K. MS Pressure: 85 kg/cm2 MS Temperature: 5000C 03

50'

HRH Pressure: 12 kg/cm2 HRH Temperature: 4500C.

Raise the starting device to about 70%.

Check and ensure opening of valves in HP/IP secondary fluid lines to EHC at speed control rack.

  Turbine Ready for rolling.  Bypass steam flow: 360t/hr. ­

­

­

If tracking device is Raise the speed set point to switched on starting device 360 rpm and watch the position will automatically actual speed. track the EHC position.

­

­

­

Raise the speeder gear to 100%.

Ensure closure of gate valve gearing at 240 rpm.

Hold the speed at 360 rpm for about 5 minutes.

Monitor bearing vibrations, bearing temperatures, shaft vibrations, TSE margins and turbovisory readings.

­

­

04

52'

­

­

­

­

­

Turbine reading at 360 rpm. ­

­

Raise the speed set point to Ensure tripping of Jacking 300 rpm. oil pump at 540 rpm. ­

The rate of acceleration will be 600 to 800 rpm2.

­

Monitor bearing vibrations and temperatures, shaft vibration, turbovisory readings and TSE margins.

­

­

­

­

Monitor and control, seal oil temperatures, primary water temperature. Hydrogen gas temperature and winding temperature.

­

­

­

­

Ensure tripping of AOP at 2950 rpm.

05

56'

­

­

Put AVR on auto Close field breaker.

­

­

Set Manually generator voltage to grid voltage.

­

Turbine speed: 3000 rpm.

Speed set point will be raised automatically by about 8 rpm and load will be picked upto 20 MW.

­

­

­

Synchronise the generator with grid.

­

­

­

Synchronise the generator with grid.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves and spray valves.

­

Close other drains of MS. CRH and HRH, keeping SLC drains ‘ON’.

Drain pot drains of MS, CRH, HRH and extraction steam lines will operate as per the actuation of level switches.

­

­

­

C – ROLLING THROUGH SGC TURBINE. MS: 85 kg/cm2/4850C http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

23/26

7/15/2015

Technical Services

02

40'

HRH: 12kg/cm2.

Cut in first coal mill & cut in Make ready SH & RH spray auto controllers. systems.

Bypass steam flow: 280t/hr. ­

­

Ensure Ash handling system is ready.

­

Charge ESP fields.

­

­

­

­

Increase the windbox to furnace diff. Pressure to 100mm W.C. by adjusting S.A.D.C.

­

­

­

Cut in second mill and cut in auto controllers.

­

­

­

­

Peg the deaerator from CRH gradually upto 2 kg/cm2.

­

­

­

­

Switch on the start up Ensure TSE influence is programme of SGC­Turbine. switched ‘ON’.

­

­

­

­

­

­

­

If the programme interrupts, the particular step and criteria to be checked and corrected for the programme to proceed further.

­

All operations as explained under EHC rolling will be carried out by SGC­Turbine programme sequentially.

Turbine ready for rolling. MS: 85 kg/cm2/5000C 03

50'

HRH: 12kg/cm2/4500C

Turbine speed will be raised Ensure closure of gate to 360 rpm through SGC­ valve gearing at 240 rpm. programme.

Bypass steam flow: 360t/hr. ­

­

­

­

04

52'

­

­

­

­

­

­

Turbine reading at 360 rpm. ­

­

­

Monitor bearing vibration, bearing temperature, shaft vibration, TSE margins and Turbovisory readings.

­

To achieve the programme as per the start up curve, the main steam temperature should be maintained steadily till loading of 50 MW.

Turbine speed will be raised Ensure tripping of JOP at upto 3000 rpm through 540 rpm. SGC­ programme. ­

Ensure tripping of AOP at 2950 rpm.

­

Monitor bearing temperature and vibrations, shaft vibrations, TSE margins, Turbovisory readings, seal oil, primary water, Hydrogen gas and Generator winding temperatures.

Turbine speed: 3000 rpm. MS: 85 kg/cm2/5000C

SGC Programme will switch

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

24/26

7/15/2015

Technical Services

05

56'

HRH: 12kg/cm2/4500C Bypass steam flow: 360t/hr.

ON field breaker, put AVR on auto synchronise and pick up load upto 20 MW.

Ensure SGC­start up programme is completed.

­

­

­

Raise the speed set point and pick up load upto 50 MW.

­

­

­

Increase HPBP set point.

Ensure closure of HPBP steam valves & spray valves.

­

Close other drains of M.S, CRH and HRH, keeping SLC drains ‘ON’.

Drain pot drains of MS, CRH, HRH and Extraction steam lines will operate as per the actuation of level switches.

Cut in L.P. heaters 2 and 3.

Ensure switching on of load controller at 60 MW.

­

­

­

LOAD: 60 MW. 06

60'

MS: 85 kg/cm2/5000C HRH: 16kg/cm2/4700C

­

­

­

Cut out heating steam from Aux. PRDS to Deaerator.

­

­

­

Raise the generator pressure from 2kg/cm2 to 4kg/cm2.

­

­

­

Cut in auto controller.

­

­

­

Start withdrawing oil support gradually.

­ Raise the pressure set point of Deaerator pressure controller. ­ Ensure healthiness of fire ball scanners.

LOAD: 150 MW. MS: 100 kg/cm2/5000C 07

65'

Charge Aux. PRDS station from CRH. Cut in spray and maintain a temperature of 0 Main steam flow: 1620t/hr. 250 C. HRH: 20kg/cm2/4800C

­

Trimming device is in ‘OFF’. ­

­

­

Cut in H.P. heaters and put the level controls on auto.

­

­

­

­

Start first TD BFP and second CEP around a load of 170 MW.

­

­

­

­

Control main steam and reheat steam temperature by using spray if required.

­

­

­

­

Change deaerator pegging steam from CRH to Extraction steam.

Ensure Deaeator pressure controller remains on auto.

­

­

­

Cut in IIIrd mill and cut in auto controllers.

­

Cut in IVth mill and cut in auto controllers.

­

LOAD: 230 MW. MS: 120 kg/cm2/5000C 08

70' HRH: 20kg/cm2/4950C Main steam flow: 820t/hr.

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm

25/26

7/15/2015

Technical Services

­

­

­

Cut off oil support completely.

Ensure healthiness of fire ball scanners.

­

­

­

Cut in Vth coal mill and cut in auto controllers.

­

­

­

­

Start second TD BFP and switch off motor driven BFP.

­

­

­

­

Cut in VIth coal mill and cut in auto controllers.

­

Check all parameters at full load and ensure them within limits.

­

Increase the set point of SH & RH spray controllers such that rated parameters are achieved.

­

­

­

LOAD: 500 MW. MS: 170 kg/cm2/5000C 09

86' HRH: 40.5kg/cm2/5000C Main steam flow: 1620t/hr.

­

­

­ LOAD: 500 MW. MS: 170 kg/cm2/5000C

10

135'

HRH: 40.5 kg/cm2/4800C Main steam flow: 1570 t/hr.

    ********************              

http://www.bhelpswr.co.in/Technical/COMMISSIONING%20PROCEDURES/comm%20proced11.htm