Surface Preparation Methods and Standards Dry abrasive blast cleaning Abrasives Sizing of abrasives Adhesion and profile Profile Shot blasted profile Profile measurement Assessing a profile to BS 7079 Pt C ISO 8503.1 Use of the comparators Using the comparators Preparation of steel substrate before application of paints and related products Abrasive blasting grades Equipment Water blasting Flame cleaning Method Pickling Vapour degreasing Weathering
Film Thicknesses Comb gauges Tests done on dry paint films Destructive test gauges Non-destructive test gauges Tests for mechanical properties on paint films Accelerated testing Drying and curing tests BK drying recorders Other tests Trough type Black and white fused plates Hiding power charts and micrometer adjustable film applicator Degree of gloss Adhesion
12 12.1 12.2
Specified Coating Conditions The whirling hygrometer, aspirated hygrometer or psychrometer Steel temperature measurement
13 13.1 13.2 13.3 13.4 13.5
Cathodic Protection Sacrificial anode systems Impressed current system Interference Monitoring CP Cathodic disbondment
Metal Coatings Galvanising Sheradising Calorising Anodising Electro-plating Hot metal spraying Powder system Electric arc system Wire and pistol system
17
Coating Faults
18
Colour
19 19.1 19.2 19.3 19.4
Health and Safety Hazard warning symbols Responsibilities Maximum exposure limit (MEL) Occupations exposure standard (OES)
20
Duties of An Inspector
21
List of Specification and British Standards (BS) Numbers
22
Quality
23
Revision Questions Appendix 1
Insulation
Appendix 2 PA 9
Specification for paint systems, properties and performance requirements.
PA10
Specification for now and maintenance painting at works. Site for above ground pipeline and plant installations.
Thank you for interesting in our services. We are a non-profit group that run this website to share documents. We need your help to maintenance this website.