SITE NAME: SITE BUILD BILL OF ENGINEERING MEASUREMENT AND EVALUATION APRIL, 2011
SITE TYPE: 36m DATE: DATE: Ap ril 2011 2011 WBS CODE BEME CODE
A
B EME Des c r i p t i o n
UNIT
QTY
RA TE
A MOUNT
m3
59.10 .10
45,60 ,600.00 .00
sum
1.00
m
35.00 .00
Civils (36m Monopole Tower Foundation) - 150kPa 150kPa (Includi (Includi ng all earthing i nstallation)
Construct reinforced concrete foundations for tower (including 50mm thick concrete blinding,connection to earthing, excavation, rebar and Dispose previously excavated materials,compression, formwork,). 220CVT
1.A1
220CVT
1.A1.2
260PMT
1.A2
E rect a self-supporting self- supporting tower of structural structural capacity 42m/sec, 42m/sec, 53.29msq 53.29msq load area, 0.5degrees max allo allow wable able defle eflect ction ion; incl inclu uding ing full full heig eight lad ladder with ith safe safetty hoop oops, tower ower iden identtity plat late
260PMT
1.A4
Install and connect obstruction warning light and cabling
260PMT
1.A5
Install standard M/W antenna pole and Brackets Light (Set of 2) - 76mm - 2000mm
260PMT
1.A6
Install standard M/W antenna pole and Microwave Brackets Heavy (Set of 2) - 114mm - 2000mm
300CST
1.A7
Installation of site earthing materials (Tower Foundation and Perimeter Earthing) to achieve earthing resistance of less than 5 Ohms
B
Backfill with IMPORTED LATERITE materials and dispose same in excess from site;
Inc Inc
2,69 ,694,96 ,960.00 .00
100,000.00
Inc Inc
50,00 ,000.00 .00
1,75 ,750,00 ,000.00 .00
Inc Inc
Inc Inc
Inc
Inc
site
1.00
Inc
Inc
25,000.00
25,000.00
Fence and Gate installation - (12m (12m x 12m)
220CVT
2.B5 2.B5
Overg Overgro roun und d Part; Part; Backfil Backfilll wit with impo import rted ed later laterit ite e fillin filling g
m3
118.1 118.13 3
1,800 1,800.00 .00
212, 212,62 625.0 5.00 0
220CVT
2.B6 2.B6
Constru Construct ct concr concret ete e ram ramp to site site gat gate, 4m wide wide x 3m long long
sum
1.00 1.00
30,00 30,000.0 0.00 0
30,00 30,000.0 0.00 0
220CVT
2.B7
Lay chip stone dressing (depth 100mm), over 50mm depth cement blinding.
m2
225.00
900.00
202,500.00
Page 1
220CVT
2.B8
Blinding (depth 50mm, Lean Concrete)
220CVT
2.B9
220CVT
2.B10 C
m3
11.25
9,000.00
101,250.00
Security Diamond wire mesh fence and 3m wide gate on perimeter wall; uprights are galvanised and painted, (Installation only)
m
60.00
600.00
36,000.00
Construct 4m wide x 100m, gravel access road, scrape, lay chip stone and compact, with concrete edging and drain holes at 3m intervals
m
8,400.00
0.00
Plinths Works / Electrofit Works
220CVT
3.C2
Construct reinforced concrete plinth for Generator and Diesel Tank (7000mm*2500mm*250mm)
m3
4.38
39,600.00
173,448.00
220CVT
3.C4
Construct reinforced concrete plinth for Shelter
m3
3.00
39,600.00
118,800.00
220CVT
3.C6
Construct reinforced concrete base for IP55
m3
0.12
39,600.00
4,752.00
260PMT
3.C7
Site electrical installation and commissioning (gen sets)
sum
1.00
39,600.00
39,600.00
260PMT
3.C8
Installation and Commisioning of Shelter
sum
1.00
100,000.00
100,000.00
440xxT
3.C9
Indstall Weather-proof 150 watt halogen security light system at 5m on tower, including power cable and PIR switch
300CST
3.C10
Supply & Install Diesel pipe system (schedule 40 black steel, red oxide coated after installation) including one water/fuel separator (Perkins) to be provided by Raeanna
300CST
3.C11
Install and commission diesel supply system (including fuel tank, pipes, water seperator, etc)
D
Inc
sum
1.00
30,000.00
30,000.00 Inc
Project Mgt / Community Relations / Other Anciliaries
220CVT
4.D1
Clear and level the site, install safety signs
sum
260PMT
4.D2
Obtain insurances for personnel, sub-contractors, site build activities and equipment; provide proof of cover to Raeanna
260PMT
4.D3
As-Build Documentation / Tower Certification
260PMT
4.D4
Civils: Remove all waste, excess materials and packaging from site
15,000.00
15,000.00
Inc sum
Page 2
1.00
1.00
20,000.00
20,000.00 Inc
260PMT
4.D5
Provide warehousing and storage for all Site Build and Locally Procured Materials including securit sum
1.00
20,000.00
260PMT
4.D6
Project management, supervision services, Site Secuirty, Area Boys, Acceptance testing and Logistics- Tower sorting on & Off site; Off-loading of Equipments and materials
sum
1.00
100,000.00
100,000.00
260PMT
4.D7
Guard House Guard House (as per specifications); 2000mm x 1500mm
sum
1.00
250,000.00
250,000.00
Supply all Electrical Materials & cables - ( Security light -2nos, 16m 4 core Armoured cable-40, 16mm bared earth cable- 40,2.5mm 7core control cable - 25m,2.5mm 3core power cable -65m, 10mm 5core flex cable -40m, Ten pair alarm cable -25m, 16mm (green/Yellow) copper wire -20m & 1.5mm flex cable -40m , Cable Gland, Photocells, Tie raps & other accessories.
sum
0.00
300CST
5.6
GRAND TOTAL
180,000.00
20,000.00
130,000.00
6,153,935.00
Page 3