This document is the property of Larsen & Toubro Limited, Construction, Buildings and Factories, EDRC B&F and must not be passed on to any third person or firm not authorised by us, nor be copied/made use of in full or part by such person or firm without our prior permission in writing
26.10.2017
A
ISSUED FOR APPROVAL
DATE
REV. NO.
DESCRIPTION
NRM
REN
Designed
Checked
Approved
REVISIONS
LARSEN & TOUBRO LIMITED, CONSTRUCTION, BUILDINGS & FACTORIES ENGINEERING DESIGN AND RESEARCH CENTRE CLIENT :
Larsen & Toubro Limited - Construction - B&F IC O16213
TOTAL NO. OF PAGES
TITLE :
NAME
SIGN
DATE
DSGN
MGP
MGP
27.10.17
CHKD
NRM
NRM
30.10.17
APPD
REN
REN
1.11.17
Doc. No.
O
1
RELEASED FOR
#
MGP
Sensitivity: LNT Construction Internal Use
6
2
1
3
TRICON POLYMERS PVT LIMITED
SARDAR PATEL GUJARAT CRICKET STADIUM
BEARING TESTING METHODOLOGY
-
PRELIMINARY
A
-
S
A
TENDER
-
0
1
-
D
INFORMATION
C
-
P
0
2
APPROVAL
0
7
CODE
REV.
IS
A
CONSTRUCTION
Annexure - 1
TRICON POLYMERS PVT. LTD., MUMBAI.
Inspection Testing Plan AS PER IRC : 83 - 2015 (PART - II) [ PROJECT : SARDAR PATEL GUJARAT STADIUM AT MOTERA, AHMEDABAD ]. Table 1 : Raw material test on specially moulded test slab Test for
Test to measure Compression Set physical properties Adhession Test of elastomer Ozone Resistance Test Chemical Composition test
c. max Ash Content
DATE
31.10.2017
Dipesh Devle VERIFIED BY TRICON POLYMERS PVT LTD
max. 5%
Vinay Kurmi QUALITY CONTROL INCHARGE TRICON POLYMERS PVT LTD
Annexure - 2
TRICON POLYMERS PVT. LTD., MUMBAI. INSPECTION TESTING PLAN AS PER IRC : 83 - 2015 (PART - II) [ PROJECT : SARDAR PATEL GUJARAT STADIUM AT MOTERA, AHMEDABAD ]. Table 2 : Test on complete bearing (two bearings shall be selected at random from the lot as test bearings). Test for
Test to be Reference of test Method conducted As per Appendix 3 of IRC Apparent Compression 83-2015 (Part-II) stiffness Test CL : 8.4.2
Reference Doc
Limiting Value
IRC : 83 - 2015 (Part-II)
Maximum axial load 100% and (Ea ± 20% In Kn/mm) As Per IRC 83-2015 Part - II
Shear modulus As per Appendix 3 of IRC test 83-2015 (Part-II) CL : 7.1
IRC : 83 - 2015 (Part-II)
(0.70 Mpa) ± 0.15 of the specified value for IRHD 50±5
Test on finished Compressive bearings stiffness
Shear bond test
Ash Content
DATE
31.10.2017
Frequency of test
Testing facility
Observation
Remark
Per lot
In-House
calculation to be done on basis of observed guage Reading
As per IRC:83-2015 (Part-II) require one bearing
In-House
Visual observetion to be made for inspecting detachment of elastomer from steel and shear pattern
Require two bearing [ IRC : 83-2015 (Part-II) ]
a) Test summary to be endorsed on each bearing b) if any surface defect is Physical inspection for surface fount which is rectifiable using defects, misplacing of steel appropriate methods, the test certificate plates with the note of repair and even retest to be furnished
Per lot
As per Appendix 3 of IRC 83-2015 (Part-II) CL : 8.1
IRC : 83 - 2015 (Part-II)
Deflection Between 100% & 30% load (±20% of Avg. Deflection)
100%
In - house
As per Appendix 3 of IRC 83-2015 (Part-II) CL : 9.1
IRC : 83 - 2015 (Part-II)
Deflection = 2 X Te ( Two Times of total Neoprene Thickness)
per lot
In - House
per lot
IN - House
AS per IRC : 83-2015 (PartIS : 3400 Part XXII II) Cl 4.1.3
Shall not excced 5%
Dipesh Devle VERIFIED BY TRICON POLYMERS PVT LTD
Report MTC
MTC
MTC
Observed and bond failure between elastomer & Steel
Require two identical bearingselect from lot
MTC
Calculation to be done on basis of observed weighing balance
From destructive bearing
MTC
Vinay Kurmi QUALITY CONTROL INCHARGE TRICON POLYMERS PVT LTD
Annexure - 3
TRICON POLYMERS PVT. LTD., MUMBAI. Inspection Testing Plan
AS PER IRC : 83 - 2015 (PART - II) [ PROJECT : SARDAR PATEL GUJARAT STADIUM AT MOTERA, AHMEDABAD ]. Table 3 : General Inspection as per IRC : 83 - 2015 (PART - II) Test for
Check points
Reference Doc
Limiting Values
Testing Facility
1) Plan size
As per IRC : 83-2015 (Part - II) table - 5
0mm, +6mm
In house facility shall be
100%
2) Total Bearing Thickness
As per IRC : 83-2015 (Part - II) table - 5
0mm, +5%
Do
100%
Do
100%
3) Parallelism 1 in 200 (A) of top surface of bearing with respect to the As per IRC : 83-2015 bottom surfae as datum (Part - II) table - 5 Dimensional (B) Of one side surface with respect to the 1 in 100 Checking other as datum 4) (A) Thickness of Individual internal layer of (+/-10%) (Maximum of Do Elastomer 2mm) (B) Thickness of Individual outer layer Do (0, +2mm)
Frequency of Check
Remarks
Report
Each and every bearing shall be dimensionally checked and shall be documented for future needs MTC
Do
100%
Do
100%
5) (A) Plan dimension of laminates
Do
(-3mm, +0)
Do
100%
(B) Thickness of laminates ( C) Parallelism of laminates with respect to bearing base as datum
Do
(+/-) 10%
Do
100%
Do
1 in 100
Do
100%
Check on destructive bearing
Storing and handling of finished bearing 1) All the finished bearings before inspection should have an identification mark / sticker appended on it to have all the details mentioned as per Cl 8 & 9 of IRC:83-2015 (Part - II) The marking should be done with indelible ink or flexible paint if practible should be visible after installation. DATE
31.10.2017
Dipesh Devle VERIFIED BY TRICON POLYMERS PVT LTD
Vinay Kurmi QUALITY CONTROL INCHARGE TRICON POLYMERS PVT LTD