BCO BC O GUI UID DE
2000 Best Pra Best ractice ctice in th the e Specification Specificatio n for Offices Offices
C ontents ontents
P resident’s resident’s introdu i ntroduction ction
I am pleased that that this new edition of the Guide has has been issued to coincide with the tenth anniversary of the founding of the BCO. Over the decade, our members membership hip has grown to some 600 members mem bers representing all elements elements of the supply chain in the procurement of c omm ommercial ercial office space.
President’s introduction Editorial How to use the Guide to Best Practice
1.0 1. 0
2.0 2. 0
3.0 3. 0
4.0
5.0 5. 0
6.0 6. 0
Key Ke y decisio decisions ns before before deciding to build The brief
1.1
Is a new building necessary?
1.2
Freehold or leasehold?
1.3
Key Ke y vari variables a bles if you decideto build Basisof funding
2.1
Site location
2.2
Town planning
2.3
Planning for sustainability
2.4
Building size
2.5
The objectives objectives of the BC O are:
These objectives have influenced the
• to understand the changing nature
manner in which the guide has been
of work work and the waythat business iness
produced and the eventual content
locates,uses and manages workspace
of the individual sections.
• to understand the investment
Key design design parame parameters ters Site density
3.1
Circulation
3.9
Parking
3.2
Core elements and stairs
3.10
Landscaping
3.3
Use of atria
3.11
Building orientation
3.4
Building section
3.12
The BC O Guide to Best Practice Practice in
anddevelopment issues thataffect
the specification f or offices is currently
the provision of workspace
recognised in the market placea placea s
• to understand the urban system
representing good practicein thep rocurement
within which workplace locations
of commercial office workspace.
feature as prime generators
It is not a presc prescriptiv riptive e specifica specification, tion,
Floor plate efficiency
3.5
Structural systems
3.13
Building plan depth
3.6
Envelope
3.14
Column grid
3.7
Services systems
3.15
Planning grid
3.8
Finishes
3.16
Sustainability
4.1
Capital cost
4.7
so diligentlyto produce theG uide are are
Workstyle
4.2
Embodied energycost
4.8
listed listed at the end of this documen document. t.
Occupancystandards
4.3
Cost in use
4.9
Comfort
4.4
Adaptability/design life
4.10
Amenity
4.5
Safety, security, risk
4.11
Accessibility
4.6
• to understand workplace design and construction i ssues
butrather a documen document of its time that seeks to recognise the key elements in a complex suppl supplychain. ychain. The many members who have worked
Key performan performance ce criteria
I would like to thank them all for their invaluable contribution in, again, establishing a recognised and authoritative yardstick for our industrythat will be of benefit to
Building d ing compl completion e tion Commissioning/handover
5.1
Building logbook and training
5.2
all those involved in the procurement, and the occupation, of commercial offi ce space.
Appen Ap pendix dix The design team
6.1
Comparative table
6.7
Construction strategy
6.2
Materialsguide
Best practice
6.3
Useful websites
6.9
CategoriesA & B
6.4
Tenantsservice charges
6.10
BREEAM 98
6.5
Gross/net internal areas
6.11
Statutoryregulations
6.6
Index
6.12
6.8
Hugh Stebbing President of the British Council for Offices June 2000
Editorial
The Year 2000 Guide to Best Practice The Guide to B est Practice wasf irst published in
Given that buildings are directlyresponsible for approximately50% of CO 2 emissions, and
1994 as a reaction to the constantlyrising levels
indirectlyfor another 25% through transport and
of specification i n the design and procurement of
materialsmanufacturing, the construction industry
offices experienced in the preceding decade, and which wasrecognised asbeing excessive and wasteful of resources. The G uide quicklybecame a document used by clientsand their professional teamsin deciding the level of specification to be adopted, and to that extent it has achieved itsobjective. The second edition, produced in 1997, reflected
hasa large part to play. The implicationsof sustainabilityare examined in thisGuide and k eyreference sourcesare identified. The B RE and Forum for the Future have reviewed each section and the G uide now includesmany valuable pointers to current best practicesin sustainable design and procurement.
some of the changesthat had tak en place in the awarenessof environmental issuesand their
(2) Recognising the role of the occupier, the end user
influence on the design of the workplace.
In 1998, the B CO adopted the theme ‘Connecting
preceding three years; in particular the growing
This third edition of the Guide coversa broader
• Working with clientsand occupiers to agree whole life cost/value parameters • Educating clients that higher design qualitydoes not necessarilymean greater complexityor cost • Educating investment fundsthat their funding
Productivity staff made a difference to bottom line business
dealing with performance criteria (S ection 4.0).
performance. But with staff costs representing as
When considering, for instance, the appropriate
much as 75-80% of operational costs, it is not
plan depth or mechanical system, a variety of
surprising that businessis increasingly focusing
performance factorsshould be taken into
on the importance of maximising staff productivity.
consideration.
There are a number of keymoti vators:
propertyto business’ and, in preparing this • The recognition of the impact that the qualityof
has a greater pool of expertise to draw on in order
comfort, satisfaction and productivity
to decide what represents current best practice.
Representativesof major space occupiers
Of fices, whether located in business parks
contributed to the Guide. T heir aspirationshave been reflected in the text. Inadequate client briefing to the procurement
which have influenced our collective approach:
acrimoniouscontractual relationship, and the
the BCO Guide to Best Practice in the
Guide to Best P ractice now establishes an
Specification of O ffices. With thisrevision comes
(1) Sustainability and sustainable development
obligation on all the parties to establish a clear
the opportunity to addressthese issuesexplicitly
brief at the outset.
and give guidance to those responsible for
made aware of the implicationsof the 1997 K yoto
brief, and to evaluate advice given by their many advisers.
Choice of Plan Depth
Selected Specification
Choice of Mechanical System
Selected Specification
Comfort Capital Cost
Cost in Use Adaptability
specifying offices on some of the measuresthat can be taken to enhance office productivity.
Controlability
We have therefore chosen to make productivity Capital Cost
a theme which runs through the document. Where appropriate, under each section you will find a
committed to achieve reductionsin their emissions of greenhouse gasses byan average of 5.2% in
(3) New ideas and new methods
the period 2008 to 2012. The UK Government
In 1998, the Egan Report ‘Rethinking
has a manifesto commitment to reduce CO 2
Construction’ sought to create a new mind set for
emissionsto 20% below 1990 levelsby2010.
the whole industryon what might be a chievable in termsof unit cost, construction time and construction quality.
Energy Use
Specification
adverselyaff ecting staff performance
environments has alwaysbeen an implicit goal of
that the membership, and a wider audience, is
Design Parameters
Workstyle
• The wish to intensifythe use of space without
all too easily, lead to an unsatisfactoryand
The intention of this document is to help the
Decision Line Performance Criteria
to support effective team work
The realisation of productive working
client make informed decisionsi n establishing a
Selecting a specification
• The wish to provide flexible spacesand settings
team on the desired outcome of the project can,
Global Energy Use
Of ten the performance outcomesof a particular choice of design parameter are multiple, and for this reason the Guide separates the section
the internal environment can have on staff
Protocol. Under this Protocol, developed countries
appropriat e cross-refere nce to backgr ound and
It is a statement of the obviousthat contented
workspace wit h the end user in mind.
The BC O has been at the forefront in ensuring
manycases presents optional choices, giving
performance.
approach the procurement of commercial
There are four i ssues that we have highlighted
Section 3.0 deals with design specification and in
related information, particularlyconcerning
document, a deliberate effort has been made to
however, these have been clearlyidentified.
the content and location of a development.
dissatisfaction.
It recognisesthat, as an organisation, the B CO
characteristics. Where there are dif ferences,
decisionsabout whether or not to build and about
criteria can lead to over-specification and to user
spectrum of criteria than in the previous editions.
or in urban areas, share many common key
Sections 1.0 and 2.0 are concerned with strategic
:
http://www.construction.detr.gov.uk/cis/rethink/ index.htm
ð
‘Creating the Productive Workplace’ SPON, 2000
Current typical design standards How to use the Guide to Best Practice
Current typical design standardsare available f or
This printed document isan edited version of the
ease of reference in the appendix, section 6.7,
full report. The complete research carried out by
comparativetable.
the Editorial C ommittee and related material can The Guide recognisesthat substantial benefits in procurement time and cost can be achieved by: • Establishing accepted industryperformance criteria for the building fabric and for the engineeringservices • Encouraging the use of standard components,
Cost in Use
discussion of issues relating to productivityand pointersto achieving good practice.
be accessed on www.constructionplus.co.uk Sections will be regularlyupdated and additional information made available on the www copy. The G uide can be used as a conventional
Icons have been used to facilitate ease of reference in addition to the detailed index, section 6.10.
ð :
Relevant reference section in the text
&
Paper document
www site for an electronic source paper
reference tool, but it is also arranged to enable
standard design solutionsfor repetitive detail
a structured approach to the creation of a
and repeating proven technical solutions
tailored design specification appropriate to a particular development need.
Ti m Batt le
Gr ah am Fr ancis
R ybk a B at tle
S heppa rd R obson
1.0
K ey decisions before deciding to build
The brief sets the performance criteria which will determine the choice of the design parameters. The purpose of the brief is to establish a framework of desired outc omes. 1.1 The brief
1.2 Is a new building necessary?
2.0
K ey variables if you decide to build
This section covers the strategic decisions which w ill affect the choice of office product.
2.1 Basis of Funding (End user/ speculative developer)
2.2 Site location (in-town/out-of-town)
The brief is an essential process bywhich clients
In considering options, the more efficient use of
communicate their requirements and their
existing buildingsshould alwaysbe evaluated.
Users will need to decide whether to acquire land
In selecting a site for development or occupation,
aspirations. The successof a project relies heavily
Internal reorganisation, or the application of new
and develop a building for their own use, or to
a number of factors need to be considered:
on the quality of briefing. Brief s should not be
working practices, often using new technologies
lease a building constructed bya property
static, but challenged and developed throughout
intensively, can produce verysubstantia l
developer. T he route selected will affect the ability
the life of a project. However, a clear set of
efficiencies which mayobviate the need for a new
of the end user to influence the design and
strategic objectivesshould be established at the
building. Re-location maylead to staff losses. The
specification. Occupiersand developershave
outset which are not challenged.
decision to develop or refurbish should be driven
much to gain from pre-letting arrangements in
bythe opportunity cost, and the anticipated return,
reducing overall project costs and deliverytimes,
from each alternative.
as well asend user satisfaction.
A f ailure on the part of the design team to be aware of the operational issues during the design processcan lead to buildingsbeing costlyto
Property developers mayadhere to a standard
• Current national and local planning policyis driven bya desire to: reduce private car use; encourage other meansof private (eg. shared journeys) and public transport; encourage development on previously used sites (particularlyat transport nodes/corridors); and, to encourage mixed use and sustainable development
maintain and operate, sometimesto the detriment
specification, which hashistoricallybecome the
and well-being of the occupants. A ccess to
BC O S pecification. Institutional funding for an
facilities management expertise or an awareness
owner occupier building will only be given on
• Road congestion
of facilities issueswill minimise these impacts.
condition that the building can be returned to the
• Work patterns
Project successwill be reliant on good teamwork; the client should therefore select a
commercial mark et place. A building, either new or refurbished, would
team that will work well together, with roles and
normallybe completed at Practical Completion to
responsibilities clearlydefined. The client’srole
what isk nown as a C ategoryA fit-out. Further
• The availabilityof public transport
Site location isa k eyf actor considered byBREEAM
should be to give clear instructionsbased on good
fitting-out work required bythe incoming occupier
qualityinformation and optionsprovided bythe
of the workspace to meet their particular
design team. Changesmade early will be less
requirementsis known asC ategoryB.
The Town and CountryP lanning Act 1990 is the
costlythan those made later in the project. The
ð
principal legislation for development control.
6.4 Cat A & B
2.3 Town planning
client’songoing i nvolvement should be matched
Where proposalsa ffect listed buildingsor
with sufficient resources to evaluate optionsand
conservation areas, the Planning ( Listed B uildings
make decisionson a timely basis.
and Conservation Areas) Act 1990 comes into play. G overnment guidance, which is intended to
‘Brief ing the Team’ produced bythe
amplify this legislation, is provided in a series of
Construction IndustryB oard in 1997, provides a
Planning P olicyG uidance Notes, or ‘PP Gs’. M ore
detailed guide.
detailed planning policies are drafted by each local authoritywithin this national framework; these are
BR EEA M providesa meansof specifying
set out in a Unitary Development Plan.
an environmental performance in a simple and flexible manner.
ð
:
6.1 The Design Team, 6.5 BREEAM www.ciboard.org.uk/Procrmnt/briefing.htm
Site location Urban Location
Rural Location
Use of public transport More transport options Less car parking Lower energyand pollution costs Higher capital cost
Reliance on car Fewer transport options More car parking Higher energyand pollution costs Lower capital cost
2.0
Early contact with the relevant local authority to discuss the town planning issueswill prove
3.0
2.5 Building size
beneficial. The length of time taken to determine
The development or tenancybrief will specify total
formal applications can be reduced substantially
space requirements, based on expected
byadopting a f lexible approach to negotiations
occupancy, applying relevant space standards and
prior to submitting proposalsfor planning
having regard to workstyle.
permission.
ð
2.4 Planning for sustainability
1.1 The brief, 4.2 Workstyle, 4.3 Occupancy Standards
For speculative developments, the total quantum of space maybe determined simplyby optimising
The main principlesof sustainable development
the development potential of the site, but aspects
are:
of amenity, accessibilityand planning control will
• economic growth
need to be considered on arriving at an appropriate site density.
• social progress
ð
• environmental protection
There may also be market-driven requirements
• prudent use of natural resourcesand mixed-use
for buildingsand/ or lettingsof a particular size.
developments Theya re being incorporated into planning policy at all levels in the UK . Under Local Agenda 21, local government is obliged to address sustainability issues. BR EEA M can be used as a negotiating tool also.
4.5 Amenity, 4.6 Accessibility
It may be necessaryto provide the total quantum of space in the form of a number of smaller buildingsrather than a single large one; however, this approach will tend to reduce site densityand increase capital cost.
ð
K ey design parameters
This section describes common design parameters and gives background information together with crossreferences to aspects of performance to enable the reader to determine an appropriate specification standard under each subject heading. No two office developments have identical requirements. The developers and users of buildings have their own particular needs and aspirations, and these are rightly reflected in the specifications that are evolved for their buildings. In some cases, typical standards will b e applicable, but in others, selection from a range of possible options will be necessary in order to achieve a specific performance result.
3.1 Site density, 4.7 Capital cost
Where subdivision of larger floor platesto f orm separate tenancies is relied upon to satisfyuser requirements, then the position and number of coresand escape staircases is critical, and can
Development densityi s affected bybuilding size.
3.1 Site density
Groupings of small buildings result in lower
affect adaptabilityand floor plate efficiency.
ð
3.10 Core elements, 4.10 Adaptability
optimum densitiesthan the provision of larger
45% (gross external area to site area)
buildingsof similar total area, because more space
for business parks
is required for road access to small buildings, and
In general, larger floor plates are more efficient
The key variablesaf fecting site density are car
and more cost-effective. For a given floor plate
parking ratio, design of road network, quantityof
configuration, cost efficiencyand floor plate
landscaping, and building shape. O ptimising the
efficient. Increasing the number of storeysof
efficiency will diminish as building height is
because smaller floor plates are lessspace-
right balance between these variables is critical to
buildingsof a given area reduces footprint;
increased or decreased above or below four
the success of a development and will have an
however, plate efficiencyalso reducesand capital
storeys.
effect on value and on perceived amenity.
cost will increase.
ð
ð
3.5 Floor plate efficiency
3.2 Parking, 3.3 Landscaping, 4.5 Amenity
Site density Lower Density
45% (GEA to site area)
Higher Density
smaller buildings more flexible lettings more landscaping
larger buildings less flexible lettings less landscaping
higher energy consumption higher capital cost
lower energy consumption lower capital cost
3.0
3.0
Another useful measure of plate efficiencyis the
3.4 Building orientation
3.2 Parking
Large floor plates of 2,000m 2 or more can be
ratio of floor area to external wall surface area,
veryeff icient and flexible both for single-tenanted
1 space per 25m 2 (of GEA) for business car parks
The orientation of building facadesin relation to
which reflectsthe amount ( and therefore the cost)
and multi-tenanted buildings. O ptimum plate size
Local authoritypoliciesand G overnment
the sun path can have a signifi cant impact on
of envelope required for a given plan shape. If the
is closelyrelated to workstyle.
legislation are together i ncreasinglyrestricting the
running cost. In general, east- and west-facing
floor to wall ratio exceeds0 .4, a value engineering
ð
levelsof car parking that can be provided on both
elevationsare difficult to shade; south-facing
exercise should be considered to test the validity
citycentre and out-of-town sitesbecause of the
elevationscan be provided with effective sun
of the design criteria and value for money.
impact of park ing provision on congestion,
breaks; while north-facing elevationsare
ð
pollution and the use of energy. Accessby private
unconstrained in respect of glazing.
car is still considered desirable, but there is an
&
associated cost to the environment. C ycle and
3.6 Building plan depth
3.14 Envelope, 4.7 Capital cost
13.5m-21m
Plate eff iciencycan be optimised by:
‘Solar Shading of Buildings’ – BR364, Constructi on Research Communications, 1999
• Reducing to a minimum the size and number of
motorcycle spacesare now required, and
In practice, however, the relative location and
elementsserving the usable space, such as core
standards are applied for the provision of disabled
orientation of buildings is often determined either
areas (stairs, toilets, lifts), duct risersand
spaces.
bythe surrounding urban context, or bythe
enclosed circulation routes
ð
attributesand constraintsof a masterplan, in the
3.1 Site density, 4.6 Accessibility 2
Park ing layoutsof 25m per space are optimum and can be achieved byensuring that aisles serve parking bayson both sides.
are suitable for use with a varietyof mechanial
and converselyby increasing the floor plate in
systems, including conventional air conditioning,
size, where possible, so that maximum travel
mixed-mode. Depths of lessthan 15 metresare
distancesto escape staircasesare achieved
preferred for eff ective natural ventilation, but very
degree of identityand separation theyprovide to
narrow plates (of 13.5 metres or less) are less • Creating square and atrium-based plan shapes
80-85% ( NIA:GIA)
shrub planting, together with hard surface
M easuresof plate efficiencyper floor include:
landscaping, as part of a masterplan strategyi s
• ratio of net internal area to gross internal area
area to wall area, which reducescapital cost. The of good practice in the UK is 21m.
ð
of approximately80-85% (NI A:GI A) maybe
(NIA:GIA)
and ventilation are available to occupiersof
diagram p.23). In general, smaller platesare less
perimeter space which, depending on the size
efficient because the core elementsbecome
(NIA:GEA)
disproportionatelylarge as plate size isdecreased.
2
• cost per m of net internal area
Floor platesof lessthan 750m 2 are relatively inefficient.
have controlled access. Tree planting adjacent to
Cost per m2 of net internal area isa reliable
glazed elevationsabsorbs solar energyas well as
measure of the cost-efficiencyof providing usable
creating shade and actsas a wind barrier, and can
space, which doesnot relyon interpretations of
therebycontribute to energyeff iciency.
the basisfor calculation of grossfloor area ( such
3.12 Building section, 4.4 Comfort, 4.9 Cost in use
The relationship between plan depth a nd building section should also be considered. Natura l light
achieved, depending on building shape (see
• ratio of net internal area to gross external area
and location of windows, is a zone approximately 5m-7.5mwide or 2 to 2.5 times the floor-to-ceiling height of the room. C omfort in the space which is not within thisperimeter zone hasto be maintained using artificial light and ventilation, with resulting effectson energyconsumption.
ð
as whether plant areasand escape staircasesare
3.15 Services systems, 4.9 Cost in use
maximum plan depth regarded as within the range
3.10 Core elements, 3.11 Use of atria, 6.6 Statutory regulations
M aximum efficiencyfi guresf or the whole building
a primary contributor to a sense of amenity.
ð
Greater plan depth increasesthe ratio of f loor
minimum practical dimension (when a measure
ð
terms of landscape impact. Structured tree and
open-plan working space.
• Reducing the thickness of the envelope to the of NIA:GEA isused)
O ut-of-town locations are increasinglyassessed in
both implying and/or determining which areas
able to effi cientlyaccommodate mixed cellular and
and cubic rather than linear building shapes
4.5 Amenity
3.5 Floor plate efficiency
Landscape featurescan contribute to securityby
4.2 Workstyle, 4.7 Capital cost
configuration required byS tatutoryRegulations,
3.14 Envelope, 4.9 Cost in use
3.3 Landscaping
ð
ð
ð
Wind-driven generators, Sainsbury’s
3.1 Site density, 4.5 Amenity
Europeansf avour narrow space.
Depths of 15-18 metres are verycommon, and
ð
essential for major businesspark schemes, and is
appropriate to deep-plan space; continental
staircasesfor a given plate size and
of building orientation.
25% (of site area) for business parks
bywork style. American working culture is
case of businesspark locations.
building occupiersi s also a veryimportant aspect
negotiation with the planning authority.
Practice variesacross the world, and isaf fected
• Providing the minimum number of escape
The prominence given to entrancesand the
Park ing levelsin urban areas will be dependent on
4.2 Workstyle, 4.7 Capital cost
included or not).
4.4 Comfort diagram
Site density
Typical multi-storey office buildings efficiency ranges (net grossfloorarea ratios) 40+ storeys 30 to 39 storeys 20 to 29 storeys
Narrow plate
Wide plate
cellular/two zone planning views out individual control natural ventilation natural lighting lower energyc onsumption lower C0 2 emission lower running cost higher capital cost
open plan/multi zone planning internal areas constant conditions mechanical ventilation artificiallighting higher energyconsumption higher C0 2 emission higher running cost lower capital cost
10 to 19 storeys 5 to 9 storeys 2 to 4 storeys
European model 65%
70%
75%
80%
85%
90%
UK model
US model
3.0
3.7 Column grid
3.0
The planning grid is typicallyexpressed on the elevation to facilitate partitioning of perimeter
7.5m-9.0m
offices, and it also operates as the co-ordinating
The column grid dimension should be a multiple of
grid in plan for the principal componentsof the
the planning grid dimension. The column grid
structure, services, fabric and finishes, including
should be as large as possible taking i nto account
column grid, envelope, ceiling ti le grid and
the characteristicsof the proposed structural
partition grid.
system and having regard to capital cost and
appropriate if workstyle dictatestheir use.
ð
3.8 Planning grid, 3.13 Structural systems, 4.2 Workstyle, 4.7 Capital cost,
Space budgeting isnormally based on an allocation for working footprint area ( derived from standards for occupancy) together with allowancesfor ancillaryspace, and for primaryand
restrict subdivision nor create unusable space.
secondarycirculation.
ð
Common UK standard – 1.5m
and anticipate the maximum occupancy requirement during the life of the building
• be located to promote adaptability and permit flexibility of letting and workstyle • where practical be located to encourage their use for short journeysbetween floors
ð
3.9 Circulation, 4.3 Occupancy, 4.7 Capital cost, 4.10 Adaptability, 6.6 Statutory regulations, See diagram page 10
4.3 Occupancy
Primary circulation space isthe minimum area required to accessand escape from open plan work areas and cellular offices. Secondary
The planning grid is derived primarily from
circulation space is that which isprovided
workstyle and reflectsthe smallest unit of
between and around personal workspaces.
subdivision of space made available bya particular
• be designed to minimum occupancystandards
largest possible floor plate area
3.9 Circulation
The location of perimeter columns should neither
3.8 Planning grid
Core elements and staircases
• be located to optimise capital cost, and serve the
floor-to-floor constraints. In general, spansof 7.5m to 9m are economic and greater spanswill only be
3.10
Escape staircases should:
Current North A merican, British and Japanese
Goods lifts should: Lavatories should:
• be designed to a standard of one person per 14m2 net area based on 120% of the population (60:6 0 male/female ratio) when male and female toiletsare provided • be designed to a standard of one person per 14m2 net area based on 100% of the population
building system. A mullion grid of 3.0m is not
office developmentstypicallyminimise circulation
uncommon because cellular offi ces are rarely
space to achieve maximum efficiency. Many
narrower; however a 1.5m grid wi ll inevitably
Northern European examples, on the other hand,
Consider whether it is appropriate to install or
provide more layout flexibility. A grid of 1.35m is
demonstrate the importance attached to the
leave space for spare drainage, water risersand
an option used more frequentlyi n Europe. This
function of secondarycirculation areas as
ventilation to provide additional lavatories to meet
grid co-ordinateswith ground floor or basement
when unisex toiletsare provided
interactive and stimulating communal workspaces
increased population, or where sub-letting
parking and brick dimensions, and also permits
which promote a sense of amenity and enhance
requires, the provision of additional services.
slightlysmaller unit offices (2.7m wide) which are
working eff ectiveness and productivity. The
ð
4.3 Occupancy, 4.10 Adaptability
• be provided in buildingsover 10,000m 2, but also consider the need for goods lifts in buildings over 5,000m2 and an associated goodsreceiving area separate from the passenger entrance Kitchens in buildings over 5,000m 2:
• if it would be difficult to adapt the building later, give due consideration to increased fresh air requirementsand position of k itchen exhaust relative to air intakes and adjacent properties
3.11 Use of atria The use of atria i n conjunction with office f loor platesof optimum width can reduce capital cost
regarded asmore efficient in termsof space
imaginative use of atria is a common feature
usage. The lessgenerous standard based on a
of this approach.
Passenger lifts should:
because envelope cost is less, and can reduce
ð
• be designed to a standard of one person
running cost because exposure to external climate
1.2m grid will also co-ordinate with parking.
ð
3.11 Use of atria, 4.2 Workstyle, 4.5 Amenity
3.7 Column Grid, 3.14 Envelope, 3.16 Finishes, 4.2 W orkstyle
per 14m net area 2
• target an average interval of lift departure at the main entrance of 30 secondswith cars assumed
Structural grid/ planning grid
is reduced. Employing building shapesbased on atria also improvesplate effi ciency.
ð
to be loaded at 80% of capacity( for cenic lifts
Plate subdivision/ circulation diagram
reduce car loading to 60% ) • provide a minimum percentage passenger handling capacity in a fi ve-minute interval of 15% • be selected from manufacturers’ standard range
3.5 Floor plate efficiency, 4.7 Capital cost, 4.9 Cost in use,
Apart from the purelytechnical advantages of atria, they can be used to support a workstyle which is more open and interactive, and when used in conjunction with shared resources, such as meeting areas, catering and retail facilities, can significantlycontribute to the ef fectiveness
(use of standard and pre-engineered
of the office environment and to amenity.
components reducesinitial costs, maintenance
ð
costsand increases reliability) • be located to provide a choice between lift and main stairsf or both occupantsand visitors
ð
4.3 Occupancy
&
“Transportation Systems in Buildings” – Chartered Institution of Building Services Engineers Guide D, 1993
4.2 Workstyle, 4.5 Amenity
In the life of larger buildings, it may be an advantage to be able to create large areas of deep plan space by infilling atria.
ð
4.10 Adaptability
&
“Daylight in Atrium Buildings’ – BRE Information Paper,IP3/98, Construction Research Communications, 1998
3.0
Cross section dimensions diagram
3.12 Building section
3.0
3.13 Structural systems
The overall dimensionsfor servicesand structural
The choice of structural system can be complex.
zoneswill depend on the frame solution and
Itwill be influenced by many factors including site
extent of services to be included. For column grids
location and site constraints, building form, planning
of up to 9m centres, it is usual to keep the
and structural grids, loading requirements and
horizontal servicesi n a separate zone from the
sustainability issues.
The design of longer span and shallower floor
3.14.2
systemsshould be checked to ensure that any
At the earliest opportunity, the designers of the
vibration from footfall (and other sources) is within
structural frame and the designersof the building
acceptable limits.
envelope need to consult on the effects that building frame movement and toleranceswill have on the j ointing between building envelope
3.14 Envelope
structure. For larger span spaces, a different
3 .1 3.1
The space between long-span beamsis the main
Standard allowances for live load:
ð
3.13 Structural systems, 3.15 Services systems, 4.7 Capital cost
Structure and building servicesshould be integrated to achieve a compact zone, but not so tightlyarranged that buildability, accessand flexibility are compromised. Significant savings in overall storeyheight can be obtained bycoordinated overlapsin zones. Ceiling/l ighting zone: 100mm overall
This figure assumessuspended ceiling and
Lo ad in gs
General area 2
• 2.5 kN/m over approx 95% of each potentially sub-lettable floor area High loading area
• 7.5 kN/m 2 over approx 5% of each potentially sub-lettable floor area a nd not in primary
The building envelope provides an interface between
without exception, it is better to provide extra
the controlled internal environment and the
stiffnessto structural framing membersaround
uncontrolled and variable external climate. The
building perimetersto limit movement in the
design of the envelope, therefore, determines how
building envelope elementsrather than design
the climate is moderated while maximising the
frames to minimum code requirementsand then
benefits, such as fresher air and daylight.
have expensive retrofit stiffening done on site.
3.1 4.1
C omponent life
• replaceable elementsshould last lessthan 60 yearsand replacement hasto be considered at
circulationroutes
design stage – double-glazed units (20 to 25 Standard allowances for dead load:
years), sealants (20 to 25 years) • maintainable elements should last a minimum of
• 1.0 kN/m2
opening windows
natural ventilation is proposed, alternative zones,
• 0.8 5 kN/m 2
• long-life elements will last 60 yearswithout any
connecting the envelope to the f rame to be connected to the top surfaces of floor slabs. At
maintenance, eg. bracketing attaching cladding
least 150mm clear nominal above the target level
designed and marketed with floor loadings
to primary structural frame, cladding framing
of the floor slab should be allowed for these
significantlyhigher than the current British
members
brackets.
The choice of floor-to-ceiling height within these
Standard loading threshold of 2.5 kN/ m .
ð
dimensionswill be influenced bybuilding plan
Research has shown this to be an over-provision.
&
BS 7534: 1992 Amendment – 1998
depth, the form of environmental control system
&
2
selected and daylighting.
Stanhope Position Paper “An Assessment of the Imposed Loading for Current Commercial Office Buildings inGreat Britain”, August 1992
3.14.4
Watertightness
Performance requirementsare defined in the Centre for Wi ndow and Cladding Technology (C WCT ) Standard for Curtain Walling. Testing to
3.6 Building plan depth, 3.15 Services systems, 4.4 Comfort
verifycompliance isdescribed in the CWC T Test
3.13.2
Frame and materials
Raised floor zone: 150mm overall
A steel or reinforced concrete structure is equally
If an underfloor air conditioning or ventilation
acceptable. A comparative table is given below.
system is adopted, thisdimension will increase
inside face of the envelope and the outside edge
Historically, UK off ice buildings have been
4.10 Adaptability
by300 mm to 450mm.
structural frame. When it does, a nominal gap of at
and safetyconsiderations, for bracketing
building services equipment
ð
achieved if the envelope passesoutside the
of the structural frame. It is preferable, from health
Raised floors, ceiling and
technology. Where underfloor air conditioning or
Floor-to-ceiling height: 2600-3000mm
Support system
Generally, better overall envelope performance is
60 years with periodic treatment, eg. opening window ironmongery, weathering gaskets on
considered.
3.1 4.3
least 50mm should be allowed for between the
Demountable partitions
integral fluorescent fittings using T5 lamp
possiblyi ncorporating exposed soffits, can be
elements, and on the connections between the building envelope and the structural frame. A lmost
strategyis needed to avoid large storeyheights. area of services distribution.
Envelope/frame in terfaces
A clear strategyfor flexibility and future adaptabilityof the structure should be developed.
M ethodsfor Curtain Walling.
Steel or reinforced concrete? Steel
Reinforced concrete
Specialised operations
The eff icient and sustainable use of structural
If there is a reasonable expectation that the
materials should be a vital consideration.
relativelylightweight
relatively heavy
ð
greater depths minimumdepth solutionsinefficient
shallower depths for modest spans, flat slabs give minimum depth
good for longer spans but depth requirements imply combined structure and services zone
for longer spans, post-tensioned slabs give
can be effiicient on rectangular and square grids
building mayincorporate dealing operationsor a www internet exchange during its life, the slab-to-
4.7 Capital Cost, 4.8 Embodied Energy Cost, 4.10 Adaptability,
slab height should be increased on relevant floors to accommodate the requirement for greater
3.13.3
raised floor and ceiling void depths. Modern
The overall depth of the structural floor zone
cabling hasreduced the need for very deep floor
should make adequate allowance for dead load
more efficient on rectangular grids than on square grids
voidsi n dealer areas. Consider 200-300mm
deflection of the structure.
inherentlygood for holes and fixings (into soffit)
overall. Major changesin power supplies and
Deflections, tolerances and vibration
The building elements attached to the structure
cooling capacity should be considered.
should be detailed to accommodate both dead
ð
load and live load deflectionsof the structure.
4.10 Adaptability
They should also be detailed to accommodate manufacturing, fabrication and construction tolerancesin the structure.
minimumdepths
holes and fixings can be accommodated but strategy must be considered early.Holes should avoid prestressing tendons concrete soffits give option of chilled beam cooling
3.0
3.0
The following requirementsare appropriate
&
for offices:
“Minimising Air Infiltration in Office Buildings” – Construction Research Communications, BRE Report BR265, 1994
Performance under test
• no leakage onto the internal face of the curtain
Average U-values for building envelopes used
600 P ascalsheld for 5 minuteswhen tested in
for buildingsother than dwellingsare quoted in
accordance with CWC T test methods section 5
Table 5 of the Building RegulationsL1 ,
wall under a dynamic test pressure differential of
conservation of fuel and power, approved document and are as follows: Roofs
0.25 W/m2k
accordance with CWC T test methodssection 6
Solid sections of exposed walls
0.45 W/m2k
wall under a hose test carried out in accordance with CWC T test methodssection 7, when tested on a test specimen off-site and on the actual wall on-site
3.1 4.5
Windows/personnel doors and roof lights 3.3 W/m2k Vehicle access and similar large doors
0.7 W/m2k
These valuesare used to carryout initial assessmentsof the energyefficiency of a particular building. Adjustmentscan then be made to these valuesto obtain the required aesthetic
Air tig htness
Performance requirements for curtain wallsare
occupancy, lighting and office equipment power. should preferablynot exceed 60-90W/ m2 of perimeter office f loor area. O ccupancyshould be based typicallyon one person per 12m 2, but diversified, where possible, to one per 14m 2 at the central plant. Lig hting should be designed to ensure no more than 12W/ m 2 heat gain to the
600 P ascalsheld for 15 minuteswhen tested in
• no leakage onto the internal face of the curtain
Mechanical systems
Solar gai ns, which depend on facade orientations,
Thermal insulation
wall under a static test pressure differential of
• no leakage onto the internal face of the curtain
without compromising the overall requirementsof the Regulations.
central cooling plant. Cooling loads due to power consumption for office equipment in general office areas rarely exceed 15W/ m2 when diversified and measured over an area of 1,000m 2 or more, but with an abilityto upgrade to 25W/ m 2. Local work station loadsare typically20-25W/ m 2. Where possible provide space for additional cooling plant.
&
“Stanhope BCO Occupancy and Small Power Position Paper”, June 2000
• Adaptability4.10
Air tightnesstesting,
• Capital cost 4.7
DoxfordInternational,Sunderland © R ybka Battle
defined in the Centre for Windowsand C ladding
Zoning
• Controllability4.4.7
Technology(C WCT) Standard for C urtain
Zoning of air conditioning should segregate the
• Energyand maintenance costs4.9
perimeter and internal zonesand be selected to
• Workstyle 4.2
take account of likely partitioning, occupancyand
• Noise 4.4.6
use of the space.
• Spacerequirements 4.3
Walling. Testing to verifycompliance of curtain wallsis described in the CWCT Test Methodsfor Ionica building, Cambridgeshire
3.14.6
3.15.2
Cooling requirementsare dictated bysolar gains,
Curtain Walling. Performance requirementsand test procedures for the whole completed building envelope are described in BSR IA T echnical M emorandum TN8/ 95 Air Leakage of O ffice Buildings. The following requirementsare appropriate for offices:
3.15 Services systems 3.15.1
Electrical systems
Small power consumption
When diversified over an area of 1,000m2 or more, power consumption for equipment in offices rarely exceeds15W/m 2. Ri sers/busbars should be sized for 25W/m2 overall asa minimum. Provide a sufficient number of spare ways, typically15-25% , at each riser distribution board
Performance under test
and at the central mainspanel.
• the permissible air leakage rate through the
&
curtain wall should not be more than
“Stanhope BCO Occupancy and Small Power Position Paper”, June 2000
1.5cu.m 3/hour/m2 of wall for fixed areas, and not
Standby generation
more than 2.0cu.m 3/hour/ linear metre of joint
The base building design may provide for standby
At the perimeter, provide one control device to
• Special user requirements5.9
perimeter office depth of 4.5m. Zoning of
An appropriate system may be, amongst others,
mechanical equipment should be consistent with
anyof the following:
the planning grid to take into account future partitioning. Internal zones do not attract solar gainsand
• Variable refrigerant volume
ð
ð
3.15.3
Choice of mechanical system
generator plant for essential servicesto maintain the use of the building during power failure (when
available, each of which has particular
not operating in fire mode) . Provision should be
performance characteristicsand is therefore
methodssection 4
made for occupiers’ standbyplant, i ncluding
suitable for differing locations or building forms
space, for fuel storage and exhaust flue.
and for specific applications.
There are many mechanical-air cooling systems
and opening areas for static test pressure
Information technology
differentials of between 50 and 600 Pascals
Consideration should be given to diverse routes
account the particular circumstancesof the
should not be more than the values given in
for links to external telecommunications
building, and the following factors:
figure 1 of the CWC T Standard for Curtain
infrastructure. Each i ntake position should make
Walling
provision for several service providers. Whenever possible the intake roomsshould be at the building perimeter and have incoming ducts
5.0m /hr/m at 50 P ascalstest pressure
directlyfrom outside.
3
2
differential, and with anyair leak age paths evenlydistributed about the envelope
&
“Air leakage Testing of Buildings” – Chartered Institution of Building Services Engineers, TM23, 2000
• Fan coils • Variable air volume
4.3 Occupancy
when tested in accordance with CWC T test
completed envelope should not be more than
• Displacement ventilation
zonesof 50-80m 2 to be accommodated.
differential of 600 P ascalsheld for 5 minutes
• the permissible air leakage rate for the whole
• Chilled ceiling/beams
have more stable conditions. This allowslarger
for opening areas under a static test pressure
• the permissible air leakage ratesf or fixed areas
• Comfort 4.4
not more than 6m of perimeter space assuming a
The selecti on of system type should take into
4.9 Cost in use
Regardlessof which system is selected, installationsshould be designed to take maximum advantage of natural or renewable energy. This should include “free cooling”, where advantage is taken of uncooled ambient air in mid-season conditions, when economic. Occupantsshould be able to run their systems in a simple but effective manner, regardlessof other occupants.
ð
4.4 Comfort
Where refrigerantsare to be used, theyshould have an ozone depletion potential of zero.
&
Refrigeration and air-conditioning gases – March 1993, DETR
3.0
3.1 5.4
3.0
C ontrols /BMS
flushes, having spraytaps for wash hand basins,
Procedures for preventative measuresagai nst the
Office space
Controls should be designed to operate the
the use of low flush WCs and of greywater
sludge-generating effectsin pipework of the
The use of emulsion paint on plasterboard walls
mechanical system in line with each anticipated
systems.
aerobi c bacteria, Pseudomona s, should be
is acceptable. For suspended ceilings, use either
incorporated into the commissioning
mineral fibre or metal ceilings that are easily
documentation.
demountable and allow the incorporation and
&
interchangeability of recessed light fittings.
occupancy. The system should be capable of operation on a part-floor basiswhere large f loor platesare proposed. Controls should enable occupants to make limited adjustments locally to the heating/air-conditioning systems.
ð
4.4.7 Comfort control, 4.10 Adaptability
A Building Management System (B M S) should be
Rainwater
Evaluat e siphonic systems which can reduce the number of roof outlets and enable horizontal pipework to be used.
BSRIA Pre-commissioning and cleaning of water systems Guide AG 8-91 with report of BSRIA Seminar, 12th February 1999
C ommis sioning
Efficient and effective operation of building
cubiclesand vanityunits provide a perfectly
3.16 Finishes
satisfactoryand functional level of finish.
considered a standard requirement to co-ordinate
servicessystems is reliant on successful
Too often, elaborate and individual designs,
the control of building engineering systemsand to
commissioning of the i nstallationsand their
using expensive and unique materials, have been
monitor their performance. The system
subsequent maintenance; provision for
evolved in areasof the building where theyare
architecture should be based on intelligent plant
commissioning must be considered during the
not warranted, with the result that occupiershave
controllers networked to a PC supervisory
design of the services.
been faced with high costsof maintenance and
terminal. Provision should be made to allow integration of future tenant billing of heating, cooling and power.
Consideration should be given to employing an independent commissioning engineer. Adequate time must be programmed during the
3 .1 5.5
construction processto allow all commissioning
Wa te r
replacement during the life of a building. The use of standardised productsand proprietarysystems increasesreliability and the availability of replacement parts.
20 litres per person per dayto k eep turnover high
monitored under operating conditions. Full records
and it isa ccepted that richer materials maybe
to minimise the risk of LegionnairesD isease.
of the installed systems, together with clear and
used in the public areasof the building, in
complete maintenance recommendations, must be
particular the entrance hall.
Natural ventilation Capital cost
Staircases in modern buildingsare generallyused for escape purposesrather than inter-floor communication. A functional and utilitarian standard of finish, such as painted plaster wall finishes, painted concrete floors and painted metal handrails, istherefore appropriate. Where interfloor communication isanticipated, then a higher standard of finish could be appropriate.
activities to be completed. Systemsshould be
PI R control with sequenced flushing of all urinal
Core/staircase area
This doesnot seek to limit the qualityof design
If required, provide water storage at a rate of 10-
To minimise water usage, consider the use of
Lavatories
Ceramic tiles to floorsand walls with laminate
3.15.6
provided.
Mixed mode
Energy-efficient airconditioning
Low
C apital cost
M edium
Capital cost
R unning cost
Low
R unning cost
M edium
Small power capaci ty
L ow
Small power capacity
M edi um
S i mp il ci ty o f c on st ru ct io n Fe l xi bi li ty/ ad ap ta bi li ty
S i mp e l M o de ra te
S i mp li ci ty o f c on st ru ct io n Fe l xi bi li ty/ ad ap ta bi li ty
M o de ra te M o de ra te
S i mp li ci t y of c on st ru ct i on Fe l xi bi li ty/ ad ap ta bi li ty
Conventional airconditioning H igh
Capital cost
Running cost
M edium
R unning cost
High
S mall power capaci ty
H igh
S mall power capaci ty
H igh H igh
C o mp e l x H i gh
S i mp li ci t y of c on st ru ct i on Fe l xi bi li ty/ ad ap ta bi li ty
C o mp e l x H i gh
High-level windowsallow passive cooling at night.
Displacement mechanicalventilationunderfloorplenum.Integral
Fancoil unitsin ceiling void.
Shading andblindsreduce solargain.
Shadingand blindsreducesolargain.
Buildingstructurescanbeexposedfor masscooling. Perimeter heating offsetsheat losses.
Building structurescanbe exposedfor masscooling. Maximum temperature 25°C for95% of year.
blindsreduce solargain. Maximum temperature 24°C for95% of yearor lower.
Blindsreducesolargain. Maximum temperature 24°C orlower.
TypicalannualC O 2 emissions: 60-90 kg/ m 2
TypicalannualC O 2 emissions: 80-140 kg/ m2
High-levelwindowsallowpassivecoolingat night.
Maximum temperature 25°C for95% of year. TypicalannualC O 2 emissions: 30-80 kg/ m
2
TypicalannualC O 2 emissions: 40-80 kg/ m 2
3.0
4.0
Lift car interiors
The building shell-and-core should be offered
The lift car interior isgenerally seen asan integral
to the occupier completed to the following
part of the design of the entrance hall and, as
specification:
such, the quality of f inishesshould be compatible. However, unique designsfor the functional
Fully finished areas:
aspectsof the li ft car, such as call buttons, etc.,
• Entrance hall, staircases, common parts, toilets,
should be avoided. The use of manufacturers’ standard car finishes is more economic and allows for easier mai ntenance.
3.1 6.1
Shell and core
lifts and core Shell finish areas:
• Of fice space excluding suspended ceiling, lighting, raised floor, wiring, air conditioning ductwork and terminal boxes, decoration
There are advantages to both owner and occupier in completing the building to shell-and-core standard. These are: • Shorter construction period for owner and earlier possession byoccupier for fitting out
• Base servicesplant and equipment terminated at breakout to floors When completing a building to shell-and-core, a portion of the space maybe fitted out to the developers standard into which a marketing suite
• Savings in coststo occupier asdevelopers’
can be incorporated.
standard itemsdo not need to be removed or protected during fitting out • Flexibility for the occupier to varyfi nishes specification without cost of removing and discarding materials alreadyinstalled byowner • Reducing waste caused by stripping out base
3.1 6.2
Fully -fitted
identified prior to completion of the building. The landlord undertakes to complete the building to a standard readyfor occupation bythe occupier and to a specification agreed between
out requirement
the parties.
6.4 Categories A & B
Users and owners of buildings are interested in the way in which their workplace p erforms; whether the buildings and spaces support their working p atterns and corporate aspirations, and whether they provide a safe, comfortable and productive environment. The location and accessibility of a development, its function and appearance, and its whole-life costs (including both c apital and running costs) are all aspects of performance, but not as important as the performance of the workforce. All of t hese features should be understood and measured.
This option applies where an occupier hasbeen
building works to accommodate tenant fitting-
ð
K ey performance criteria
The cost of bringing the building up to notional developer’s standard will be borne bythe landlord but the extent to which the landlord will contribute to the additional cost of fitting out beyond that point will be subject to negotiation.
4.1 Sustainability and building performance
4.2 Workstyle Trendsin workstyle are evolving and vary
Buildings alone are directlyresponsible for
considerablybetween business processes and
approximately50% of all energyconsumption, and
cultures. The traditi onal practice of allocating
much more if the effects of road traffic generation
space bygrade or statusis being replaced bya
are taken into account. Buildings are also
new pattern in which space standards are related
responsible for half of the UK ’sC O 2 emissions,
to specific activities with specific footprint and
double that caused byindustryor transport.
environmenta l requirements. Group-based,
M anyof the choicesmade by the developers and designers of buildings have a direct and inevitable impact on sustainable performance. These include choicesassociated with, the reuse of existing buildings; site location; building orientation; building shape; heating and cooling methods; and the selection of materials. Standardsf or sustainable design will
interactive working is becoming more prevalent than isolated, cellularised working. As work becomesmore project-oriented and less processdriven, the interaction between people becomes more fluid and more dynamic. Developments in IT have made possible a variety of mobile, timeflexible working practices, and these have an impact on the variable use of space. At peak occupancymany spaces( in addition to cellular
increasingly be set bylegislation. Theywill also be
offices and open workstations) are occupied
used byprogressive businessesas criteria for the
dynamicallyas short stay work settings.
selection of suitable premises. Improved environmental performance and sustainabilityin a building can result in significant benefits in running costs, staff satisfaction and productivity. The BR EE AM 98 environmental assessment method is the current industrystandard for measuring environmental performance; it establishes levelsof performance that represent industrybestpractice.
ð
:
6.5 BREEAM, p3 Productivity www.products.bre.co.uk/breeam
O rganisationscan be characterised bythe degree to which these new workstyleshave been embraced or are appropriate, and solutionscan be tailored to their specific corporate requirements. H owever, when buildingsare developed speculatively,and when design life i s an overriding concern, the most versatile solutions anticipating the widest application of innovative work ing practice should be sought. In general, change of space planning from open to closed
4.0
4.0
and vice versa hasto be anticipated, as doesthe
Good U K practice for conventional occupancyis
4.4.2 Temperature
flexible insertion of distributed support faciliti es
currentlybetween 1 2m2 and 17m2 per person of
Recommended standards for offices are:
such asmeeting rooms, project spaces, rest and
net internal area. Space standardsf or specific
catering spaces and local centres for
individual task-based activities range from a 4m 2
copier/printer/post and office suppliesdistribution.
to 6m2 footprint for trading desks or call-centre
This degree of flexibility can be facilitated by
workstations, and up to 15m or more for
creating wider floor platesand bymak ing
enclosed offices.
provision (in section and in plan) for future
ð
changesto building services.
2
&
3.15 Services systems “Stanhope BCO Occupancy and Small Power Position Paper”, June 2000
How hot is too hot/ design criteria
24ºC for summer design
Inland Revenue,Nott ingham
22ºC for winter design The range of temperatures achieved in the space will depend on the selected control band
other comfort criteria such asradiant effects and
reinterpretation of the use and value of secondary circulation space, and use of atria.
Set point
Maximum
ISO 7730 @10% PPD BCOSpecification
chilled ceilings, achieve equal comfort at higher
CIBSEGuide A.1
workplace productivity. B uilding services
design temperatures.
18
19
20
21
22
23
24
25
26
27
28
Predicted thermal comfort in naturallyventilated
ð
3.6 Plan depth, 3.9 Circulation, 3.11 Use of atria, 4.3 Occupancy, 4.10 Adaptability
(pa ssive measures) should be designed together
buildings can be assessed based on the
to help ensure a healthywork ing environment.
percentage of occupied hoursfor which particular
&
“The New Office” – Francis Duffy, ISBN 85029 8912
&
internal temperaturesare expected to be
can permit dimming. The high f requency
exceeded. An appropriate design target might be
eliminates stroboscopic effects, so reducing the
to limit the time when air temperaturesexceed
feeling of nausea and headachessometimes
25°C f or 5% of occupied hours.
associated with fluorescent lighting. I nstalled
&
efficiencyshould be at least 75lm/W.
4.3 Occupancy standards
&
“Sick Building Syndrome: A Review of the Evidence onCauses and Solutions” – The Health and Safety Executive, 1992 Creating the protective workplace, SPON 2000
In recent years the norm hasbeen 10m 2 per
4.4.1 Visual Comfort
person of net floor area. R esearch hasshown that
Daylight and sunlight playan essential part i n the
veryfew buildings are occupied to a density that is
physiological well-being of occupantsand have an
General Information Report 30 – “A Performance Specification for the Energy Efficient Office of the Future”.
Uplighting, or a combination of up and downlighting, can avoid dull ceilingsbut the
this high. However, it is essential to ensure that
effect on productivityin the workplace. Evolving
If wider bands of tolerance can be set for
the maximum number of people occupying a
glasstechnologycan provide improved solar
temperature rangeswithin general offi ce space,
building is not artificiallylimited, particularlysince
characteristicswhile allowing good daylight
then there isan opportunityto consider ventilation
4.4.4 Fresh air
new workstyles can involve variable levelsof
penetration. Provision should be made for user-
systemswith reduced cooling capacityor without
General offi ce areasshould be provided with fresh
occupancy.
controlled blinds to prevent glare and resulting eye
mechanical cooling.B RE EAM requires adequate
air at a minimum rate of 8-12 litres per second
ð
strain.
thermal modelling to ascertain that these criteria
per person, and thisshould take into a ccount
are achieved.
desired indoor air quality and the quality of proposed and i ts ventilation effectiveness.
3.9 Circulation, 3.10 Core elements, 4.2 Workstyle, 6.6 Statutory regulations
O ptimum standardsfor the off ice workplace are:
power consumption maybe greater.
outdoor air. C onsider the type of system being
M i ni mu m d ayl ig ht fa ct or
> 0 .5 %
4.4.3 Lighting
A ve ra ge da yl ig ht f ac to r
>2%-5%
Design for a maintai ned illuminance level of 300-
ð
4.3 Occupancy
500 lux (open plan) with a uniformityrati o of 0.8
&
“Minimising Pollution at Air Intakes” – Chartered Institution of Building Services Engineers, TM21, 1999
(D aylight factor: lux inside/ lux outside x 100% )
Daylight penetration/di stribution and natural ventilation depth Note should be taken of Health & Safety (Display Screen Equipment) Regulations 1992
ð & &
Ionica Cambridge
air movement . Radia nt cooling systems, such as
Occupants’ perception of comfort influences (active measures) and the fabric of the building
3.6 Plan depth, 3.11 Use of atria, 3.12 Building section, 3.14 Envelope, 3.15 Services systems “Desktop Guide to Daylighting for Architects” – GoodPractice Guide 245, Department of the Environment, Transport and the Regions, 1998 “Daylighting and Window Design” – Chartered Institution of Building Services Engineers, LG10, 19 99
over the designated task area, with 12W/ m
2
maximum power consumption. Lighting is a significant cause of energyuse in
The system should be designed as a non-smoking environment, but if smoking areas are required the
office buildings, and the use of photoelectric or
system should be augmented locally to provide
presence switching devices should be considered.
increased ventilation extraction rates and to
The lighting control system should allow
discharge externally. Provision should be made for
reconfiguration to Part L of the Building
additional fresh air to meeting rooms.
Regulations without the need to modifythe wiring. In V DT environments, where bright uncontrolled
4.4.5 Humidity
The provision of daylighting will eff ect decisions
light sources can cause glare and eye strain,
Humidity control should not be i nstalled within the
with regard to overall plan depth, floor-to-ceiling
compliance with CIB SE L ighting Guide 3 must be
base office scheme unless a particularlyhigh rate
heights, shading solutions and glass type.
sought. Unless specific occupant activities are
of fresh air per occupant is required, (2.0 litres per
ð
known, base the lighting design on luminaires
second per m 2), in which case it should be
incorporating reflectorswith Category 2
controlled to give a minimum of 35-40% RH
performance suitable for regular use with VD T’s.
(relative humidity). Humidification is rarelyneeded
3.6 Plan depth, 3.15 Services systems
BRE
when summer design conditionsare exceeded.
interaction leadsto the need to accommodate a
4.4 Comfort
Actual
typicallybe ± 2°C. Internal temperatureswill rise Design air temperaturesneed to be reviewed with
as well asplanned meetings. One outcome isa
Minimum
which can varyfor dif ferent system typesbut will
The importance to working effectivenessof varietyof spacesand facilities for spontaneous,
Medium acceptable
Satisfactory Intermediate
Use high frequency control gear on fluorescent
for general office use but space should be
luminairesas it haslower energyconsumption and
allowed for a steam-based system to be added at a later date.
29
30
°C
4.0
4.0
4.4.6 Acoustics
ventilated buildings, designed to a broader
The acoustic environment inside a building is
temperature band, tend to be perceived as
dependent on noise from the following:
relativelycomfortable both because theyare
The accessibilityof a development bymore than
to construct on site.
easier to manage, and because theyafford more
one meansof transport, and the qualityof
ð
personal control.
interconnection between the available means of
• Building servicesplant and equipment
ð
3.6 Plan depth, 3.15 Services systems
transport, are now veryimportant selection criteria
• O ccupiers’ use of the space,
&
Probe Reports (Post-Occupancy Review of Buildings and their Engineering)
• External sources, such as traffic or aircraft noise
includingequipment • The level of sound insulation of walls and floors
:
www.usable buildings.co.uk/Probe/ProbeIndex.html
4.6 Accessibility
the building structure, but also the finisheslik ely to be used bythe building’s occupants. Acoustic privacybetween offices is a performance requirement. Residual external noise, after attenuation bythe
4.5 Amenity Workstyle, occupancylevelsand comfort are
design will make the building easier and faster 3.5 Floor plate efficiency, 3.6 Plan depth, 3.7 Column grid, 3.12 Building section, 3.13 Structural systems, 3.14 Envelope, 3.15 Service systems, 3.16 Finishes
applied bydevelopersand end users in assessing
The optimisation of capital cost, once the level of
desirability. For endusers, location in relation to an
specification or qualityof product hasbeen fi xed,
established workforce will also be critical.
is assisted bythe use of techniques such as Cost
ð
Planning, Value M anagement, Value Engineering,
2.2 Site location, 3.2 Parking, 6.5 BREEAM
The design of anynoise control measuresin occupier areasshould take account not onlyof
of envelope and finishes. Simple and effective
Developmentsthat relyexclusivelyon accessby car not onlylimit choice, but also contribute to environmental and lifestyle costs(i ncluding
performance measuresconcerned with the nature
pollution, energyconsumption and wasted ti me).
and qualityof the workspace itself. The additional
In general, there isan emphasison reduction in
featuresand characteristicsthat contribute to the
car parking and support for proposalswhich
Risk A nalysis/C ontrol and Whole Lif e Costing. The latter is used to optimise the cost of construction together with maintenance and running costs– Cost in Use.
ð
4.9 Cost in use, 5.3.6 Value engineering
The efficiencyand effectivenessof the
creation of an agreeable and pleasant general
building facade, should meet the following criteria
contribute to a mixed-use urban environment
procurement method used will also impact on
working environment are also important. T hese are
within the relevant space:
encompassing employment, housing and social
capital cost. Integrated design and construction
referred to as ‘amenity’ and are those thingsthat
facilities, so that people can live and work in the
processes help to reduce waste, both in the
• Open plan offices
45-50 LAeq
usersfeel add qualityto their working liveswhen
same area without having to travel far. The term
finished product and during construction.
• Cellular offices
40-45 LAeq
theyare ‘away from their desks’. From a user and
‘accessibility’ can be used in the context of access
Benchmarking and the rigorous measurement
• Conference rooms
30-40 LAeq
an investment perspective, there is a clear
for the disabled.
of resultsin the context of a rolling development
relationship between amenityand value.
ð
programme can also be an effective technique
In the case of naturallyventilated buildings, it may be appropriate to accept higher values. Building Services noise should be controlled to meet the following criteria:
qualityof landscaping, relationship of entrances, positioning of buildingscreating framed viewsand
NR40
vistas, and the relationships with surrounding and
NR38
adjoining developmentsneed to be determined
• Cellular offices
NR35
with great care.
• Conference rooms
NR 25-35
ð
2.2 Site location, 3.1 Site density, 3.3 Landscaping 4.6 Accessibility,
Reverberation time should be in the range of 0 .4 seconds for small rooms of 50m3 to 0.7 seconds
Proximity to local high street services providing
for a 500m3 room. BR EEA Mrequiresthe lower
restaurants and cafés, shopping, hairdressing,
end of these scalesin all office areasas a
sportsand other leisure facilitiesi s desirable.
reflection of best practice.
When town centre facilities are remote, these
&
servicescan be i ntegrated into a development
Research showsa causal relationship between the ease of control of services systemsand the
ð
significantlycontribute to a sense of amenity. The
• Open plan offices
4.4.7 Control
for optimising expenditure.
The character of the external environment can
• Entrance hallsand lavatories
BS 823-1999
6.6.3 Access and facilities for disabled people
and can be particularlyeff ective when provided as part of a workstyle concept operating asthe focus of an interactive worki ng community.
ð
4.7
Capital cost is defined as the expenditure incurred in the construction of new buildings and the extension or refurbishment of exi sting buildings. It includesthe cost of construction works and
• Maximum lettable m2 floor area per m 2 site
purchase and letting costs.
• Mi nimum building cost per m2 lettable floor area
Variableswhich aff ect capital cost include:
• Reduce amount of most expensive item per m2 of lettable
• location of site, including regional variationsi n materials and wage costs, remoteness and weather conditions
contours,exi sting vegetation, a rchaeological interest and accessibility
3.11 Use of atria, 4.2 Workstyle
• building control requirements, town planning
M ore difficult to measure, but neverthelessof great importance, are the image and the
capable of delivering precise and constant
aestheticsof a new office development. Buildings
conditions, but which are poorlymaintained and/ or
impose compulsoryviewing on their owners and
poorlymanaged, are perceived as uncomfortable.
usersover many years. Insufficient attention, time,
Buildings whose servicesare well-managed are
talent and financial investment applied to the
perceived asrelativelycomfortable.
design of the building envelope can yield results
Capital cost is a performance issue in the sense
which fail to represent occupiers’ aspirations.
that design choices, made after the above
are regarded asmore comfortable. Naturally
ð
floor area = cladding in quantity • The most efficient geometrywould be the sphere or cube
• nature of site, including ground conditions,
Buildings which relyon sophisticated systems
individual occupantsover their local circumstances
Ideal building diagram from commercial points of view
associated professional fees, but excludessite
perceived comfort of buildingsby their occupiers.
In general, buildingswhich off er greater control by
5.2 Construction strategy, 5.3.5 Benchmarking
Capital cost
3.14 Envelope
constraints • availabilityof mains servicesand diversion works
Ratio of cladding to floor area
P lan
Section
• market conditions • level of specification or quality of product
variableshave been established for a specific project, will directlyaff ect building cost. These choicesinclude building size, floor plate design, structural and services systemsand the design
© Foster& Partners
Cladding area100
Cladding area 100
Floorarea
Floorarea
100
60
4.0
4.8 Embodied energy cost
4.0
The reduction of embodied energycan be achieved through applying the four R s: Rethink, Reduce, Recycle and Reuse.
Cost in use isalso referred to asT otal Occupancy
of the building occupants. Accordi ngly, careful
procuring raw materials, manufacture, transport,
ð
Cost, and is the sum of costsassociated with:
selection of componentsand systems that have
amount of energy needed can be high, typically accounting for 20% of the building’senergy useduring a 50-year life cycle, the equivalent of 10 to 20 times the annual energyuse. Reducing embodied energycan reduce the overall environmental burden of a building, and provide
3.13 Structural Systems, 3.16 Finishes, 5.1 Procurement
• propertyoccupation (rent, propertytax)
• design for flexibilityand adaptability( longer
• adaptation (fit-out, furniture, equipment)
cooling, ventilation, control and the selection of
• building operation (insurance, maintenance,
furniture) is the most important issue.
spans, higher ceilings, ease of maintenance • design for durabilityconsidering the extended design life of permanent partsof the building (foundations, structure, service core, drainage)
plasticsand rubber, can easilybe stripped out
Note: excludesoccupants’ staff costs
and replaced • minimise transport of materials to site
ð
3.15 Services systems, 4.4 Comfort, 4.5 Amenity
sewage, energy)
&
“Whole Life Costing – A Client’s Guide” – Construction Clients Forum, 19 99
&
Investment property data-bank. www.ipindex.co.uk
post room) • management (FM and estate management)
consumption, production of greenhouse gases and
While rent and local propertytax will often
other pollutants, and transportation costsresulting
account for half of the total cost in use, adaptation
from site location and accessibility.
durabilityand mechanical properties are still
and building operation costscan also be very
acceptable ( eg. aggregates, bricks, steel
ð
significant, typicallyaccounting for a further 30% .
2.2 Site location, 3.6 Plandepth, 3.11 Use of atria, 3.14 Envelope, 3.15 Services systems
sections)
Building design solutions mayhave a direct impact
&
The Long Term Cost of Owning & Using Buildings, Royal Academy of Engineering www.raeng.org.uk
• use materials alreadypresent on site, provided
• advertise (with BR E’s construction materials
on cost in use, particularlyon maintenance and
information exchange) anymaterials which are
running costs, and the performance of design
7.5% Furnishingsand furniture
present on site but cannot be used, and search
choicesshould therefore be understood and
for local supplies of potential recycled materials
tested. A buildi ng with low cost in use should
7% Land
• specifywaste minimisation and productivity 6% Building – maintenance 5.5% Cleaning
3.5% Furnishingsandfurniture – maintenance and depreciation
have a lower rate of rental depreciation.
Typical and good practice standards for energy consumption and C O 2 emission are contrasted below.
enhancement measuresto be implemented during construction • utilise, where possible, formsof renewable
5.5% M& E services– depreciation
Cost in use in the context of sustainability includesthe coststo societyof energy
• IT/ technology
andmaintenance – capitalcost
the building occupants( such asfi nishes, heating,
security,cleaning, wastedisposal, water,
• business support (telephones, reception services,
• ensure that less durable materials, such as
Total investment in office building discount ed to present value
an influence on the productivity and comfort of
In general:
pointersto reducing capital cost.
24% M& E services– running
with commercial office buildingsare the salaries
Embodied energyi s the energyneeded for construction, maintenance and repair. T he total
41% Buildi ng – constructioncost
By far the greatest whole life costsassociated
4.9 Cost in use
2 Energy (kwh/ m / yr)
energy
Naturally Ventilated Office
• minimise the use of high energymaterials
Gas
(eg. plastics)
ð
4.10 Adaptability
&
Energy Consumption Guide 19 – ‘Energy Use inOffices’, Department of the Environment, Transportand Regions, January 2000
&
‘Building for Energy Efficiency – TheClients’Briefing Guide – CIC, 1997
&
‘Environmentally Smart Buildings – A Quantity Surveyor’s Guide to the Cost Effectiveness of Energy Efficient Offices’ – Department of Environment, Transport and Regions, November 199 9
&
‘What will Energy Efficiency do for Your Business – A Business Manager’s Guide to Environmentally Smart Buildings’ – Department of Environment, Transport and Regions (due to be available April2000)
&
‘A Developers Guide to Environmentally Smart Buildings’. Department of the Environment, Transportand Regions, September 1999
Electricity Total
Airconditioned
Typical pra cti ce
Good practice
151
79
Gas
178
97
54
33
Electricity
Typical practic e 226
128
205
112
Total
404
228
(45% improvement)
Good practice
(44% improvement)
CO2 emission (kg/m2 /yr) Naturally Ventilated Office
Typical practic e Total
58.7
Airconditioned
Good practic e 33.0
Typical practice
Good practic e
144.8
86.2
Total
(44% improvement)
(40%improvement)
Comparison of Whole Life Costs for Alternative Mechanical Systems (at year 2000) Capital cost Installation £/ m 2
Annual Maintenance Cost £/m 2
Annual Energy Cost £/m 2
2 pipe fan coil
155
8
16
Displacement ventilation
140
4
13
1 Both systemsbasedon the use of electricheating 2
All figuresassume a notionaloffice building of 10,000m2 gross( 8,000m2 net)
3 All figuresare expressedin termsof grossinternal area
4.0
4.10 Adaptability/design life
4.0
4.11 Safety, security and risk
Current businessculture and work style require
The key to good safety, security and risk
office buildingsto accommodate high levels of
management is early identification of the issues
both transience (in terms of tenant turnover) and
involved.
distinction is therefore made between the
4.11.1
optimum life span of the physical elements of the
The site
office environment:
• Location of building in relation to site boundary
• site (indefinite)
• skin or envelope (50-75 years) • services(15 years) • space planning elements (5 years) • work settings( constantlychanging) In practice, servicesand space planning elements( in particular) mayhave to be adapted on a much more frequent basis, and IT (which drivesmuch of the change in workstyle) is obsolescent within 3 yearsor less. In general, long-life features (eg. structure, plate shape, access points, location) should allow as manyservicing and layout optionsas possible to accommodate transience and volatility. This approach accordswith the need to create generic solutionswhen buildingsare developed speculatively. Consi deratio n should also be given to the inclusion of features designed to deliver high levelsof future flexibility. These include the provision of additional space capacityin vertical service risers, plant areasand building section. The additional construction cost of these features
• Single point of secure accessto building. • The number of recessesand re-entrant corners to be minimised or covered byC CT V cameras • Conduit to be installed to allow tenant to install
volatility( in termsof work setting change). A
• structure (75 yearsor more)
The building
Risk management
and the provision of external wall or fence to provide the principle of ‘defensible space’ • Single, monitored/manned point of accessto site • External C CT V coverage to entryroad/building approach • Car parki ng areasare to be well lit, covered by
4.11.4
The following should be considered:
changed
provision of blast shelter • Incorporate design features to minimise effects of bomb blast
4.1 1.2
Fir e protection
to the business, to manage any business interruption. Functionsthat require consideration
people to leave a building more quickly, theyare
include: a central manager, accommodation,
• Securitypatrols to external and internal areas • All vulnerable external spacesto be well lit, including access doors, external doorsand windows • Access to car park/goodsentrancesto be monitored bycentral securityroom
ð
2.2 Site location, 4.5 Amenity
&
BCO ManagementGuidanceSecurity ISBN 0952 413 132
essential for phased evacuation but should be considered f or all installations.
&
Building Regulations Part L
Current advice is that hose reelsshould not be installed, although this should be agreed with individual Building Control officers at the outset.
ð
5.9 Statutory regulations
Consideration should be given to the relationship between active and passive fire protection systemswhen formulating the design of a building. The combination of all aspects of life safetyshould be considered as a whole as opposed to element byelement.
enhancement measures, and can include the
Supportfacil ities
following:
BPG Building Fabric Component Life Manual ISBN 0-419-26000-5
manage an interruption • Formation of a core team, of a size appropriate
detection and alarms. Voice alarms motivate
The performance in use of supplied building
&
key contactswith work/customers/suppliers, meansof testing the plansto allow them to
L2 covera ge should be provided in respect of
probabilityof more compact, lower energy-use
ð
identification of critical components, names of
controlled
products in the future.
3.12 Building section, 3.14 Envelope, 3.15 Services systems, 4.8 Embodiedenergycost
business includingbusinessimpact analysis,
CC TV cameras and have accessri gorously
availabilityof M & E systemsmay be part of tenant
components under consideration will meet the
Disaster recovery planning
• Production of detailed action plansby the
• Robust construction of building, including
Standard practice in the diversification and
specific requirements of designers and users.
3.15 Services systems
required 30 days. Video cassettesto be regularly
4.11.3
should be undertak en to determine whether
maintenancecyclesetc
ð
recorded in securityroom and stored for
looser fit and longer design life and against the
maintainability is extremelyvariable, and research
planned testsand inspections • Install control systemsthat can measure energy,
CC TV coverage to all common areas. Film to be
must be weighed against value attached to a
components in terms of durability and
• Provide a regular maintenance regime of
• Providing alternative and well separated sources of supplyfor utilityservices • Assess the reliabilityand qualityof the electrical supply • Caref ul and selective oversizing of main plant and running them at a percentage of full load but be aware of the possible adverse impact on energyconsumption • Specifying high qualityequipment • Siting of normal and standbyplant in different fire compartments, floors and aspects of the building • Provide suitable maintenance facilitiesand design of plant for ease of maintenance and repair
personnel, communications, IT and insurance • Identifying and, if necessary, procuring recovery options: these mayi nclude doing nothing, working f rom home, switching operation, using off-site backed up faciliti es, using alternative accommodation • Ongoing programme to maintain, and validate, recoveryplans
5.0
5.0
B uilding C ompletion
The construction of new, or refurbished building is only satisfactorily concluded when the end user has been adequately briefed in how t o occupy the workspace
5.1 Commissioning/handover Commissioning/ handover should be regarded as the successful transition from a construction project to an occupied, operational and defect-free building.
This process can be broken down into distinct elementsdependent upon timing of occupation. Construction: pre-practical completion
FacilitiesM anagement Familiarisation/P rePlanning Stage comprising: • Development of proposed operational strategies
Post practical completion to occupation
• Preparation of an occupational operation guide covering fitti ng-out procedures, cleaning, security, operation and maintenance • Planned maintenance contracts put into operation • Confi rmation of occupier acceptance following Construction Team issue of Practical Completion Certification • Identification of facilitiesmanagement space and equipment needsas a result of agreed
5.2 Building log book and training
• Progressive consideration of all the information which will be in the Building Log Book
• Guidance for tenantsf or fitting-out works and re-commissioning procedures
• Attendance at Construction Team inspections prior to Practical Completion Certifi cation • Preparation of standard Planned Maintenance Contract T ender documentation • Set up of requisite facilities management
systemsthat have been incorporated within the
• Building register recording all maintenance activities, breakdownsand defects • Compliance procedures
• Early rectification of identified building defects
building structure and to give guidance to the user
• Environmental management, B RE EAM
of the best way in which theyshould be
• Building warranties, including construction
cost efficiency The commissioning/handover processrepresents
security, cleaning and operation/maintenance
a total concept of qualitycontrol covering the
generally
inter-relationship of building componentsand
3.15 Services systems, 5.2 Building log book
The aim of the building log book is to provide a
• Ensuring building’soperational energyand
proceduresand documentation covering staffing,
ð
5.2.1 Building log book proper record of the components, materialsand
12 months post practical completion
In addition, provisionsare made for: • Recording system for all occupier requests
operational strategies
maintained. It is also to provide a working
team’s termsof engagement, statutoryapprovals
document that can be updated when changes
and consentsand building contracts
occur in the building. The building log book should comprise a
operation to anticipate the future ‘impact’ upon
number of volumes, each covering a particular
building use.
subject. The information within each volume
Commissioning/handover of the building has the habit of bringing up the unexpected. It is
should be presented in a structured and logical format.
essential to have the facilities management
Contents to include:
experience and expertise to cope with all
• Fabric and data
situationsthat might arise.
ð
3.15.6 Commissioning
• Building services
• M ethodologyfor regular audit procedures The building log book is to be made available in paper form and computer disk a t the completion of the project.
5.2.2 Training The componentsof a modern office building are complex and varied. The building owner must ensure that the building user/maintainer is given clear training and has the necessary
• Specialist elements
understanding so that the building can be run
• M anufacturers’ literature
efficiently and economically, and above all else, safely.
• Commissioning and testing data • Record drawings • Information produced during construction (CD M regulations)
:
www.hse.gov.uk
6.0
6.0
A ppendix
The procurement of construction projects can follow a number of routes, each with advantages and disa dvantages. A successful outcome or a potential failure, commences with the selection and briefing of the design team by the client.
trade contractors. Unlike T raditional Lump Sum
Construction Best Practice Programme, the
and Design and B uild, there are no standard
M ovement for Innovation, the Reading
contractsfor the appointment of a construction
Construction Forum, the Design + B uild
manager or the trade contractors. All of the trade
Foundation and the Construction Round Table.
contractors are appointed directlybythe client, not
: : : :
the construction manager.
6.2.5 Management Contracting
6.1 The design team
Standard forms of building contract published by the Joint ContractsT ribunal are commonlyused
There are two alternativesf or the formsof
and three versionsare available for projects of
appointment for the design team, either a
varying size. For the construction of an of fice
standard form produced bythe professional
building, the ‘Private with Q uantities’ version will
bodies( RI BA, AC E, RIC S) or bespoke forms
normallybe used. An alternative to requesting
drafted bysolicitors.
tenderson the basis of completed designs, which
The selection will be influenced bythe experience of the client, the complexityand size of the project and the choice of construction strategy.
is becoming increasinglypopular, is known as‘two stage tendering’. With this approach, the contractor is selected much earlier, either bynegotiation or
preliminaries and perhapssome elementsof the
6.1.1 Warranties
6.2.3 ‘Design and Build’
Warrantieswill usuallybe required where a
A design team, or perhapsa single consultant, is appointed bythe client to work with him to agree
party. The purpose of the warrantyis to provide
and document his brief for the construction of the
the tenant or purchaser with direct contractual
office building. O nce this brief hasbeen
rightsto the design team member.
developed in conjunction with the design team, a set of employer’s requirements is prepared and
6.1.2 Professional Indemnity Insurance
issued to, typically, three or four contractors who
Professional IndemnityInsurance (PI ) cover should
have previously been assessed to have the
be provided byeach member of the design team
competence, resourcesand f inancial strength to
to a level that reflects their risk profile in the
design and construct the project. The contracto r
project.
designsas well asconstructs the new building.
6.3.2 Partnering
benefits of the Construction M anagement as it
The essential principle of partnering is the ability to develop long-term relationshipswith the supply
for the delivery of the building. The disadvantage
chain and to create a project environment within
is that the main contractor doesnot have an
which the objectivesof the customer and those of
obligation to complete on time and to cost, but
the variousparticipants can be aligned as closely
aims to complete the project within a target cost
as possible.
(the Prime Cost).
There are four principal ways in which contracts for the construction of offi ce buildingsare arranged.
opportunityf or developing objectives.
6.3 Best Practice
6.3.3 Selection on quality and price 6.3.1 Background
It is imperative that all appointmentsof contractors
In 1994, Sir M ichael Latham’sreport ‘Constructing
and consultantsproperlyref lect the quality of the
the Team’ was published which identified failings
service aswell asits price. The C IB guide
of the U K construction industry and proposed
‘Selecting Consultantsfor the Team – B alancing
measuresto develop effective, profitable and
Quality& Price’ providesa basis for a project- or
customer-focused approaches. Tak ing their lead
client-specific approach.
from the work of Sir Mi chael, the CI B and the
ð
1.1 The brief
Construction Task Force developments include the
Principal criteria in selecting forms of contract/procurement rout es Tr ad ti o i na l L um pS um fixed price
Ac ce e l rat ed /2 Sa t ge Tr ad ti o i na l methods
Co ns rt uc it on M an ag em en t
Price certaintybefore commitment to build
5
2
1
1
5
Lowestconstruction cost
4
3
2
2
5
5
Programme commitment fromContractor before entering Contract
5
4
1
1
5
5
confirm the acceptability of the ‘C ontractor’s Proposals’ for the design and construction of the
Shortest overall programme (inception to completion)
2
4
5
5
4
3
Control over designand materials
5
5
5
5
2
4
Control over choice of TradeContractors and Sub-contractors
3
4
5
5
1
1
Input (during design) from Contractoron programming and buildability
1
4
5
5
5
3
bythe Joint ContractsT ribunal, namelythe ‘With Contractor’s Design’ version, 1998. The design team, or single consultant, will
project received from the tendering contractors. A contract is then placed solely with the contractor
These fall under the generic headingsof :
for the delivery of the building, an Employer’s
• Traditional Lump Sum
Agent being retained by the client to represent his
• Design and Build
Partnering can have significant benefits in termsof sustainability as it allowsa greater
The form of building contract is that published
6.2.1 The options
www.crtp.org.uk
Management C ontract is created. This hasmany
Sel ec it on cr ti er a i
6.2 Construction strategy
www.m4i.org.uk
enablesthe client to contract with a single unity
work, for example).
development will be f inanced, let or sold to a third
www.ciboard.org.uk
the main contractor rather than the client, a
byinviting competitive proposalson certain aspectsof the project ( the cost of staff and
Bespoke forms can lead to misinterpretation by the partiesi nvolved.
If the individual trade contractors are contracted to
www.cbpp.org.uk
interests.
Mana gem ent C on tr ac ti ng
De si gn a nd B ui d l
De ve o l pa nd C on st ru ct
5
• Construction M anagement
6.2.4 Construction Management
Control over programming/planning on site
2
2
5
5
1
1
• M anagement contracting
A design team, usuallyled bythe architect, is
Single point of responsibilityfor design and construction
1
1
1
1
5
5
3
appointed bythe client to develop designsfor the
6.2.2 Traditional Lump Sum
new office building. A construction manager is
Direct contractual relationshipbetween employer and designers
5
5
5
5
1
5
5
1
1
5
5
will then be tendered to i ndividual specialist trade
Liquidated damages recoverable fromContractor if he completes late
requested from, typically, four contractors who
contractors, eg. f oundations, steelwork, air
Ability to introduce and accommodate changes
4
4
5
5
2
2
have been assessed to have the competence,
conditioning, etc. The construction manager will
Suitability for complex design
4
3
5
5
2
3
A design team, usuallyled bythe architect, is
also appointed who will direct the preparation and
appointed bythe client to develop designsfor the
completion of the designs into ‘packages’ which
new office building. Competitive tenders are
6.0
6.3.4 Standardisation and pre-assembly C IR IA 1997 offer the following definitions:
6.0
6.4 Categories A&B
‘The extensive use of components, methodsor
6.4.1 Category ‘A’ works (Background fitting out)
processesi n which there is regularity, repetition
• These worksgenerally follow completion of the
Standardisation
and a background of successful practice. M ore generally, an agreed shared framework for project decisions, such ascommon interfaces or a dimensionalgrid.’
base building structural works • Category A is the definition used to describe the level of f itting out between the shell and core building option, and a point at which internal
Pre-assembly
components must be designed to a specification
‘The organisation and completion of a substantial
for the particular end user, which isk nown as
proportion of final assembly work before
Category B, bespoke fitting out works.
installation in itsf inal position. It includes many forms of sub-assembly. It can take place on site, but more usuallyoff-site, and of ten involves standardisation from project to project.’
‘K eyP erformance Indicators’, published in 1999 bythe C onstruction Best Practice Programme, are a good first step towards introducing objective performance benchmarking standards. CAL IB RE has been developed bythe B RE to assess, and
teams’ responsesto that brief, by the application of structured processesand work shops.
: &
http://helios.bre.co.uk/valman ‘Value Management in Construction – A Client’s Guide’, Ciria Special Publication 129
property developers and occupiers in 1990 and has been revised twice since then. The current scheme is neither prescriptive nor biased against any particular situation and so provides a fair
etc.) • Basic lighting, heating, ventilation and cooling control system • Raised flooring system or other cable distribution systemsinstalled
• Basic safety signage system installed.
6.4.2 Category ‘B’ works (Bespoke fitting out) These works generallyfollow completion of Category ‘A’ works, but maysometimes be incorporated into the Category ‘A’ construction programme to reduce construction time and avoid duplication of materials and handling.
• Suspended ceiling upgrade/modifications
BS RI A have developed tools to improve
• Installation of internal partitioning
productivity and efficiency on construction sites.
There are a number of proprietary ED M S systems available that enable information to be exchanged electronicallyvia telephone linesand a central ‘hub’.
:
www.team-work.org.uk
requirements. A second scale, the Environmental Performance Index or EP I, is also calculated. This providesa di rect comparison of performance between buildings of all ages.
:
www.bre.co.uk
comparison of the environmental impacts of one building with those of others.
6.6
Statutoryregulations
• Floor finishes
powersgranted in the Building Act 1984. A
• Management policyand procedural issuesi ncluding commissioning
designer is at libertyto demonstrate compliance with the requirementsof the Regulations using parametersother than those contained in the
• Health and well-being
Approved D ocuments.
indoor and external factors
O f principal importance are the Regulations
• Operatio nal energy including C O 2 emissionsand controllability
governing escape, energyconservation and accessfor the disabled.
• Transport including C O 2 emissionsfor commuting
meansof escape. Standardsfor off ice buildings
consumption and leak age
include, but are not limited to, the following:
• Materials environmental implicationsof materialsselection
Limitations on travel distance:
• M aximum travel distance in one direction only:
• Land use
18m
Greenfield and Brownfield sites
• M aximum travel distance in more than one
• Site ecology
direction: 45m
Ecological Value of the site
• Pollution
Limitations on direct distance:
air and water pollution
&
6.6.1 Means of escape Regulation and Approved Document B1 deal with
• Water
• M aximum travel distance in one direction only:
‘Looking for a New Investment Angle – A Developer’s Guide to Environmentally Smart Buildings’ – Good Practice Guide 258, Department of Environment, Transport and Regions, September 19 99
• Acoustic upgrades
6.3.8 Electronic Document Management Systems
a significant i mprovement on regulatory
Secretaryof State for the Environment under
6.3.7 Site productivity
:
in collaboration with ECD and a number of major
These are asf ollows:
• Basic mechanical and electrical services
Fitting out elements will include :
www.bsria.co.uk
The scheme was originally launched by BRE
The UK Building Regulations are issued bythe
• Fullyfitted out WC’s
VE and VM are methods to eliminate waste from
calculate the final B RE EA M rati ng on a scale of Pass; Good; Very Good or Excellent. All represent
Buildings.
which performance criteria are defined.
:
the client brief, and the design and construction
consensus-based weightings. These are used to
BR EEA M 98 establishesa set of issuesfor
• Finishesto cores
6.3.6 Value Engineering and Value Management
BRE’s Environmental Assessment Method for
• Suspended ceilings
benchmark, site performance. www.CALIBRE2000.com
is taken into account through the application of
BREEAM 98 for Offices is the latest version of the
Fitting out elements will include :
(lighting, heating, ventilation and cooling systems
6.3.5 Benchmarking
The relative importance of these different issues
6.5 BREEAM 98
12m • M aximum travel distance in more than one direction: 30m
• M echanical and electrical servicesupgrades (lighting, heating, ventilation and cooling systemsetc.) • Tailoring/upgrading lighting, heating, ventilation and cooling control systems
BREEAMrating for commercial offices by location
• Adaptation of raised flooring system or other cabledistribution systemsinstalled • Reconfiguration of below-floor cabling and floor/ceiling outlets • Upgradesto coresfinishes • Executive WC’s • Basic safetysignage system installed
Building location
Medium sustainability target rating
High sustainability target rating
City Centre a/c
Good
Excellent
City Centre n/v
Very good
Excellent
Town Centre
Good
Excellent
Out of Town
Pass
Excellent
6.0
Occupancy factors for means of escape calculations:
• Open plan officesexceeding 60m 2: 6m2 per person • Other offices: 7m2 per person
6.0
6.6.3 Access and facilities for disabled people
6.7 Comparative table
Regulation and Approved Document M deal with accessand facilities for disabled people.
Current typical design standards
For offices, the A pproved Document covers Minimum widths of escape routes:
accessto and into a building, accesswithin the
• Maximum number of persons– 50:750mm
building and sanitaryconveniences within the
• Maximum number of persons – 110:850mm
building. Standardsinclude, but are not limited to:
• Maximum number of persons – 220:1050mm
Ramped approach
• M aximum number of persons– greater than
Length of ramp:
220:5mm per person. Stair widths:
Section 5 of Regulation B1 deals with numbers and widthsof stairs and describestwo methods of width calculation based upon total or phased evacuation. The numbers of stairs provided and their widths must be assessed byreference to varioustables and to other British Standards. These stairs mayalso be fire-fighting stairs if the building comes within the requirements laid out in Part B5: Access and facilitiesfor the fire service.
10m for 1:15 to 1:20 slope 5m for 1:12 to 1:15 slope Width of ramp: 1200mm surface width / 1000mm unobstructed width Landing length: 1200mm minimum Entrance doorways minimum clear opening:
Occupancy: Net area/perso n
Germany
14m2
15m2
6m2
Occupancy: minimum workspace
5m2
Plan efficiency: NIA: GIA Plan depth:
USA
Ref 4.3
Occupancy: Net area/person escape
3.10 100ft 2 /10m2 4.3 5m2 3.5 85%
80%
15m to 18m
13.5m to 15m
60ft/18.2m
3.6
7.5m or 9m or 8.1m
7.2m or 7.5m
32ft/9.8m
3.7
1.5m or 1.35m
1.2m or 1.5m
4ft/1.2m
3.8
Floor to ceiling clear height
2.7m
3m
9ft/2.7m
3.12
Lifts: standards
80% loading 30 sec.inte rval
60% loading 30-40 sec. in terval
5.5 sec. per floor in terval
3.10
Column grid:
Planning grid:
800mm Internal doorwaysminimum clear opening:
UK (BCO)
750mm
6.6.2 Energy conservation Regulation and Approved Document L deal with
Lift cars
conservation of fuel and power. T hese documents
M inimum internal dimensions:
are undergoing a full review and a radicallyrevised version, targeting the reduction of C O 2 emissions, is due for release during 2000. C urrently, however, the Approved Document permits three methods of calculating the heat lossthrough a building f abric. Theyare:
Raised floors
150mm 300/450mm (subfloorA/C)
150mm
2 inches 50mm
3.12
Structural loading live
General:2.5kN/m2 High: 7.5kN/m2
General: 5.0kN/m2
100psf
3.13
Structural loadingdead
General: 2.0kN/m2 High: 4.0kN/m2
30psf
3.13
Small power loading
15W/m2 – 25W/m2
10-35W/m 2
1.57W/ft2 17W/m2
3.15
300-450 lux open plan
400-500 lux
500 lux
4.4.3
1100mm wide x 1400mm deep Height of controlsfrom F FL: 900mm minimum 1200mm maximum Wheelchair WC compartment: 1500mm wide x 2000mm deep
The elemental method:
Where the thermal performances of building
6.6.4 Health and safety
elementsare required to conform with stated
Other relevant regulations governing health
‘U’ Values.
and safetyin the UK include:
The calculation method:
Where the heat loss through the whole envelope
The Construction
(Design & Management) R egulations1994
of a building is compared with, and shown to be better than, that for a notional building of the
Management of Health & Safety at Work
same size and shape calculated bythe element al
Regulations1992
method. The energy use method:
Where the calculated annual energyuse of a building is shown to be lessthan that for a similar building calculated bythe elemental method. Guidance for the design of energy-efficient space-heating controls, hot-water storage systems and lighting within offices is also given in Approved Document L.
ð
Workplace
(Health Safety& Welfare) R egulations1992 Provision and Use of Work Equipment
Regulations1992 Health & Safety (Display Screen Equipment)
Regulations1992 Manual Handling Operations
Regulations1992
3.14 Envelope, 3.15 Services systems
Personal Protective Equipment at Work
Regulations1992
Lighting standard Temperature standard Fresh air standard Air conditioning Systems
22ºC+ –2ºC
4.4.2
8-12l/s/person
23ºC
20ft3 /person
4.4.4
VA V/ fa nc oi l/ di sp lac eme nt ch il led c ei li ng
O pe ni ng wi nd ow s s imp le s ys te ms
VAV/ fan co il
3 .1 5. 3
Energy: 2 A/C (kwh/m /yr)
Typical: 404 Good: 225
Energy: 2 N/V (kwh/m /yr)
Typical: 205 Good: 112
CO2 emission: 2 A/C (kg/m /yr)
Typical:120-14 0 Good: 86
CO2 emission: 2 N/V (kg/m /yr)
Typical: 40-50 Good: 33
Noise criteria
75ºF/23ºC
LAeg
4.9
4.4.6
6.0
6.8 Materials guide
6.0
6.10 Tenants’ Services Charge s
Certain materials should not be specified, or used,
Tenantsshould require their landlords to follow the
in the construction of a building to avoid hazards
Briti sh Property Federation Code of Practice for
to the health and safety of the occupants, and to
Service Chargesi n Commercial Properties. This
ensure long-term structural integrity.
requireslandlordsto produce annual budgets, to
The G uide to Good Practice in the selection of
seek regular competitive tendersfor services, not
construction materials, produced by a steering
to make a profit out of service charges, to bear
group representing the B CO and the British
themselves the share of cost attributable to vacant
PropertyF ederation, the Guide to Good Practice
unitsand to be open in providing information.
coversthe following categories of materials:
GrossExternal Area (GEA) is the area of a
• Admixtures for use in concrete and mortar
building measured externallyat each floor level. It
• Aggregates for use in reinforced concrete • Asbestosproducts • Brick slips
includeswall thicknessesand external projections, the area of internal walls and partitions, atria measured at base level only, and covered plant rooms. It excludes open balconies and open fire escapes.
• Calcium silicate bricks • High alumina cement in structural elements • Lead or materials containing lead • Man-made with mineral fibres(M M M F)
6.11 Internal gross/ net areas GrossInternal Area (GIA ) is the area of a building measured to the internal face of the perimeter
• Urea formaldehyde (UH ) foam
wall at each floor level. It includes areas occupied
• Vermiculite products
byi nternal walls and partitions, columns, piersand
• Wood preservatives • Wood wool cement slabs
&
‘Good Practice in the Selection of Construction Materials’. Tony Sheeham (Lead author). Ove Arup and Partners, R&D, 1997
other internal projections, internal balconies, stairwells, toilets, lif t lobbies, fire corridors, atria measured at base level only, and covered plant rooms. It excludesthe perimeter wall thickness and external projections, external balconiesand external fire escapes. Net Internal Area (NIA ) i s the usable area
6.9 Useful websites Useful web sites and references
within a building measured to the internal face of the perimeter wallsat each floor level. It includes kitchens and cleanerscupboards. (A tria and
BRE www.bre.co.uk British Institute of Facilities Management www.bifm.org.uk BSRIA www.bsria.co.uk CIBSE www.cibse.org DETR www.detr.gov.uk HSE www.hse.gov.uk Reading Construction Forum www.ref.org.uk RIBA www.riba.org RICS www.rics.org.uk
entrance hallsshould be measured separately.) It excludestoilets, stairwells, plant rooms, fire corridors, and internal structural walls, columns, internal projectionsand vertical ducts.
&
Code of Measuring Practice, Fourth Edition, RICS Books, ISBN 0 85406 610 1.
6.11 Index
Quantity surveying
Editor Ti mo th y B at tl e
Ry bk a B at tl e
Deputy Editor G ra ha m Fr an ci s
S he pp ar d Ro bs on
Nick Rowe
G&T
M ichael C harley
M DA G roup
R B rodi e-C ooper
G leeds
R ichard H arr g i an
E C Ha rri s
Editorial Reviewing Panel
James C larke
D L& E
A lastai rM ellon
S tanhope
C li ve A rdi ng
I nsi gni a R ichard E li s
B arry Nugent
M ott G reen Wall
P et er F r ac ko wi ec z
L a nd S e cu ri ti es
A ndrew L ett
A uk ett A ssociates
N eal P ennell
L and Securi ti es
Sm i on Wilk es
L egal & G eneral
G eoff Wright
H ammersons
Planning Pe te r Re es
Ci ty of Lo nd on Co rp or at io n
Productivity W O R K I N G P A R T I ES
Architecture
David Warriner
B RE
Ja me sP i ck ar d
C ar tw ri gh tP i ck ar d
Paul Ruyssevelt
Energyfor Sustainable Development
Ro b er t D al z ie l
G eo f fr ey Re i d A s so c ia te s
D avi dN elson
Foster & P tnrs
P aul Stansall
Tectus
Nigel P ittam
BA A
D enice Jaunzens
BRE
R ob K night
D L& E
M indy H adi
BRE
S te ph en B r ad le y
D E G W & Sp ac ef or B u si ne ss
B ob K eenan
Sheppard Robson
J oh n D og ga rt
E C D E ne rg y& En vi ro nm en t
Risk Management Mark Di l on
Sheppard Robs on
D avi d Hadden
O ve Arup and P art ners
John H addon
O ve A rup a nd P art ner s
B R E E AM
Alan Yates
BRE
B ill Gloyne
A ON Risk Services
I nsp ec to r R oo ke
N a ti on al T e rr or is t C r im e PreventionU nit
Construction P ru d en ti al P or t fo l io Ma na ge rs
R ichard J ones
A bbey N at o i nal
R ichard H uxster
K va erner
R o ge r P ar so ns
W at es C i ty o f L on do n D ev el op me nt s
G raham Jelly
Bovis
M artin Davis
D rak e& Scull
Paul Warner
G eoffrey Reid
N ig el Wo ol c oc k
Development Ju l ia n B ar wi c k
D ev el o pm e nt S ec ur i ti e s M an ag er s
M B ur ge ss -A sh to n
R a il tr ac k
Jonat hanWeymout h
Prudent a i lPortfo li oManagers
D avid Easson
M A B UK
Legal
Services Tr ev or F ar nf i el d
R og er P re st o n & P ar t ne rs
G uy Battle
Battle M cCarthy
D avid Warriner
BR E
R on German
Stanhope
K evi nR eed
R oger P reston & P artners
Structures Ri ch ar d Te rr y
O ve Ar up an d P ar tn er s
Jim M athys
Waterman
S ta n G ni ad ow sk i
Wi ld e Sa pt e
Paul Clark
D J Freeman
Evelyn Murray
WSP
D avi d Sa und er s
C am er on M cK e nn a
H anif K ara
A dams Kara T aylor
R icha rd W hi te
O ve A rup and P art ners
Occupiers Tony Bones
JLW
Accountants P au l H ar ri ng to n John M ason
Envelope D av id A nd er so n
Faro
Sustainability G eo rg e M ar ti n
Corporate Ted P earce
B T plc
Financial
Price £50
A ru p Fa ca de
P ri ce Wa te rh ou se
Fo ru m f or th e F ut ur e
ProfessorDavidCadman
Forumforthe Future
A lan Y ates
BRE
Electronic and Web Advisor
G reville B ar
A bbey National
Nigel Waring
HSB C
Pa ul S ti mp so n
Ry bk a B at tl e
Editing and Production Wordsearch
ISBN 0 9524131 2 4 Copiesof this report are available from
The British Council for Offices Shinfield Grange Cutbush Lane Shinfield Reading RG2 9AF Tel: 0118 988 5505 www.constructionplus.co.uk
First published: May 1994 Secondedition: 1997 Thisedition: June2000 The British Councilfor Officesand the membersof the working partycommittee which producedthis specificationhave endeavouredto ensure the accuracyof its contents.However, the guidance and recommendationsgiven in thisspecificationshouldalwaysbe reviewedby those using it in the light of their particularcase andshouldnot be relied onwithout obtaining specialist advice asnecessary. No liabilityf or negligence orotherwise inrelationto this specificationand itscontentsis acceptedby the BritishCouncilfor Offices, the membersof the working partycommittee, itsservantsor agents. © 2000 BritishC ouncil forO ffices